CN213014377U - Basement roof seals post-cast strip structure in advance - Google Patents
Basement roof seals post-cast strip structure in advance Download PDFInfo
- Publication number
- CN213014377U CN213014377U CN202021557135.5U CN202021557135U CN213014377U CN 213014377 U CN213014377 U CN 213014377U CN 202021557135 U CN202021557135 U CN 202021557135U CN 213014377 U CN213014377 U CN 213014377U
- Authority
- CN
- China
- Prior art keywords
- cast strip
- post
- basement
- concrete column
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a basement roof seals post-cast strip structure in advance relates to the building engineering field, including basement bottom plate, a roof and a post-cast strip, basement bottom plate upper end is provided with concrete column No. one, a concrete column is inside to be provided with the reinforcing bar No. one, the inside platform of pouring that is provided with of roof, a roof upper end is provided with. This basement roof seals post-cast strip structure in advance, be favorable to arranging in advance of construction site, improve the efficiency of construction, can make things convenient for the later stage to pour concrete to post-cast strip No. one, the dismantlement in later stage of can being convenient for, prevent the impact of backfill to the pipe of pouring, and its simple process, make later stage construction speed accelerate, and save material, the shaping is of high quality, it is laborsaving to save labour, the efficiency of construction has been improved greatly, neither influence building structure, can accord with construction standard's regulation again, construction period can also be shortened.
Description
Technical Field
The utility model relates to a building engineering field specifically is a basement roof seals post-cast strip structure in advance.
Background
The arrangement of the post-settlement pouring belt is used for preventing structural cracks caused by different settlement differences between a main building and a group house or a basement of a high-rise building. According to the requirements of structural design specifications and building construction specifications, the concrete of the post-sedimentation pouring belt can be poured, and construction can be carried out after the structure of the main building is completely constructed.
The basement roof on market seals post-cast strip structure in advance, and the construction is complicated, is unfavorable for arranging in advance of construction place, and the efficiency of construction is low, and the later stage of being not convenient for is dismantled, is not convenient for pour concrete to a post-cast strip, can not prevent the impact of backfill to pouring the pipe.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a basement roof seals post-cast strip structure in advance to solve the basement roof on the market that proposes in the above-mentioned background and seal post-cast strip structure in advance, the construction is complicated, is unfavorable for arranging in advance of construction place, and the efficiency of construction is low, and later stage dismantlement not convenient for is not convenient for pour concrete to post-cast strip, can not prevent the problem of backfill to the impact of pouring the pipe.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a basement roof seals post-cast strip structure in advance, includes basement bottom plate, a roof and a post-cast strip, basement bottom plate upper end is provided with concrete column No. one, the inside reinforcing bar that is provided with of concrete column No. one, the inside platform of pouring that is provided with of roof, a roof upper end is provided with No. two concrete columns, No. one the roof upper end is close to No. two concrete column left sides and is provided with the fixed plate, the fixed plate upper end is provided with the fixed block, the fixed block right side is provided with the barrier plate, it is provided with No. two reinforcing bars to pour the inside, roof upper end intermediate position is provided with pours the pipe.
Preferably, two groups of the first concrete columns are uniformly distributed at the upper end of the basement bottom plate.
Preferably, the first concrete column and the second concrete column are formed by pouring concrete, the upper end of the second concrete column is provided with a reinforcing steel bar hole in a penetrating mode, and the plurality of groups of reinforcing steel bar holes are evenly distributed in the upper end of the second concrete column.
Preferably, the upper end of the pouring pipe is provided with a through hole in a penetrating manner, support columns are arranged in the through hole, and the two groups of support columns are distributed in the pouring pipe at equal intervals.
Preferably, the sliding groove is formed in the right side of the blocking plate, and sliding blocks are welded on the left side and the right side of the fixing block.
Preferably, two sets of barrier plates distribute in fixed plate upper end left and right sides edge, and a plurality of groups the fixed block passes through slider cooperation spout evenly distributed in the fixed plate upper end.
Compared with the prior art, the beneficial effects of the utility model are that:
this basement roof seals post-cast strip structure in advance through being provided with pours the pipe, through setting up the fixed plate in roof and post-cast strip upper end No. one, can make the fixed plate seal a post-cast strip in advance to pour self-compaction concrete through pouring the pipe in the later stage, and then make self-compaction concrete fall into a post-cast strip through the through-hole of pouring intraductal, thereby make the construction simple and convenient swift, be favorable to arranging in advance of construction site, improve the efficiency of construction.
The basement roof pre-closed post-cast strip structure is provided with support columns, a second concrete column is butted with a second steel bar through steel bar holes and is placed on a pouring platform, two groups of stop plates are placed on the left side of the second concrete column and the right side of a pouring pipe, then fixed blocks are placed in sliding grooves on the side edges of the stop plates through two groups of sliding blocks, and then the stop plates are arranged on the left side and the right side of the pouring pipe to be matched with a plurality of groups of fixed blocks, so that the pouring pipe can be fixed by means of the second steel bar, the first post-cast strip can be conveniently poured with concrete in the later period, later-period disassembly can be conveniently carried out, impact of backfill on the pouring pipe is prevented, the process is simple, the later-period construction speed is accelerated, materials are saved, the forming quality is good, labor and force are saved, the construction efficiency is greatly improved, the building structure is not influenced, and the construction period can be shortened.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a schematic view of the structure of a second concrete column of the present invention;
FIG. 3 is a schematic view of the structure of the pouring pipe half plane of the present invention;
FIG. 4 is a schematic diagram of the structure of the baffle plate of the present invention;
fig. 5 is a schematic view of the fixing block structure of the present invention.
In the figure: 1. a basement floor; 2. a basement roof; 3. post-pouring a belt; 4. a first concrete column; 5. A first steel bar; 6. a pouring platform; 7. a second concrete column; 8. a fixing plate; 9. a fixed block; 10. a blocking plate; 11. a second steel bar; 12. pouring a pipe; 13. reinforcing steel bar holes; 14. a through hole; 15. a support pillar; 16. A chute; 17. a slide block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a basement roof seals post-cast strip structure in advance, including basement bottom plate 1, roof 2 and post-cast strip 3, 2 inside being provided with of roof pour platform 6, 2 upper ends of roof are provided with concrete column 7 No. two, 2 upper ends of roof are close to No. two concrete column 7 left sides and are provided with fixed plate 8, 8 upper ends of fixed plate are provided with fixed block 9, 9 right sides of fixed block are provided with barrier plate 10, 6 inside reinforcing bars 11 that are provided with of platform of pouring, 2 upper end intermediate positions of roof are provided with pours pipe 12.
Specifically, a first concrete column 4 is arranged at the upper end of the basement bottom plate 1, a first reinforcing steel bar 5 is arranged inside the first concrete column 4, and two groups of first concrete columns 4 are uniformly distributed at the upper end of the basement bottom plate 1; the first concrete column 4 and the second concrete column 7 are formed by pouring concrete, the upper end of the second concrete column 7 is provided with a reinforcing steel bar hole 13 in a penetrating way, and a plurality of groups of reinforcing steel bar holes 13 are uniformly distributed at the upper end of the second concrete column 7; pour pipe 12 upper end and run through and seted up through-hole 14, through-hole 14 internally mounted has support column 15, two sets of support columns 15 equidistance distribute in pouring pipe 12, wherein, be provided with and pour pipe 12, set up fixed plate 8 through roof 2 and 3 upper ends of a post-cast strip, can make fixed plate 8 seal a post-cast strip 3 in advance, and pour self-compaction concrete through pouring pipe 12 in the later stage, and then make self-compaction concrete fall into a post-cast strip 3 through-hole 14 in pouring pipe 12 in, thereby the construction is simple and convenient swift, be favorable to arranging in advance of construction site, and the efficiency of construction is improved.
Specifically, a sliding groove 16 is formed in the right side of the blocking plate 10, and sliding blocks 17 are welded to the left side and the right side of the fixing block 9; two groups of baffle plates 10 are distributed at the left edge and the right edge of the upper end of a fixed plate 8, a plurality of groups of fixed blocks 9 are uniformly distributed at the upper end of the fixed plate 8 through a slide block 17 and a slide groove 16, wherein, the second concrete column 7 is butted with a second steel bar 11 through a steel bar hole 13 and is placed on a pouring table 6, the two groups of baffle plates 10 are placed at the left side of the second concrete column 7 and the right side of a pouring pipe 12, then the fixed blocks 9 are placed in the slide grooves 16 at the side edges of the baffle plates 10 through two groups of slide blocks 17, and the baffle plates 10 are arranged at the left side and the right side of the pouring pipe 12 and are matched with the plurality of groups of fixed blocks 9, so that the pouring pipe 12 can be fixed by means of the second steel bar 11, thereby facilitating the later stage to pour concrete on the first post-pouring belt 3, being convenient for later stage disassembly, preventing impact of backfill on, the method has the advantages of accelerating the later construction speed, saving materials, having good forming quality, saving labor and force, greatly improving the construction efficiency, not influencing the building structure, meeting the requirements of construction specifications and shortening the construction period.
The working principle is as follows: for the pre-closed post-cast strip structure of the basement roof, firstly, a second concrete column 7 is butted with a second steel bar 11 through a steel bar hole 13 by arranging a support column 15 and is placed on a pouring platform 6, two groups of stop plates 10 are placed on the left side of the second concrete column 7 and the right side of a pouring pipe 12, then a fixed block 9 is placed in a sliding groove 16 on the side edge of the stop plate 10 through two groups of sliding blocks 17, and the stop plates 10 are arranged on the left side and the right side of the pouring pipe 12 and are matched with a plurality of groups of fixed blocks 9, so that the pouring pipe 12 can be fixed by means of the second steel bar 11, thereby facilitating the post-cast strip 3 to be poured with concrete in the later period, facilitating the later period disassembly and preventing the impact of backfill soil on the pouring pipe 12, and having simple process, accelerating the later period construction speed, saving materials and labor, having good molding quality and saving labor, and greatly improving the construction efficiency, neither influence building structure, can accord with construction specification's regulation again, can also shorten construction period, then, through be provided with two sets of concrete column 4 No. one in 1 upper end of basement bottom plate, and then can support roof 2 No. one, and through setting up reinforcing bar 5 No. one in 4 insides of concrete column, make a concrete column 4 more firm to the support of roof 2 No. one, and finally, through being provided with pouring pipe 12, through setting up fixed plate 8 in roof 2 and 3 upper ends of post-cast strip No. one, can make fixed plate 8 seal post-cast strip 3 No. one in advance, and pour self-compacting concrete through pouring pipe 12 in the later stage, and then make self-compacting concrete fall into post-cast strip 3 No. one through the through-hole 14 in pouring pipe 12, thereby the construction is simple and convenient swift, be favorable to being favorable to arranging in advance of construction place, and construction efficiency is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a basement roof seals post-cast strip structure in advance, includes basement bottom plate (1), a roof (2) and a post-cast strip (3), its characterized in that: basement bottom plate (1) upper end is provided with concrete column (4) No. one, concrete column (4) inside is provided with reinforcing bar (5) No. one, top board (2) inside is provided with pours platform (6), top board (2) upper end is provided with No. two concrete columns (7), top board (2) upper end is close to No. two concrete columns (7) left side and is provided with fixed plate (8), fixed plate (8) upper end is provided with fixed block (9), fixed block (9) right side is provided with barrier plate (10), it is provided with reinforcing bar (11) No. two to pour platform (6) inside, top board (2) upper end intermediate position is provided with pours pipe (12).
2. The structure of pre-closed post-cast strip for top plate of basement as claimed in claim 1, wherein: two groups of the first concrete columns (4) are uniformly distributed at the upper end of the basement bottom plate (1).
3. The structure of pre-closed post-cast strip for top plate of basement as claimed in claim 2, wherein: the concrete column (4) and the second concrete column (7) are formed by pouring concrete, the upper end of the second concrete column (7) is provided with a reinforcing steel bar hole (13) in a penetrating mode, and the plurality of groups of reinforcing steel bar holes (13) are uniformly distributed in the upper end of the second concrete column (7).
4. The structure of pre-closed post-cast strip for top plate of basement as claimed in claim 1, wherein: the upper end of the pouring pipe (12) is provided with a through hole (14) in a penetrating mode, supporting columns (15) are installed inside the through hole (14), and the two groups of supporting columns (15) are distributed in the pouring pipe (12) at equal intervals.
5. The structure of pre-closed post-cast strip for top plate of basement as claimed in claim 1, wherein: sliding grooves (16) are formed in the right side of the blocking plate (10), and sliding blocks (17) are welded on the left side and the right side of the fixing block (9).
6. The structure of pre-closed post-cast strip for top plate of basement as claimed in claim 1, wherein: two sets of baffle plate (10) distribute in fixed plate (8) upper end two edges about, a plurality of groups fixed block (9) are through slider (17) cooperation spout (16) evenly distributed in fixed plate (8) upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021557135.5U CN213014377U (en) | 2020-07-31 | 2020-07-31 | Basement roof seals post-cast strip structure in advance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021557135.5U CN213014377U (en) | 2020-07-31 | 2020-07-31 | Basement roof seals post-cast strip structure in advance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213014377U true CN213014377U (en) | 2021-04-20 |
Family
ID=75461179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021557135.5U Active CN213014377U (en) | 2020-07-31 | 2020-07-31 | Basement roof seals post-cast strip structure in advance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213014377U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114059596A (en) * | 2021-11-09 | 2022-02-18 | 中建二局第二建筑工程有限公司 | Top plate post-cast strip waterproof equipment |
-
2020
- 2020-07-31 CN CN202021557135.5U patent/CN213014377U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114059596A (en) * | 2021-11-09 | 2022-02-18 | 中建二局第二建筑工程有限公司 | Top plate post-cast strip waterproof equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208072950U (en) | A kind of combination set shaped steel formwork | |
CN210712751U (en) | Aqueduct trough body post-cast strip concrete formwork mounting structure | |
CN215801709U (en) | Slope-attaching concrete sliding formwork structure | |
CN213014377U (en) | Basement roof seals post-cast strip structure in advance | |
CN112726878A (en) | Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould | |
CN108265749A (en) | A kind of combined steel template and application method for municipal administration synthesis pipe gallery | |
CN106320373A (en) | Supporting system at position of post-pouring belt of underground garage roof and construction method | |
CN206397137U (en) | A kind of framed column template bracing means | |
CN201011127Y (en) | Suspended steel wood combined template | |
CN209779560U (en) | Steel formwork for irrigation and water conservancy concrete channel | |
CN111350348A (en) | Positioning and reinforcing device for outer wall anti-seepage inverted beam template and construction method | |
CN214940390U (en) | Template for pouring full-package concrete of pipeline | |
CN207260636U (en) | Pipe die reinforced column supporting member | |
CN205976478U (en) | Precast concrete piece typical forms | |
CN208396295U (en) | A kind of open-cut station construction stair formwork erecting structure | |
CN212689559U (en) | Concrete pouring template with thin-wall structure | |
CN210597794U (en) | Connecting device of prefabricated plate | |
CN112177010A (en) | Mixed type crown beam formwork prefabricated outer framework and construction method thereof | |
CN208168349U (en) | A kind of profile steel concrete column template reinforcing device | |
CN113339055A (en) | Filling body pouring and curing device and using method thereof | |
CN111561103A (en) | BM interlocking building block constructional column, tie beam structure and construction method thereof | |
CN205986064U (en) | Assembled cable pit | |
CN206220057U (en) | Open drain one-time-shaped mould | |
CN206053129U (en) | A kind of light steel construction post of T-shaped | |
CN219006422U (en) | Prefabricated cushion cap template of foam concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |