CN212837125U CN202020770966.4U CN202020770966U CN212837125U CN 212837125 U CN212837125 U CN 212837125U CN 202020770966 U CN202020770966 U CN 202020770966U CN 212837125 U CN212837125 U CN 212837125U
Authority
CN
China
Prior art keywords
screw
connecting plate
fence
upright post
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020770966.4U
Other languages
Chinese (zh)
Inventor
江安杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Xie Heng Engineering Management Co ltd
Original Assignee
Shanghai Xie Heng Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Xie Heng Engineering Management Co ltd filed Critical Shanghai Xie Heng Engineering Management Co ltd
Priority to CN202020770966.4U priority Critical patent/CN212837125U/en
Application granted granted Critical
Publication of CN212837125U publication Critical patent/CN212837125U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a rail is used in municipal works supervision, including two stands, two the top of one side that the stand is close to each other is provided with the upper junction plate, and the bottom of one side that two stands are close to each other is provided with down the connecting plate, the second has been seted up at the top of one side of stand and has been put the diaphragm orifice, the first diaphragm orifice of putting has been seted up to the bottom of one side of stand, the bottom of stand is provided with the base, first screw has been seted up on the top of stand, the top of stand is connected with stop screw, the second screw has all been seted up on the both sides on the top of upper junction plate. The utility model discloses an upper junction plate, lower junction plate, first put the diaphragm orifice, the second put diaphragm orifice, first put pole groove, the second put the pole groove, change hand, first screw, second screw and stop screw, can be convenient with the different component composite mounting of this rail together, this rail of dismouting that the user can be convenient, and then be convenient for deposit, transport to the practicality of this rail has been improved.

Description

Municipal works supervise and manage and use rail
Technical Field
The utility model relates to a municipal facilities technical field specifically is a fence is used in municipal works supervision.
Background
The municipal works are also called municipal facility construction works, and the municipal facilities refer to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns (villages) and provide paid or unpaid public products and services for residents based on responsibility and obligation. Project supervision refers to the entrust of a supervision unit with related qualification by a party A, and represents a specialized service activity for monitoring the project construction of a party B by the party A according to project construction documents approved by the country, laws and regulations related to the project construction, project construction supervision contracts and other project construction contracts.
There are multiple municipal works to manage and use rail on the existing market, but these rail ubiquitous rail wholly adopt the welding mode shaping, can not convenient dismantlement, accomodate. Accordingly, those skilled in the art have provided a municipal administration fence to solve the problems set forth in the background art described above.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a municipal works supervise uses rail to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a fence for municipal engineering supervision comprises two upright posts, wherein the top parts of the two adjacent sides of the upright posts are provided with an upper connecting plate, and the bottom of the side where the two upright posts are close to each other is provided with a lower connecting plate, the top of one side of the upright posts is provided with a second plate placing hole, the bottom of one side of the upright post is provided with a first plate placing hole, the bottom end of the upright post is provided with a base, the top end of the upright post is provided with a first screw hole, the top end of the upright post is connected with a limit screw, the two sides of the top end of the upper connecting plate are both provided with second screw holes, a plurality of first rod placing grooves are formed at the bottom end of the upper connecting plate at equal intervals, a plurality of second rod placing grooves are formed at the top end of the lower connecting plate at equal intervals, a plurality of railing rods are arranged between the upper connecting plate and the lower connecting plate at equal intervals, and rotating hands are installed at the top ends of the limiting screw rods.
Further, the top of the rail is arranged in the first rod placing groove, and the bottom of the rail is arranged in the second rod placing groove.
Furthermore, rubber gaskets are arranged inside the first rod placing groove and the second rod placing groove.
Furthermore, stop screw runs through the inside at first screw and second screw in proper order, the upper junction plate is connected through first screw and second screw with stop screw firmly.
Further, the bottom of stand is connected with removes the wheel, the external fixation screw thread has been seted up to the bottom in the outside of stand, the top of base is provided with the solenoid.
Further, the stand with set up in the inside of screwed pipe, stand and screwed pipe pass through external fixation screw thread and are connected firmly.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through upper junction plate, lower connecting plate, first put the diaphragm orifice, the second is put diaphragm orifice, first put the pole groove, the second is put the pole groove, change hand, first screw, second screw and stop screw, can be convenient with the different component aggregate erection of this rail together, this rail of dismouting that the user can be convenient, and then be convenient for deposit, transport to the practicality of this rail has been improved.
2. Through external fixation screw thread, removal wheel and solenoid, when this rail need be removed, can be convenient will remove the wheel and contact with ground to the user can remove whole rail through removing the wheel, thereby has improved the practicality of this rail, has made things convenient for the user to use.
Drawings
FIG. 1 is a schematic structural view of a municipal administration fence according to example 1;
FIG. 2 is an enlarged view of a municipal administration fence A according to example 1;
fig. 3 is a partial exploded view of the column and the base of the municipal administration fence according to example 2.
In the figure: 1. a moving wheel; 2. a first placing plate hole; 3. an upper connecting plate; 4. a first rod placing groove; 5. a second plate placing hole; 6. A column; 7. a lower connecting plate; 8. a base; 9. a second rod placing groove; 10. a railing rod; 11. a solenoid; 12. turning the hand; 13. A first screw hole; 14. a limit screw; 15. a second screw hole; 16. and external fixing threads.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-2, in the embodiment of the present invention, a fence for municipal engineering supervision comprises two upright posts 6, an upper connecting plate 3 is disposed on the top of the side where the two upright posts 6 are close to each other, a lower connecting plate 7 is disposed on the bottom of the side where the two upright posts 6 are close to each other, a second plate hole 5 is disposed on the top of one side of each upright post 6, a first plate hole 2 is disposed on the bottom of one side of each upright post 6, a base 8 is disposed at the bottom end of each upright post 6, a first screw hole 13 is disposed at the top end of each upright post 6, a limit screw 14 is connected to the top end of each upright post 6, second screw holes 15 are disposed on both sides of the top end of each upper connecting plate 3, a plurality of first rod placing grooves 4 are disposed at equal intervals on the bottom end of each upper connecting plate 3, a plurality of second rod placing grooves 9 are disposed at equal intervals, the top end of the limit screw 14 is provided with a rotating hand 12.
Wherein, the top of the railing 10 is arranged inside the first rod placing groove 4, and the bottom of the railing 10 is arranged inside the second rod placing groove 9.
Wherein, the first rod placing groove 4 and the second rod placing groove 9 are both provided with rubber gaskets.
Wherein, stop screw 14 runs through in the inside of first screw 13 and second screw 15 in proper order, and upper junction plate 3 is connected through first screw 13 and second screw 15 with stop screw 14 firmly.
The working principle is as follows: when the fence is used, all accessories of the fence are combined and installed together, at the moment, the bases 8 arranged on the two upright posts 6 are stably placed on the ground, then the upper connecting plate 3 is sequentially inserted into the second hole placing plates 5 arranged on the two upright posts 6, the lower connecting plate 7 is sequentially inserted into the first hole placing plates 2 arranged on the two upright posts 6, then the positions of the two upright posts 6 are moved to enable the positions of the first screw holes 13 arranged on the upright posts 6 to correspond to the positions of the second screw holes 15 arranged on the upper connecting plate 3, then the fence 10 is held by hand to enable the top of the fence 10 to be embedded into the first hole placing plates 4 arranged on the upper connecting plate 3, then the bottom of the fence 10 is embedded into the second hole placing plates 9 arranged on the lower connecting plate 7, after all the fence 10 are arranged between the upper connecting plate 3 and the lower connecting plate 7, the hand 12 is held by hand and sequentially switched into the first screw holes 13 arranged on the upright posts 6 and the second screw holes 15 arranged on the upper connecting plate 3, the handle 12 is tightened further so that the stop screw 14 drives the upper connecting plate 3 to press the railing 10 against the lower connecting plate 7, thereby completing the assembly of the fence.
Example 2
Referring to fig. 3, a rail is used in municipal works supervision, this embodiment compares in embodiment 1, still includes that the bottom of stand 6 is connected with removes wheel 1, and outer fixed thread 16 has been seted up to the bottom in the outside of stand 6, and the top of base 8 is provided with solenoid 11.
Wherein, stand 6 with set up in the inside of screwed pipe 11, stand 6 and screwed pipe 11 are through external fixation screw thread 16 firm connection.
The working principle is as follows: when the fence needs to be moved, the upright post 6 can be lifted by a hand and the solenoid 11 can be rotated upwards, so that the solenoid 11 and the base 8 can move upwards, the bottom end of the base 8 is higher than the moving wheel 1, the moving wheel 1 is contacted with the ground, and the whole fence can be moved by the moving wheel 1.
The utility model discloses the standard part that uses all can purchase from the market, and dysmorphism piece all can be customized according to the description with the record of drawing of description, and the concrete connection mode of each part all adopts conventional means such as ripe bolt, rivet, welding among the prior art, and machinery, part and equipment all adopt prior art, and conventional model, including circuit connection adopts conventional connection mode among the prior art, does not detailed here again.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The fence for municipal engineering supervision comprises two upright posts (6) and is characterized in that an upper connecting plate (3) is arranged at the top of one side, close to each other, of the two upright posts (6), a lower connecting plate (7) is arranged at the bottom of one side, close to each other, of the two upright posts (6), a second plate hole (5) is formed in the top of one side of each upright post (6), a first plate hole (2) is formed in the bottom of one side of each upright post (6), a base (8) is arranged at the bottom end of each upright post (6), a first screw hole (13) is formed in the top end of each upright post (6), a limit screw (14) is connected to the top end of each upright post (6), second screw holes (15) with equal distance are formed in two sides of the top end of each upper connecting plate (3), and a plurality of first rod placing grooves (4) are formed in, a plurality of second is seted up on the top of lower connecting plate (7) equidistance and is put pole groove (9), equidistance is provided with a plurality of rail pole (10) between upper junction plate (3) and lower connecting plate (7), rotating hand (12) are installed on the top of stop screw (14).
2. A fence for municipal engineering supervision according to claim 1, characterized in that the top of the fence rod (10) is placed inside the first put-in groove (4) and the bottom of the fence rod (10) is placed inside the second put-in groove (9).
3. The municipal works supervision fence according to any one of claims 1 to 2, wherein the first bar placing groove (4) and the second bar placing groove (9) are provided with rubber gaskets inside.
4. The municipal engineering supervision rail according to claim 1, wherein the limit screw (14) sequentially penetrates through the inside of the first screw hole (13) and the second screw hole (15), and the upper connecting plate (3) is firmly connected with the limit screw (14) through the first screw hole (13) and the second screw hole (15).
5. The fence for municipal engineering supervision according to claim 1, wherein the bottom end of the upright post (6) is connected with a moving wheel (1), the bottom of the outer side of the upright post (6) is provided with an external fixed thread (16), and the top end of the base (8) is provided with a screw tube (11).
6. The municipal engineering supervision fence according to claim 5, wherein the post (6) is arranged inside the coil (11), and the post (6) is firmly connected with the coil (11) through an external fixing thread (16).
CN202020770966.4U 2020-05-11 2020-05-11 Municipal works supervise and manage and use rail Expired - Fee Related CN212837125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020770966.4U CN212837125U (en) 2020-05-11 2020-05-11 Municipal works supervise and manage and use rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020770966.4U CN212837125U (en) 2020-05-11 2020-05-11 Municipal works supervise and manage and use rail

Publications (1)

Publication Number Publication Date
CN212837125U true CN212837125U (en) 2021-03-30

Family

ID=75161129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020770966.4U Expired - Fee Related CN212837125U (en) 2020-05-11 2020-05-11 Municipal works supervise and manage and use rail

Country Status (1)

Country Link
CN (1) CN212837125U (en)

Similar Documents

Publication Publication Date Title
CN212837125U (en) Municipal works supervise and manage and use rail
CN213062380U (en) Assembled steel construction beam slab of convenient dismantlement
CN212298447U (en) Artificial intelligence surveillance camera head convenient to installation
CN212224879U (en) Assembled plastics rail
CN211079905U (en) Construction protective fence for building bridge
CN210459920U (en) Construction frame
CN210239339U (en) Building rail convenient to assembly connection
CN213869270U (en) Municipal works are with construction rail guard
CN217759869U (en) Scaffold frame that indoor building fitment was used
CN218436791U (en) Municipal administration guardrail
CN220166770U (en) Rail guard for municipal works
CN217353665U (en) Multifunctional protective fence for building construction
CN218242798U (en) Cable erecting device for building construction
CN212201596U (en) Construction engineering construction is with dismantling guardrail
CN210127544U (en) Connecting structure of steel structure beam and steel structure column and steel structure system
CN215485190U (en) Building site is with protection rail convenient to installation
CN210798474U (en) Make things convenient for portable guardrail of dismouting
CN214696953U (en) Civil engineering pipeline placing equipment
CN213205193U (en) Subway station foundation pit guardrail device
CN218277995U (en) Pre-buried component of big-arch shelter skeleton installation
CN213838030U (en) Municipal works protection rail
CN217812791U (en) A enclose shelves device for town road construction
CN214459746U (en) Bridge maintenance workbench
CN214246896U (en) Building protective fence
CN220620961U (en) Building construction has building construction frame of anti falling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210330