CN212836786U - Construction platform - Google Patents

Construction platform Download PDF

Info

Publication number
CN212836786U
CN212836786U CN202021507134.XU CN202021507134U CN212836786U CN 212836786 U CN212836786 U CN 212836786U CN 202021507134 U CN202021507134 U CN 202021507134U CN 212836786 U CN212836786 U CN 212836786U
Authority
CN
China
Prior art keywords
hanging basket
guide rail
linear bearing
construction platform
fasteners
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021507134.XU
Other languages
Chinese (zh)
Inventor
谢从玉
廖禄武
刘海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nine Construction Group Co ltd
Original Assignee
Nine Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nine Construction Group Co ltd filed Critical Nine Construction Group Co ltd
Priority to CN202021507134.XU priority Critical patent/CN212836786U/en
Application granted granted Critical
Publication of CN212836786U publication Critical patent/CN212836786U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a building construction platform, which comprises two guide rails, a hanging basket, two guys and two support frames; the two guide rails are connected with the outer wall of the building through connecting pieces; the hanging basket is connected with four linear bearings; the first ends of the two pull cables are respectively fixedly connected with the upper ends of the two sides of the hanging basket, and the second ends of the two pull cables are respectively connected with a linear bearing; the first ends of the two support frames are respectively fixedly connected with the lower ends of the two sides of the hanging basket, and the second ends of the two support frames are respectively connected with a linear bearing; the linear bearing is sleeved on the guide rail; according to the hanging basket, the hanging basket can move up and down through the sliding fit of the guide rails and the hanging basket, so that the hanging basket can be used on each floor, and the construction platform is prevented from being built on each floor due to waste of manpower and material resources; through the sliding fit of the guide rail, the stay cable and the support frame, the stay cable, the support frame and the guide rail are positioned after the hanging basket is in place, the hanging basket can be supported, the hanging basket is moved by the matching of the movable support and the movable support, the hanging basket is quickly supported, and the hanging basket is convenient and quick.

Description

Construction platform
Technical Field
The utility model belongs to the technical field of the construction is built in the room, concretely relates to construction platform.
Background
When building construction is carried out, in floors on which concrete is cast preliminarily, construction tools such as templates and scaffolds which are not used are required to be transferred, and therefore a construction platform is required to be erected outside each floor for transferring the templates and the scaffolds.
In the prior art, one construction platform is erected on each floor; however, the construction of the construction platform is very labor and material consuming.
Therefore, it is urgently needed to develop a building construction platform capable of avoiding repeated erection to solve the above problems.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a construction platform.
In order to achieve the above object, the utility model provides a following technical scheme:
a construction platform comprising:
two guide rails; the two guide rails are parallel to each other, the two guide rails are vertically arranged along the outer wall of the building, and the upper ends and the lower ends of the two guide rails are respectively connected with the outer wall of the building through connecting pieces;
a hanging basket; four corners of one end of the hanging basket are respectively connected with four linear bearings, wherein two linear bearings are sleeved on one guide rail, and the other two linear bearings are sleeved on the other guide rail;
two pull cables; the first ends of the two pull cables are respectively fixedly connected with the upper ends of the two sides of the hanging basket, the second ends of the two pull cables are respectively connected with a linear bearing, one linear bearing is sleeved on one guide rail, and the other linear bearing is sleeved on the other guide rail;
two support frames; the first ends of the two support frames are respectively fixedly connected with the lower ends of the two sides of the hanging basket, the second ends of the two support frames are respectively connected with a linear bearing, one linear bearing is sleeved on one guide rail, and the other linear bearing is sleeved on the other guide rail;
wherein, the two guys and the two support frames are obliquely arranged; after the hanging basket is in place, the hanging basket is connected with the plate surface through a plurality of I-shaped steel bars to support the hanging basket; the position of the linear bearing on the guide rail is defined by a plurality of fixing means.
Specifically, the fixing device is a bolt assembly, a plurality of through holes which penetrate through the bolt assembly in the transverse direction are correspondingly formed in the two guide rails, and the bolt assembly limits the bottom position of the linear bearing after penetrating through the through holes.
In particular, a protective net is provided around three sides of the basket, which do not include the side facing the building.
Specifically, a plurality of rows of fasteners are arranged at the bottom of the hanging basket, a plurality of rows of I-steel buckles are pre-embedded on the surface of the hanging basket, one I-steel penetrates through the row of I-steel buckles and the row of fasteners, and the I-steel is connected with the fasteners and the I-steel buckles.
Preferably, the number of the I-shaped steel is two, the number of the fasteners is two, and the number of the I-shaped steel buckles is two.
Preferably, the minimum included angle between the stay cable and the support frame and the hanging basket is 30-60 degrees.
Specifically, a plurality of lifting lugs are arranged at the upper end of the hanging basket.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the sliding fit through guide rail and hanging flower basket can realize reciprocating of hanging flower basket in this application to the use of each floor avoids extravagant manpower and materials to set up construction platform at each floor.
2. Through the sliding fit of guide rail and cable, support frame in this application to carry out the location of cable, support frame and guide rail after the hanging flower basket is taken one's place, and can realize the support to the hanging flower basket, remove to support the cooperation and remove the hanging flower basket, realized the quick support to the hanging flower basket, convenient and fast.
Drawings
FIG. 1 is a schematic perspective view of the present application;
FIG. 2 is a side view of the present application;
FIG. 3 is a schematic view of a connection structure of a hanging basket and a plate surface in the present application;
FIG. 4 is a schematic view of a position fixing structure of a linear bearing according to the present application;
FIG. 5 is a schematic view of the construction of the protective netting of the present application;
fig. 6 is a schematic structural diagram of a linear bearing on a basket in the present application.
The attached drawings are as follows: the method comprises the following steps of 1-plate surface, 11-I-steel buckle, 2-hanging basket, 21-protective net, 22-fastener, 3-guide rail, 31-through hole, 32-connecting piece, 4-inhaul cable, 5-support frame, 6-linear bearing, 7-bolt assembly and 8-I-steel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a following technical scheme:
as shown in fig. 1-6, a construction platform comprises:
two guide rails 3; the two guide rails 3 are parallel to each other, the two guide rails 3 are both vertically arranged along the outer wall of the building, and the upper ends and the lower ends of the two guide rails 3 are respectively connected with the outer wall of the building through connecting pieces 32;
a hanging basket 2; four corners of one end of the hanging basket 2 are respectively connected with four linear bearings 6, wherein two linear bearings 6 are sleeved on one guide rail 3, and the other two linear bearings 6 are sleeved on the other guide rail 3;
two pull cables 4; the first ends of the two guys 4 are respectively fixedly connected with the upper ends of the two sides of the hanging basket 2, the second ends of the two guys 4 are respectively connected with a linear bearing 6, one linear bearing 6 is sleeved on one guide rail 3, and the other linear bearing 6 is sleeved on the other guide rail 3;
two support frames 5; the first ends of the two support frames 5 are respectively fixedly connected with the lower ends of the two sides of the hanging basket 2, the second ends of the two support frames 5 are respectively connected with a linear bearing 6, one linear bearing 6 is sleeved on one guide rail 3, and the other linear bearing 6 is sleeved on the other guide rail 3;
wherein, the two guys 4 and the two support frames 5 are all obliquely arranged; after the hanging basket 2 is in place, the hanging basket 2 is connected with the plate surface 1 through a plurality of I-shaped steel bars, and the hanging basket 2 is supported; the position of the linear bearing 6 on the guide rail 3 is defined by a plurality of fixing means.
In the present embodiment, all the linear bearings 6 are in the vertical direction along the sliding direction of the guide rail 3.
In the present embodiment, the guide rail 3 is preferably cylindrical.
As shown in fig. 4, the fixing device is a bolt assembly 7, a plurality of through holes 31 are correspondingly formed in the two guide rails 3, and the bolt assembly 7 passes through the through holes 31 to define the bottom position of the linear bearing 6.
In some embodiments, the through holes 31 may be replaced with screw holes;
in some embodiments, the through holes 31 include a plurality of groups, each group of through holes 31 includes 5 through holes on one guide rail 3, correspondingly, the height of the floor panel 1 plus the thickness of the i-beam is the first, and the position of the through hole 31 of the group is determined according to the position of the first through hole 31 and the position heights of the rest installation components; the plate surface 1 of each floor corresponds to a group of through holes 31.
As shown in fig. 5, a protective net 21 is provided around three sides of the basket 2, which do not include the side facing the building.
In this embodiment, the protection net 21 is provided to prevent the operator from falling down when operating on the construction platform, and at this time, the protection net 21 can block a large falling object.
As shown in fig. 3, a plurality of rows of fasteners 22 are arranged at the bottom of the hanging basket 2, a plurality of rows of i-steel buckles 11 are pre-embedded on the plate surface 1, one i-steel 8 passes through the row of i-steel buckles 11 and the row of fasteners 22, and the i-steel 8 is connected with the fasteners 22 and the i-steel buckles 11.
Preferably, there are two i-beams 8, two rows of fasteners 22, and two rows of i-beam buckles 11.
Preferably, the minimum included angle between the stay cable 4 and the support frame 5 and the hanging basket 2 is 30-60 degrees.
Specifically, a plurality of lifting lugs (not shown in the drawings) are provided at the upper end of the basket 2.
This application during operation, can carry out reciprocating of hanging flower basket 2 through the tower crane is supplementary, the removal of general hanging flower basket 2 is from up to down, need hang the lug of hanging flower basket 2 through the tower crane earlier when needs remove hanging flower basket 2, break away from all connecting pieces 32 again, rise to last floor with hanging flower basket 2 again, penetrate I-steel buckle 11 with the I-steel in proper order again, fastener 22, carry out the fixed of I-steel again (generally be the fixed of carrying out I-steel buckle 11 on face 1), carry out the lower extreme support of the linear bearing 6 of being connected with support frame 5 after later rethread a plurality of bolt assembly 7 pass through-hole 31 on the guide rail 3, and after drawing cable 4 to the regulation angle, carry out the lower extreme support of the linear bearing 6 of being connected with cable 4 after passing through-hole 31 on the guide rail 3 through a plurality of bolt assembly 7.
When the guide rail fixing device works, the guide rail can be lapped from bottom to top as required, and the connecting piece correspondingly positioned at the upper end of the guide rail needs to be continuously disassembled and assembled.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. Construction platform, its characterized in that includes:
two guide rails; the two guide rails are parallel to each other, the two guide rails are vertically arranged along the outer wall of the building, and the upper ends and the lower ends of the two guide rails are respectively connected with the outer wall of the building through connecting pieces;
a hanging basket; four corners of one end of the hanging basket are respectively connected with four linear bearings, wherein two linear bearings are sleeved on one guide rail, and the other two linear bearings are sleeved on the other guide rail;
two pull cables; the first ends of the two pull cables are respectively fixedly connected with the upper ends of the two sides of the hanging basket, the second ends of the two pull cables are respectively connected with a linear bearing, one linear bearing is sleeved on one guide rail, and the other linear bearing is sleeved on the other guide rail;
two support frames; the first ends of the two support frames are respectively fixedly connected with the lower ends of the two sides of the hanging basket, the second ends of the two support frames are respectively connected with a linear bearing, one linear bearing is sleeved on one guide rail, and the other linear bearing is sleeved on the other guide rail;
wherein, the two guys and the two support frames are obliquely arranged; after the hanging basket is in place, the hanging basket is connected with the plate surface through a plurality of I-shaped steel bars to support the hanging basket; the position of the linear bearing on the guide rail is defined by a plurality of fixing means.
2. The construction platform according to claim 1, wherein the fixing means is a bolt assembly, and a plurality of through holes are formed in the two rails, respectively, and extend transversely therethrough, and the bolt assembly passes through the through holes to define a bottom position of the linear bearing.
3. The building construction platform according to claim 1, wherein a protective netting is provided around three sides of the basket, the three sides not including the side facing the building.
4. The building construction platform according to claim 1, wherein a plurality of rows of fasteners are arranged at the bottom of the hanging basket, a plurality of rows of I-steel fasteners are embedded in the surface of the hanging basket, one I-steel penetrates through the rows of I-steel fasteners and the rows of fasteners, and the I-steel is connected with the fasteners and the I-steel fasteners.
5. The building construction platform of claim 4, wherein there are two I-beams, two rows of fasteners, and two rows of I-beam fasteners.
6. The building construction platform of claim 1, wherein the minimum included angle between the guy cable, the support frame and the basket is 30-60 °.
7. The construction platform according to claim 1, wherein a plurality of lifting lugs are provided at an upper end of the gondola.
CN202021507134.XU 2020-07-27 2020-07-27 Construction platform Active CN212836786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021507134.XU CN212836786U (en) 2020-07-27 2020-07-27 Construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021507134.XU CN212836786U (en) 2020-07-27 2020-07-27 Construction platform

Publications (1)

Publication Number Publication Date
CN212836786U true CN212836786U (en) 2021-03-30

Family

ID=75121503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021507134.XU Active CN212836786U (en) 2020-07-27 2020-07-27 Construction platform

Country Status (1)

Country Link
CN (1) CN212836786U (en)

Similar Documents

Publication Publication Date Title
CN1793590A (en) Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN202227701U (en) Spliced type horizontal channel device
CN102912981B (en) Gate type high-rise building connected structure construction device
CN108277994B (en) Method for quickly dismantling safety protection shed of overhead high-speed rail operation line
CN109879179B (en) Assembled steel construction tower crane platform
CN108584646B (en) Assembled type additional elevator shaft structure suitable for jacking construction
CN212836786U (en) Construction platform
CN101457587B (en) Template mutually lifting climbing apparatus and method
CN217439544U (en) Building top outer vertical surface overhanging structure template supporting system
CN107700363B (en) Bridge tower rack with lifting system and construction method
CN112502473B (en) Supporting bearing capacity conversion device and method for dismantling large steel framework by using same
CN112502475B (en) Supporting bearing capacity conversion device and using method thereof
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN215212427U (en) Adjustable unloading platform with steel structure for building
CN110118014B (en) Exterior wall template system free of exterior scaffold and construction method thereof
CN110359697B (en) Overhead sliding splicing operation platform of high-altitude unit type
CN210767838U (en) Large-section inclined column template construction structure for constructional engineering
CN209799320U (en) Integral steel platform for multi-cylinder steel plate shear wall
CN113605659A (en) Elevator shaft tool type safe operation platform and construction method thereof
CN112376947A (en) Support frame capable of being adjusted in lifting mode and using method thereof
CN205077876U (en) Prestressed steel strand pulling machine and tensioning jack suspension device
CN218953310U (en) Lifting platform for shaft wall construction
CN217439505U (en) Assembled elevator shaft construction operation platform
CN217839714U (en) Adjustable railway pier top hanging fence installation device
CN218988724U (en) Integrated mounting platform for purlines of roof of large-scale steel structure factory building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant