CN103669835B - A kind of support post and mounting method thereof adopting the top mould system of Bailey bracket - Google Patents

A kind of support post and mounting method thereof adopting the top mould system of Bailey bracket Download PDF

Info

Publication number
CN103669835B
CN103669835B CN201310677152.0A CN201310677152A CN103669835B CN 103669835 B CN103669835 B CN 103669835B CN 201310677152 A CN201310677152 A CN 201310677152A CN 103669835 B CN103669835 B CN 103669835B
Authority
CN
China
Prior art keywords
column
bailey frame
connector
bailey
lattice column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310677152.0A
Other languages
Chinese (zh)
Other versions
CN103669835A (en
Inventor
何景鸿
楼跃清
郑建军
寇广辉
占琳
童涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201310677152.0A priority Critical patent/CN103669835B/en
Publication of CN103669835A publication Critical patent/CN103669835A/en
Application granted granted Critical
Publication of CN103669835B publication Critical patent/CN103669835B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明涉及用于超高层核心筒的一种采用贝雷架的顶模体系的支撑立柱及其安装方法,其特征在于:它包括贝雷架柱头连接件、上部支撑格构柱和下部支撑格构柱,所述下部支撑格构柱安装在液压顶升系统的液压支撑箱梁上,所述上部支撑格构柱固定连接在下部支撑格构柱的上端,所述贝雷架柱头连接件固定连接在上部支撑格构柱的上端;所述贝雷架柱头连接件为正长方体结构(即上下底面为正方形),贝雷架柱头连接件的四个侧面的上下两端各设有多个与贝雷架阴阳接头相匹配的连接件阴阳接头,连接件阴阳接头上开设有连接销孔,用于通过贝雷销头与贝雷架连接。本发明能方便牢固的将贝雷架和液压顶升系统连接起来。

The invention relates to a supporting column of a topform system using a Bailey frame and an installation method thereof for a super-high-rise core tube, and is characterized in that it includes a column head connector of a Bailey frame, an upper supporting lattice column and a lower supporting lattice The lower supporting lattice column is installed on the hydraulically supported box girder of the hydraulic jacking system, the upper supporting lattice column is fixedly connected to the upper end of the lower supporting lattice column, and the column head connector of the Bailey frame is fixed It is connected to the upper end of the upper supporting lattice column; the column head connector of the Bailey frame is a regular cuboid structure (that is, the upper and lower bottom surfaces are square), and the upper and lower ends of the four sides of the column head connector of the Bailey frame are respectively provided with a plurality of The female and male connectors of the Bailey frame are matched with the female and male connectors of the connecting piece, and the female and male connectors of the connecting piece are provided with connecting pin holes for connecting with the Bailey frame through the Bailey pin head. The invention can conveniently and firmly connect the Bailey frame with the hydraulic jacking system.

Description

一种采用贝雷架的顶模体系的支撑立柱及其安装方法A support column of a top formwork system using a Bailey frame and its installation method

技术领域 technical field

本发明涉及用于超高层核心筒的一种采用贝雷架的顶模体系的支撑立柱,具体涉及一种采用贝雷架的顶模体系的支撑立柱及其安装方法。 The invention relates to a support column of a top form system using a Bailey frame for a super high-rise core tube, in particular to a support column of a top form system using a Bailey frame and an installation method thereof.

背景技术 Background technique

当前正处于高层建筑高速发展时期,越来越高的建筑不断涌现,顶模系统在超高层混凝土结构施工中的运用越来越普及。顶模体系所采用的构件均为钢结构,成本高且重复利用率底,为了提高顶模体系钢结构构件的通用性、便捷性、轻型化、标准化,现在一般都采用类似贝雷架的顶模体系。而现有的顶模平台钢结构桁架采用工字钢或其它型钢参照贝雷架结构形式(受力形式)焊结而成,此受力形式的顶模钢结构桁架需在工厂定制加工而成,设计与加工周期长。因此使用标准型贝雷架(实际采用200型)采购、周转使用便利,可极大的减少顶模系统桁架使用成本,缩短了设计周期、生产周期及安装周期。而已有顶模桁架支撑立柱连接装置无法与标准型成品贝雷架连接,只能与特制的钢结构桁架(或采用型钢制作成贝雷架构造形式)进行连接。 Currently in the period of high-speed development of high-rise buildings, taller and taller buildings continue to emerge, and the application of top formwork systems in the construction of super high-rise concrete structures is becoming more and more popular. The components used in the top formwork system are all steel structures, which are costly and have a low reuse rate. In order to improve the versatility, convenience, light weight and standardization of the steel structure components of the top formwork system, the top formwork similar to the Bailey frame is now generally used. model system. However, the existing steel structure trusses of the top formwork platform are welded with I-beams or other shaped steels with reference to the structure form (stressed form) of the Bailey frame. The steel structure trusses of the top formwork in this form of force need to be customized and processed in the factory , The design and processing cycle is long. Therefore, the use of standard Bailey frame (actually 200 type) is convenient for procurement, turnover and use, which can greatly reduce the use cost of the top formwork system truss, and shorten the design cycle, production cycle and installation cycle. However, the existing topform truss support column connection device cannot be connected with the standard finished Bailey frame, and can only be connected with a special steel structure truss (or a Bailey frame structure made of section steel).

发明内容 Contents of the invention

本发明的目的在于提供一种采用贝雷架的顶模体系的支撑立柱及其安装方法,该支撑立柱能方便牢固的将标准型贝雷架和液压顶升系统连接起来。 The purpose of the present invention is to provide a support column and its installation method using the top formwork system of the Bailey frame. The support column can conveniently and firmly connect the standard type Bailey frame with the hydraulic jacking system.

为实现上述目的,本发明所采取的技术方案是: For realizing above-mentioned purpose, the technical scheme that the present invention takes is:

一种采用贝雷架的顶模体系的支撑立柱,其特征在于:它包括贝雷架柱头连接件、上部支撑格构柱和下部支撑格构柱,所述下部支撑格构柱安装在液压顶升系统的液压支撑箱梁上,所述上部支撑格构柱固定连接在下部支撑格构柱的上端,所述贝雷架柱头连接件固定连接在上部支撑格构柱的上端;所述贝雷架柱头连接件为正长方体结构(即上下底面为正方形),贝雷架柱头连接件的四个侧面的上下两端各设有多个与贝雷架阴阳接头相匹配的连接件阴阳接头,连接件阴阳接头上开设有连接销孔,用于通过贝雷销头与贝雷架连接。 A supporting column adopting a top mold system of a Bailey frame, characterized in that it includes a column head connector of a Bailey frame, an upper supporting lattice column and a lower supporting lattice column, and the lower supporting lattice column is installed on a hydraulic top On the hydraulically supported box girder of the lifting system, the upper supporting lattice column is fixedly connected to the upper end of the lower supporting lattice column, and the column head connector of the Bailey frame is fixedly connected to the upper end of the upper supporting lattice column; The column head connector of the frame is a regular cuboid structure (that is, the upper and lower bottom surfaces are square), and the upper and lower ends of the four sides of the column head connector of the Bailey frame are respectively provided with a plurality of male and female joints of the connecting piece that match the male and female connectors of the Bailey frame. A connecting pin hole is provided on the female and male joints of the parts, which are used to connect with the Bailey frame through the Bailey pin head.

所述贝雷架柱头连接件包括两个正方形的连接板和一个方形格构柱;每个连接板的其中两个边上都均匀设有四个连接件阴接头,剩下两个边上都均匀设有四个连接件阳接头;两个连接板分别固定在方形格构柱的上下两端,且相互平行对应。 The column head connector of the Bailey frame includes two square connecting plates and a square lattice column; four connector female joints are evenly arranged on two sides of each connecting plate, and four connector female joints are evenly arranged on the remaining two sides. There are four male joints of connecting parts uniformly arranged; two connecting plates are respectively fixed on the upper and lower ends of the square lattice column, and are parallel to each other.

所述连接板上相对的两个边上分别设有连接件阴接头和连接件阳接头。 The two opposite sides of the connecting plate are respectively provided with a female joint of the connecting piece and a male joint of the connecting piece.

所述位于方形格构柱下端的连接板上均匀分布有多个螺栓孔,所述上部支撑格构柱的上端焊接有一块连接钢板,所述连接钢板上分布有与上述连接板上螺栓孔位置个数相对应的螺栓孔,并且上述连接钢板与上述连接板通过螺栓固定连接。 A plurality of bolt holes are evenly distributed on the connecting plate located at the lower end of the square lattice column, and a connecting steel plate is welded on the upper end of the upper supporting lattice column, and the connecting plate is distributed with bolt holes on the connecting plate. There are corresponding bolt holes, and the connecting steel plate and the connecting plate are fixedly connected by bolts.

所述连接板的中心处开设有一个圆形孔洞。 A circular hole is opened at the center of the connecting plate.

所述上部支撑格构柱与下部支撑格构柱之间以及贝雷架柱头连接件与上部支撑格构柱之间均通过高强螺栓连接。 The upper supporting lattice column and the lower supporting lattice column, and the connection between the column head connector of the Bailey frame and the upper supporting lattice column are all connected by high-strength bolts.

所述连接板为加厚钢板一体成型结构或由加厚钢板切割而成。 The connecting plate is an integrally formed structure of a thickened steel plate or is cut from a thickened steel plate.

一种采用贝雷架的顶模体系的支撑立柱的安装方法,其特征在于包括以下步骤: A method for installing a supporting column of a topform system using a Bailey frame, is characterized in that it comprises the following steps:

1)组装支撑立柱:将贝雷架柱头连接件、上部支撑格构柱和下部支撑格构柱依次从上到下通过高强螺栓固定连接起来,构成整个支撑立柱; 1) Assembling the supporting column: connect the column head connector of the Bailey frame, the upper supporting lattice column and the lower supporting lattice column from top to bottom through high-strength bolts to form the entire supporting column;

2)固定支撑立柱:在将整个支撑立柱立在液压顶升系统的液压支撑箱梁上,并且用螺栓将下部支撑格构柱固定在液压支撑箱梁上; 2) Fix the support column: erect the entire support column on the hydraulically supported box girder of the hydraulic jacking system, and fix the lower support lattice column on the hydraulically supported box girder with bolts;

3)安装贝雷架:将贝雷架一端的阴接头或阳接头卡到连接板上的连接件阳接头或连接件阴接头内,再用贝雷销头同时穿过贝雷架阴接头或阳接头上的连接销孔和连接板连接件阳接头或连接件阴接头上的连接销孔将两者固定; 3) Install the Bailey frame: snap the female or male connector at one end of the Bailey frame into the male connector of the connecting piece or the female connector of the connecting piece on the connecting plate, and then use the Bailey pin head to pass through the female or male connector of the Bailey frame at the same time. The connecting pin hole on the male joint and the connecting pin hole on the male joint of the connecting piece of the connecting plate or the female joint of the connecting piece fix the two;

4)重复3)的步骤将所有的贝雷架都固定到连接板上。 4) Repeat the step 3) to fix all the Baileys to the connecting plate.

本发明与现有技术相比的有益效果是: The beneficial effect of the present invention compared with prior art is:

1、本发明通过贝雷架柱头连接件的四个侧面上的连接件阴阳接头与标准型贝雷架连接,能方便牢固的将该贝雷架和液压顶升系统连接起来。 1. The present invention connects the male and female joints of the connectors on the four sides of the column head connector of the Bailey frame to the standard type of Bailey frame, which can conveniently and firmly connect the Bailey frame to the hydraulic jacking system.

2、本发明上部支撑格构柱与下部支撑格构柱之间以及贝雷架柱头连接件与上部支撑格构柱之间均通过高强螺栓水平连接,相比较已有连接装置采用竖向钢板螺栓或焊接的方式,本支撑立柱拆分简易。 2. In the present invention, the upper supporting lattice column and the lower supporting lattice column and between the column head connector of the Bailey frame and the upper supporting lattice column are horizontally connected by high-strength bolts. Compared with the existing connecting device, vertical steel plate bolts are used. Or welding, the supporting column is easy to disassemble.

附图说明 Description of drawings

图1为本发明的整体结构示意图。 Figure 1 is a schematic diagram of the overall structure of the present invention.

图2为本发明的分解结构示意图。 Fig. 2 is a schematic diagram of an exploded structure of the present invention.

图3为贝雷架柱头连接件的结构示意图。 Fig. 3 is a structural schematic diagram of the column head connector of the Bailey frame.

图4为图3中贝雷架柱头连接件的A-A向视图。 Fig. 4 is an A-A view of the connecting piece of the column head of the Bailey frame in Fig. 3 .

图5为贝雷架的立体示意图。 Fig. 5 is a three-dimensional schematic diagram of a Bailey rack.

图6为本发明的使用状态示意图。 Fig. 6 is a schematic diagram of the use state of the present invention.

附图标记说明:1-贝雷架柱头连接件;2-上部支撑格构柱;3-下部支撑格构柱;4-贝雷架;5-液压支撑箱梁;6-连接板;7-方形格构柱;8-连接件阴接头;9-连接件阳接头。 Explanation of reference numerals: 1- column head connector of Bailey frame; 2- upper supporting lattice column; 3- lower supporting lattice column; 4- Bailey frame; 5- hydraulically supported box girder; Square lattice column; 8-connector female connector; 9-connector male connector.

具体实施方式 detailed description

为了更好的理解本发明的技术方案,下面通过实施例和附图对本发明进行进一步的说明。 In order to better understand the technical solution of the present invention, the present invention will be further described below through examples and accompanying drawings.

一种采用贝雷架的顶模体系的支撑立柱,如图1、图2和图6所示,它包括贝雷架柱头连接件1、上部支撑格构柱2和下部支撑格构柱3,所述下部支撑格构柱3安装在液压顶升系统的液压支撑箱梁5上,所述上部支撑格构柱2固定连接在下部支撑格构柱3的上端,所述贝雷架柱头连接件1固定连接在上部支撑格构柱2的上端;所述贝雷架柱头连接件1为正长方体结构(即上下底面为正方形),贝雷架柱头连接件1的四个侧面的上下两端各设有多个与贝雷架4阴阳接头相匹配的连接件阴阳接头,连接件阴阳接头上开设有连接销孔,用于通过贝雷销头与贝雷架4连接。 A support column adopting a topform system of a Bailey frame, as shown in Figure 1, Figure 2 and Figure 6, it comprises a Bailey frame column head connector 1, an upper supporting lattice column 2 and a lower supporting lattice column 3, The lower support lattice column 3 is installed on the hydraulically supported box girder 5 of the hydraulic jacking system, the upper support lattice column 2 is fixedly connected to the upper end of the lower support lattice column 3, and the Bailey frame column head connector 1 is fixedly connected to the upper end of the upper supporting lattice column 2; the column head connector 1 of the Bailey frame is a regular cuboid structure (that is, the upper and lower bottom surfaces are square), and the upper and lower ends of the four sides of the column head connector 1 of the Bailey frame are respectively There are a plurality of male and female joints of connectors matching the female and male connectors of the Bailey frame 4, and connecting pin holes are provided on the male and female connectors of the connectors for connecting with the Bailey frame 4 through the Bailey pin heads.

如图3和图4所示,所述贝雷架柱头连接件1包括两个正方形的连接板6和一个方形格构柱7;每个连接板6的其中两个边上都均匀设有四个连接件阴接头8,剩下两个边上都均匀设有四个连接件阳接头9;两个连接板6分别固定在方形格构柱7的上下两端,且相互平行对应(两个连接板6可以是焊接固定在方形格构柱7上)。 As shown in Fig. 3 and Fig. 4, the column head connector 1 of the Bailey frame includes two square connecting plates 6 and a square lattice column 7; four connecting piece female joints 8, and four connecting piece male joints 9 are evenly arranged on the remaining two sides; two connecting plates 6 are respectively fixed on the upper and lower ends of the square lattice column 7, and correspond to each other in parallel (two The connecting plate 6 may be welded and fixed on the square lattice column 7).

所述连接板6上相对的两个边上分别设有连接件阴接头8和连接件阳接头9(即正方形连接板6上对边的连接件阴阳接头不同)。 The two opposite sides of the connecting plate 6 are respectively provided with a connecting piece female joint 8 and a connecting piece male joint 9 (that is, the connecting piece male and female joints on opposite sides of the square connecting plate 6 are different).

所述位于方形格构柱7下端的连接板6上均匀分布有多个螺栓孔,所述上部支撑格构柱2的上端焊接有一块连接钢板,所述连接钢板上分布有与上述连接板6上螺栓孔位置个数相对应的螺栓孔,并且上述连接钢板与上述连接板6通过螺栓固定连接。 A plurality of bolt holes are evenly distributed on the connecting plate 6 located at the lower end of the square lattice column 7, and a connecting steel plate is welded on the upper end of the upper supporting lattice column 2, and the connecting plate 6 is distributed on the connecting steel plate. The number of bolt holes corresponds to the number of bolt holes, and the connecting steel plate and the connecting plate 6 are fixedly connected by bolts.

所述连接板6的中心处开设有一个圆形孔洞。 A circular hole is opened at the center of the connecting plate 6 .

所述上部支撑格构柱2与下部支撑格构柱3之间以及贝雷架柱头连接件1与上部支撑格构柱2之间均通过高强螺栓连接。 The upper supporting lattice column 2 and the lower supporting lattice column 3 and the connection between the column head connector 1 of the Bailey frame and the upper supporting lattice column 2 are all connected by high-strength bolts.

所述连接板6为加厚钢板一体成型结构或由加厚钢板切割而成。 The connecting plate 6 is an integrally formed structure of a thickened steel plate or is cut from a thickened steel plate.

如图5所示,所述贝雷架4为常规结构,上下弦杆的端部有阴阳接头,阴阳接头上设有连接销孔。 As shown in Fig. 5, the Bailey frame 4 is a conventional structure, and the ends of the upper and lower chords have male and female joints, and connecting pin holes are arranged on the male and female joints.

一种采用贝雷架的顶模体系的支撑立柱的安装方法,其特征在于包括以下步骤: A method for installing a supporting column of a topform system using a Bailey frame, is characterized in that it comprises the following steps:

1)组装支撑立柱:将贝雷架柱头连接件1、上部支撑格构柱2和下部支撑格构柱3依次从上到下通过高强螺栓固定连接起来,构成整个支撑立柱; 1) Assemble the support column: connect the column head connector 1 of the Bailey frame, the upper support lattice column 2 and the lower support lattice column 3 from top to bottom in sequence through high-strength bolts to form the entire support column;

2)固定支撑立柱:在将整个支撑立柱立在液压顶升系统的液压支撑箱梁5上,并且用高强螺栓将下部支撑格构柱3固定在液压支撑箱梁5上; 2) Fixing the support column: erect the entire support column on the hydraulic support box beam 5 of the hydraulic jacking system, and fix the lower support lattice column 3 on the hydraulic support box beam 5 with high-strength bolts;

3)安装贝雷架4:将贝雷架4一端的阴接头或阳接头卡到连接板6上的连接件阳接头9或连接件阴接头8内,再用贝雷销头同时穿过贝雷架4阴接头或阳接头上的连接销孔和连接板6连接件阳接头9或连接件阴接头8上的连接销孔将两者固定; 3) Install the Bailey frame 4: snap the female or male joint at one end of the Bailey frame 4 into the connector male connector 9 or the connector female connector 8 on the connecting plate 6, and then use the Bailey pin head to pass through the Bailey at the same time The connection pin holes on the lightning frame 4 female joints or the male joints and the connection pin holes on the connecting plate 6 connector male connectors 9 or the connector female connectors 8 are fixed;

4)重复3)的步骤将所有的贝雷架4都固定到连接板6上。 4) Repeat the step 3) to fix all Bailey racks 4 to the connection plate 6.

以上实施例仅为本发明之优选方案,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以做出各种变换或变型,因此所有等同的技术方案,都落入本发明的保护范围。 The above embodiments are only preferred versions of the present invention, rather than limitations of the present invention. Those skilled in the art can also make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all Equivalent technical solutions all fall within the protection scope of the present invention.

Claims (8)

1.一种采用贝雷架的顶模体系的支撑立柱,其特征在于:它包括贝雷架柱头连接件(1)、上部支撑格构柱(2)和下部支撑格构柱(3),所述下部支撑格构柱(3)安装在液压顶升系统的液压支撑箱梁(5)上,所述上部支撑格构柱(2)固定连接在下部支撑格构柱(3)的上端,所述贝雷架柱头连接件(1)固定连接在上部支撑格构柱(2)的上端;所述贝雷架柱头连接件(1)为正长方体结构,即上下底面为正方形的长方体,贝雷架柱头连接件(1)的四个侧面的上下两端各设有多个与贝雷架(4)阴阳接头相匹配的连接件阴阳接头,连接件阴阳接头上开设有连接销孔,用于通过贝雷销头与贝雷架(4)连接。 1. A support column adopting a topform system of a Bailey frame is characterized in that: it comprises a Bailey frame column head connector (1), an upper supporting lattice column (2) and a lower supporting lattice column (3), The lower supporting lattice column (3) is installed on the hydraulically supporting box girder (5) of the hydraulic jacking system, and the upper supporting lattice column (2) is fixedly connected to the upper end of the lower supporting lattice column (3), The column head connector (1) of the Bailey frame is fixedly connected to the upper end of the upper supporting lattice column (2); the column head connector (1) of the Bailey frame is a regular cuboid structure, that is, a cuboid whose upper and lower bottom surfaces are square. The upper and lower ends of the four sides of the lightning frame column head connector (1) are each provided with a plurality of male and female joints of the connecting piece that match the male and female joints of the Bailey frame (4). Yu is connected with the Bailey frame (4) by the Bailey pin head. 2.根据权利要求1所述的一种采用贝雷架的顶模体系的支撑立柱,其特征在于:所述贝雷架柱头连接件(1)包括两个正方形的连接板(6)和一个方形格构柱(7);每个连接板(6)的其中两个边上都均匀设有四个连接件阴接头(8),剩下两个边上都均匀设有四个连接件阳接头(9);两个连接板(6)分别固定在方形格构柱(7)的上下两端,且相互平行对应。 2. The supporting column of a top formwork system using a Bailey frame according to claim 1, characterized in that: the column head connector (1) of the Bailey frame includes two square connecting plates (6) and a Square lattice column (7); four connecting piece female joints (8) are evenly arranged on two sides of each connecting plate (6), and four connecting piece male joints are evenly arranged on the remaining two sides. The joint (9); the two connecting plates (6) are respectively fixed on the upper and lower ends of the square lattice column (7), and are parallel to each other. 3.根据权利要求2所述的一种采用贝雷架的顶模体系的支撑立柱,其特征在于:所述连接板(6)上相对的两个边上分别设有连接件阴接头(8)和连接件阳接头(9)。 3. The supporting column of a top mold system using a Bailey frame according to claim 2, characterized in that: the two opposite sides of the connecting plate (6) are respectively provided with connector female joints (8 ) and connector nipple (9). 4.根据权利要求2所述的一种采用贝雷架的顶模体系的支撑立柱,其特征在于:所述位于方形格构柱(7)下端的连接板(6)上均匀分布有多个螺栓孔,所述上部支撑格构柱(2)的上端焊接有一块连接钢板,所述连接钢板上分布有与上述连接板(6)上螺栓孔位置个数相对应的螺栓孔,并且上述连接钢板与上述连接板(6)通过螺栓固定连接。 4. The supporting column of a top mold system using a Bailey frame according to claim 2, characterized in that: the connecting plate (6) located at the lower end of the square lattice column (7) is evenly distributed with a plurality of Bolt holes, the upper end of the upper support lattice column (2) is welded with a connecting steel plate, and the connecting steel plate is distributed with bolt holes corresponding to the number of bolt holes on the connecting plate (6), and the above connecting The steel plate is fixedly connected with the above connecting plate (6) by bolts. 5.根据权利要求2所述的一种采用贝雷架的顶模体系的支撑立柱,其特征在于:所述连接板(6)的中心处开设有一个圆形孔洞。 5. The supporting column of a top formwork system using a Bailey frame according to claim 2, characterized in that: a circular hole is opened in the center of the connecting plate (6). 6.根据权利要求1或4所述的一种采用贝雷架的顶模体系的支撑立柱,其特征在于:所述上部支撑格构柱(2)与下部支撑格构柱(3)之间以及贝雷架柱头连接件(1)与上部支撑格构柱(2)之间均通过高强螺栓连接。 6. The support column of a top formwork system using a Bailey frame according to claim 1 or 4, characterized in that: between the upper support lattice column (2) and the lower support lattice column (3) And the column head connector (1) of the Bailey frame and the upper supporting lattice column (2) are all connected by high-strength bolts. 7.根据权利要求2所述的一种采用贝雷架的顶模体系的支撑立柱,其特征在于:所述连接板(6)为加厚钢板一体成型结构或由加厚钢板切割而成。 7. The supporting column of a top formwork system using a Bailey frame according to claim 2, characterized in that: the connecting plate (6) is an integrally formed structure of a thickened steel plate or is cut from a thickened steel plate. 8.一种采用贝雷架的顶模体系的支撑立柱的安装方法,其特征在于包括以下步骤: 8. A method for installing a supporting column of a topform system that adopts a Bailey frame, is characterized in that it may further comprise the steps: 1)组装支撑立柱:将贝雷架柱头连接件(1)、上部支撑格构柱(2)和下部支撑格构柱(3)依次从上到下通过高强螺栓固定连接起来,构成整个支撑立柱; 1) Assembling the supporting column: connect the column head connector (1), the upper supporting lattice column (2) and the lower supporting lattice column (3) from top to bottom in sequence through high-strength bolts to form the entire supporting column ; 所述贝雷架柱头连接件(1)包括两个正方形的连接板(6)和一个方形格构柱(7);每个连接板(6)的其中两个边上都均匀设有四个连接件阴接头(8),剩下两个边上都均匀设有四个连接件阳接头(9);两个连接板(6)分别固定在方形格构柱(7)的上下两端,且相互平行对应; The column head connector (1) of the Bailey frame includes two square connecting plates (6) and a square lattice column (7); four connecting plates (6) are uniformly arranged on two sides Connector female joints (8), four connector male joints (9) are evenly arranged on the remaining two sides; two connecting plates (6) are respectively fixed on the upper and lower ends of the square lattice column (7), and parallel to each other; 2)固定支撑立柱:在将整个支撑立柱立在液压顶升系统的液压支撑箱梁(5)上,并且用高强螺栓将下部支撑格构柱(3)固定在液压支撑箱梁(5)上; 2) Fix the support column: erect the entire support column on the hydraulic support box beam (5) of the hydraulic jacking system, and fix the lower support lattice column (3) on the hydraulic support box beam (5) with high-strength bolts ; 3)安装贝雷架(4):将贝雷架(4)一端的阴接头或阳接头卡到连接板(6)上的连接件阳接头(9)或连接件阴接头(8)内,再用贝雷销头同时穿过贝雷架(4)阴接头或阳接头上的连接销孔和连接板(6)连接件阳接头(9)或连接件阴接头(8)上的连接销孔将两者固定; 3) Install the Bailey frame (4): snap the female connector or male connector at one end of the Bailey frame (4) into the connector male connector (9) or the connector female connector (8) on the connection plate (6), Then use the Bailey pin head to pass through the connecting pin hole on the female joint or male joint of the Bailey frame (4) and the connecting pin on the connecting plate (6) male joint (9) or female joint (8) of the connecting piece at the same time holes to hold the two in place; 4)重复3)的步骤将所有的贝雷架(4)都固定到连接板(6)上。 4) Repeat the step 3) to fix all the Baileys (4) to the connecting plate (6).
CN201310677152.0A 2013-12-13 2013-12-13 A kind of support post and mounting method thereof adopting the top mould system of Bailey bracket Active CN103669835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310677152.0A CN103669835B (en) 2013-12-13 2013-12-13 A kind of support post and mounting method thereof adopting the top mould system of Bailey bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310677152.0A CN103669835B (en) 2013-12-13 2013-12-13 A kind of support post and mounting method thereof adopting the top mould system of Bailey bracket

Publications (2)

Publication Number Publication Date
CN103669835A CN103669835A (en) 2014-03-26
CN103669835B true CN103669835B (en) 2016-02-17

Family

ID=50308544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310677152.0A Active CN103669835B (en) 2013-12-13 2013-12-13 A kind of support post and mounting method thereof adopting the top mould system of Bailey bracket

Country Status (1)

Country Link
CN (1) CN103669835B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090975A (en) * 2017-05-26 2017-08-25 中建五局第三建设有限公司 Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133842A (en) * 2015-08-31 2015-12-09 上海中建八局装饰有限责任公司 Installation and construction method for decorative stand column
CN106121238A (en) * 2016-06-28 2016-11-16 中国建筑第二工程局有限公司 High-altitude concrete conveying device
CN109898849B (en) * 2017-12-07 2021-03-02 广宏建设集团有限公司 Support device of formwork system adopting bailey frames and using method thereof
CN114991439A (en) * 2022-03-14 2022-09-02 中建八局新型建造工程有限公司 An ultra-high and large-span umbrella-shaped support combined system and its construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996034152A1 (en) * 1995-04-24 1996-10-31 Vanderklaauw Peter M Apparatus and method for a modular support and lifting system
CN101100902A (en) * 2007-07-31 2008-01-09 龙信建设集团有限公司 Diagonal steel truss high-formwork structural system and construction method thereof
CN102108788A (en) * 2010-12-31 2011-06-29 华煜建设集团有限公司 Method for constructing hanging in the air large-span support
CN202745351U (en) * 2012-04-12 2013-02-20 广州协安建设工程有限公司 Bailey truss supporting structure
CN103061501A (en) * 2012-12-29 2013-04-24 中建八局第二建设有限公司 Formwork supporting system for composite beam and floor-slab structure of building and construction method for formwork supporting system
CN203007814U (en) * 2012-12-19 2013-06-19 中铁十局集团第三建设有限公司 Connection piece used for building bailey beam truss

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1996034152A1 (en) * 1995-04-24 1996-10-31 Vanderklaauw Peter M Apparatus and method for a modular support and lifting system
CN101100902A (en) * 2007-07-31 2008-01-09 龙信建设集团有限公司 Diagonal steel truss high-formwork structural system and construction method thereof
CN102108788A (en) * 2010-12-31 2011-06-29 华煜建设集团有限公司 Method for constructing hanging in the air large-span support
CN202745351U (en) * 2012-04-12 2013-02-20 广州协安建设工程有限公司 Bailey truss supporting structure
CN203007814U (en) * 2012-12-19 2013-06-19 中铁十局集团第三建设有限公司 Connection piece used for building bailey beam truss
CN103061501A (en) * 2012-12-29 2013-04-24 中建八局第二建设有限公司 Formwork supporting system for composite beam and floor-slab structure of building and construction method for formwork supporting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107090975A (en) * 2017-05-26 2017-08-25 中建五局第三建设有限公司 Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
CN107090975B (en) * 2017-05-26 2020-06-26 中建五局第三建设有限公司 Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss

Also Published As

Publication number Publication date
CN103669835A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103669835B (en) A kind of support post and mounting method thereof adopting the top mould system of Bailey bracket
CN103437425A (en) Connecting joint of prefabricated hollow steel-reinforced concrete column and steel beam and construction method
CN103233525A (en) Channel steel assembling type steel structure prestress anti-bending support
CN109755907B (en) Subway station comprehensive pipeline assembly type support and hanger and construction method thereof
CN202324340U (en) Combined type large steel-pipe truss
CN102828560B (en) Flange joint structure of hinge pin for assembled cold forming sectional steel structural connection
CN105926773A (en) Assembly type single-flange beam column bolt joint connecting device provided with cover plates
CN206800949U (en) Operating platform for construction work high above the ground
CN202969589U (en) H-type steel beam and rectangular steel tube column variable-beam depth assembly type node
CN204983173U (en) Steel construction beam -column connection node
CN216196889U (en) Assembled steel structure frame and assembled steel structure house
CN203347205U (en) Overhung scaffold
CN202265836U (en) Basic structure of communication tower
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN103470063B (en) From promoting protection canopy
CN102864746A (en) Bearing frame for bridge construction
CN209227765U (en) Concrete-filled steel tube joint connection structure
CN203034615U (en) Novel outer sleeve tube type connecting node of cold-bending rectangular steel tube column and H-shaped steel girder
CN104947804A (en) Steel bracket and construction method for constructing beam column joint structure through steel bracket
CN214784734U (en) A prefabricated steel structure residential structure
CN206600005U (en) The positioning component and positioner of reserved joint bar in shear wall
CN104372948A (en) Elevator shaft formwork lifting frame
CN204551755U (en) A kind of Staggered-truss System post and truss hinged joint
CN205153121U (en) Buckling restrained brace and concrete beam column angle steel anchor connected node
CN202913356U (en) Load-bearing frame for bridge construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant