CN212840556U - Supervision is with building engineering project intelligent monitoring device - Google Patents

Supervision is with building engineering project intelligent monitoring device Download PDF

Info

Publication number
CN212840556U
CN212840556U CN202021255557.7U CN202021255557U CN212840556U CN 212840556 U CN212840556 U CN 212840556U CN 202021255557 U CN202021255557 U CN 202021255557U CN 212840556 U CN212840556 U CN 212840556U
Authority
CN
China
Prior art keywords
groove
installation frame
fixing
frame
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021255557.7U
Other languages
Chinese (zh)
Inventor
谢鹏飞
姜萍
怀悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang Jianke Engineering Management Co ltd
Original Assignee
Zhenjiang Jianke Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Jianke Engineering Management Co ltd filed Critical Zhenjiang Jianke Engineering Management Co ltd
Priority to CN202021255557.7U priority Critical patent/CN212840556U/en
Application granted granted Critical
Publication of CN212840556U publication Critical patent/CN212840556U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The utility model provides a manage and use building engineering project intelligent monitoring device relates to the building control field. The intelligent monitoring device for the construction engineering project for supervision comprises a fixing rod connected with a bearing on one side of an installation frame, a fixing plate fixedly connected with the other side of the installation frame, an installation buckle movably clamped in the fixing plate, a fixing frame movably clamped in the installation frame, a sliding rail fixedly connected with the back of the installation frame, a fixing rod and a sliding rail fixedly connected with the back of the installation frame, wherein the installation frame rotates on the wall surface by taking the fixing rod as an axis, then the deflector rod is pulled downwards, and then the fixing frame is lifted upwards, so that the clamping strip is moved out from the inside of the fixing groove, then the fixed frame is pulled outwards, so that the fixed frame enters the first sliding groove through the connecting groove, then the fixed frame is slid to the bottom end along the first sliding groove and then taken out from the mounting groove at the outer side of the sliding rail, the display screen is maintained, and the phenomenon that the display screen is broken due to sliding of hands in the process of moving the display screen when the display screen at a high position is maintained is avoided.

Description

Supervision is with building engineering project intelligent monitoring device
Technical Field
The utility model relates to a building monitoring device, concretely relates to manage and use building engineering project intelligent monitoring device.
Background
In the process of construction of building engineering, in order to deal with safety accidents occurring at a construction site and prevent goods at the construction site from being stolen, monitoring equipment is usually installed at each corner of the construction site, and then a plurality of groups of monitoring display screens are arranged in a security room to monitor and check each part of the construction site.
However, most of the monitoring display screens in the monitoring rooms work continuously for 24 hours at present, and security rooms in accident sites are relatively simple, the monitoring display screens are easy to be damaged due to self and external factors in the using process, and the monitoring display screens need to be repaired or replaced at the moment, the monitoring display screens are basically fixed on a bracket, then the bracket is fixed on the wall surface through bolts, the disassembly is very inconvenient during maintenance, some projects are huge, the number of corresponding monitoring devices is large, the display screens are required to be stacked and fixed, when the display screen at a high position is maintained, the display screen needs to be detached and then moved to the ground, the display screen is easy to break due to the sliding of hands in the process, therefore, it is necessary to provide an intelligent monitoring device for supervising the construction project to solve the above problems.
Disclosure of Invention
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a manage and use building engineering project intelligent monitoring device has solved current manage and use building engineering project intelligent monitoring device installation inconvenient, is not convenient for dismantle when the maintenance, and the display screen of eminence removes the condition of taking place to break easily simultaneously.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: an intelligent monitoring device for a construction engineering project for supervision comprises an installation frame, wherein a bearing on one side of the installation frame is connected with a fixed rod, the other side of the installation frame is fixedly connected with a fixed plate, an installation buckle is movably clamped in the fixed plate, a fixed frame is movably clamped in the installation frame, slide rails are fixedly connected to the back surface of the installation frame and positioned on two sides of the fixed frame, a first slide groove is formed in the slide rails, a movable groove is formed in the inner side wall of the installation frame, a fixed groove is formed in the inner bottom of the installation frame, a clamping hole is formed in the installation frame, slide blocks are fixedly connected to two sides of the fixed frame, a clamping groove is formed in the front surface of the fixed frame, and a clamping component matched with the fixed;
the clamping assembly comprises a fixed box, a second sliding groove, a clamping head, a shifting rod, a sliding rod and a spring, wherein the second sliding groove is formed in the outer surface of the fixed box, the sliding rod is fixedly connected to the inner bottom of the fixed box, the spring is sleeved on the outer surface of the sliding rod, the clamping head is sleeved on the outer surface of the top end of the sliding rod, the shifting rod is fixedly connected to the side face of the clamping head, and the shifting rod is connected to the inner portion of the second sliding groove in a sliding mode.
Preferably, the fixing rod and the mounting buckle are both fixed on the wall surface through bolts, and the outer surface of the mounting buckle is provided with a locking groove.
Preferably, the number of the slide rails is multiple groups, and the opposite side of the slide rails is provided with a first sliding groove.
Preferably, the connecting groove is opened at one side of the slide rail close to the fixing frame, and the mounting groove is opened at one side of the bottom end of the slide rail far away from the fixing frame.
Preferably, the bottom fixedly connected with card strip of mount, the fixed slot and the adaptation of card strip.
Preferably, one end of the spring abuts against the lower surface of the clamping head, the other end of the spring abuts against the inner bottom of the fixed box, and the clamping head is matched with the clamping hole.
Preferably, the movable groove is an L-shaped groove, one end of the movable groove is communicated with the inside of the connecting groove, and the height of the other end of the movable groove is the same as the depth of the fixed groove.
(III) advantageous effects
The utility model provides a manage and use building engineering project intelligent monitoring device. Compared with the prior art, the method has the following beneficial effects:
1. this manage and use building engineering project intelligent monitoring device, rotate on the wall through using the dead lever as the axle center with the installation frame, make the installation frame back forward, through pulling the driving lever downwards, then upwards lifting with the mount, make the card strip shift out from the fixed slot is inside, then with the outside pulling of mount, make the mount enter into first spout inside through the spread groove, then slide the mount to the bottom along first spout, then take out in the mounting groove in the follow slide rail outside, maintain the display screen, prevent when the display screen of maintenance eminence, the in-process at the removal display screen takes place to break because the hand is smooth.
2. This supervision is with building engineering project intelligent monitoring device through with display screen activity joint in the inside of mount, during the installation, the activity of mount bottom is pegged graft inside the fixed slot, and the mount top is passed through dop activity joint and is blocked inside the card hole, prevents that the display screen from taking place to drop because of the collision in the use, causes the injury to equipment and personnel.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of the main structure of the present invention;
fig. 2 is a schematic structural view of a back portion of the mounting frame of the present invention;
FIG. 3 is an enlarged view of the point A in FIG. 2 according to the present invention;
FIG. 4 is a schematic view of the back structure of the fixing frame of the present invention;
fig. 5 is a schematic structural view of the clamping assembly of the present invention.
In the figure: 1. a mounting frame; 2. fixing the rod; 3. a fixing plate; 4. installing a buckle; 5. a fixed mount; 6. a slide rail; 7. a first chute; 8. a clamping hole; 9. connecting grooves; 10. a movable groove; 11. fixing grooves; 12. a slider; 13. a card slot; 14. a clamping assembly; 141. a fixed box; 142. a second chute; 143. clamping a head; 144. a deflector rod; 145. a slide bar; 146. a spring.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The embodiment of the application provides a prison and manage with building engineering project intelligent monitoring device, has solved current prison and has managed with building engineering project intelligent monitoring device steadiness not good enough, can't realize the whole reinforcement problem of wall body and built-in fitting, realizes the bearing capacity requirement of large-tonnage tower crane, the overall stability of tower crane in perpendicular transportation.
In order to solve the technical problems, the general idea of the embodiment of the application is as follows: through the observation to current monitoring device, make the consideration in combination with the actual environment of job site simultaneously, the pertinence raises the problem to it advances to the pertinence solution to propose simple and effectual practical scheme.
In order to better understand the technical solution, the technical solution will be described in detail with reference to the drawings and the specific embodiments.
The embodiment of the utility model discloses building engineering project intelligent monitoring device for supervision, as shown in fig. 1-5, including installation frame 1, one side bearing of installation frame 1 is connected with dead lever 2, opposite side fixedly connected with fixed plate 3 of installation frame 1, the inside activity joint of fixed plate 3 has installation buckle 4, the inside activity joint of installation frame 1 has mount 5, the back of installation frame 1 just is located the equal fixedly connected with slide rail 6 in both sides of mount 5, first spout 7 has been seted up to the inside of slide rail 6, movable groove 10 has been seted up to the inside wall of installation frame 1, fixed slot 11 has been seted up to the interior bottom of installation frame 1, card hole 8 has been seted up to the inside of installation frame 1, the both sides fixedly connected with slider 12 of mount 5, draw-in groove 13 has been seted up in the front of mount 5, the back fixedly connected with of mount 5 and.
More specifically, the clamping assembly 14 includes a fixed box 141, a second sliding groove 142, a clamping head 143, a shift lever 144, a sliding rod 145 and a spring 146, the second sliding groove 142 is formed in the outer surface of the fixed box 141, the sliding rod 145 is fixedly connected to the inner bottom of the fixed box 141, the spring 146 is movably sleeved on the outer surface of the sliding rod 145, the clamping head 143 is movably sleeved on the outer surface of the top end of the sliding rod 145, the shift lever 144 is fixedly connected to the side surface of the clamping head 143, the shift lever 144 is slidably connected to the inside of the second sliding groove 142, one end of the spring 146 abuts against the lower surface of the clamping head 143, the other end of the spring 146 abuts against the inner bottom of the fixed box 141, and the clamping head 143.
Furthermore, the fixed rod 2 and the installation buckle 4 are both fixed on the wall surface through bolts, the outer surface of the installation buckle 4 is provided with a lock groove, the installation buckle 4 is inserted into the fixed plate 3 to complete clamping, the installation buckle 4 is protected by additionally installing a mechanical lock inside a lock groove on the outer surface of the installation buckle 4, the number of the slide rails 6 is multiple, a first slide groove 7 is arranged on one side, opposite to the slide rails 6, of each slide rail 6, a connecting groove 9 is arranged on one side, close to the fixed frame 5, of each slide rail 6, an installation groove is arranged at the bottom end of each slide rail 6 and on one side, far away from the fixed frame 5, the bottom end of the fixed frame 5 is fixedly connected with a clamping strip, the fixed groove 11 is matched with the clamping strip, the movable groove 10 is an L-shaped groove, one end of the movable groove 10 is communicated with the, when the fixing is performed, the bottom end of the fixing frame 5 enters the inside of the fixing groove 11, and the sliding block 12 falls into the bottom of the movable groove 10.
In this embodiment, the fixing rod 2 is first fixed on the wall surface by a bolt, the mounting buckle 4 is fixed on the wall surface by a bolt, then the display screen is movably inserted into the slot 13 on the front surface of the fixing frame 5, then the sliding blocks 12 on the two sides of the fixing frame 5 are aligned to the mounting slots on the outer side surface of the sliding rail 6, so that the sliding blocks 12 enter the first sliding slot 7, then the fixing frame 5 is slid upwards along the first sliding slot 7, when the sliding blocks 12 slide to the position of the connecting slot 9, the driving lever 144 is pulled downwards in the second sliding slot 142, so that the spring 146 is compressed, and the clamping head 143 moves towards the inside of the fixing box 141, and at the same time, the fixing frame 5 is pushed towards the side close to the mounting frame 1, so that the sliding blocks 12 enter the movable slot 10, when the sliding blocks 12 slide to the end of the movable slot 10, the sliding blocks 12 move, at this moment, the shifting lever 144 is released, so that the clamping head 143 moves upwards under the action of the spring 146 to enter the clamping hole 8, at this moment, the installation of a group of display screens is completed, all the display screens are correspondingly installed in the installation frame 1 according to the above steps, then the installation frame 1 is rotated, so that the installation buckle 4 is inserted into the fixing plate 3 to complete clamping, and at this moment, a mechanical lock can be additionally installed in the lock groove on the outer surface of the installation buckle 4 to protect the installation buckle.
When the maintenance, through pulling driving lever 144 downwards, then with the ascending lifting of mount 5 for the card strip shifts out from fixed slot 11 is inside, then with the outside pulling of mount 5, makes mount 5 enter into first spout 7 through spread groove 9 inside, then slides mount 5 to the bottom along first spout 7, then takes out in the mounting groove in the outside of follow slide rail 6, maintains the display screen.
In summary, compared with the prior art, the method has the following beneficial effects:
1. this intelligent monitoring device for construction engineering project for prison, rotate on the wall through using dead lever 2 to install frame 1 as the axle center, make install frame 1 back forward, through pulling driving lever 144 downwards, then make mount 5 lifting upwards, make the card strip shift out from fixed slot 11 is inside, then with the outside pulling of mount 5, make mount 5 enter into first spout 7 inside through spread groove 9, then slide mount 5 to the bottom along first spout 7, then take out in the mounting groove in the 6 outsides of slide rail, maintain the display screen, when preventing the display screen at the maintenance eminence, take place to break because the hand is smooth at the in-process that removes the display screen.
2. This manage and use building engineering project intelligent monitoring device through with display screen activity joint in the inside of mount 5, during the installation, the activity of mount 5 bottom is pegged graft inside fixed slot 11, and the mount 5 top is passed through dop 143 activity joint inside card hole 8, prevents that the display screen from dropping because of the collision in the use, leads to the fact the injury to equipment and personnel.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (7)

1. The utility model provides a supervision is with building engineering project intelligent monitoring device, includes installation frame (1), its characterized in that, one side bearing of installation frame (1) is connected with dead lever (2), the opposite side fixedly connected with fixed plate (3) of installation frame (1), the inside activity joint of fixed plate (3) has installation knot (4), the inside activity joint of installation frame (1) has mount (5), the back of installation frame (1) just is located both sides of mount (5) and all fixedly connected with slide rail (6), first spout (7) have been seted up to the inside of slide rail (6), movable groove (10) have been seted up to the inside wall of installation frame (1), fixed slot (11) have been seted up to the interior bottom of installation frame (1), the inside of installation frame (1) has been seted up card hole (8), the both sides fixedly connected with slider (12) of mount (5), the front surface of the fixing frame (5) is provided with a clamping groove (13), and the back surface of the fixing frame (5) is fixedly connected with a clamping assembly (14) matched with the fixing groove (11);
clamping subassembly (14) is including fixed casket (141), second spout (142), dop (143), driving lever (144), slide bar (145) and spring (146), second spout (142) have been seted up to the surface of fixed casket (141), the interior bottom fixedly connected with slide bar (145) of fixed casket (141), spring (146) have been cup jointed in the surface activity of slide bar (145), dop (143) have been cup jointed in the top surface activity of slide bar (145), side fixedly connected with driving lever (144) of dop (143), driving lever (144) sliding connection is in the inside of second spout (142).
2. The intelligent monitoring device for the supervision building engineering project according to claim 1, wherein the fixing rod (2) and the mounting buckle (4) are both fixed on the wall surface through bolts, and the outer surface of the mounting buckle (4) is provided with a locking groove.
3. The intelligent monitoring device for monitoring the construction engineering project for supervision as recited in claim 1, wherein the number of the slide rails (6) is multiple, and the first sliding grooves (7) are formed on the opposite sides of the slide rails (6).
4. The intelligent monitoring device for monitoring the construction engineering project for supervision as recited in claim 1, wherein a connecting groove (9) is formed at one side of the sliding rail (6) close to the fixing frame (5), and a mounting groove is formed at the bottom end of the sliding rail (6) and at one side far away from the fixing frame (5).
5. The intelligent monitoring device for monitoring the construction engineering project for supervision as recited in claim 1, wherein a card strip is fixedly connected to the bottom end of the fixing frame (5), and the fixing groove (11) is matched with the card strip.
6. An intelligent monitoring device for supervising constructional engineering projects as claimed in claim 1, wherein one end of the spring (146) abuts against the lower surface of the clip (143), the other end of the spring (146) abuts against the inner bottom of the fixing box (141), and the clip (143) is fitted with the clip hole (8).
7. The intelligent monitoring device for monitoring the construction engineering project for prison as claimed in claim 4, wherein the movable slot (10) is an L-shaped slot, one end of the movable slot (10) is communicated with the inside of the connecting slot (9), and the other end of the movable slot (10) has the same height as the depth of the fixed slot (11).
CN202021255557.7U 2020-07-01 2020-07-01 Supervision is with building engineering project intelligent monitoring device Active CN212840556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021255557.7U CN212840556U (en) 2020-07-01 2020-07-01 Supervision is with building engineering project intelligent monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021255557.7U CN212840556U (en) 2020-07-01 2020-07-01 Supervision is with building engineering project intelligent monitoring device

Publications (1)

Publication Number Publication Date
CN212840556U true CN212840556U (en) 2021-03-30

Family

ID=75179151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021255557.7U Active CN212840556U (en) 2020-07-01 2020-07-01 Supervision is with building engineering project intelligent monitoring device

Country Status (1)

Country Link
CN (1) CN212840556U (en)

Similar Documents

Publication Publication Date Title
DE102012206353A1 (en) Lifting device for slab formwork elements and method
CN213391145U (en) Construction hanging flower basket is built in room
CN212840556U (en) Supervision is with building engineering project intelligent monitoring device
CN114753609A (en) Safety device is used in electric power engineering operation
CN212689494U (en) Construction platform for building construction
CN208153983U (en) A kind of safe protection engineering fixes device with monitoring device
CN213458178U (en) 915M ultrahigh frequency waterproof dustproof access controller
CN111365574B (en) Security protection monitor terminal based on face identification
CN111306428B (en) Intelligent security monitoring equipment
CN219810488U (en) Mountain fire prevention comprehensive monitor
CN216194183U (en) Safety warning device for house building engineering management
CN217269275U (en) Automatic fence that hides of transformer substation
CN216839132U (en) Indoor entrance guard remote control device
CN217151125U (en) Operating platform for electric power construction climbing vehicle
CN117255520A (en) Modular structure and method convenient to install and overhaul
CN214383129U (en) Mining operation panel skeleton texture
CN219622434U (en) Construction security protection device
CN220106908U (en) Be used for earth connection to prevent missing positioner
CN213186310U (en) Display screen installation equipment for security system
CN212113050U (en) Disease and pest early warning and prevention and control information publishing equipment based on mobile network
CN220393000U (en) Underground safety baffle
CN216512571U (en) Tower crane protector for lease
CN215721823U (en) Construction project is with on-spot safety and quality monitoring device
CN220647685U (en) Camera support for security engineering
CN220402110U (en) Station dispatch command tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant