CN2130922Y - 全塑膨胀固化锚杆 - Google Patents

全塑膨胀固化锚杆 Download PDF

Info

Publication number
CN2130922Y
CN2130922Y CN 92231398 CN92231398U CN2130922Y CN 2130922 Y CN2130922 Y CN 2130922Y CN 92231398 CN92231398 CN 92231398 CN 92231398 U CN92231398 U CN 92231398U CN 2130922 Y CN2130922 Y CN 2130922Y
Authority
CN
China
Prior art keywords
outer tube
rubber
liquid
coal
stifled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 92231398
Other languages
English (en)
Inventor
毕华照
郑葆明
何贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 92231398 priority Critical patent/CN2130922Y/zh
Application granted granted Critical
Publication of CN2130922Y publication Critical patent/CN2130922Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本实用新型为一种用于煤矿井下采煤工作面的 装置,它包括外管(1)、橡胶外堵(2)、金属垫(3)、泄孔 (4)、泄孔塞(5)、内管(6)、端头(7)、导液孔(8)、排液 孔(9)、密封圈(10)、螺帽(11)、O型密封圈(12)、橡 胶内堵(13)、小金属垫(14)、尼龙绳(15)和拉环 (16)。使用前全塑的内外管分别灌装甲乙两种膨胀 固化药液,在开采松软煤层时,先将煤壁钻孔,然后将 装有药液的锚杆插入打好的钻孔中,拉出内管,使甲 乙两种药液混合,并膨胀,最后固化,胀紧煤壁。

Description

一种用于煤矿井下采煤工作面的装置。
以往,采煤工作面遇到松软煤层时,时常会发生片帮、冒顶等事故,影响安全生产和正常作业。国内外也已有多种解决方法,如全木锚杆、金属筒充液锚杆等。现有技术都不同的存在着不足。金属的容易在割煤时发生火花,造成不安全因素,且成本较高,全木锚杆虽造价较低,但效果不甚理想。本实用新型提出一种新的解决方案,经过专利检索,未发现与本实用新型相同的结构。
本实用新型的目的在于:1、解决采煤过程中煤层松软的问题;2、采取更佳方法,使其主要技术经济指标优于国内外产品。
本实用新型的结构如附图所示:外管(1)前端粘合橡胶外堵(2),橡胶外堵(2)外侧附以金属垫(3),外管(1)上还有泄孔(4)和泄孔塞(5),内管(6)套在外管(1)内,内管(6)前端粘合端头(7),端头(7)上留有导液孔(8)和排液孔(9),端头(7)前部塞入橡胶外堵(2)中,保证使用前的密封。在锚杆后部,外管(1)上有密封圈(10),密封圈(10)靠螺帽(11)紧固密封,螺帽(11)上有O型密封圈(12),O型密封圈(12)保证与内管(6)的密封。内管(6)有橡胶内堵(13)和小金属垫(14),尼龙绳(15)从内管(6)中穿过,前端穿过端头(7)、橡胶外堵(2)和金属垫(3),另一端穿过橡胶内堵(13)和小金属垫(14),两端在外部打结。内管(6)最后部有拉环(16)。
本实用新型的优点在于:比现有技术造价低,而且安全,使用效果好。
附图1为本实用新型的纵剖面图;
附图2为本实用新型的A-A横剖面图。
本实用新型的实施方法如下:先将外管(1)与橡胶外堵(2)、内管(6)与端头(7)用胶粘合牢固。外管(1)的泄孔(4)上堵好泄孔塞(5),然后将尼龙绳(15)穿过金属垫(3)和橡胶外堵(2),再从外管(1)后部穿出,之后再将尼龙绳(15)穿过端头(7),从内管(6)中穿过,从后部穿出。此后尼龙绳(15)再穿过橡胶内堵(13)和小金属垫(14),将内管(6)放入外管(1)之内,并到位。然后开始向内管(6)和其与外管(1)之间分别灌注甲乙两种药液,灌好后,外管(1)后部上好密封圈(10)和螺帽(11),将橡胶内堵(13)和小金属垫(14)放入内管(6)中,最后打好尼龙绳(15)绳结。
在松软煤壁上打好钻孔后,即可放入锚杆,放入后,缓慢向外拉出内管(6),使用甲乙两种药液不断从导液孔(8)和排液孔(9)中流出,并混合,两种药液一经混合,便迅速膨涨,并较快凝固,在内管(6)抽出一段距离后,泄孔(4)便处于药液混合的位置,在膨涨力的作用下,泄孔塞(5)被膨涨掉,膨涨药液流入外管(1)与钻孔之间,将锚杆固定在钻孔内,待内管(6)全部拉出,端头(7)与一直固定不动的橡胶内堵(13)相接触,便完成整个作业过程,药液涨破外管(1),渗入煤壁,涨紧松软的煤壁,使其坚挺。

Claims (4)

1、一种用于煤矿井下采煤工作面的全塑膨涨固化锚杆,它包括外管(1)、橡胶外堵(2)、金属垫(3)、泄孔(4)、泄孔塞(5)、内管(6)、端头(7)、导液孔(8)、排液孔(9)、密封圈(10)、螺帽(11)、O型密封圈(12)、橡胶内堵(13)、小金属垫(14)、尼龙绳(15)和拉环(16),其特征在于:内管(6)置于外管(1)之内,内管(6)可以从外管(1)拉出。
2、根据权利要求1所述的装置,其特征在于:端头(7)上有导液孔(8)和排液孔(9)。
3、根据权利要求1所述的装置,其特征在于:内管(6)中有尼龙绳(15),尼龙绳(15)一端穿过端头(7)、橡胶外堵(2)和金属垫(3),另一端穿过橡胶内堵(12)和小金属垫(14),两端在外部打结。
4、根据权利要求1所述的装置,其特征在于:外管(1)上有泄孔(4)。
CN 92231398 1992-08-31 1992-08-31 全塑膨胀固化锚杆 Expired - Fee Related CN2130922Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92231398 CN2130922Y (zh) 1992-08-31 1992-08-31 全塑膨胀固化锚杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92231398 CN2130922Y (zh) 1992-08-31 1992-08-31 全塑膨胀固化锚杆

Publications (1)

Publication Number Publication Date
CN2130922Y true CN2130922Y (zh) 1993-04-28

Family

ID=33774260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92231398 Expired - Fee Related CN2130922Y (zh) 1992-08-31 1992-08-31 全塑膨胀固化锚杆

Country Status (1)

Country Link
CN (1) CN2130922Y (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100532789C (zh) * 2003-01-20 2009-08-26 希尔蒂股份公司 岩石锚杆

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100532789C (zh) * 2003-01-20 2009-08-26 希尔蒂股份公司 岩石锚杆

Similar Documents

Publication Publication Date Title
DE2929677A1 (de) Verfahren zum absaugen von gas im steinkohlenbergbau aus bohrloechern mittels verrohrungen und verrohrungen hierzu
CN107142872B (zh) 公路护栏植筋装置及其施工方法
CN210530792U (zh) 一种较大孔径超深钻孔内双液安全注浆装置
CN109026101A (zh) 一种矿用锚注装置及其使用方法
CN2130922Y (zh) 全塑膨胀固化锚杆
CN207436988U (zh) 一种通径钻孔动压涌水快速封堵装置
CN105201447B (zh) 一种速凝浆液注浆固结系统及其使用方法
CN106640160B (zh) 一种左旋无纵筋全长高预应力锚杆及其施工工艺
CN112252339A (zh) 上仰式全长粘结锚索孔内分段止浆结构及止浆方法
CN203022782U (zh) 封孔止浆锚固件
CN205189911U (zh) 一种防滑自封孔式注浆锚索
CN214063013U (zh) 压胀封孔胶囊
CN2415159Y (zh) 聚氨酯树脂锚固剂锚杆
CN214330576U (zh) 一种便于安装的溶洞施工用防水装置
CN216741445U (zh) 一种钻孔用双层注浆法兰盘固管装置
CN212835397U (zh) 一种预应力注浆锚杆注浆分隔器
CN2616685Y (zh) 水力自动封孔煤层注水器
CN221277782U (zh) 一种加固锚杆
CN215444137U (zh) 一种采空区注浆充填处理止浆塞装置
CN110820737A (zh) 一种锚固施工中的止水装置
CN112593976A (zh) 一种煤矿地质堵水用注浆装置
CN2065667U (zh) 内注浆锚杆及注浆时配套用的逆止阀
CN205637186U (zh) 后装式可更换主动压力密封止水带
CN206409245U (zh) 一种分段注浆小导管
CN210603006U (zh) 一种水孔的快速吹水装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee