CN212927069U - A concrete placement equipment for construction of shear force wall - Google Patents

A concrete placement equipment for construction of shear force wall Download PDF

Info

Publication number
CN212927069U
CN212927069U CN202020445179.2U CN202020445179U CN212927069U CN 212927069 U CN212927069 U CN 212927069U CN 202020445179 U CN202020445179 U CN 202020445179U CN 212927069 U CN212927069 U CN 212927069U
Authority
CN
China
Prior art keywords
pipe
agitator tank
box
dust collection
stirring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020445179.2U
Other languages
Chinese (zh)
Inventor
罗锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Zhongtiejianye Group Co ltd
Original Assignee
Tianjin Zhongtiejianye Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Zhongtiejianye Group Co ltd filed Critical Tianjin Zhongtiejianye Group Co ltd
Priority to CN202020445179.2U priority Critical patent/CN212927069U/en
Application granted granted Critical
Publication of CN212927069U publication Critical patent/CN212927069U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concrete pouring equipment for shear force wall construction, including agitator tank, bottom plate, storage case and suction box, the even vertical support column of installing of one end on bottom plate top, and the top of support column installs the agitator tank, the feeder hopper is installed to the one end on agitator tank top, and the positive intermediate position department of agitator tank installs control panel, the intermediate position department on bottom plate top installs the spiral conveying pipe, and installs the blanking pipe that runs through the agitator tank bottom on spiral conveying pipe top, the one end that the agitator tank was kept away from on the bottom plate top is installed the storage case, and installs the air pump on storage case top, the material pipe that takes out that runs through the storage case is installed to the input of air pump, and the discharging pipe is installed to the output of air pump. The utility model discloses a fan makes the dust under the filtration and the absorption of filter layer and adsorbed layer, falls to the kicking block on, and it is inside to fall to the agitator tank behind the certain dust to accomplish to remove dust and retrieve.

Description

A concrete placement equipment for construction of shear force wall
Technical Field
The utility model relates to a concrete placement technical field specifically is a concrete placement equipment for shear force wall construction.
Background
Shear wall is also called as wind-resistant wall, anti-seismic wall or structural wall, the wall body of the horizontal load and vertical load (gravity) that mainly receives wind load or earthquake action in house or structure prevents structure shearing (receives the shear) destruction, also called as anti-seismic wall, generally is made with reinforced concrete, shear wall roughly constructs exactly through pouring concrete between shear wall template, and the pouring concrete need use the concrete pouring equipment that is used for shear wall construction, has accelerated the efficiency of construction greatly, but this type of equipment has certain problem, specific problem is as follows:
when the traditional concrete pouring equipment is used for stirring concrete, too much dust is generated, and a large amount of dust is lifted in the processes of feeding and stirring, so that the body of a constructor is greatly influenced;
the inner wall of the traditional concrete pouring equipment is often adhered with concrete, and after stirring, part of the concrete is adhered to the inner wall, so that not only is part of the concrete wasted, but also trouble is brought to equipment cleaning;
the manual hand-held pouring of traditional this type of concrete pouring equipment is too troublesome, generally needs the workman to hand the pipeline and waters, brings very big physical demands for the workman.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete placement equipment for shear force wall construction to the dust is too much, the inner wall is stained with often when carrying out the concrete mixing that proposes in solving above-mentioned background art and attaches the too troublesome problem of concrete and artifical handheld watering.
In order to achieve the above object, the utility model provides a following technical scheme: a concrete pouring device for shear wall construction comprises a stirring tank, a bottom plate, a storage tank and a dust suction box, wherein a supporting column is uniformly and vertically arranged at one end of the top end of the bottom plate, the stirring tank is arranged at the top end of the supporting column, a feeding hopper is arranged at one end of the top end of the stirring tank, a first motor is arranged in the central position of one side of the stirring tank, the output end of the first motor penetrates through the stirring tank and is provided with a rotating rod, stirring blades are arranged on the outer wall of the rotating rod, a control panel is arranged in the middle position of the front side of the stirring tank, a spiral feeding pipe is arranged in the middle position of the top end of the bottom plate, a blanking pipe penetrating through the bottom end of the stirring tank is arranged at the top end of the bottom plate, the storage tank is arranged at one end of the top end of the bottom plate, far, and the output end of the air pump is provided with a discharge pipe.
Preferably, universal wheels are installed around the bottom end of the bottom plate, and braking structures are arranged inside the universal wheels.
Preferably, first link plate is all installed at the both ends of bull stick, and the bull stick both ends all vertically install the puddler all around, the one end horizontal installation that the bull stick was kept away from to the puddler has the second scraper blade.
Preferably, the middle position department on agitator tank top installs the suction box, and the inside one side of keeping away from the feeder hopper of suction box installs the fan, the inside filter layer of installing is close to feeder hopper one side of being close to of suction box, and the inside feeder hopper one side of keeping away from of suction box installs the adsorbed layer, the suction box is close to the top of feeder hopper one side and installs the suction hopper.
Preferably, the dust collection bottom of filter layer and adsorbed layer near feeder hopper one side all installs the dust collecting tube who runs through the agitator tank, and the equal vertical spring of installing in the upper end of the inside both sides of dust collecting tube, the kicking block is installed to the bottom of spring, and the kicking block constitutes sliding construction at the dust collecting tube inside.
Preferably, a second motor is horizontally arranged on one side, close to the feed hopper, inside the spiral feed pipe, and a spiral feed rod is horizontally arranged at the output end of the second motor.
Preferably, the lower extreme horizontal installation of ejection of compact pipe outer wall has the mounting panel, and the slide has all been seted up to the bottom of mounting panel both sides, the screwed pipe is installed in the inside outside of slide, and the inside cover of screwed pipe is equipped with the bolt, the slide is inside to link to each other with the bolt through with slide assorted slider, and the bottom of slider installs rubber splint.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the dust collection device is provided with the fan, the dust collection hopper, the feeding hopper, the dust collection box, the filter layer, the adsorption layer, the dust collection pipe, the top block, the spring and the stirring box, wherein wind power is generated when the fan works, dust near the feeding hopper is sucked into the dust collection box through the dust collection hopper, the dust falls onto the top block inside the dust collection pipe under the filtering and adsorption of the filter layer and the adsorption layer, the spring is elastically deformed after certain dust is accumulated, and the top block moves downwards, so that the dust falls into the stirring box, and dust collection and dust recovery are achieved;
(2) meanwhile, the concrete pouring equipment is provided with a first motor, a rotating rod, a stirring blade, a stirring rod, a stirring box, a first hanging plate and a second scraping plate, the first motor works to drive the rotating rod to rotate, so that the stirring blade and the stirring rod are driven to rotate for stirring, the first hanging plate and the second scraping plate are driven to scrape the inner wall of the stirring box, and finally, a large amount of concrete is prevented from being attached to the equipment under the action of the first hanging plate and the second scraping plate;
(3) simultaneously concrete placement equipment places the mounting panel on shear force wall top through installing mounting panel, bolt, screwed pipe, slider, slide, rubber splint and discharging pipe, rotates the bolt and rotates at the screwed pipe inside to drive the slider and slide in the slide is inside, and then drive rubber splint and clip the shear force wall, finally make the discharging pipe firmly fixed, thereby avoided the long-time handheld of workman.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a schematic front view of the structure of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 1 according to the present invention;
fig. 4 is an enlarged schematic view of a portion B in fig. 1 according to the present invention.
In the figure: 1. a feed hopper; 2. a stirring box; 3. a first hanging plate; 4. a first motor; 5. a rotating rod; 6. a stirring rod; 7. stirring blades; 8. a second squeegee; 9. a support pillar; 10. a base plate; 11. a second motor; 12. a blanking pipe; 13. a screw feed rod; 14. a helical feed tube; 15. a material storage box; 16. a universal wheel; 17. a material pumping pipe; 18. an air pump; 19. mounting a plate; 20. a discharge pipe; 21. a fan; 22. a dust collection box; 23. a dust suction hopper; 24. a control panel; 25. a threaded pipe; 26. a bolt; 27. a rubber splint; 28. a slideway; 29. a slider; 30. a filter layer; 31. a dust collecting pipe; 32. a top block; 33. a spring; 34. and an adsorption layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a concrete pouring device for shear wall construction comprises a stirring box 2, a bottom plate 10, a material storage box 15 and a dust suction box 22, wherein universal wheels 16 are mounted on the periphery of the bottom end of the bottom plate 10, and braking structures are arranged inside the universal wheels 16;
after the device is conveniently moved to a proper position through the universal wheel 16, the device is locked through a braking structure inside the universal wheel 16, and sliding is prevented;
the stirring device comprises a base plate 10, a stirring box 2, a feeding hopper 1, a first motor 4, a rotating rod 5 and stirring blades 7, wherein supporting columns 9 are uniformly and vertically arranged at one end of the top end of the base plate 10, the stirring box 2 is arranged at the top end of the supporting columns 9, the feeding hopper 1 is arranged at one end of the top end of the stirring box 2, the first motor 4 is arranged in the center of one side of the stirring box 2, the type of the first motor 4 can be Y90S-2, the output end of the first motor 4 penetrates through the stirring box 2 and;
the two ends of the rotating rod 5 are both provided with the first hanging plates 3, the peripheries of the two ends of the rotating rod 5 are both vertically provided with the stirring rods 6, and one end of each stirring rod 6, which is far away from the rotating rod 5, is horizontally provided with the second scraper 8;
the rotating rod 5 rotates to drive the first hanging plate 3 and the second scraping plate 8 to scrape the inner wall of the stirring box 2, and finally, a large amount of concrete is prevented from being attached to equipment under the action of the first hanging plate 3 and the second scraping plate 8;
a dust suction box 22 is arranged in the middle of the top end of the stirring box 2, a fan 21 is arranged on one side, far away from the feed hopper 1, inside the dust suction box 22, a filter layer 30 is arranged on one side, close to the feed hopper 1, inside the dust suction box 22, an adsorption layer 34 is arranged on one side, far away from the feed hopper 1, inside the dust suction box 22, and a dust suction hopper 23 is arranged on the top end, close to the feed hopper 1, of the dust suction box 22;
the fan 21 works to generate wind power, dust near the feed hopper 1 is sucked into the dust suction box 22 through the dust suction hopper 23, and dust is removed under the filtering and adsorption of the filtering layer 30 and the adsorption layer 34;
the bottom ends of the dust collection boxes 22 on the side, close to the feed hopper 1, of the filter layer 30 and the adsorption layer 34 are respectively provided with a dust collection pipe 31 penetrating through the stirring box 2, the upper ends of two sides inside the dust collection pipe 31 are respectively provided with a spring 33 vertically, the bottom end of the spring 33 is provided with a top block 32, and the top block 32 forms a sliding structure inside the dust collection pipe 31;
dust falls onto the top block 32 in the dust collecting pipe 31, the spring 33 is elastically deformed after certain dust is accumulated, and the top block 32 moves downwards, so that the dust falls into the stirring box 2, and the dust is recovered;
a control panel 24 is arranged in the middle of the front surface of the stirring box 2, a spiral feeding pipe 14 is arranged in the middle of the top end of the bottom plate 10, and a blanking pipe 12 penetrating through the bottom end of the stirring box 2 is arranged at the top end of the spiral feeding pipe 14;
a second motor 11 is horizontally arranged at one side of the inside of the spiral feeding pipe 14 close to the feeding hopper 1, the type of the second motor 11 can be Y315M-2, and the output end of the second motor 11 is horizontally provided with a spiral feeding rod 13;
the concrete in the stirring box 2 falls into the spiral feeding pipe 14 through the blanking pipe 12, and the concrete is conveyed and stored conveniently under the rotation of the spiral feeding rod 13;
a material storage tank 15 is arranged at one end of the top end of the bottom plate 10, which is far away from the stirring tank 2, an air pump 18 is arranged at the top end of the material storage tank 15, the model of the air pump 18 can be DG6-25, a material pumping pipe 17 penetrating through the material storage tank 15 is arranged at the input end of the air pump 18, and a material discharging pipe 20 is arranged at the output end of the air pump 18;
the lower end of the outer wall of the discharge pipe 20 is horizontally provided with a mounting plate 19, the bottom ends of two sides of the mounting plate 19 are respectively provided with a slide way 28, the outer side of the inner part of each slide way 28 is provided with a threaded pipe 25, a bolt 26 is sleeved in each threaded pipe 25, the inner part of each slide way 28 is connected with the bolt 26 through a slide block 29 matched with the corresponding slide way 28, and the bottom end of each slide block 29 is provided with a rubber clamping plate 27;
the mounting plate 19 is placed at the top end of the shear wall, the rotating bolt 26 rotates inside the threaded pipe 25, so that the sliding block 29 is driven to slide inside the sliding rail 28, the rubber clamping plate 27 is driven to clamp the shear wall, and finally the discharging pipe 20 is firmly fixed, so that a worker is prevented from holding the shear wall for a long time;
the single chip microcomputer in the control panel 24 is electrically connected with the first motor 4, the second motor 11, the air pump 18 and the fan 21 through wires.
The working principle is as follows: after the equipment is conveniently moved to a proper position through the universal wheel 16, the equipment is locked through a braking structure in the universal wheel 16 to prevent sliding, an external power supply is switched on, and cement, sand and stone and water are poured into the stirring box 2 through the feed hopper 1 according to a certain proportion;
the fan 21 is controlled by the control panel 24 to work to generate wind power, dust near the feed hopper 1 is sucked into the dust suction box 22 through the dust suction hopper 23, the dust falls onto the top block 32 in the dust collection pipe 31 under the filtering and adsorption of the filter layer 30 and the adsorption layer 34, the spring 33 is elastically deformed after certain dust is accumulated, and the top block 32 moves downwards, so that the dust falls into the stirring box 2, and the dust removal and dust recovery are realized;
the control panel 24 controls the first motor 4 to work to drive the rotating rod 5 to rotate, so that the stirring blades 7 and the stirring rod 6 are driven to rotate for stirring, the first hanging plate 3 and the second scraping plate 8 are driven to scrape the inner wall of the stirring box 2, and finally, a large amount of concrete is prevented from being attached to equipment under the action of the first hanging plate 3 and the second scraping plate 8;
the second motor 11 is controlled to work through the control panel 24 to drive the spiral feeding rod 13 to rotate, concrete in the stirring box 2 falls into the spiral feeding pipe 14 through the blanking pipe 12, and the concrete is conveyed into the storage box 15 to be stored under the rotation of the spiral feeding rod 13;
the mounting plate 19 is placed at the top end of the shear wall, the rotating bolt 26 rotates inside the threaded pipe 25, so that the sliding block 29 is driven to slide inside the sliding rail 28, the rubber clamping plate 27 is driven to clamp the shear wall, and finally the discharging pipe 20 is firmly fixed, so that a worker is prevented from holding the shear wall for a long time;
the air pump 18 is controlled by the control panel 24 to work, concrete in the storage box 15 is pumped through the pumping pipe 17 and sprayed between the shear wall templates through the discharge pipe 20, and concrete pouring of the shear wall is achieved.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a concrete placement equipment for shear force wall construction, includes agitator tank (2), bottom plate (10), storage case (15) and suction box (22), its characterized in that: the stirring device is characterized in that supporting columns (9) are evenly and vertically installed at one end of the top end of the bottom plate (10), the stirring box (2) is installed at the top end of the supporting columns (9), a feeding hopper (1) is installed at one end of the top end of the stirring box (2), a first motor (4) is installed at the central position of one side of the stirring box (2), an output end of the first motor (4) penetrates through the stirring box (2) and is provided with a rotating rod (5), stirring blades (7) are installed on the outer wall of the rotating rod (5), a control panel (24) is installed at the front middle position of the stirring box (2), a spiral feeding pipe (14) is installed at the middle position of the top end of the bottom plate (10), a blanking pipe (12) penetrating through the bottom end of the stirring box (2) is installed at the top end of the spiral feeding pipe (14), a storage box (15), and air pump (18) are installed on storage tank (15) top, material pumping pipe (17) that runs through storage tank (15) are installed to the input of air pump (18), and discharging pipe (20) are installed to the output of air pump (18).
2. A concrete casting apparatus for shear wall construction according to claim 1, wherein: the universal wheels (16) are mounted on the periphery of the bottom end of the bottom plate (10), and braking structures are arranged inside the universal wheels (16).
3. A concrete casting apparatus for shear wall construction according to claim 1, wherein: first link plate (3) are all installed at the both ends of bull stick (5), and bull stick (6) are all vertically installed all around at bull stick (5) both ends, the one end horizontal installation that bull stick (5) were kept away from in puddler (6) has second scraper blade (8).
4. A concrete casting apparatus for shear wall construction according to claim 1, wherein: the utility model discloses a dust collection box, including agitator tank (2), hopper (1), dust collection box (22), filter layer (34), dust collection box (22) are inside to be close to feeder hopper (1), the intermediate position department on agitator tank (2) top installs dust collection box (22), and inside one side of keeping away from feeder hopper (1) of dust collection box (22) installs fan (21), inside feeder hopper (1) one side of keeping away from of dust collection box (22) is installed adsorbed layer (34), dust collection box (22) are close to the top of feeder hopper (1) one side and install dust collection hopper (23).
5. A concrete pouring apparatus for shear wall construction according to claim 4, wherein: filter layer (30) and adsorbed layer (34) are close to dust collection box (22) bottom of feeder hopper (1) one side and all install dust collecting tube (31) that run through agitator tank (2), and the equal vertical spring (33) of installing in upper end of the inside both sides of dust collecting tube (31), kicking block (32) is installed to the bottom of spring (33), and kicking block (32) are at the inside sliding construction that constitutes of dust collecting tube (31).
6. A concrete casting apparatus for shear wall construction according to claim 1, wherein: a second motor (11) is horizontally arranged on one side, close to the feed hopper (1), inside the spiral feed pipe (14), and a spiral feed rod (13) is horizontally arranged at the output end of the second motor (11).
7. A concrete casting apparatus for shear wall construction according to claim 1, wherein: mounting panel (19) are installed to the lower extreme horizontal installation of discharging pipe (20) outer wall, and slide (28) have all been seted up to the bottom of mounting panel (19) both sides, screwed pipe (25) are installed in the outside of slide (28) inside, and the inside cover of screwed pipe (25) is equipped with bolt (26), slide (28) are inside to link to each other with bolt (26) through slider (29) with slide (28) assorted, and rubber splint (27) are installed to the bottom of slider (29).
CN202020445179.2U 2020-03-31 2020-03-31 A concrete placement equipment for construction of shear force wall Active CN212927069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020445179.2U CN212927069U (en) 2020-03-31 2020-03-31 A concrete placement equipment for construction of shear force wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020445179.2U CN212927069U (en) 2020-03-31 2020-03-31 A concrete placement equipment for construction of shear force wall

Publications (1)

Publication Number Publication Date
CN212927069U true CN212927069U (en) 2021-04-09

Family

ID=75297240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020445179.2U Active CN212927069U (en) 2020-03-31 2020-03-31 A concrete placement equipment for construction of shear force wall

Country Status (1)

Country Link
CN (1) CN212927069U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197888A (en) * 2021-12-21 2022-03-18 荣泰建设集团有限公司 But assembled building connecting device of quick location

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197888A (en) * 2021-12-21 2022-03-18 荣泰建设集团有限公司 But assembled building connecting device of quick location

Similar Documents

Publication Publication Date Title
CN212352483U (en) Ceramic tile dysmorphism cutting device
CN212927069U (en) A concrete placement equipment for construction of shear force wall
CN212998882U (en) Dust collector is used in concrete processing
CN110898477A (en) Sludge discharge device for sewage treatment
CN212093651U (en) Dust keeper for asphalt concrete mix
CN212790012U (en) Special processing system of grit sewage
CN211329510U (en) Stone crushing device for building engineering
CN210791506U (en) Concrete integral type production facility
CN213103692U (en) Dust adsorption equipment for construction waste
CN210752916U (en) Civil engineering construction waste treatment device
CN208604673U (en) A kind of garden architecture object roof rain water collecting reuse means
CN221194139U (en) Wall guniting device
CN219965151U (en) Material preprocessing device
CN213965440U (en) Waste water recovery filter equipment that granite polished
CN220530961U (en) Cleaning wastewater recovery device for concrete production site
CN214136674U (en) Concrete mixing device for road construction
CN208665726U (en) A kind of dust-proof cement device for discharging
CN211329807U (en) Sundry sorting device for building garbage regeneration
CN214130462U (en) Water supply and drainage engineering is with sewage treatment plant who has high-efficient blowdown
CN211587380U (en) Mechanical equipment that sand and soil was selected separately for construction
CN215327449U (en) Sand washing sewage treatment equipment
CN217797975U (en) Building garbage handles dust collector
CN212919906U (en) Be used for building engineering concrete mixing device
CN220424913U (en) Spray dust device
CN215505920U (en) Roadbed resourceful treatment device for waste water-based slurry production

Legal Events