CN212984547U - Building construction steel pipe support bracket - Google Patents

Building construction steel pipe support bracket Download PDF

Info

Publication number
CN212984547U
CN212984547U CN202021334221.XU CN202021334221U CN212984547U CN 212984547 U CN212984547 U CN 212984547U CN 202021334221 U CN202021334221 U CN 202021334221U CN 212984547 U CN212984547 U CN 212984547U
Authority
CN
China
Prior art keywords
rows
scaffold board
rods
steel pipe
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021334221.XU
Other languages
Chinese (zh)
Inventor
曹婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jishun Construction Engineering Co ltd
Original Assignee
Beijing Jishun Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jishun Construction Engineering Co ltd filed Critical Beijing Jishun Construction Engineering Co ltd
Priority to CN202021334221.XU priority Critical patent/CN212984547U/en
Application granted granted Critical
Publication of CN212984547U publication Critical patent/CN212984547U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a construction steel pipe support bracket, which comprises a bracket, the bottom of support is installed with the bottom plate, and the support includes two rows of pole settings, two rows of pole settings are respectively located the front and back ends of bottom plate, every row of pole setting quantity is five, and installs two rows of long horizontal poles between two rows of pole settings, two rows of install a plurality of short horizontal poles between long horizontal pole and two rows of pole settings, and the front end of two rows of pole settings installs the cross rod, two rows of install the scaffold board between the long horizontal pole inboard, the top of pole setting is installed with the semicircle indent seat, and the bottom of pole setting is installed with the semicircle indent seat down, one side of long horizontal pole and one side of short horizontal pole all install the fixed inserted sheet, and the top of fixed inserted sheet has seted up the mounting hole, the front end of scaffold board is installed the antiskid cover, and the both ends of scaffold board; the utility model discloses possess better fixed effect, it is also comparatively convenient to possess better dismantlement installation function operation simultaneously.

Description

Building construction steel pipe support bracket
Technical Field
The utility model belongs to the building construction field specifically is a construction steel pipe support holder.
Background
At present, the building industry is one of the important pillars of national economy, the building industry has close relation with the development of the whole national economy and the improvement of the people's life, and during the building construction, a platform which is built on a construction site by using a steel pipe support bracket is needed, so that the operation of constructors is convenient.
The existing steel pipe support bracket for building construction has certain disadvantages when in use, and when in use, the existing steel pipe support bracket for building construction is composed of a plurality of groups of transverse rods and vertical rods, so that the bracket is troublesome in mounting and dismounting and has long time consumption; when the existing steel pipe supporting bracket for building construction is used, the scaffold board is easy to turn over and has lower displacement safety due to unstable fixation of the scaffold board, and certain influence is brought to practical use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction steel pipe supports support, the utility model discloses the effectual current construction steel pipe support of having solved is when using, because the support is multiunit horizontal pole and pole setting constitution, leads to the support comparatively troublesome when the installation is dismantled, and is consuming time longer, and current construction steel pipe support is when using, because the fixed unstable of scaffold board, leads to the scaffold board to take place easily to turn on one's side the lower scheduling technical problem of displaceable security.
The purpose of the utility model can be realized by the following technical scheme:
a steel pipe supporting bracket for building construction comprises a bracket, wherein a bottom plate is installed at the bottom end of the bracket, the bracket comprises two rows of upright rods, the two rows of upright rods are respectively arranged at the front end and the rear end of the bottom plate, the number of the upright rods in each row is five, two rows of long transverse rods are installed between the two rows of upright rods, a plurality of short transverse rods are installed between the two rows of long transverse rods and the two rows of upright rods, cross rods are installed at the front ends of the two rows of upright rods, and scaffold boards are installed between the inner sides of the two rows;
an upper semicircular concave base is installed at the top end of the vertical rod, a lower semicircular concave base is installed at the bottom end of the vertical rod, fixing insertion pieces are installed on one side of the long cross rod and one side of the short cross rod, and installation holes are formed in the top ends of the fixing insertion pieces;
the anti-skidding cover is installed to the front end of scaffold board, and the through-hole has all been seted up at the both ends of scaffold board, the gim peg is all installed to the bottom both sides of scaffold board, and the bottom of gim peg installs the bolt cover.
As a further aspect of the present invention, a plurality of grooves are provided on the top of the long horizontal rod, and the fixing bolt on the bottom of the scaffold board runs through the grooves and is connected with the two rows of long horizontal rods.
As a further scheme of the utility model, the screw has all been seted up with the rear end of the interior recess of semicircle down to the interior recess of semicircle, and the interior recess of semicircle is passed through screw and pole setting swing joint with the interior recess of semicircle down through the bolt.
As a further proposal of the utility model, one side of long horizontal pole and short horizontal pole is all through welding aluminium silk and fixed inserted sheet fixed connection.
As a further aspect of the utility model, the peg is all installed at the both ends of scaffold board, and the through-hole that scaffold board both ends were seted up is connected with long horizontal pole through hanging the post.
As a further proposal of the utility model, the fixed frame is installed to the front end of scaffold board, and the antiskid cover is through fixed frame and scaffold board front end fixed connection.
The utility model has the advantages that:
the utility model discloses a set up interior concave seat of semicircle and interior concave seat of semicircle down, the rear end of interior concave seat of semicircle has all seted up the screw on the last, the fixed inserted sheet is all installed to one side of long horizontal pole and short horizontal pole, and the both ends of fixed inserted sheet embolia the inside of interior concave seat of semicircle and semicircle down, utilize the bolt to run through the screw and fix interior concave seat of semicircle and semicircle down through the nut, thereby make long horizontal pole, short horizontal pole better fix in the pole setting, and be convenient for dismantle and install the support through unscrewing the nut;
through setting up the gim peg cooperation peg, the gim peg is all installed to the bottom of scaffold board, and a plurality of recess has all been seted up on the top of two rows of long horizontal poles, and the gim peg that the scaffold board passes through the bottom runs through the recess, utilizes the bolt cover to fix the gim peg, makes the scaffold board fix between two rows of long horizontal poles, and the through-hole through scaffold board both ends makes the peg run through the through-hole and hangs between two rows of long horizontal poles, makes it fixed to scaffold board secondary to the stability and the security of scaffold board have been improved.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a structural diagram of the vertical rod of the present invention;
fig. 3 is a bottom view of the scaffold board of the present invention.
In the figure: 1. a support; 2. a base plate; 3. erecting a rod; 4. a long cross bar; 5. a scaffold board; 6. a short cross bar; 7. a cross bar; 8. a concave base is arranged in the lower semicircle; 9. fixing the inserting sheet; 10. an upper semicircular concave base; 11. mounting holes; 12. a bolt sleeve; 13. a through hole; 14. an anti-slip sleeve; 15. and (6) fixing the bolt.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1-3, a steel pipe supporting bracket for building construction comprises a bracket 1, a bottom plate 2 is installed at the bottom end of the bracket 1, the bracket 1 comprises two rows of upright rods 3, the two rows of upright rods 3 are respectively arranged at the front end and the rear end of the bottom plate 2, the number of the upright rods 3 in each row is five, two rows of long cross rods 4 are installed between the two rows of upright rods 3, a plurality of short cross rods 6 are installed between the two rows of long cross rods 4 and the two rows of upright rods 3, cross rods 7 are installed at the front ends of the two rows of upright rods 3, and scaffold boards 5 are installed between the inner sides;
an upper semicircular concave base 10 is installed at the top end of the vertical rod 3, a lower semicircular concave base 8 is installed at the bottom end of the vertical rod 3, fixing insertion pieces 9 are installed on one side of the long cross rod 4 and one side of the short cross rod 6, an installation hole 11 is formed in the top end of each fixing insertion piece 9, and the fixing insertion pieces 9 on the two sides of the long cross rod 4 and the short cross rod 6 are fixed in the vertical rod 3 through the upper semicircular concave base 10 and the lower semicircular concave base 8;
antiskid cover 14 is installed to the front end of scaffold board 5, and through-hole 13 has all been seted up at the both ends of scaffold board 5, and gim peg 15 is all installed to the bottom both sides of scaffold board 5, and gim peg 12 is installed to the bottom of gim peg 15, prevents through antiskid cover 14 that scaffold board 5 from skidding, utilizes gim peg 15 and gim peg 12 to fix scaffold board 5.
The top end of the long transverse rod 4 is provided with a plurality of grooves, and the fixing bolts 15 at the bottom end of the scaffold board 5 penetrate through the grooves and are connected with the two rows of long transverse rods 4, so that the fixing bolts 15 can be fixed at the top ends of the two rows of long transverse rods 4.
Go up semicircle inner concave seat 10 and the rear end of semicircle inner concave seat 8 has all seted up the screw, and go up semicircle inner concave seat 10 and pass through screw and 3 swing joint of pole setting with semicircle inner concave seat 8 down through the bolt, can fix last semicircle inner concave seat 10 and semicircle inner concave seat 8 down on pole setting 3, be convenient for dismantle last semicircle inner concave seat 10 and semicircle inner concave seat 8 down simultaneously.
One side of the long cross rod 4 and one side of the short cross rod 6 are fixedly connected with the fixing insertion pieces 9 through welding aluminum wires, so that the long cross rod 4 and the short cross rod 6 are conveniently fixed.
Hanging columns are installed at two ends of the scaffold board 5, through holes 13 formed in two ends of the scaffold board 5 are connected with the long transverse rods 4 through the hanging columns, and the scaffold board 5 is hung between the two rows of long transverse rods 4 through the hanging columns and is fixed for the second time.
The fixed frame is installed to the front end of scaffold board 5, and antiskid cover 14 passes through fixed frame and scaffold board 5 front end fixed connection to prevent that antiskid cover 14 from droing.
A steel pipe supporting bracket for building construction is provided, when in use, an upper semicircle concave base 10 and a lower semicircle concave base 8 surround the periphery of a vertical rod 3, a long cross rod 4 and a fixing inserting piece 9 at one side of a short cross rod 6 are sleeved into the upper semicircle concave base 10 and the lower semicircle concave base 8, the upper semicircle concave base 10 and the lower semicircle concave base 8 can be fixed at the periphery of the vertical rod 3 through bolts and nuts, so that the installation and disassembly are convenient, fixing bolts 15 at the bottom end of a scaffold board 5 penetrate through two rows of long cross rods 4, the fixing bolts 15 are fixed through bolt sleeves 12, so that the scaffold board 5 can be fixed, two sides of the hanging column are arranged in a half-hook manner, through holes 13 at two ends of the scaffold board 5 penetrate through the hanging column, two rows of long cross rods 4 are hooked at two ends of the hanging column, so that the scaffold board 5 is secondarily fixed, the scaffold board 5 is prevented from inclining and shaking, the front end of the scaffold board 5 passes through a fixing antiskid sleeve 14, the phenomenon of slipping at the front end of the scaffold board 5 is avoided, so that the risk of the scaffold board 5 is reduced, and the construction at the later stage can be safely carried out.
The utility model discloses a through setting up semicircle concave seat 10 and semicircle concave seat 8 down, the rear end of semicircle concave seat 10 has all seted up the screw with semicircle concave seat 8 down, long horizontal pole 4 all installs fixed inserted sheet 9 with one side of short horizontal pole 6, and the both ends of fixed inserted sheet 9 embolia the inside of semicircle concave seat 10 and semicircle concave seat 8 down, utilize the bolt to run through the screw and fix semicircle concave seat 10 and semicircle concave seat 8 down through the nut with semicircle concave seat 10 down, thereby make long horizontal pole 4, short horizontal pole 6 better fix on pole setting 3, and be convenient for dismantle and install support 1 through unscrewing the nut; through setting up the 15 cooperation pegs of gim peg, gim peg 15 is all installed to the bottom of scaffold board 5, a plurality of recess has all been seted up on the top of two rows of long horizontal poles 4, and the gim peg 15 of scaffold board 5 through the bottom runs through the recess, utilize tie cover 12 to fix gim peg 15, make scaffold board 5 fix between two rows of long horizontal poles 4, through-hole 13 through scaffold board 5 both ends makes the peg run through-hole 13 and hangs between two rows of long horizontal poles 4, make it fixed 5 secondary to scaffold board, thereby the stability and the security of scaffold board 5 have been improved, make its efficiency of construction higher.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The utility model provides a construction steel pipe support holder, includes support (1), its characterized in that: the bottom end of the support (1) is provided with a bottom plate (2), the support (1) comprises two rows of upright rods (3), the two rows of upright rods (3) are respectively arranged at the front end and the rear end of the bottom plate (2), the number of the upright rods (3) in each row is five, two rows of long transverse rods (4) are arranged between the two rows of upright rods (3), a plurality of short transverse rods (6) are arranged between the two rows of long transverse rods (4) and the two rows of upright rods (3), the front ends of the two rows of upright rods (3) are provided with cross rods (7), and a scaffold plate (5) is arranged between the inner sides of the two rows of long transverse;
an upper semicircular concave base (10) is mounted at the top end of the vertical rod (3), a lower semicircular concave base (8) is mounted at the bottom end of the vertical rod (3), fixing insertion pieces (9) are mounted on one side of the long cross rod (4) and one side of the short cross rod (6), and mounting holes (11) are formed in the top ends of the fixing insertion pieces (9);
anti-skidding cover (14) are installed to the front end of scaffold board (5), and through-hole (13) have all been seted up at the both ends of scaffold board (5), gim peg (15) are all installed to the bottom both sides of scaffold board (5), and the bottom of gim peg (15) installs and tie cover (12).
2. The support bracket for the steel pipes for building construction according to claim 1, wherein a plurality of grooves are formed at the top end of the long cross rod (4), and the fixing bolts (15) at the bottom end of the scaffold board (5) penetrate through the grooves to be connected with the two rows of the long cross rods (4).
3. The building construction steel pipe supporting bracket as claimed in claim 1, wherein the rear ends of the upper semicircular concave base (10) and the lower semicircular concave base (8) are provided with screw holes, and the upper semicircular concave base (10) and the lower semicircular concave base (8) are movably connected with the vertical rod (3) through the screw holes by bolts.
4. The building construction steel pipe support bracket of claim 1, characterized in that one side of the long cross bar (4) and one side of the short cross bar (6) are fixedly connected with the fixing insertion sheet (9) by welding aluminum wires.
5. The building construction steel pipe support bracket according to claim 1, characterized in that the two ends of the scaffold board (5) are both provided with hanging columns, the hanging columns are arranged in a half-hook shape, and the through holes (13) formed at the two ends of the scaffold board (5) are connected with the long cross rod (4) through the hanging columns.
6. The building construction steel pipe support bracket according to claim 1, characterized in that a fixing frame is installed at the front end of the scaffold board (5), and the anti-slip sleeve (14) is fixedly connected with the front end of the scaffold board (5) through the fixing frame.
CN202021334221.XU 2020-07-07 2020-07-07 Building construction steel pipe support bracket Expired - Fee Related CN212984547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021334221.XU CN212984547U (en) 2020-07-07 2020-07-07 Building construction steel pipe support bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021334221.XU CN212984547U (en) 2020-07-07 2020-07-07 Building construction steel pipe support bracket

Publications (1)

Publication Number Publication Date
CN212984547U true CN212984547U (en) 2021-04-16

Family

ID=75426909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021334221.XU Expired - Fee Related CN212984547U (en) 2020-07-07 2020-07-07 Building construction steel pipe support bracket

Country Status (1)

Country Link
CN (1) CN212984547U (en)

Similar Documents

Publication Publication Date Title
CN212984547U (en) Building construction steel pipe support bracket
CN204920178U (en) Attaching scaffold main part
CN209947316U (en) Hanging type LED screen mounting structure
CN209158342U (en) A kind of civic building construction site reinforcing bar laying rack
CN214626280U (en) Hanging bracket
CN219471484U (en) Construction frame for building construction
CN214143725U (en) Foundation ditch supporting device for highway construction
CN111980052A (en) Electric power construction pile foundation structure
CN211037791U (en) Novel hanging ladder for scaffold
CN217557574U (en) Historical site protection construction table
CN219548347U (en) Cantilever scaffold
CN216276853U (en) Scaffold platform for construction
CN213626544U (en) Scaffold for highway construction
CN211524315U (en) Large-span tent frame
CN216109852U (en) Can dismantle vestibule and prevent railing
CN215405772U (en) Guardrail convenient to carry out local maintenance
CN212583415U (en) Building fence installation node structure
CN217782775U (en) Scaffold for civil engineering construction
CN213477332U (en) Curtain wall framework mounting structure
CN207700648U (en) A kind of speed takes formula arched door type external scaffolding
CN216657861U (en) A suspension type bed-jig for bent cap, stand framework of steel reinforcement processing
CN212333249U (en) Steel pipe storage frame for building site
CN215594841U (en) Photovoltaic module mounting structure
CN220184597U (en) Scaffold with reinforced structure
CN213087647U (en) Convenient warning of concatenation is enclosed and is kept off for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210416