CN203238784U - Rectangular concrete filled steel tubular column and box-type steel beam rib-penetrated type node structure - Google Patents
Rectangular concrete filled steel tubular column and box-type steel beam rib-penetrated type node structure Download PDFInfo
- Publication number
- CN203238784U CN203238784U CN 201320277316 CN201320277316U CN203238784U CN 203238784 U CN203238784 U CN 203238784U CN 201320277316 CN201320277316 CN 201320277316 CN 201320277316 U CN201320277316 U CN 201320277316U CN 203238784 U CN203238784 U CN 203238784U
- Authority
- CN
- China
- Prior art keywords
- box
- steel
- steel beam
- steel plate
- concrete column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种矩形钢管混凝土柱与箱型钢梁穿筋式节点结构,它是在箱型钢梁的端面预先焊接有连接钢板,连接钢板的宽度应不大于矩形钢管混凝土柱的连接面宽度,而且连接钢板的四周应伸出箱型钢梁端面以外,在连接钢板的伸出的四周加工有孔,通过孔用穿筋式高强螺栓将箱型钢梁固定在矩形钢管混凝土柱的设计位置上。本实用新型节点构造简单,现场方便,节省钢材,通过穿筋式高强螺栓有效的传递结构间的弯矩和轴力,使结构更具整体性,在地震时不会因为节点的破坏而导致结构的整体破坏,实现“强节弱构”的设计理念。
The utility model discloses a rectangular steel pipe concrete column and a box-shaped steel beam piercing joint structure, which is pre-welded with a connecting steel plate on the end face of the box-shaped steel beam, and the width of the connecting steel plate should not be greater than the connection of the rectangular steel pipe concrete column. The width of the surface, and the surrounding of the connecting steel plate should protrude beyond the end face of the box-shaped steel beam. Holes are processed around the protruding surrounding of the connecting steel plate, and the box-shaped steel beam is fixed to the rectangular steel pipe concrete column through the hole with high-strength bolts. design position. The utility model has simple node structure, convenient on-site, saves steel, effectively transmits the bending moment and axial force between the structures through the high-strength bolts through the ribs, makes the structure more integral, and will not cause structural damage due to node damage during earthquakes. The overall destruction of the building realizes the design concept of "strong section and weak structure".
Description
技术领域technical field
本实用新型属于建筑工程领域,涉及一种钢与混凝土组合结构。The utility model belongs to the field of construction engineering and relates to a combined structure of steel and concrete.
背景技术Background technique
近年来,高层建筑结构以矩形钢管混凝土柱与钢梁组成的框架结构体系在国内开始应用。矩形钢管混凝土柱框架结构,既可以改善框架结构的双向性能,提高钢结构框架的侧向刚度和稳定性,防止结构破坏时柱体迅速屈曲破坏,又能增强结构的防火性能。钢管混凝土结构把钢和混凝土两种材料结合成一个整体,使两种材料扬长补短,增强了钢管的局部稳定性,提高了混凝土的强度。矩形钢管混凝土-钢框架结构可以满足建筑灵活布局的需求,提供较大的建筑空间,满足各种功能要求,也可构成丰富多变的立面造型,具有较高的整体力学性能和抗震性能。In recent years, the frame structure system consisting of rectangular steel pipe concrete columns and steel beams has been applied in China for high-rise building structures. Rectangular steel tube concrete column frame structure can not only improve the two-way performance of the frame structure, but also improve the lateral stiffness and stability of the steel structure frame, prevent the column from rapidly buckling damage when the structure is damaged, and enhance the fire performance of the structure. The steel tube concrete structure combines steel and concrete into a whole, which makes the two materials complement each other, enhances the local stability of the steel tube, and improves the strength of the concrete. Rectangular steel tube concrete-steel frame structure can meet the needs of flexible layout of the building, provide a large building space, meet various functional requirements, and can also form a variety of facade shapes, with high overall mechanical properties and seismic performance.
目前,矩形钢管混凝土-钢框架结构中,钢梁以工字型和H型钢为主,有的采用箱型钢梁,箱型钢梁多用于大跨结构及桥梁结构中,箱型钢梁在普通框架结构中可以发挥其承载力高、受力性能好、截面形式比较规则的优点。箱型钢梁的节点大多采用现场焊接的施工方式,将箱型钢梁焊接在矩形钢管上。焊接方式属于刚性节点构造,刚性节点构造存在节点延性差、焊接残余应力大等问题,在地震作用下容易出现脆性破坏。At present, in the rectangular steel tube concrete-steel frame structure, the steel girders are mainly I-shaped and H-shaped steel, and some use box-shaped steel girders, which are mostly used in long-span structures and bridge structures. In the ordinary frame structure, the advantages of high bearing capacity, good mechanical performance and relatively regular cross-sectional form can be brought into play. Most of the joints of the box-shaped steel girder adopt the construction method of on-site welding, and the box-shaped steel girder is welded on the rectangular steel pipe. The welding method belongs to the rigid joint structure. The rigid joint structure has problems such as poor joint ductility and large welding residual stress, and is prone to brittle failure under earthquake action.
实用新型内容Utility model content
本实用新型的目的是为了克服矩形钢管混凝土框架焊接形式的不足,提供一种矩形钢管混凝土柱与箱型钢梁穿筋式节点结构。The purpose of the utility model is to overcome the deficiency of the welding form of the rectangular steel pipe concrete frame, and provide a rectangular steel pipe concrete column and a box-shaped steel beam piercing joint structure.
为达到上述目的,本实用新型采取的技术方案是:In order to achieve the above object, the technical scheme that the utility model takes is:
一种矩形钢管混凝土柱与箱型钢梁穿筋式节点结构,其特征在于,它是在箱型钢梁的端面预先焊接有连接钢板,连接钢板的宽度应不大于矩形钢管混凝土柱的连接面宽度,而且连接钢板的四周应伸出箱型钢梁端面以外,在连接钢板的伸出的四周加工有若干孔,通过孔用穿筋式高强螺栓将箱型钢梁固定在矩形钢管混凝土柱的设计位置上。A rectangular concrete-filled steel tube column and box-shaped steel beam piercing joint structure, characterized in that it is pre-welded with connecting steel plates on the end faces of the box-shaped steel beams, and the width of the connecting steel plates should not be greater than the connecting surface of the rectangular steel-filled steel tube concrete columns width, and the surrounding of the connecting steel plate should protrude beyond the end face of the box-shaped steel girder, and a number of holes are processed around the protruding surrounding of the connecting steel plate, and the box-shaped steel beam is fixed to the rectangular steel pipe concrete column through the holes with high-strength bolts design position.
为保证工程质量,焊接连接钢板时,四周的角焊缝应保证焊接牢固。In order to ensure the quality of the project, when welding and connecting steel plates, the surrounding fillet welds should ensure that the welding is firm.
与现有技术相比,本实用新型具有如下优点:Compared with the prior art, the utility model has the following advantages:
1、由于连接钢板可在工厂预先焊接在箱型钢梁端部,成为一个整体构件,现场施工只需要进行螺栓的连接,使得现场的施工其方便简单,避免了现场焊接的施工麻烦以及焊接应力所带来的不利影响。1. Since the connecting steel plate can be pre-welded at the end of the box-shaped steel girder in the factory to become an integral component, the on-site construction only needs to be connected by bolts, which makes the on-site construction convenient and simple, and avoids the construction trouble and welding stress of on-site welding the adverse effects brought about.
2、通过穿筋式高强螺栓与矩形钢管混凝土柱连接,其作用相当于内隔板,可以有效的传递钢梁上下翼缘的拉力和压力;而且在矩形钢管内穿筋式高强螺栓比内隔板更有利于管内混凝土的浇筑及密实。2. Connect the rectangular steel tube concrete column with high-strength bolts through the reinforcement, which acts as an inner partition, which can effectively transmit the tension and pressure of the upper and lower flanges of the steel beam; It is more conducive to the pouring and compaction of concrete in the pipe.
3、箱型钢梁承载力高、受力性能好,同时截面形式比较规则(相比于H型钢),后期装修比较方便。3. The box-shaped steel beam has high bearing capacity and good mechanical performance. At the same time, the cross-sectional form is relatively regular (compared to H-shaped steel), and the later decoration is more convenient.
总之,该节点构造简单,现场方便,节省钢材,通过穿筋式高强螺栓有效的传递结构间的弯矩和轴力,使结构更具整体性,在地震时不会因为节点的破坏而导致结构的整体破坏,实现“强节弱构”的设计理念。In short, the structure of the joint is simple, the site is convenient, and steel is saved. The bending moment and axial force between the structures can be effectively transmitted through the high-strength bolts through the reinforcement, so that the structure is more integrated, and the structure will not be damaged due to the damage of the joint during an earthquake. The overall destruction of the building realizes the design concept of "strong section and weak structure".
下面参照附图,对本实用新型作进一步说明:Below with reference to accompanying drawing, the utility model is further described:
附图说明Description of drawings
图1为本实用新型的主视图,图中显示矩形钢管混凝土柱两面设有箱型钢梁;Fig. 1 is the front view of the utility model, shows in the figure that rectangular steel tube concrete column two sides are provided with box-shaped steel girder;
图2为图1的侧视图;Fig. 2 is the side view of Fig. 1;
图3为本实用新型的俯视图,图中显示矩形钢管混凝土柱四面设有箱型钢梁。Fig. 3 is a top view of the utility model, which shows that box-shaped steel beams are arranged on four sides of a rectangular steel tube concrete column.
图例说明,1-矩形钢管混凝土柱,2-箱型钢梁,3-连接钢板,4-穿筋式高强螺栓,5-角焊缝。The legend shows that 1-rectangular steel tube concrete column, 2-box steel beam, 3-connecting steel plate, 4-high-strength bolt with reinforcement, 5-fillet weld.
具体实施方式Detailed ways
如图1-3所示,本实用新型的节点结构,是在箱型钢梁2的端面预先焊接有连接钢板3,连接钢板3的宽度应不大于矩形钢管混凝土柱1的连接面宽度,而且连接钢板3的四周应伸出箱型钢梁2端面以外,在连接钢板3的伸出的四周加工有若干孔,通过孔用穿筋式高强螺栓4将箱型钢梁2固定在矩形钢管混凝土柱1的设计位置上。As shown in Figures 1-3, the node structure of the present invention is that a connecting
为保证工程质量,焊接连接钢板3时,四周的角焊缝5应保证焊接牢固。In order to ensure the quality of the project, when the
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320277316 CN203238784U (en) | 2013-05-20 | 2013-05-20 | Rectangular concrete filled steel tubular column and box-type steel beam rib-penetrated type node structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320277316 CN203238784U (en) | 2013-05-20 | 2013-05-20 | Rectangular concrete filled steel tubular column and box-type steel beam rib-penetrated type node structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203238784U true CN203238784U (en) | 2013-10-16 |
Family
ID=49316097
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201320277316 Expired - Fee Related CN203238784U (en) | 2013-05-20 | 2013-05-20 | Rectangular concrete filled steel tubular column and box-type steel beam rib-penetrated type node structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203238784U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104213644A (en) * | 2014-09-13 | 2014-12-17 | 内蒙古科技大学 | H section steel girder-column minor axis connecting end plate node and preparing method of H section steel girder-column minor axis connecting end plate node |
| CN104674952A (en) * | 2015-03-01 | 2015-06-03 | 长安大学 | Connection joint and connection method for box girder and box column |
| CN105804321A (en) * | 2016-05-12 | 2016-07-27 | 温州大学 | Steel pipe gypsum mortar and waste concrete combined column and preparation method thereof |
| CN107965055A (en) * | 2017-12-15 | 2018-04-27 | 北京万兴建筑集团有限公司 | A kind of connecting node and the practice of H profile steel beam and girder with rolled steel section en cased in concrete |
| CN108978860A (en) * | 2018-09-29 | 2018-12-11 | 沈阳工业大学 | A kind of steel core concrete column-steel tube concrete beam node connecting structure |
-
2013
- 2013-05-20 CN CN 201320277316 patent/CN203238784U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104213644A (en) * | 2014-09-13 | 2014-12-17 | 内蒙古科技大学 | H section steel girder-column minor axis connecting end plate node and preparing method of H section steel girder-column minor axis connecting end plate node |
| CN104674952A (en) * | 2015-03-01 | 2015-06-03 | 长安大学 | Connection joint and connection method for box girder and box column |
| CN105804321A (en) * | 2016-05-12 | 2016-07-27 | 温州大学 | Steel pipe gypsum mortar and waste concrete combined column and preparation method thereof |
| CN107965055A (en) * | 2017-12-15 | 2018-04-27 | 北京万兴建筑集团有限公司 | A kind of connecting node and the practice of H profile steel beam and girder with rolled steel section en cased in concrete |
| CN107965055B (en) * | 2017-12-15 | 2023-10-03 | 北京万兴建筑集团有限公司 | A kind of connection node and method of H-shaped steel beam and shaped steel concrete beam |
| CN108978860A (en) * | 2018-09-29 | 2018-12-11 | 沈阳工业大学 | A kind of steel core concrete column-steel tube concrete beam node connecting structure |
| CN108978860B (en) * | 2018-09-29 | 2023-12-26 | 沈阳工业大学 | Steel pipe concrete column-steel pipe concrete beam node connection structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102121274B (en) | Section steel concrete column-steel girder node | |
| CN201554121U (en) | Connection joint of inner sleeve squared rectangular steel pipe column and H-shaped steel beam | |
| CN105064503A (en) | Steel tube and core tube mixed structure | |
| CN203238783U (en) | Rectangular concrete filled steel tubular column and steel beam semi-rigid node structure | |
| CN102587538B (en) | Dog-bone type coupled shear wall with end plates, bolts and steel coupling beams | |
| CN105604182B (en) | The through round steel pipe constraint reinforced column steel girder frame node of girder steel | |
| CN105064512A (en) | Connecting structure of circular steel tube concrete column and steel beam | |
| CN104818775A (en) | Novel prefabricated frame structure | |
| CN203238784U (en) | Rectangular concrete filled steel tubular column and box-type steel beam rib-penetrated type node structure | |
| CN107327029B (en) | A steel tube concrete column-steel beam assembled space node | |
| CN108316477A (en) | Band steel pipe concrete column and section steel beam interior joint connection structure and construction method | |
| CN209457144U (en) | A Beam-Column Assembled Joint of H-section for Frames with Unequal Spans | |
| CN106368348A (en) | Overlapped combined shear wall with double-phase stress characteristic | |
| CN108589918A (en) | A kind of connection structure of assembling truss beam and quadrate steel pipe column | |
| CN102828559B (en) | Node for combination beam and 45-degree arranged cross steel reinforced concrete column | |
| CN202483027U (en) | Coupled shear wall with end plate bolts and steel coupling beams | |
| CN207048045U (en) | A kind of endplate connections node | |
| CN108331164A (en) | A kind of attachment device and installation method of Steel Truss Beam and lattice type steel column node | |
| CN103711228A (en) | Assembling and energy consuming structural system with combined fluted frameworks and shear walls | |
| CN103306376B (en) | A kind of assemble type steel tube concrete superposed column-steel reinforced concrete girder connection | |
| CN104264792B (en) | A kind of bean column node of layered assembling type steel structure | |
| CN104060700A (en) | Assembled cast steel outer sleeve-T-shaped part beam and column connecting device | |
| CN207176940U (en) | A kind of concrete filled steel tube pole steel beam assembled space nodes | |
| CN106759858A (en) | The connecting node and preparation method of a kind of H profile steel beam and rectangular steel-tube concrete column | |
| CN209163043U (en) | A kind of side's Concrete-filled Double Skin Steel Tube Columns and steel beam connecting joint |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131016 Termination date: 20210520 |
