CN212802192U - Steel bar truss concrete floor - Google Patents

Steel bar truss concrete floor Download PDF

Info

Publication number
CN212802192U
CN212802192U CN202020948496.6U CN202020948496U CN212802192U CN 212802192 U CN212802192 U CN 212802192U CN 202020948496 U CN202020948496 U CN 202020948496U CN 212802192 U CN212802192 U CN 212802192U
Authority
CN
China
Prior art keywords
steel bar
floor
bar truss
clamp plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020948496.6U
Other languages
Chinese (zh)
Inventor
曹红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xihuo Technology Co ltd
Original Assignee
Guangdong Xihuo Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Xihuo Technology Co ltd filed Critical Guangdong Xihuo Technology Co ltd
Priority to CN202020948496.6U priority Critical patent/CN212802192U/en
Application granted granted Critical
Publication of CN212802192U publication Critical patent/CN212802192U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a steel bar truss concrete floor relates to steel bar truss concrete floor field, including the floor main part, the quad slit has been seted up at floor main part both ends, and the floor main part inboard is provided with steel bar truss, steel bar truss both sides are located floor main part inner wall and are provided with the reinforcing bar, and steel bar truss's top and bottom are located the top and the bottom of floor main part and all are provided with the second clamp plate, steel bar truss's both ends are located the both ends inboard of floor main part and are provided with the third clamp plate. The utility model discloses a set up first clamp plate, second clamp plate and third clamp plate, can guarantee the leakproofness of connecting between the floor main part 1 through first clamp plate, second clamp plate and third clamp plate to and after concrete pouring accomplished, to concrete surface's protection, prevent that the floor from receiving external influence the coarse surface of appearance, the effectual floor of having solved surface when pouring the shaping is very coarse, receive the problem of damage because of the long-time erosion of external factors easily.

Description

Steel bar truss concrete floor
Technical Field
The utility model relates to a steel bar truss concrete floor field specifically is a steel bar truss concrete floor.
Background
In the building industry, a large number of concrete floors are required, so that the market of the reinforced truss concrete floors is huge.
However, the surface of the steel bar truss concrete floor slab in the current market is very rough during casting and molding, and is easily damaged due to long-time erosion of external factors, and the steel bar truss concrete floor slab is damaged by indirect connection of a lead which is formed by removing a groove with great force during decoration of the concrete floor slab.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: the steel bar truss concrete floor slab aims to solve the problems that the surface of the steel bar truss concrete floor slab in the current market is very rough during pouring forming and is easy to be damaged due to long-time erosion of external factors, and the steel bar truss concrete floor slab is damaged by indirect connection of a groove which is formed by cutting off a lead in a very laborious way during decoration of the concrete floor slab in the current market.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel bar truss concrete floor includes floor main part, the quad slit has been seted up at floor main part both ends, and the floor main part inboard is provided with steel bar truss, steel bar truss both sides are located floor main part inner wall and are provided with the reinforcing bar, and steel bar truss's top and bottom are located floor main part's top and bottom all are provided with the second clamp plate, steel bar truss's both ends are located floor main part's both ends inboard and are provided with the third clamp plate, the inner wall that the one end of reinforcing bar is located floor main part is provided with the spool, and the one end of spool is provided with tee bend pipe fitting, the outside that the other end of spool is located floor main part is provided with straight pipe fitting, and the other end.
Preferably, the outer wall that lies in floor main part on the quad slit is provided with first clamp plate, and the outer wall of first clamp plate 3 agrees with the inner wall of quad slit 2 mutually.
Preferably, the steel bar truss and the steel bars are of welded structures, four groups of steel bars are arranged, and the four groups of steel bars are parallel to each other.
Preferably, the cross section of the conduit and the cross section of the reinforcing steel bar are parallel to each other.
Preferably, the external thread of the through pipe is rotatably connected with the internal thread of the connecting pipe, and the central axis of the connecting pipe and the central axis of the steel bar truss are on the same vertical section.
Preferably, the second pressing plate and the third pressing plate are matched with the floor slab main body, and the second pressing plate and the third pressing plate are symmetrically distributed about the vertical central axis of the steel bar truss.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a set up first clamp plate, second clamp plate and third clamp plate, can be through first clamp plate, the leakproofness of connecting between floor main part 1 is guaranteed to second clamp plate and third clamp plate, and after concrete pouring accomplished, protection to the concrete surface, prevent that the floor from receiving external influence coarse surface appears, the effectual floor surface when pouring the shaping is very coarse, receive the problem of damage because of the long-time erosion of external factor easily, through setting up the spool, tee bend pipe fitting, direct pipe fitting and linking pipe, can let linking pipe 11 connect on direct pipe fitting 10, when fitment, let the electric wire pass the spool can to corresponding tee bend pipe fitting department, the effectual concrete floor that has solved when fitment, it carries out the lead wire to need very hard fluting, go up the problem of reinforcing bar purlin concrete floor damage indirectly.
Drawings
Fig. 1 is a top view of a concrete floor according to the present invention;
FIG. 2 is a front view of the concrete floor of the present invention;
fig. 3 is the utility model discloses a steel bar truss and steel bar structure schematic diagram.
In the figure: 1. a floor slab body; 2. a square hole; 3. a first platen; 4. a steel bar truss; 5. reinforcing steel bars; 6. a second platen; 7. a third press plate; 8. a conduit; 9. a tee pipe fitting; 10. a straight-through pipe fitting; 11. the tube is connected.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a steel bar truss concrete floor includes a floor main body 1, square holes 2 are formed at two ends of the floor main body 1, a steel bar truss 4 is arranged at the inner side of the floor main body 1, steel bars 5 are arranged on two sides of the steel bar truss 4 and located on the inner wall of the floor main body 1, second pressing plates 6 are arranged at the top end and the bottom end of the steel bar truss 4 and located on the top end and the bottom end of the floor main body 1, third pressing plates 7 are arranged at the inner sides of two ends of the steel bar truss 4 and located on the inner wall of the floor main body 1, a spool 8 is arranged at one end of the spool 8, a tee pipe 9 is arranged at the other end of the spool 8 and located on the outer side of the floor main body 1, a straight pipe 10 is arranged at one end of the straight pipe 10 and.
Please refer to fig. 1, the outer wall of the floor slab main body 1 on the square hole 2 is provided with the first pressing plate 3, and the outer wall of the first pressing plate 3 is matched with the inner wall of the square hole 2, so that the first pressing plate 3 can be placed on the square hole 2 for sealing, thereby ensuring that the concrete floor slab is not damaged by external factors and the floor slab surface is rough.
Please refer to fig. 1, fig. 2 and fig. 3, the steel bar truss 4 and the steel bars 5 are welded, and four sets of steel bars 5 are provided, and the four sets of steel bars 5 are parallel to each other, so that the steel bars 5 can be fully attached to the concrete.
Please refer to fig. 1, 2 and 3, the cross section of the conduit 8 is parallel to the cross section of the steel bar 5, so as to ensure that the conduit 8 is not in contact with the steel bar 5, and prevent the steel bar from damaging the conduit 8.
Please refer to fig. 2, the external thread of the straight-through pipe 10 is rotatably connected with the internal thread of the connecting pipe 11, and the central axis of the connecting pipe 11 and the central axis of the steel bar truss 4 are on the same vertical section, so that the user can fix the straight-through pipe 10 by using the connecting pipe 11 before pouring cement, and the normal connection route of the line pipe 8 is ensured.
Please refer to fig. 1 and fig. 2, the second pressing plate 6 and the third pressing plate 7 are both engaged with the floor slab main body 1, and the second pressing plate 6 and the third pressing plate 7 are both symmetrically distributed about the vertical central axis of the steel bar truss 4, so that the steel bar truss 4 can be placed between the two floor slab main bodies 1, and the connectivity of the two floor slab main bodies 1 is ensured.
The working principle is as follows: firstly, when the device is used, a straight-through pipe 10 is connected by using a connecting pipe 11, then a third pressing plate 7 is placed below two floor slab main bodies 1, then a steel bar truss 4 is placed at a corresponding position between the two floor slab main bodies 1, a gap at the bottom ends of the two floor slab main bodies 1 is shielded by the third pressing plate 7, then two ends of the two floor slab main bodies 1 are sealed by a second pressing plate 6, mixed cement can be poured down from between the two floor slab main bodies 1 which are not sealed, meanwhile, square holes 2 can be used for pouring again to ensure that the interior of the concrete floor slab is filled with concrete, after concrete pouring is finished, the surface of the leaked concrete can be cleaned and leveled, the last third pressing plate 7 can be placed between the two floor slab main bodies 1, and meanwhile, the first pressing plate 3 is placed on the square holes 2 to be sealed to wait for the concrete to be solidified, avoid external factors to lead to concrete floor surface to receive destruction, when the house needs to be decorated, only need to wear to lead to corresponding tee bend pipe fitting 9 position from the spool 8 with the lead wire and can will stimulate the electric wire to corresponding position on, reduce constructor and destroy concrete floor once more.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a steel bar truss concrete floor, includes floor main part (1), its characterized in that: square holes (2) are arranged at two ends of the floor slab main body (1), a steel bar truss (4) is arranged at the inner side of the floor slab main body (1), reinforcing steel bars (5) are arranged on the two sides of the steel bar truss (4) and positioned on the inner wall of the floor slab main body (1), and the top end and the bottom end of the steel bar truss (4) are respectively provided with a second pressing plate (6) at the top end and the bottom end of the floor slab main body (1), third pressing plates (7) are arranged at the two ends of the steel bar truss (4) and positioned at the inner sides of the two ends of the floor slab main body (1), one end of the steel bar (5) is positioned on the inner wall of the floor slab main body (1) and is provided with a line pipe (8), and one end of the line pipe (8) is provided with a three-way pipe fitting (9), the other end of the line pipe (8) is positioned at the outer side of the floor slab main body (1) and is provided with a straight-through pipe fitting (10), and one side of the straight-through pipe fitting (10) is provided with a connecting pipe (11) at one end of the steel bar truss (4).
2. A steel-reinforced truss concrete floor as claimed in claim 1, wherein: the outer wall that lies in floor main part (1) on quad slit (2) is provided with first clamp plate (3), and the outer wall of first clamp plate (3) agrees with mutually with the inner wall of quad slit (2).
3. A steel-reinforced truss concrete floor as claimed in claim 1, wherein: the steel bar truss (4) and the steel bars (5) are of welded structures, four groups of steel bars (5) are arranged, and the four groups of steel bars (5) are parallel to each other.
4. A steel-reinforced truss concrete floor as claimed in claim 1, wherein: the cross section of the line pipe (8) is parallel to the cross section of the reinforcing steel bar (5).
5. A steel-reinforced truss concrete floor as claimed in claim 1, wherein: the external thread of the straight-through pipe fitting (10) is rotationally connected with the internal thread of the connecting pipe (11), and the central axis of the connecting pipe (11) and the central axis of the steel bar truss (4) are on the same vertical section.
6. A steel-reinforced truss concrete floor as claimed in claim 1, wherein: second clamp plate (6) and third clamp plate (7) all agree with mutually with floor main part (1), and second clamp plate (6) and third clamp plate (7) all are about steel bar truss (4) vertical axis symmetric distribution.
CN202020948496.6U 2020-05-29 2020-05-29 Steel bar truss concrete floor Expired - Fee Related CN212802192U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020948496.6U CN212802192U (en) 2020-05-29 2020-05-29 Steel bar truss concrete floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020948496.6U CN212802192U (en) 2020-05-29 2020-05-29 Steel bar truss concrete floor

Publications (1)

Publication Number Publication Date
CN212802192U true CN212802192U (en) 2021-03-26

Family

ID=75093770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020948496.6U Expired - Fee Related CN212802192U (en) 2020-05-29 2020-05-29 Steel bar truss concrete floor

Country Status (1)

Country Link
CN (1) CN212802192U (en)

Similar Documents

Publication Publication Date Title
CN207829012U (en) A kind of foundation pit support post is constructed with basement bottom board connecting node
CN209163438U (en) A kind of drop plate tool formula hoisting die construction structure
CN212802192U (en) Steel bar truss concrete floor
CN209011364U (en) A kind of vertical connector of precast wall body
CN208717895U (en) A kind of interim corset plate in tubular pole top
CN206319597U (en) A kind of cantilever steel girder erecting device
CN211622016U (en) Cast-in-place floor construction hole shutoff hangs mould device
CN206530058U (en) Plug-in type stair pour mould
CN212001213U (en) Prefabricated cushion cap of instrument formula
CN209741685U (en) Road and bridge crack reinforced structure
CN206467999U (en) A kind of construction formwork for placing
CN207156081U (en) A kind of prefabricated box -beam internal model anti-floating system
CN211517886U (en) A concrete placement workstation for building in room
CN213476966U (en) Novel assembled post-cast strip template system
CN216921009U (en) Assembled precast concrete post
CN213268933U (en) Wall-penetrating pull rod structure of clear water template
CN212957629U (en) Slurry leakage prevention column mould for residential construction
CN212613753U (en) Mould is used in construction of cast-in-place board unwrapping wire hole
CN216615546U (en) Assembly type box culvert top plate connecting structure
CN210421929U (en) Reinforced structure for building indoor external corner
CN212849442U (en) Inside strutting arrangement of pre-buried electronic box
CN218373320U (en) Continuous sealed water-proof and drainage system for railway bridge
CN215484103U (en) Building engineering floor thickness controller
CN213203839U (en) Reusable box culvert slip form
CN212454465U (en) Bury formula waterstop mounting fixture in short side wall of tunnel invert

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210326