CN213014135U - Hydraulic engineering is with high-efficient durable flood bank - Google Patents
Hydraulic engineering is with high-efficient durable flood bank Download PDFInfo
- Publication number
- CN213014135U CN213014135U CN202021693359.9U CN202021693359U CN213014135U CN 213014135 U CN213014135 U CN 213014135U CN 202021693359 U CN202021693359 U CN 202021693359U CN 213014135 U CN213014135 U CN 213014135U
- Authority
- CN
- China
- Prior art keywords
- flood bank
- block
- slide
- bank body
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000006978 adaptation Effects 0.000 claims description 3
- 229920003023 plastic Polymers 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 230000002146 bilateral effect Effects 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a hydraulic engineering is with high-efficient durable dyke relates to dyke technical field, including dyke body and connecting pile, the first slider of the equal symmetrical fixedly connected with in front side and the rear side of dyke body. The utility model discloses in, through the flood bank body, the connecting pile, cooperation between first slide and the collet is used, can accomplish the installation work to flood bank body and connecting pile, need not the simple easy operation of instrument, it is more convenient to make the process of installation and dismantlement, the effectual work efficiency that has improved, through first rectangular channel, the second rectangular channel, the fixture block, the second slide, cooperation between connecting block and the second slider is used, the fixed work to flood bank body and connecting pile has been accomplished, through the flood bank body, the guard plate, first fixed block, cooperation between second fixed block and the spring is used, the guard action to the flood bank body has been played, the effectual life who prolongs the flood bank body.
Description
Technical Field
The utility model belongs to the technical field of the breakwater, specifically be a hydraulic engineering is with high-efficient durable breakwater.
Background
A flood bank refers to a dike constructed to prevent a river from flooding. Flood dams have emerged hundreds of years ago. Flood dams are usually arranged in long strips, sometimes extending several kilometers along a river, lake or ocean. The flood control dike can restrain flood, and the efficient durable flood control dike for the hydraulic engineering is indispensable in flood control work.
However, in the prior art, the installation and disassembly processes of most of the flood dams for hydraulic engineering are too complicated, and the strike resistance of the flood dams for the hydraulic engineering is poor, so that the flood dams are easily damaged.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hydraulic engineering is with high-efficient durable dyke dam to solve the installation that prior art exists and dismantle the loaded down with trivial details problem of process.
In order to achieve the above object, the utility model provides a following technical scheme:
a high-efficiency durable flood bank for hydraulic engineering comprises a flood bank body and connecting piles, wherein the front side and the rear side of the flood bank body are symmetrically and fixedly connected with first sliding blocks, the top of each first sliding block is provided with a first rectangular groove, the bottom of the flood bank body is fixedly connected with a base, one side of the top of the base is provided with a trapezoidal groove, a protection plate is arranged inside the trapezoidal groove, one side of the protection plate, which is close to the flood bank body, is fixedly provided with a second fixed block, one side of the second fixed block, which is far away from the protection plate, is fixedly provided with a spring, one side of the flood bank body, which is close to the protection plate, is fixedly provided with a first fixed block, a balancing weight is arranged inside the flood bank body, the top of the connecting pile is symmetrically provided with a second rectangular groove, the front side and the rear side of the connecting pile are symmetrically provided with first slide ways, and the top of the connecting, the top fixed mounting of fixture block has the connecting block, one side fixedly connected with second slider that the connecting block closes on the connecting pile, the bilateral symmetry of connecting pile is provided with the second slide, the both ends fixedly connected with fixed slot of second slide, the equal fixedly connected with rail guard in one side that connecting pile was kept away from to second slide and rail guard, the bottom fixedly connected with collet of connecting pile.
As a further aspect of the present invention: the guard plate contacts with the dovetail groove, one side and the first fixed block fixed connection of second fixed block are kept away from to the spring, and spring and flood bank body looks adaptation.
As a further aspect of the present invention: the first slide is located the top of collet, first slider is located the inside of first slide, and the bottom of first slider contacts with the top of collet, first slider passes through sliding fit with first slide and is connected.
As a further aspect of the present invention: the height and width of the first rectangular groove are equal to that of the second rectangular groove, the fixture block is located in the first rectangular groove and the second rectangular groove, and the fixture block is matched with the first rectangular groove and the second rectangular groove.
As a further aspect of the present invention: the second slider is located the inside of second slide and fixed slot, and the second slider passes through sliding fit with second slide, fixed slot and is connected, second slider and second slide, fixed slot looks adaptation.
As a further aspect of the present invention: the flood bank body is a member made of organic plastics, and the balancing weight is a member made of concrete.
The utility model has the advantages that: through the flood bank body, the connecting pile, cooperation between first slide and the collet is used, can accomplish the installation work to the flood bank body and connecting pile, need not the simple easy operation of instrument, it is more convenient to make the process of installation and dismantlement, the effectual work efficiency that has improved, through first rectangular channel, the second rectangular channel, the fixture block, the second slide, cooperation between connecting block and the second slider is used, the fixed work to flood bank body and connecting pile has been accomplished, through the flood bank body, the guard plate, first fixed block, cooperation between second fixed block and the spring is used, the guard action to the flood bank body has been played, the effectual life who prolongs the flood bank body.
Drawings
Fig. 1 is a schematic structural view of a high-efficiency durable flood bank for hydraulic engineering.
Fig. 2 is a schematic structural view of a connecting pile in a high-efficiency durable flood bank for hydraulic engineering.
Fig. 3 is a cross-sectional view of a front view of a flood bank of an efficient durable flood bank for hydraulic engineering.
The labels in the figure are: 1. a flood bank body; 2. a first slider; 3. a first rectangular groove; 4. a base; 5. a trapezoidal groove; 6. a protection plate; 7. a spring; 8. connecting piles; 9. a first slideway; 10. connecting blocks; 11. a clamping block; 12. a second slideway; 13. a second rectangular groove; 14. protecting the fence; 15. fixing grooves; 16. a bottom support; 17. a balancing weight; 18. a first fixed block; 19. a second fixed block; 20. and a second slider.
Detailed Description
The technical solution provided by the present invention is clearly and completely described below with reference to the embodiments and the accompanying drawings.
Referring to fig. 1 to 3, in an embodiment of the present invention, a high-efficiency durable flood bank for hydraulic engineering includes a flood bank body 1 and a connecting pile 8, wherein a first slider 2 is symmetrically and fixedly connected to both the front side and the rear side of the flood bank body 1, a first rectangular groove 3 is formed in the top of the first slider 2, a base 4 is fixedly connected to the bottom of the flood bank body 1, a trapezoidal groove 5 is formed in one side of the top of the base 4, a protection plate 6 is disposed inside the trapezoidal groove 5, a second fixing block 19 is fixedly mounted on one side of the protection plate 6 close to the flood bank body 1, a spring 7 is fixedly connected to one side of the second fixing block 19 far from the protection plate 6, the protection plate 6 contacts the trapezoidal groove 5, one side of the spring 7 far from the second fixing block 19 is fixedly connected to a first fixing block 18, the spring 7 is adapted to the flood bank body 1, a first fixing block 18 is fixedly mounted on one side of the flood bank body 1 close, the interior of the flood bank body 1 is provided with a balancing weight 17, the flood bank body 1 is a member made of organic plastics, the balancing weight 17 is a member made of concrete, the top of the connecting pile 8 is symmetrically provided with a second rectangular groove 13, the front side and the rear side of the connecting pile 8 are symmetrically provided with a first slideway 9, the top of the connecting pile 8 is provided with a clamping block 11, the height and the width of the first rectangular groove 3 are equal to those of the second rectangular groove 13, the clamping block 11 is positioned in the first rectangular groove 3 and the second rectangular groove 13, the clamping block 11 is matched with the first rectangular groove 3 and the second rectangular groove 13, the top of the clamping block 11 is fixedly provided with a connecting block 10, one side of the connecting block 10, which is close to the connecting pile 8, is fixedly connected with a second sliding block 20, the two sides of the connecting pile 8 are symmetrically provided with second slideways 12, the two ends of the second slideway 12 are fixedly connected with fixing grooves 15, the second sliding block 20 is positioned in the second slideway 12 and the, and the second slider 20 is connected with the second slide way 12 and the fixing groove 15 in a sliding fit manner, the second slider 20 is matched with the second slide way 12 and the fixing groove 15, the guard rail 14 is fixedly connected to one side of the second slide way 12, which is far away from the connecting pile 8, of the guard rail 14, the bottom of the connecting pile 8 is fixedly connected with the bottom support 16, the first slide way 9 is positioned at the top of the bottom support 16, the first slider 2 is positioned inside the first slide way 9, the bottom of the first slider 2 is contacted with the top of the bottom support 16, and the first slider 2 is connected with the first slide way 9 in a sliding fit manner.
The utility model discloses a theory of operation is: in the using process, the bottom of the first slide block 2 on the flood bank body 1 is aligned to the top of the first slide way 9, and the force is applied to enable the first slide block 2 to enter the first slide way 9 in a sliding manner, so that the bottom of the first slide block 2 is contacted with the bottom support 16, the installation work of the flood bank body 1 and the connecting pile 8 can be completed, the simple and easy operation of tools is not needed, the installation and disassembly process is more convenient, the working efficiency is effectively improved, then a force is applied to the fixture block 11 to enable the fixture block 11 to drive the second slide block 20 to move in the second slide way 12, when the fixture block 11 is pushed into the fixing groove 15, the fixture block 11 is positioned in the first rectangular groove 3 and the second rectangular groove 13, the fixing work of the flood bank body 1 and the connecting pile 8 is completed, when flood water rises and a flood flap is taken to hit the flood bank, flood waves firstly contact with the protection plate 6, the protection plate 6 transmits the flapping force to the flood bank body 1 through the springs, through the cushioning effect that spring 7 played between guard plate and flood bank body 1, played the guard action to the flood bank body, the effectual life who prolongs the flood bank body.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.
Claims (6)
1. The utility model provides a hydraulic engineering is with high-efficient durable dyke, includes dyke body (1) and connecting pile (8), its characterized in that: the front side and the rear side of the flood bank body (1) are symmetrically and fixedly connected with first sliding blocks (2), the top of each first sliding block (2) is provided with a first rectangular groove (3), the bottom of the flood bank body (1) is fixedly connected with a base (4), one side of the top of each base (4) is provided with a trapezoidal groove (5), a protection plate (6) is arranged in each trapezoidal groove (5), one side, close to the flood bank body (1), of each protection plate (6) is fixedly provided with a second fixing block (19), one side, far away from the protection plate (6), of each second fixing block (19) is fixedly connected with a spring (7), one side, close to the protection plate (6), of the flood bank body (1) is fixedly provided with a first fixing block (18), a balancing weight (17) is arranged in the flood bank body (1), the top of each connecting pile (8) is symmetrically provided with a second rectangular groove (13), and first slide (9) have been seted up with the rear symmetry to the front side of connecting stake (8), the top of connecting stake (8) is provided with fixture block (11), the top fixed mounting of fixture block (11) has connecting block (10), one side fixedly connected with second slider (20) that connecting stake (8) are close to in connecting block (10), the bilateral symmetry of connecting stake (8) is provided with second slide (12), the both ends fixedly connected with fixed slot (15) of second slide (12), the equal fixedly connected with rail guard (14) in one side of connecting stake (8) are kept away from with rail guard (14) in second slide (12), the bottom fixedly connected with collet (16) of connecting stake (8).
2. The efficient durable flood bank for the hydraulic engineering according to claim 1, wherein: the protection plate (6) is in contact with the trapezoid groove (5), one side, far away from the second fixing block (19), of the spring (7) is fixedly connected with the first fixing block (18), and the spring (7) is matched with the flood bank body (1).
3. The efficient durable flood bank for the hydraulic engineering according to claim 1, wherein: first slide (9) are in the top of collet (16), first slider (2) are in the inside of first slide (9), and the bottom of first slider (2) contacts with the top of collet (16), first slider (2) are connected through sliding fit with first slide (9).
4. The efficient durable flood bank for the hydraulic engineering according to claim 1, wherein: the height width of first rectangular channel (3) and second rectangular channel (13) equals, fixture block (11) are in the inside of first rectangular channel (3) and second rectangular channel (13), and fixture block (11) and first rectangular channel (3), second rectangular channel (13) looks adaptation.
5. The efficient durable flood bank for the hydraulic engineering according to claim 1, wherein: the second sliding block (20) is located inside the second sliding way (12) and the fixing groove (15), the second sliding block (20) is connected with the second sliding way (12) and the fixing groove (15) in a sliding fit mode, and the second sliding block (20) is matched with the second sliding way (12) and the fixing groove (15).
6. The efficient durable flood bank for the hydraulic engineering according to claim 1, wherein: the flood bank body (1) is a member made of organic plastics, and the balancing weight (17) is a member made of concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021693359.9U CN213014135U (en) | 2020-08-14 | 2020-08-14 | Hydraulic engineering is with high-efficient durable flood bank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021693359.9U CN213014135U (en) | 2020-08-14 | 2020-08-14 | Hydraulic engineering is with high-efficient durable flood bank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213014135U true CN213014135U (en) | 2021-04-20 |
Family
ID=75464752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021693359.9U Expired - Fee Related CN213014135U (en) | 2020-08-14 | 2020-08-14 | Hydraulic engineering is with high-efficient durable flood bank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213014135U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113638370A (en) * | 2021-08-04 | 2021-11-12 | 侯亮 | Hydraulic engineering is with high-efficient durable flood bank |
KR102497788B1 (en) * | 2022-10-04 | 2023-02-15 | 주식회사 건축사사무소건원엔지니어링 | System for monitoring flood damage through cutoff wall with shore guard rail for preventing disaster |
-
2020
- 2020-08-14 CN CN202021693359.9U patent/CN213014135U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113638370A (en) * | 2021-08-04 | 2021-11-12 | 侯亮 | Hydraulic engineering is with high-efficient durable flood bank |
KR102497788B1 (en) * | 2022-10-04 | 2023-02-15 | 주식회사 건축사사무소건원엔지니어링 | System for monitoring flood damage through cutoff wall with shore guard rail for preventing disaster |
KR102601256B1 (en) * | 2022-10-04 | 2023-11-13 | 주식회사 건축사사무소건원엔지니어링 | System for monitoring flood damage through cutoff wall with shore guard rail for preventing disaster |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213014135U (en) | Hydraulic engineering is with high-efficient durable flood bank | |
CN210975715U (en) | Scour protection water conservancy dykes and dams | |
CN108571019B (en) | Scour prevention device for offshore wind power pile | |
KR101012772B1 (en) | Turning type floodgate | |
CN206189429U (en) | Cofferdam for river channel revetment | |
CN113638370A (en) | Hydraulic engineering is with high-efficient durable flood bank | |
CN217710615U (en) | Avoid pollutant intercepting device for river course restoration of jam | |
CN210086158U (en) | Dykes and dams anticollision protection architecture | |
CN216948213U (en) | Water conservancy sheet inserting pile for building water conservancy construction | |
CN206448245U (en) | A kind of overflow bridge like diversion dam | |
CN214573756U (en) | Cover plate for ditch | |
CN210975743U (en) | Hydraulic gate for hydraulic engineering | |
CN213625621U (en) | A bank protection network structure for hydraulic engineering | |
CN211547623U (en) | Dykes and dams buffer stop for hydraulic engineering | |
CN216640440U (en) | Scour protection dykes and dams protection device for water conservancy construction | |
CN211285656U (en) | Highway bridge construction cofferdam device | |
CN216006849U (en) | Small-size dam body structure of blocking of mountain area river | |
CN112112123A (en) | Self-buffering connection assembly flood prevention plate | |
CN216428142U (en) | Bank protection funnel and be equipped with funnel plastic steel sheet pile | |
CN213653340U (en) | Water conservancy protective wall seepage prevention structure | |
CN209585156U (en) | A kind of dredger | |
CN219450603U (en) | Flood prevention box capable of preventing collision | |
CN214656841U (en) | Water sluicegate limiting and locking device | |
CN218540571U (en) | Hydraulic engineering is with high-efficient durable flood bank | |
CN219825140U (en) | Water stop type hydraulic lifting dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |