CN213477332U - Curtain wall framework mounting structure - Google Patents

Curtain wall framework mounting structure Download PDF

Info

Publication number
CN213477332U
CN213477332U CN202022216756.3U CN202022216756U CN213477332U CN 213477332 U CN213477332 U CN 213477332U CN 202022216756 U CN202022216756 U CN 202022216756U CN 213477332 U CN213477332 U CN 213477332U
Authority
CN
China
Prior art keywords
steel plate
embedded steel
curtain wall
fixed
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022216756.3U
Other languages
Chinese (zh)
Inventor
程海剑
徐劲清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dingyuan Construction Group Co ltd
Original Assignee
China State Ding Yuan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Ding Yuan Construction Engineering Co Ltd filed Critical China State Ding Yuan Construction Engineering Co Ltd
Priority to CN202022216756.3U priority Critical patent/CN213477332U/en
Application granted granted Critical
Publication of CN213477332U publication Critical patent/CN213477332U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

本申请涉及一种幕墙骨架安装结构,包括建筑物主体、立柱、第一预埋钢板、第二预埋钢板、水平梁和斜撑梁,所述第一预埋钢板、所述第二预埋钢板均固定于所述建筑物主体,且所述第一预埋钢板位于所述第二预埋钢板的上方,所述水平梁的一端焊接固定于所述第一预埋钢板上且垂直于所述第一预埋钢板,所述立柱竖向布置且固定装配于所述水平梁的另一端,所述斜撑梁的一端焊接固定于所述第二预埋钢板上,所述斜撑梁的另一端焊接固定于所述水平梁的底部。本申请具有结构稳定性更高的效果。

Figure 202022216756

The present application relates to a curtain wall skeleton installation structure, comprising a building body, a column, a first embedded steel plate, a second embedded steel plate, a horizontal beam and a diagonal braced beam, the first embedded steel plate, the second embedded steel plate The steel plates are all fixed on the main body of the building, and the first embedded steel plate is located above the second embedded steel plate, and one end of the horizontal beam is welded and fixed on the first embedded steel plate and is perpendicular to the first embedded steel plate. For the first embedded steel plate, the column is vertically arranged and fixedly assembled on the other end of the horizontal beam, one end of the diagonal bracing beam is welded and fixed on the second embedded steel plate, and the diagonal bracing beam The other end is welded and fixed to the bottom of the horizontal beam. The present application has the effect of higher structural stability.

Figure 202022216756

Description

Curtain wall framework mounting structure
Technical Field
The application relates to the technical field of curtain wall installation, in particular to a curtain wall framework installation structure.
Background
The curtain wall is an outer wall enclosure of a building, does not bear load, is hung like a curtain, and is a light wall with a decorative effect commonly used by modern large-scale and high-rise buildings. At present, with the rapid development of economy and the acceleration of urbanization process in China, the requirements of people on the shape of a building structure are higher and higher.
The prior Chinese utility model patent with application number CN201922345088.1 discloses a small-unit aluminum plate vertical line curtain wall steel frame system, which relates to the technical field of curtain wall installation and comprises curtain wall frameworks and decorative frameworks arranged between adjacent curtain wall frameworks; the curtain skeleton includes the stand and sets firmly the crossbeam between adjacent stand, the stand sets firmly on pre-buried steel sheet through L type connecting piece, pre-buried steel sheet sets firmly on the building.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: when installing stone material curtain or heavier glass curtain wall, because the support effect of L type connecting piece is not good, can't ensure the stand and stabilize the connection, influence the structural stability of whole curtain system, so wait to improve.
SUMMERY OF THE UTILITY MODEL
In order to promote structural stability, the application provides a curtain skeleton mounting structure.
First aspect, the application provides a curtain wall skeleton mounting structure adopts following technical scheme:
the utility model provides a curtain skeleton mounting structure, includes building main part and stand, still includes the pre-buried steel sheet of first pre-buried steel sheet, second, horizontal beam and bracing beam, first pre-buried steel sheet the pre-buried steel sheet of second all is fixed in the building main part, just first pre-buried steel sheet is located the top of the pre-buried steel sheet of second, the one end welded fastening of horizontal beam in just perpendicular to on the first pre-buried steel sheet, stand vertical arrangement and fixed assembly in the other end of horizontal beam, the one end welded fastening of bracing beam in on the pre-buried steel sheet of second, the other end welded fastening of bracing beam in the bottom of horizontal beam.
Through adopting above-mentioned technical scheme, compare with common L type connecting piece, and this application removes the common L type connecting piece of replacement through horizontal beam and bracing beam, forms triangular supports structure between horizontal beam, bracing beam, first pre-buried steel sheet, the pre-buried steel sheet of second, and the bearing capacity is stronger, and when installing stone material curtain or heavier glass curtain wall, the stand can be more firm, is difficult for rocking, has promoted whole curtain skeleton mounting structure's structural firmness, and the construction security is higher.
Preferably, at least two horizontal beams are fixed on the first embedded steel plate at intervals, at least two diagonal bracing beams are fixed on the second embedded steel plate at intervals, and the vertical columns are clamped between the two horizontal beams.
Through adopting above-mentioned technical scheme, two horizontal beams press from both sides the stand and establish the centre, have certain spacing fixed action to the stand, prevent effectively that the stand from rocking, and two raking arms support two horizontal beams respectively moreover, and the structure is more firm, has further promoted whole curtain skeleton mounting structure's structural firmness.
Preferably, 1-3 first connecting beams are fixedly connected between two adjacent horizontal beams.
Through adopting above-mentioned technical scheme, first tie beam is as an organic whole with two horizontal beams connection, has further promoted whole curtain skeleton mounting structure's structural firmness.
Preferably, a second connecting beam is fixedly connected between two adjacent diagonal bracing beams.
Through adopting above-mentioned technical scheme, the second tie-beam is as an organic whole with two bracing beams connection, has further promoted whole curtain skeleton mounting structure's structural firmness.
Preferably, the upright column, the first connecting beam and the second connecting beam are all made of square steel tubes.
Through adopting above-mentioned technical scheme, square steel tube convenient for material collection, the cost is lower, processes simple to operate moreover, and sound construction, indeformable warp, weight is lighter, has promoted whole curtain skeleton mounting structure's construction cost and structural firmness.
Preferably, the horizontal beam and the diagonal beam are made of channel steel or I-steel.
Through adopting above-mentioned technical scheme, channel-section steel or I-steel, convenient for material collection, cost are lower, process simple to operate moreover, and sound construction, indeformable warp, weight is lighter, has promoted whole curtain skeleton mounting structure's construction cost and structural firmness.
Preferably, the upper surface of horizontal beam is fixed with two baffles, forms the mounting groove between two baffles and is fixed in order to supply the removable installation of a spirit level.
Through adopting above-mentioned technical scheme, in the installation work progress, the staff can place the spirit level that hand-carries in the mounting groove, and the mounting groove has certain spacing fixed action to the spirit level, can prevent effectively that the spirit level landing to the installer can judge whether enough level of horizon beam according to the spirit level, so that adjust the mounted position of horizon beam.
Preferably, the end parts of the upright post and the horizontal beam are provided with through holes, and the upright post and the horizontal beam are fixed through one or more groups of split bolts.
Through adopting above-mentioned technical scheme, above-mentioned connection structure makes things convenient for staff fixed mounting stand for removable assembly, and the stand is comparatively firm moreover, is difficult for rocking.
Preferably, a lightning protection copper wire is fixedly connected between the split bolt and the upright post.
Through adopting above-mentioned technical scheme, lightning-arrest copper conductor has good electric conductive property, can in time guide the electric current to the ground in, under the thunderstorm weather, promotes this curtain skeleton mounting structure security.
In summary, the present application includes at least one of the following beneficial technical effects:
1. a triangular support structure is formed among the horizontal beam, the diagonal bracing beam, the first embedded steel plate and the second embedded steel plate, so that the bearing capacity is higher, when a stone curtain wall or a heavy glass curtain wall is installed, the upright posts are firmer and are not easy to shake, the structural firmness of the whole curtain wall framework installation structure is improved, and the construction safety is higher;
2. the first tie beam is connected two horizontal beams as an organic whole, and the second tie beam is connected two bracing beams as an organic whole, has further promoted whole curtain skeleton mounting structure's structural firmness.
Drawings
Fig. 1 is a schematic structural view of a curtain wall skeleton mounting structure according to an embodiment of the present application.
Description of reference numerals: 1. a building body; 2. a column; 3. a first pre-buried steel plate; 4. a second pre-buried steel plate; 5. a horizontal beam; 6. a diagonal bracing beam; 7. a first connecting beam; 8. a second connecting beam; 9. a baffle plate; 10. oppositely pulling the bolts; 11. lightning-arrest copper wire; 12. an angle iron beam.
Detailed Description
The present application is described in further detail below with reference to fig. 1.
The embodiment of the application discloses curtain wall framework mounting structure. Referring to fig. 1, the curtain wall framework mounting structure comprises a building main body 1, a stand column 2, a first embedded steel plate 3, a second embedded steel plate 4, a horizontal beam 5, an inclined supporting beam 6, a first connecting beam 7, a second connecting beam 8, a baffle 9, a split bolt 10, a lightning-protection copper wire 11 and an angle iron beam 12.
First pre-buried steel sheet 3, the pre-buried steel sheet 4 of second comprise a rectangle steel sheet and four expansion bolts, and the four corners of rectangle steel sheet is provided with the through-hole, and expansion bolts's most is pre-buried in being fixed in building main part 1, and the rectangle steel sheet laminating is in building main part 1's outer wall, and the rectangle steel sheet is fixed in building main part 1 through four expansion bolts, and first pre-buried steel sheet 3 is located the top of the pre-buried steel sheet 4 of second.
One end welded fastening of horizontal beam 5 is on first pre-buried steel sheet 3 and the first pre-buried steel sheet 3 of perpendicular to, 2 vertical arrangement of stand and fixed assembly in the other end of horizontal beam 5, and the one end welded fastening of bracing beam 6 is on the pre-buried steel sheet 4 of second, and the other end welded fastening of bracing beam 6 is in the bottom of horizontal beam 5, and angle bar crossbeam 12 is provided with many and upper and lower interval arrangement, and angle bar crossbeam 12 welded fastening is between the lateral surface of many stands 2.
Four horizontal beams 5 which are horizontally arranged at intervals are fixed on the first embedded steel plate 3, the two horizontal beams 5 form a group, four diagonal bracing beams 6 which are arranged at intervals are fixed on the second embedded steel plate 4, the two diagonal bracing beams 6 form a group, and the stand column 2 is clamped between the two horizontal beams 5. 2 first connecting beams 7 are welded and fixed between two adjacent horizontal beams 5 (in other embodiments, the number of the first connecting beams may be 1 or 3), a second connecting beam 8 is welded and fixed between two adjacent diagonal bracing beams 6, the upright column 2, the first connecting beam 7 and the second connecting beam 8 are all made of square steel tubes, and the horizontal beams 5 and the diagonal bracing beams 6 are made of i-steel (in other embodiments, the i-steel may be replaced by channel steel). The upper surface welding of horizon beam 5 has two baffles 9, and baffle 9 specifically is made by corrosion resistant plate and is the U-shaped form, forms the mounting groove between two baffles 9 and fixes in order to supply the removable installation of a spirit level.
All be provided with the perforation on the tip of stand 2 and horizontal beam 5, and between the two fixed through a set of or multiunit split bolt 10, the lightning-arrest copper conductor 11 of fixedly connected with between split bolt 10 and the stand 2, the U-shaped breach has still been seted up on horizontal beam 5, and lightning-arrest copper conductor 11 passes from the U-shaped breach, consequently can avoid 11 bendings of lightning-arrest copper conductor as far as possible, save material, the cost is reduced.
The implementation principle of the curtain wall framework installation structure provided by the embodiment of the application is as follows: compare with common L type connecting piece, and this application removes the common L type connecting piece of replacement through horizontal beam 5 and bracing beam 6, horizontal beam 5, bracing beam 6, first pre-buried steel sheet 3, form triangular support structure between the pre-buried steel sheet 4 of second, bearing capacity is stronger, when installing stone material curtain or heavier glass curtain wall, stand 2 can be more firm, is difficult for rocking, has promoted whole curtain skeleton mounting structure's structural firmness, and the construction safety is higher.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1.一种幕墙骨架安装结构,包括建筑物主体(1)和立柱(2),其特征在于:还包括第一预埋钢板(3)、第二预埋钢板(4)、水平梁(5)和斜撑梁(6),所述第一预埋钢板(3)、所述第二预埋钢板(4)均固定于所述建筑物主体(1),且所述第一预埋钢板(3)位于所述第二预埋钢板(4)的上方,所述水平梁(5)的一端焊接固定于所述第一预埋钢板(3)上且垂直于所述第一预埋钢板(3),所述立柱(2)竖向布置且固定装配于所述水平梁(5)的另一端,所述斜撑梁(6)的一端焊接固定于所述第二预埋钢板(4)上,所述斜撑梁(6)的另一端焊接固定于所述水平梁(5)的底部。1. a curtain wall skeleton installation structure, comprising building main body (1) and upright column (2), it is characterized in that: also comprise the first embedded steel plate (3), the second embedded steel plate (4), the horizontal beam (5) ) and diagonal bracing beams (6), the first embedded steel plate (3) and the second embedded steel plate (4) are fixed to the main body of the building (1), and the first embedded steel plate (4) is (3) Located above the second embedded steel plate (4), one end of the horizontal beam (5) is welded and fixed on the first embedded steel plate (3) and is perpendicular to the first embedded steel plate (3), the upright column (2) is vertically arranged and fixedly assembled on the other end of the horizontal beam (5), and one end of the diagonal brace (6) is welded and fixed to the second embedded steel plate (4). ), the other end of the diagonal bracing beam (6) is welded and fixed to the bottom of the horizontal beam (5). 2.根据权利要求1所述的幕墙骨架安装结构,其特征在于:所述第一预埋钢板(3)上固定有至少两根水平间隔布置的所述水平梁(5),所述第二预埋钢板(4)上固定有至少两根间隔布置的所述斜撑梁(6),且所述立柱(2)夹设于两根所述水平梁(5)之间。2. The curtain wall skeleton installation structure according to claim 1, characterized in that: at least two horizontal beams (5) arranged at horizontal intervals are fixed on the first embedded steel plate (3), and the second At least two diagonal bracing beams (6) arranged at intervals are fixed on the embedded steel plate (4), and the upright column (2) is sandwiched between the two horizontal beams (5). 3.根据权利要求2所述的幕墙骨架安装结构,其特征在于:相邻两根所述水平梁(5)之间固定连接有1-3根第一连接梁(7)。3. The curtain wall skeleton installation structure according to claim 2, characterized in that 1-3 first connecting beams (7) are fixedly connected between two adjacent horizontal beams (5). 4.根据权利要求3所述的幕墙骨架安装结构,其特征在于:相邻两根所述斜撑梁(6)之间固定连接有第二连接梁(8)。4. The curtain wall skeleton installation structure according to claim 3, wherein a second connecting beam (8) is fixedly connected between two adjacent diagonal brace beams (6). 5.根据权利要求4所述的幕墙骨架安装结构,其特征在于:所述立柱(2)、所述第一连接梁(7)、所述第二连接梁(8)均由方钢管制成。5. The curtain wall skeleton installation structure according to claim 4, characterized in that: the column (2), the first connecting beam (7), and the second connecting beam (8) are all made of square steel pipes . 6.根据权利要求1所述的幕墙骨架安装结构,其特征在于:所述水平梁(5)和所述斜撑梁(6)由槽钢或者工字钢制成。6 . The curtain wall frame installation structure according to claim 1 , wherein the horizontal beam ( 5 ) and the diagonal brace beam ( 6 ) are made of channel steel or I-beam. 7 . 7.根据权利要求1所述的幕墙骨架安装结构,其特征在于:所述水平梁(5)的上表面固定有两块挡板(9),两块挡板(9)之间形成安装槽以供一水平尺可拆式安装固定。7. The curtain wall skeleton installation structure according to claim 1, characterized in that: two baffle plates (9) are fixed on the upper surface of the horizontal beam (5), and an installation groove is formed between the two baffle plates (9). For detachable installation and fixation of a spirit level. 8.根据权利要求1所述的幕墙骨架安装结构,其特征在于:所述立柱(2)和所述水平梁(5)的端部上均设置有穿孔,且两者间通过一组或者多组对拉螺栓(10)固定。8. The curtain wall skeleton installation structure according to claim 1, characterized in that: the ends of the upright column (2) and the horizontal beam (5) are provided with perforations, and one or more through holes are formed between the two. The set of pull bolts (10) is fixed. 9.根据权利要求8所述的幕墙骨架安装结构,其特征在于:所述对拉螺栓(10)和所述立柱(2)之间固定连接有避雷铜导线(11)。9 . The curtain wall skeleton installation structure according to claim 8 , characterized in that a lightning protection copper wire ( 11 ) is fixedly connected between the pull bolt ( 10 ) and the upright column ( 2 ). 10 .
CN202022216756.3U 2020-09-30 2020-09-30 Curtain wall framework mounting structure Expired - Fee Related CN213477332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022216756.3U CN213477332U (en) 2020-09-30 2020-09-30 Curtain wall framework mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022216756.3U CN213477332U (en) 2020-09-30 2020-09-30 Curtain wall framework mounting structure

Publications (1)

Publication Number Publication Date
CN213477332U true CN213477332U (en) 2021-06-18

Family

ID=76366119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022216756.3U Expired - Fee Related CN213477332U (en) 2020-09-30 2020-09-30 Curtain wall framework mounting structure

Country Status (1)

Country Link
CN (1) CN213477332U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116044065A (en) * 2022-12-28 2023-05-02 上海市机械施工集团有限公司 Supporting structure for curtain wall and mounting process thereof
CN117027246A (en) * 2023-07-11 2023-11-10 上海强荣建设集团有限公司 Construction process of semi-unit aluminum plate curtain wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116044065A (en) * 2022-12-28 2023-05-02 上海市机械施工集团有限公司 Supporting structure for curtain wall and mounting process thereof
CN116044065B (en) * 2022-12-28 2025-07-01 上海市机械施工集团有限公司 A supporting structure for curtain wall and its installation process
CN117027246A (en) * 2023-07-11 2023-11-10 上海强荣建设集团有限公司 Construction process of semi-unit aluminum plate curtain wall

Similar Documents

Publication Publication Date Title
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN213477332U (en) Curtain wall framework mounting structure
CN211849246U (en) Reverse hoisting system suitable for high-pile wharf
CN214995827U (en) A hanging basket support mechanism on a structural beam
CN102518875B (en) The wire installation frame of a kind of dome or arc or slope use
CN212249231U (en) Adjustable beam slab co-supporting type cantilever tripod construction device
CN218580831U (en) Support structure of support frame in bay window
CN210886958U (en) Bridge assembled bent cap installation support stores pylon
CN208310204U (en) Base for supporting and arranging elevator shaft coupling beam template
CN217000802U (en) Fixed calipers for electric hanging basket suspension mechanism
CN216810537U (en) Assembled superimposed sheet
CN214658788U (en) Retractable's concrete floor formwork structure
CN214446314U (en) Detachable prefabricated component storage rack
CN214462438U (en) Supporting leg fixing device of beam-holding type hanging basket
CN209780003U (en) fixing structure of reverse furred ceiling of big space grid structure
CN201877696U (en) Support for overhauling outdoor disconnecting switch
CN208310404U (en) Unit type suspended moso bamboo ecological enclosing wall
CN221524191U (en) Non-standard working condition hanging basket supporting system
CN215803090U (en) Hanging basket support frame
CN215419406U (en) Plug-in type cable bridge
CN220521918U (en) Combined type finalized steel pipe supporting temporary scaffold
CN222184068U (en) Wall body pre-buried bracket
CN220599309U (en) Precast concrete beam side shelving bracket system
CN221103229U (en) Multi-row array flexible photovoltaic bracket
CN221095940U (en) A construction elevator platform protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 2, Yangguang 1st Road, Yangguang Avenue, Miaoshan Office, Jiangxia District, Wuhan City, Hubei Province 430200

Patentee after: Dingyuan Construction Group Co.,Ltd.

Country or region after: China

Address before: 430000, No.2, Yangguang 1st Road, Yangguang Avenue, Miaoshan office, Jiangxia District, Wuhan City, Hubei Province

Patentee before: China Construction Dingyuan Construction Engineering Co.,Ltd.

Country or region before: China

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210618