CN212919170U - Installation device of natural gas high-speed burner - Google Patents
Installation device of natural gas high-speed burner Download PDFInfo
- Publication number
- CN212919170U CN212919170U CN202021881034.3U CN202021881034U CN212919170U CN 212919170 U CN212919170 U CN 212919170U CN 202021881034 U CN202021881034 U CN 202021881034U CN 212919170 U CN212919170 U CN 212919170U
- Authority
- CN
- China
- Prior art keywords
- bearing
- clamp body
- clamping
- burner
- natural gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Gas Burners (AREA)
Abstract
The utility model discloses an installation utensil of natural gas high-speed nozzle relates to heat treatment furnace technical field. The installation tool of the natural gas high-speed burner comprises auxiliary working tongs and a tying steel wire, wherein the auxiliary working tongs comprise a bearing tong body, a clamping tong body and a hinge pin, the middle upper part of the bearing tong body is connected with the clamping tong body through the tying steel wire, and the middle lower part of the bearing tong body is hinged with the clamping tong body through the hinge pin; the head parts of the bearing clamp body and the clamping clamp body are both in a curved circle shape, and the gas burner is wrapped along the circumferential direction; the tail parts of the bearing clamp body and the clamping clamp body are bent outwards in parallel with the axis of the gas burner. The utility model discloses an installation utensil of natural gas high speed burner assists installation gas burner through auxiliary work pincers with being even steel wire, hoist block and universal dolly, and the installation is accurate, and is fast, convenient operation.
Description
Technical Field
The utility model relates to a heat treatment furnace technical field especially relates to an installation utensil of natural gas high velocity burner.
Background
The heat treatment furnace is installed and operated improperly, and various safety accidents such as electric shock, scalding, burning and the like are easy to happen. The gas and the controlled atmosphere are flammable and explosive gases, and poisoning and explosion accidents can happen even if the gas and the controlled atmosphere are not used properly. Therefore, the heat treatment furnace must be operated and used in strict compliance with various safety regulations in order to prevent accidents of human bodies and facilities. Therefore, it is necessary to strictly comply with the operating regulations of the heat treatment furnace, use equipment reasonably, prepare the furnace before opening and shutting down, perform the process operation on duty, check the equipment, periodically check the equipment, lubricate the equipment, maintain the equipment, and the like. The existing heat treatment furnace mounting device has insufficient precision, is easy to collide with a gas burner during mounting, and has large labor intensity and complex process in the mounting process.
SUMMERY OF THE UTILITY MODEL
The utility model provides an installation device of a natural gas high-speed burner of a heat treatment furnace, which aims to realize the quick and accurate installation of the gas burner.
The utility model discloses a natural gas high-speed burner's installation utensil, including the auxiliary work pincers, tie the steel wire, the auxiliary work pincers include the bearing pincers body, the centre gripping pincers body and hinge pin, the bearing pincers body passes through with the centre gripping pincers body in the upper middle portion the tie steel wire is connected, the bearing pincers body passes through with the centre gripping pincers body in the lower middle portion the hinge pin is articulated; the head parts of the bearing clamp body and the clamping clamp body are both in a curved circle shape, and the gas burner is wrapped along the circumferential direction; the tail parts of the bearing clamp body and the clamping clamp body are bent outwards in parallel with the axis of the gas burner.
The utility model discloses an installation utensil of natural gas high speed burner assists installation gas burner through auxiliary work pincers with being even steel wire, hoist block and universal dolly, and the installation is accurate, and is fast, convenient operation.
Furthermore, the head of the bearing clamp body is longer than the head of the clamping clamp body, the bending circle amplitude is large, and the bearing clamp body can be opened and closed to a greater extent, so that the gas burner is easier to assemble and disassemble.
Furthermore, the head parts of the bearing clamp body and the clamping clamp body extend outwards along the axial direction of the gas burner, the bearing capacity is good, and the bearing clamp can adapt to the outer end structure of the gas burner.
Further, still include hoist block and universal dolly, universal dolly is self-control portable lifting trolley or fork truck.
Compared with the prior art, the utility model discloses utilize the auxiliary work pincers bearing gas nozzle, be convenient for adjust the position and the gesture of gas nozzle, the installation accuracy is high, can avoid moreover colliding with, has alleviateed the intensity of labour of installation simultaneously.
Drawings
FIG. 1 is a schematic view of the installation of a natural gas high velocity burner;
fig. 2 is a left side view of fig. 1.
Reference numerals: 1. the device comprises a gas burner, 2 parts of a fixing plate, 3 parts of a refractory masonry, 4 parts of a bearing clamp body, 5 parts of a hinge pin, 6 parts of a tie steel wire, 7 parts of a small hoisting block, 8 parts of a universal trolley, 9 parts of a clamping clamp body and 10 parts of a bent circle.
Detailed Description
The invention is further described with reference to the following examples and the accompanying drawings.
As shown in figures 1 and 2, a main body of a gas burner 1 to be installed is a cylinder, the outer end of the gas burner is radially communicated with variable natural gas, an air pipeline and the like, and the gas burner 1 is installed and connected with a fixing plate 2 on refractory brickwork 3 of a heat treatment furnace wall through a flange.
The utility model discloses an installation utensil includes that the auxiliary work pincers link steel wire 6, small-size hoist 7, universal dolly 8 etc. with tying, assists installation gas nozzle 1.
As shown in fig. 2, the auxiliary working tong comprises a load-bearing tong body 4, a holding tong body 9 and a hinge pin 5. The head of the bearing clamp body 4 is in a curved round shape, and the head is slightly long, namely the curved round part 10 can be inserted into the neck of the gas burner 1 to pocket the bottom for bearing, and the neck of the gas burner 1 is wrapped along the circumferential direction; the curved round part 10 can extend outwards along the axial direction of the gas burner 1 according to the outer end structure of the gas burner 1. The tail part of the bearing clamp body 4 is bent outwards in parallel with the axis of the gas burner 1. The structure of the clamping pincer body 9 is the same as that of the bearing pincer body 4 except that the head bending range is smaller. The bearing clamp body 4 is hinged with the clamping clamp body 9 at the middle lower part by a hinge pin 5, and the bearing clamp body 4 is connected with the clamping clamp body 9 at the middle upper part by a tying steel wire 6.
The universal trolley 8 can be a self-made movable hoisting trolley and can also be a forklift hoisting instrument. When the gas burner lifting device works, the small hoisting block 7 and the universal trolley 8 lift the tying steel wire 6 upwards to enable the bearing clamp body 4 and the clamping clamp body 9 to clamp the gas burner 1 tightly around the hinge pin 5, so that the gas burner 1 is lifted by the auxiliary working clamp, and the position of the gas burner 1 is adjusted up and down, left and right, and back and forth; the bent parts at the tail parts of the bearing clamp body 4 and the clamping clamp body 9 are grasped, the posture of the gas burner 1 can be controlled through the clamping of the bent round part 10, and the flange of the gas burner 1 is circumferentially adjusted to be aligned with the connecting hole of the fixing plate 2.
The above-described embodiments are only preferred embodiments of the present invention, and it should be noted that: for those skilled in the art, without departing from the principle of the present invention, several modifications and equivalent substitutions can be made, and these modifications and equivalent substitutions do not depart from the technical scope of the present invention.
Claims (4)
1. A mounting device for a natural gas high-speed burner is characterized in that: the auxiliary working pliers comprise a bearing pliers body, a clamping pliers body and a hinge pin, wherein the bearing pliers body and the clamping pliers body are connected at the middle upper part through the tie steel wire, and the bearing pliers body and the clamping pliers body are hinged at the middle lower part through the hinge pin; the head parts of the bearing clamp body and the clamping clamp body are both in a curved circle shape, and the gas burner is wrapped along the circumferential direction; the tail parts of the bearing clamp body and the clamping clamp body are bent outwards in parallel with the axis of the gas burner.
2. The installation tool of a natural gas high-speed burner according to claim 1, characterized in that: the head of the bearing clamp body is longer than the head of the clamping clamp body, and the bending range is large.
3. The installation tool of a natural gas high-speed burner according to claim 1, characterized in that: the head parts of the bearing clamp body and the clamping clamp body extend outwards along the axial direction of the gas burner.
4. A natural gas high-speed burner installation tool according to any one of claims 1 to 3, wherein: the lifting device further comprises a lifting hoist and a universal trolley, wherein the universal trolley is a self-made movable lifting trolley or a forklift.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021881034.3U CN212919170U (en) | 2020-09-01 | 2020-09-01 | Installation device of natural gas high-speed burner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021881034.3U CN212919170U (en) | 2020-09-01 | 2020-09-01 | Installation device of natural gas high-speed burner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212919170U true CN212919170U (en) | 2021-04-09 |
Family
ID=75301811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021881034.3U Active CN212919170U (en) | 2020-09-01 | 2020-09-01 | Installation device of natural gas high-speed burner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212919170U (en) |
-
2020
- 2020-09-01 CN CN202021881034.3U patent/CN212919170U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212919170U (en) | Installation device of natural gas high-speed burner | |
CN204454256U (en) | A kind of Multifunctional hanging tool | |
CN208629462U (en) | A kind of manipulator for steel part transfer | |
CN103010936A (en) | Lifting tool for large steel ingot and large forge piece | |
CN207699043U (en) | A kind of intelligent suspender of exhaust pipe of engine assembly | |
CN106335014A (en) | Gas cylinder grip | |
CN204976404U (en) | Safe type crucible tongs | |
CN212601582U (en) | Auxiliary tool for hanging crown block | |
CN203128014U (en) | Hoisting tongs for hoisting billet steel | |
CN209210216U (en) | A kind of clipping hoisting steel plate tool | |
CN216141109U (en) | Slag pot split lifting appliance suitable for wide lifting appliance | |
CN202967879U (en) | Lifting appliance for large-size steel ingot and forge piece | |
CN201321343Y (en) | Suspension device | |
CN206550894U (en) | Muffle furnace special copple is clamped | |
CN206154149U (en) | Gas cylinder pincers | |
CN212503634U (en) | Cast steel pipe handling anchor clamps | |
CN212601618U (en) | Shaft pin dismounting tool | |
CN209537540U (en) | The device of stokehold slag line position is quickly subsidized in a kind of 120t converter | |
CN203946788U (en) | A kind of large-scale circle Workpiece tilting device | |
CN205856531U (en) | A kind of Novel feeding device | |
CN214134412U (en) | Steel band repair welding robot hand device | |
CN86208920U (en) | Semi-automatic clamp for single hot ingot | |
CN104444769A (en) | Wire rope sling for pipeline | |
CN211338513U (en) | Novel pipeline clamp | |
CN207877081U (en) | Tube sling tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |