CN212957625U - Prefabricated brick moulding bed - Google Patents

Prefabricated brick moulding bed Download PDF

Info

Publication number
CN212957625U
CN212957625U CN202021132272.4U CN202021132272U CN212957625U CN 212957625 U CN212957625 U CN 212957625U CN 202021132272 U CN202021132272 U CN 202021132272U CN 212957625 U CN212957625 U CN 212957625U
Authority
CN
China
Prior art keywords
plate body
reserved
jack
connecting piece
prefabricated brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021132272.4U
Other languages
Chinese (zh)
Inventor
刘晓龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Oak New Materials Technology Co ltd
Original Assignee
Fujian Oak New Materials Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Oak New Materials Technology Co ltd filed Critical Fujian Oak New Materials Technology Co ltd
Priority to CN202021132272.4U priority Critical patent/CN212957625U/en
Application granted granted Critical
Publication of CN212957625U publication Critical patent/CN212957625U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

A prefabricated brick moulding bed relates to the technical field of prefabricated brick moulding beds. It contains first plate body, second plate body, first reservation jack, second reservation jack, connecting piece, first plate body and second plate body in proper order head and the tail cooperate and connect into the closed shape, first reservation jack and second reservation jack be the corresponding connect the via hole of level, the inserting of connecting piece head pass the second and reserve the jack and stretch into in the first reservation jack. With this utility model a prefabricated brick fetal membrane, need wait for the problem that just can carry out the backfill when intensity reaches the requirement when effectively having avoided cast in situ, also avoided current prefabricated brick fetal membrane insecure connection and the problem that causes deformation or displacement when the backfill, simple structure, practicality.

Description

Prefabricated brick moulding bed
Technical Field
The utility model relates to a prefabricated brick fetal membrane technical field, concretely relates to prefabricated brick fetal membrane.
Background
The brick moulding bed is a template made of standard bricks, and after a certain strength is achieved, concrete pouring is carried out; the template is not a part of the engineering entity, and can only be calculated as a measure in construction, and the cost is calculated in the entity cost; the brick mould is generally used for waterproof outside the basement outer wall or a part of a template which is not easy to remove, and the size and the strength of the built brick mould meet the design requirements.
In the existing building industry, the application of the brick moulding bed is more and more extensive, the traditional brick moulding bed is connected only by the tongue and groove designed by a prefabricated structural part factory, the connection strength between installation back plates is lower, concrete easily causes the deformation of the brick moulding bed when being filled, and the effective purpose of quick installation and connection of the prefabricated brick moulding bed cannot be met.
The prefabricated brick moulding bed is researched and improved aiming at the existing structure and deficiency, and the prefabricated brick moulding bed is provided to improve the practicability.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect and not enough, provide a prefabricated brick fetal membrane to joint strength between the installation back plate that proposes in solving above-mentioned background is lower, and the easy deformation scheduling problem of brick fetal membrane, the problem that just can carry out the backfill when needing wait for intensity to reach the requirement when this product has effectively avoided the site pouring, has also avoided current prefabricated brick fetal membrane to connect insecure and cause the problem of deformation or displacement when the backfill.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the connecting device comprises a first plate body, a second plate body, a first reserved jack, a second reserved jack and a connecting piece, wherein the first plate body and the second plate body are sequentially matched and connected end to form a closed shape, a top plane is arranged on the end face of the first plate body, at least more than two first reserved jacks are arranged on the top plane, two splicing grooves are arranged on the second plate body and comprise a bottom plane and a side plane, at least more than two second reserved jacks are arranged on the bottom plane, the top plane and the bottom plane are in contact connection with each other, the first reserved jacks and the second reserved jacks are horizontally corresponding connecting through holes, the insertion end of the head of the connecting piece penetrates through the second reserved jack and extends into the first reserved jack, so that an integrally connected fixed phase is formed and is not movable, can directly carry out the backfill after connecting, increased the ability that resists deformation of each prefabricated brick fetal membrane, had both avoided the problem that just can carry out the backfill when intensity reaches the requirement when the cast in situ like this, also avoided current prefabricated brick fetal membrane insecure connection and caused the problem of deformation rework and displacement easily when the backfill, simple structure, practicality.
Furthermore, the connecting piece middle part be provided with spacing pipe perpendicularly, strengthen the fixed action of connecting piece to first reservation jack and second reservation jack, prevent to deviate from. Thereby make first plate body and second plate body be connected more stably firm.
Furthermore, the connecting piece is made of steel bars.
Furthermore, the upper ends of the first plate body and the second plate body are provided with a plurality of hoisting holes, so that the first plate body and the second plate body are conveniently hoisted, and the device is practical and convenient.
The utility model discloses a theory of operation: the utility model provides a prefabricated brick fetal membrane, hoist prefabricated brick fetal membrane to appointed construction position through the hole for hoist, with the first plate body, the second plate body once carries out end to end hoist, ensure that the top plane on the first plate body is connected with the mutual level laminating of bottom plane of second plate body, reserve the jack through the connecting piece to first reservation jack and second and carry out through connection fixed, thereby it is more stable firm to make first plate body be connected with the second plate body, carry out inside filling at last, accomplish the construction of prefabricated brick fetal membrane.
After the technical scheme is adopted, the utility model discloses beneficial effect does: with this utility model a prefabricated brick fetal membrane, need wait for the problem that just can carry out the backfill when intensity reaches the requirement when effectively having avoided cast in situ, also avoided current prefabricated brick fetal membrane insecure connection and the problem that causes deformation or displacement when the backfill, simple structure, practicality.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic structural diagram of the first plate 1 of the present invention;
fig. 3 is a schematic structural view of the second plate body 2 of the present invention;
fig. 4 is a schematic structural diagram of the connector 5 of the present invention.
Description of reference numerals: the first plate body 1, the top plane 11, the first reserved insertion hole 3, the second plate body 2, the splicing groove 21, the bottom plane 22, the side plane 23, the first reserved insertion hole 3, the second reserved insertion hole 4, the connecting piece 5, the insertion end 51, the limiting pipe 52 and the hoisting hole 6.
Detailed Description
Referring to fig. 1 to 4, the technical solution adopted by the present embodiment is: the novel packaging box comprises a first plate body 1, a second plate body 2, a first reserved jack 3, a second reserved jack 4 and a connecting piece 5, wherein the first plate body 1 and the second plate body 2 are sequentially matched and connected end to form a closed shape, a top plane 11 is arranged on the end face of the first plate body 1, at least more than two first reserved jacks 3 are arranged on the top plane 11, two splicing grooves 21 are arranged on the second plate body 2, each splicing groove 21 comprises a bottom plane 22 and a side plane 23, at least more than two second reserved jacks 4 are arranged on the bottom plane 22, the top plane 11 and the bottom plane 22 are in mutual contact connection, the first reserved jack 3 and the second reserved jack 4 are horizontally corresponding connecting through holes, and an insertion end 51 of the head of the connecting piece 5 penetrates through the second reserved jack 4 to extend into the first reserved jack 3, thereby it is not portable to form an integral connection stationary phase, can directly carry out the backfill after connecting, has increased the ability of resisting the deformation of each prefabricated brick fetal membrane, has both avoided the problem that just can carry out the backfill when need wait for intensity to reach the requirement when the cast in situ like this, has also avoided current prefabricated brick fetal membrane insecure connection and has caused the problem of deformation rework and displacement easily when the backfill, simple structure, practicality.
The middle part of the connecting piece 5 is vertically provided with a limiting pipe 52, and the fixing effect of the connecting piece 5 on the first reserved insertion hole 3 and the second reserved insertion hole 4 is strengthened to prevent separation. Thereby make first plate body 1 and second plate body 2 be connected more stably firm.
The connecting piece 5 is made of steel bars.
The upper ends of the first plate body 1 and the second plate body 2 are provided with a plurality of hoisting holes 6, so that the first plate body 1 and the second plate body 2 are conveniently hoisted, and the device is practical and convenient.
The utility model discloses a theory of operation: the utility model provides a prefabricated brick fetal membrane, hoist prefabricated brick fetal membrane to appointed construction position through the hole for hoist, with the first plate body, the second plate body once carries out end to end hoist, ensure that the top plane on the first plate body is connected with the mutual level laminating of bottom plane of second plate body, reserve the jack through the connecting piece to first reservation jack and second and carry out through connection fixed, thereby it is more stable firm to make first plate body be connected with the second plate body, carry out inside filling at last, accomplish the construction of prefabricated brick fetal membrane.
After the technical scheme is adopted, the utility model discloses beneficial effect does: with this utility model a prefabricated brick fetal membrane, need wait for the problem that just can carry out the backfill when intensity reaches the requirement when effectively having avoided cast in situ, also avoided current prefabricated brick fetal membrane insecure connection and the problem that causes deformation or displacement when the backfill, simple structure, practicality.
The above description is only for the purpose of illustrating the technical solutions of the present invention and not for the purpose of limiting the same, and other modifications or equivalent replacements made by those of ordinary skill in the art to the technical solutions of the present invention should be covered within the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solutions of the present invention.

Claims (4)

1. A prefabricated brick moulding bed which is characterized in that: the novel packaging box comprises a first plate body (1), a second plate body (2), first reserved jacks (3), second reserved jacks (4) and a connecting piece (5), wherein the first plate body (1) and the second plate body (2) are sequentially matched end to form a closed shape, a top plane (11) is arranged on the end face of the first plate body (1), at least more than two first reserved jacks (3) are arranged on the top plane (11), two splicing grooves (21) are arranged on the second plate body (2), each splicing groove (21) comprises a bottom plane (22) and a side plane (23), at least more than two second reserved jacks (4) are arranged on the bottom plane (22), the top plane (11) and the bottom plane (22) are connected in a contact mode, the first reserved jacks (3) and the second jacks (4) are horizontally reserved corresponding connecting through holes, the inserting end (51) of the head part of the connecting piece (5) penetrates through the second reserved insertion hole (4) and extends into the first reserved insertion hole (3).
2. A prefabricated tile tire membrane as in claim 1, wherein: the middle part of the connecting piece (5) is vertically provided with a limiting pipe (52).
3. A prefabricated tile tire membrane as in claim 1, wherein: the connecting piece (5) is made of steel bars.
4. A prefabricated tile tire membrane as in claim 1, wherein: the upper ends of the first plate body (1) and the second plate body (2) are provided with a plurality of hoisting holes (6).
CN202021132272.4U 2020-06-18 2020-06-18 Prefabricated brick moulding bed Active CN212957625U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021132272.4U CN212957625U (en) 2020-06-18 2020-06-18 Prefabricated brick moulding bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021132272.4U CN212957625U (en) 2020-06-18 2020-06-18 Prefabricated brick moulding bed

Publications (1)

Publication Number Publication Date
CN212957625U true CN212957625U (en) 2021-04-13

Family

ID=75387170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021132272.4U Active CN212957625U (en) 2020-06-18 2020-06-18 Prefabricated brick moulding bed

Country Status (1)

Country Link
CN (1) CN212957625U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114687371A (en) * 2022-03-31 2022-07-01 成都建工第二建筑工程有限公司 Assembled prefabricated brick forming die inclined construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114687371A (en) * 2022-03-31 2022-07-01 成都建工第二建筑工程有限公司 Assembled prefabricated brick forming die inclined construction method

Similar Documents

Publication Publication Date Title
CN212957625U (en) Prefabricated brick moulding bed
CN103669835B (en) A kind of support post and mounting method thereof adopting the top mould system of Bailey bracket
CN203334270U (en) Mountable buried type prefabricated hollow underground diaphragm wall
CN203113793U (en) Large formwork installation system of oblique structure
CN213115100U (en) Cross plug-in structure for assembled shear wall
CN112758806A (en) Connecting device for assembled concrete member hoisting system and hoisting operation method
CN103850263A (en) Precast brick molding bed
CN204225360U (en) A kind of prefabricated post and the syndeton with precast beam
CN212295172U (en) Assembled building brick
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN203603262U (en) Change-over structure for connecting and mounting prefabricated building wall beam
CN209099351U (en) Back taper steel jacket box in water in the prefabricated constructing tie beam of pier foundation
CN207469617U (en) A kind of parapet position assembled room grid beam structure
CN209615872U (en) A kind of basis preformed bricks fetal membrane
CN211043391U (en) Precast concrete shear force wall installation slip casting detection device
CN204691304U (en) A kind of bracing frame for integral precast groined slab floor structure
CN204491840U (en) A kind of being convenient to is installed and the space frame formula self-contained flat be connected
CN213837052U (en) Superposed beam connecting part
CN205475322U (en) Tongue -and -groove template under multicavity
CN212656385U (en) Assembled concrete column
CN214171566U (en) Concrete prefabricated pipeline
CN211949016U (en) Novel vertical connection structure of integral shear force wallboard of assembly
CN218111142U (en) Aluminum detachable prefabricated wall formwork
CN218622339U (en) Prefabricated part for plugging post-cast strip of basement outer wall
CN210561996U (en) Rectangular geomembrane fixing structure for pumped storage power station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant