CN204551755U - A kind of Staggered-truss System post and truss hinged joint - Google Patents
A kind of Staggered-truss System post and truss hinged joint Download PDFInfo
- Publication number
- CN204551755U CN204551755U CN201520212531.7U CN201520212531U CN204551755U CN 204551755 U CN204551755 U CN 204551755U CN 201520212531 U CN201520212531 U CN 201520212531U CN 204551755 U CN204551755 U CN 204551755U
- Authority
- CN
- China
- Prior art keywords
- truss
- casing
- column
- connecting plate
- staggered
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003466 welding Methods 0.000 claims abstract description 14
- 238000000034 method Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 abstract description 20
- 229910000831 Steel Inorganic materials 0.000 abstract description 17
- 239000010959 steel Substances 0.000 abstract description 17
- 238000010586 diagram Methods 0.000 description 5
- 238000005192 partition Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000021715 photosynthesis, light harvesting Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种交错桁架体系柱与桁架铰接节点,钢管混凝土柱与弦杆采用分离式套筒的铰接连接。本实用新型的目的在于避免现场焊接,现场只进行螺栓连接,结构的所有构件可预先在工厂批量制作,在现场拼接吊装;有着巨大的工业化潜力;装配化程度高,建设速度快,可缩短工期,提高劳动生产率,现场焊接作业少,施工受天气和季节的影响小,大部分工作在工厂进行,改善了工人的劳动条件。
The utility model discloses a staggered truss system column and truss hinge joint, wherein the steel pipe concrete column and the chord are hingedly connected by a separate sleeve. The purpose of this utility model is to avoid on-site welding, only bolt connection is carried out on site, all components of the structure can be mass-produced in the factory in advance, spliced and hoisted on site; it has huge industrialization potential; the degree of assembly is high, the construction speed is fast, and the construction period can be shortened , Improve labor productivity, less on-site welding operations, construction is less affected by weather and seasons, most of the work is carried out in the factory, improving the working conditions of workers.
Description
技术领域technical field
本实用新型涉及一种节点连接构造方式,具体涉及一种交错桁架体系柱与桁架弦杆的铰接连接节点。The utility model relates to a node connection construction mode, in particular to a hinge connection node of a staggered truss system column and a truss chord.
背景技术Background technique
交错桁架结构是20世纪中期在美国钢铁公司资助下研发的一种新型结构体系。该结构体系基本组成是柱子、平面钢桁架和楼面板,柱子布置在房屋的外围,中间无柱;桁架高度与层高相同,长度与房屋宽度相同,桁架两端支承于外围柱子上,桁架沿房屋纵向隔榀布置,沿房屋高度在相邻的柱列为上下层交错布置。此结构具有合理的传力途径,能够抵抗很大的侧向荷载,其各层刚度和承载力变化均匀,各楼层屈服强度系数大致相等,避免因刚度或承载力突变处出现薄弱层,结构塑性发展过程长,耗散能量多,具有良好的抗震性能。由于桁架隔榀布置,可以提供两倍柱距的无柱大空间,因此,在满足建筑使用功能的前提下,可以缩小柱距,减小楼板跨度,有很高的经济效益,相对于普通钢框架结构体系,交错桁架结构的用钢量一般可减少30%左右。The staggered truss structure is a new type of structural system developed under the funding of the US Steel Corporation in the mid-20th century. The basic components of the structural system are columns, planar steel trusses and floor slabs. The columns are arranged on the periphery of the house without columns in the middle; the height of the trusses is the same as the floor height and the length is the same as the width of the house. The houses are arranged in vertical partitions, and the adjacent columns along the height of the houses are arranged in a staggered way on the upper and lower floors. This structure has a reasonable way of force transmission and can resist large lateral loads. The stiffness and bearing capacity of each floor vary evenly, and the yield strength coefficients of each floor are roughly equal, avoiding weak floors at sudden changes in stiffness or bearing capacity, and structural plasticity. The development process is long, the energy dissipation is large, and it has good seismic performance. Due to the arrangement of truss partitions, it can provide a column-free large space with twice the column spacing. Therefore, on the premise of meeting the building's function, the column spacing can be reduced, and the floor span can be reduced, which has high economic benefits. Compared with ordinary steel In the frame structure system, the steel consumption of the staggered truss structure can generally be reduced by about 30%.
常用交错桁架体系节点铰接构造形式为柱内隔板式连接,当桁架弦杆受力较大时,会导致节点处钢管混凝土柱壁被拉起,造成节点板在焊缝热影响区断裂。另外,由于内隔板的存在,混凝土的浇筑施工非常困难。The commonly used staggered truss system node hinge structure is the column diaphragm connection. When the truss chord is under a large force, the steel tube concrete column wall at the node will be pulled up, causing the gusset plate to break in the heat-affected zone of the weld. In addition, due to the existence of internal partitions, the pouring of concrete is very difficult.
发明内容Contents of the invention
针对现有技术存在的缺点与不足,本实用新型的目的在于,提供一种交错桁架体系柱与桁架铰接节点,该节点构造方式装配化程度高,建设速度快,可缩短工期,提高劳动生产率,现场焊接作业少,施工受天气和季节的影响小,大部分工作在工厂进行,同时还使得混凝土浇筑施工变得相对容易。Aiming at the shortcomings and deficiencies of the existing technology, the purpose of this utility model is to provide a staggered truss system column and truss hinge joint, which has a high degree of assembly and fast construction speed, can shorten the construction period, and improve labor productivity. There are few welding operations on site, and the construction is less affected by weather and seasons. Most of the work is carried out in the factory, and it also makes the concrete pouring construction relatively easy.
为了实现上述任务,本实用新型采用如下技术方案予以实现:In order to realize above-mentioned task, the utility model adopts following technical scheme to realize:
一种交错桁架体系柱与桁架铰接节点,其特征在于,该节点包括上弦节点和下弦节点;所述的上弦节点包括第一套管、第一连接板、节点板;A staggered truss system column and truss hinged node, characterized in that the node includes an upper chord node and a lower chord node; the upper chord node includes a first casing, a first connecting plate, and a gusset plate;
所述的第一套管固定套装在所述的桁架体系柱上;The first casing is fixedly set on the column of the truss system;
所述的第一连接板固定连接在所述的套管侧壁;The first connecting plate is fixedly connected to the side wall of the casing;
所述的第一连接板与所述的节点板面面贴合铰接连接;The first connection plate and the gusset plate are surface-fitted and hingedly connected;
所述的节点板与所述的桁架固定连接。The gusset plate is fixedly connected with the truss.
本实用新型还有如下技术特点:The utility model also has the following technical characteristics:
所述的下弦节点包括第二套管、第二连接板、桁架下弦杆;The lower chord node includes a second casing, a second connecting plate, and a truss lower chord;
所述的第二套管固定套装在所述的桁架体系柱上;The second casing is fixedly set on the column of the truss system;
所述的第二连接板固定连接在所述的套管侧壁;The second connecting plate is fixedly connected to the side wall of the casing;
所述的第二连接板与所述的桁架下弦杆铰接连接;The second connecting plate is hingedly connected to the lower chord of the truss;
所述的固定连接方式为焊接;The fixed connection method is welding;
所述的固定套装方式为焊接;The said fixing method is welding;
所述的组装连接方式为螺栓连接。The described assembly connection method is bolt connection.
本实用新型提供的铰接节点构造方式有很好的实用性,适用于中高层住宅、旅店、医院、办公楼等狭长平面的建筑结构。其传力明确,构造简单,结构所需的构件可预先在工厂制作,只需直接到现场进行螺栓连接,可大大减小施工周期,提高工作效率。The hinge joint structure provided by the utility model has good practicability, and is suitable for building structures with narrow and long planes such as middle and high-rise residences, hotels, hospitals, and office buildings. Its force transmission is clear, the structure is simple, and the components required for the structure can be fabricated in the factory in advance, and only need to go directly to the site for bolt connection, which can greatly reduce the construction period and improve work efficiency.
附图说明Description of drawings
图1为一种交错桁架体系柱与桁架铰接节点的结构示意图。Figure 1 is a structural schematic diagram of a staggered truss system column and truss hinge joints.
图2为A-A部分的俯视结构示意图。Fig. 2 is a top view structural schematic diagram of part A-A.
图3为B-B部分的左视结构示意图。Fig. 3 is a left view structural diagram of part B-B.
图4为C-C部分的俯视结构示意图。Fig. 4 is a top view structural schematic diagram of part C-C.
图5为D-D部分的左视结构示意图。Fig. 5 is a left view structural diagram of part D-D.
其中,各标号的含义是:1-套管;2-钢管混凝土柱;3-连接板;4-节点板,5-上弦杆;6-斜杆;7-竖杆,8-下弦杆。Among them, the meaning of each label is: 1-casing; 2-concrete steel tube column; 3-connecting plate; 4-gusset plate, 5-top chord; 6-slanting bar; 7-vertical bar, 8-bottom chord.
以下结合附图和实施例对本实用新型的具体内容作进一步详细地说明。Below in conjunction with accompanying drawing and embodiment the concrete content of the present utility model is described in further detail.
具体实施方式Detailed ways
本实用新型中的桁架体系柱和桁架包括钢管混凝土柱、套管、节点板、连接板和桁架等几个部分。The truss system column and truss in the utility model include several parts such as a steel tube concrete column, a casing, a joint plate, a connecting plate and a truss.
本实用新型中,钢管混凝土柱外焊接一套管,该套管可以抵抗较大的荷载,能够代替现有技术中焊接在钢管混凝土柱内部的内隔板。一方面,在钢管混凝土柱外焊接可以大大减小焊接难度,特别是对于内径尺寸较小的混凝土钢柱管,其效果更加突出;另一方面,这种设置可以降低混凝土的浇筑施工难度,使浇筑的混凝土更加均匀。In the utility model, a casing is welded outside the steel pipe concrete column, and the casing can resist relatively large loads, and can replace the internal partition welded inside the steel pipe concrete column in the prior art. On the one hand, welding outside the CFST column can greatly reduce the difficulty of welding, especially for concrete steel column tubes with small inner diameters, the effect is more prominent; on the other hand, this setting can reduce the difficulty of concrete pouring and construction The poured concrete is more uniform.
另外,本实用新型上弦节点在套管侧壁焊接一连接板,节点板既与连接板螺栓连接,又与桁架焊接,桁架的弦杆、斜杆及竖杆组成直角三角形,弦杆一端和斜杆一端固定于节点板上。下弦节点在套管侧壁焊接一连接板,连接板与桁架下弦杆用螺栓连接。In addition, the upper chord node of the utility model is welded with a connecting plate on the side wall of the casing. The gusset plate is not only connected with the bolts of the connecting plate, but also welded with the truss. One end of the rod is fixed on the gusset plate. The lower chord node welds a connecting plate on the side wall of the casing, and the connecting plate is connected with the lower chord of the truss with bolts.
本实用新型上弦节点改变传统的直接将桁架焊接在钢管混凝土柱的连接方式,通过连接板与节点板之间的高强度螺栓连接,将桁架间接固定到钢管混凝土柱一端。这种设置可以避免现场焊接,能够大大减小现场施工强度。去施工现场之前,与连接板焊接部分及与节点板焊接部分等所有构件都可以预先在工厂制作,施工时,只用到现场进行螺栓连接,拼接吊装,这种设置装配化程度高,建设速度快,可缩短工期,提高效率,有很好的应用前景。The upper chord node of the utility model changes the traditional connection mode of directly welding the truss to the steel tube concrete column, and indirectly fixes the truss to one end of the steel tube concrete column through the high-strength bolt connection between the connection plate and the joint plate. This setting can avoid on-site welding and can greatly reduce the on-site construction strength. Before going to the construction site, all components such as the welding part with the connecting plate and the welding part with the gusset plate can be prefabricated in the factory. During construction, only the bolts are used on site for splicing and hoisting. This setting has a high degree of assembly and a fast construction speed. Fast, can shorten the construction period, improve efficiency, and has a good application prospect.
在现场施工中,可以根据实际所需要的节点个数,重复使用本实用新型中的节点构造方式。During on-site construction, the node construction method in the utility model can be reused according to the actual required number of nodes.
实施例:Example:
以下给出本实用新型的具体实施例,需要说明的是,本实用新型并不局限于以下具体实施例,凡在本申请技术方案基础上做的等同变换均落入本实用新型的保护范围。The specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent transformations done on the basis of the technical solutions of the present application all fall within the scope of protection of the present invention.
遵从上述技术方案,如图1所示,一种交错桁架体系柱与桁架铰接节点,该节点包括上弦节点和下弦节点。According to the above technical solution, as shown in Figure 1, a staggered truss system column and truss hinge joint, the joint includes an upper chord node and a lower chord node.
上弦节点构造包括竖直放置的钢管混凝土柱2,钢管混凝土柱2外固定套装第一套管1-1,第一套管1-1与第一连接板3-1焊接,节点板4和桁架焊接。节点板能够固定桁架,其与桁架的连接方式和现有技术中连接的方式类似,具体为,上弦杆5、斜杆6和竖杆7组成直角三角形,杆件交汇的节点处均通过节点板连接,其中,上弦杆5一端和斜杆6一端与节点板4焊接。The upper chord node structure includes a vertically placed concrete-filled steel tube column 2, the first sleeve 1-1 is fixed outside the steel tube concrete column 2, the first sleeve 1-1 is welded to the first connecting plate 3-1, the gusset plate 4 and the truss welding. The gusset plate can fix the truss, and its connection with the truss is similar to that in the prior art. Specifically, the upper chord 5, the oblique bar 6 and the vertical bar 7 form a right-angled triangle, and the joints where the bars meet all pass through the gusset plate Connection, wherein, one end of the upper chord 5 and one end of the inclined rod 6 are welded to the gusset plate 4 .
下弦节点构造包括竖直放置的钢管混凝土柱2,钢管混凝土柱2外固定套装第二套管1-2,第二套管1-2与第二连接板3-2焊接,第二连接板3-2可直接与桁架下弦杆8铰接连接。The lower chord node structure includes a vertically placed concrete-filled steel tube column 2, and the second sleeve 1-2 is fixed outside the steel tube concrete column 2, and the second sleeve 1-2 is welded to the second connecting plate 3-2, and the second connecting plate 3 -2 can be directly hingedly connected with the truss bottom chord 8.
以上所述的与连接板3焊接的钢管混凝土柱部分和与节点板4焊接的桁架部分都可以事先在工厂制作,施工时,只用将节点板4和连接板3高强度螺栓连接,即能完成施工,其装配化程度高,可缩短工地工期,提高劳动效率,有很好的应用价值。The above-mentioned steel pipe concrete column part welded with the connection plate 3 and the truss part welded with the connection plate 4 can be made in advance in the factory. After the construction is completed, it has a high degree of assembly, which can shorten the construction period of the construction site, improve labor efficiency, and has good application value.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520212531.7U CN204551755U (en) | 2015-04-09 | 2015-04-09 | A kind of Staggered-truss System post and truss hinged joint |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520212531.7U CN204551755U (en) | 2015-04-09 | 2015-04-09 | A kind of Staggered-truss System post and truss hinged joint |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204551755U true CN204551755U (en) | 2015-08-12 |
Family
ID=53826886
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520212531.7U Expired - Fee Related CN204551755U (en) | 2015-04-09 | 2015-04-09 | A kind of Staggered-truss System post and truss hinged joint |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204551755U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106760182A (en) * | 2016-11-22 | 2017-05-31 | 浙江绿筑集成科技有限公司 | A kind of end diagonal web member in staggered truss structure and preparation method thereof |
| CN109518877A (en) * | 2018-11-21 | 2019-03-26 | 太原理工大学 | A kind of assembled H-shaped triangular steel truss and its assembly method |
-
2015
- 2015-04-09 CN CN201520212531.7U patent/CN204551755U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106760182A (en) * | 2016-11-22 | 2017-05-31 | 浙江绿筑集成科技有限公司 | A kind of end diagonal web member in staggered truss structure and preparation method thereof |
| CN109518877A (en) * | 2018-11-21 | 2019-03-26 | 太原理工大学 | A kind of assembled H-shaped triangular steel truss and its assembly method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103184762B (en) | Multi-story/high-rise fabricated steel structural prestressed supporting system capable of realizing rigid connection of joints | |
| CN203145194U (en) | Internal diaphragm joint of variable flange steel I-beam and square concrete filled steel tubular column | |
| CN204753813U (en) | Steel construction conversion truss | |
| CN101694110B (en) | Beam-column joint connection structure and its construction method | |
| CN206174504U (en) | Steel structure support | |
| CN106988433A (en) | A kind of modular containers build connecting node | |
| CN108316477B (en) | The connection structure and construction method of the mid-node between the flat steel tube concrete column and the steel beam | |
| CN103255841A (en) | Assembly-type concrete column-steel beam overhanging end plate type node connecting device | |
| CN105926773B (en) | A kind of assembled cover plate list flange beam column bolt joint attachment device | |
| CN104912197A (en) | Connecting node for steel pipe concrete post and outside U-shaped steel and concrete composite beam | |
| CN108915083B (en) | A new type of prefabricated cold-formed thick-walled steel frame-support structure system | |
| CN108589918A (en) | A kind of connection structure of assembling truss beam and quadrate steel pipe column | |
| CN103711227A (en) | Damping node of metal bending bamboo or wood frame structure | |
| CN210887559U (en) | Low multi-storey steel structure residential system | |
| CN107762161B (en) | A kind of energy-saving assembled system of steel residential structure and installation method | |
| CN202202412U (en) | Rectangular steel pipe concrete special-shaped column-steel beam framework middle node | |
| CN103898975B (en) | Modular many high-rise assembling type steel structure framework eccentrical braces | |
| CN204551755U (en) | A kind of Staggered-truss System post and truss hinged joint | |
| CN208934254U (en) | An assembled steel frame special-shaped column connection structure | |
| CN104947802A (en) | Node for connecting concrete-filled steel tube column and external wrapping U-shaped steel concrete composite beam | |
| CN205502246U (en) | Outsourcing steel -concrete composite beam - steel -pipe column connected node | |
| CN210396247U (en) | A modular container building connecting node | |
| CN204781356U (en) | Steel core concrete column and outsourcing U -shaped steel -concrete composite beam connected node | |
| CN115596084A (en) | Novel assembled concrete filled steel tube beam column node | |
| CN207919737U (en) | A kind of assembled steel-Combined concrete frame structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150812 Termination date: 20180409 |