CN212801178U - Frame pier connected with concrete column through steel cross beam - Google Patents

Frame pier connected with concrete column through steel cross beam Download PDF

Info

Publication number
CN212801178U
CN212801178U CN202021229426.1U CN202021229426U CN212801178U CN 212801178 U CN212801178 U CN 212801178U CN 202021229426 U CN202021229426 U CN 202021229426U CN 212801178 U CN212801178 U CN 212801178U
Authority
CN
China
Prior art keywords
steel
pier
concrete
pier stud
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021229426.1U
Other languages
Chinese (zh)
Inventor
孙树礼
苏伟
张帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
China State Railway Group Co Ltd
Original Assignee
China Railway Design Corp
China State Railway Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp, China State Railway Group Co Ltd filed Critical China Railway Design Corp
Priority to CN202021229426.1U priority Critical patent/CN212801178U/en
Application granted granted Critical
Publication of CN212801178U publication Critical patent/CN212801178U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a frame pier of being connected through steel crossbeam and concrete column relates to bridge construction technical field. The frame pier comprises a steel cross beam and a pier stud, a steel-concrete combination section is arranged at the joint of the steel cross beam and the pier stud, the steel-concrete combination section comprises a top steel plate, a bottom steel plate and a vertical plate, shear nails, stiffening ribs and rib plates are arranged on the steel-concrete structure section, a pier stud transition section is arranged above the pier stud, main ribs and the reinforcing ribs extend out of the top of the pier stud by preset lengths, during assembly, the main ribs and the reinforcing ribs on the pier stud penetrate through reserved holes in the bottom steel plate of the steel cross beam, post-cast concrete is poured into pouring holes in the top steel plate, post-cast concrete is cured, and after post-cast concrete curing is completed, connection between the steel cross beam and the pier stud is realized; the construction method corresponds to the structure of a frame pier. The structure has small influence on the railway and the road below, has small construction safety risk, has high assembling speed of the beam and the pier stud, reliable stress and low cost, and can reduce the stress of the foundation.

Description

Frame pier connected with concrete column through steel cross beam
Technical Field
The utility model relates to a bridge construction technical field especially relates to a frame pier who is connected through steel crossbeam and concrete column.
Background
When projects such as railways, municipal works, highways and the like are crossed with small angles such as the existing railways and roads, the frame type piers are often adopted, the frame piers are used for crossing barriers, and small-span beam bodies such as simply supported beams are arranged above the frame piers, so that the economic efficiency is better.
In the past, a frame pier is usually constructed in a cast-in-place mode, pier columns and cross beams are constructed by a support method, the height of the support is high, the construction risk is large, and the construction interference is large, and if the cross beams are constructed by a prefabricated assembly method, the construction speed can be obviously improved, and the construction interference can be reduced; the cross beam is usually made of a steel structure, the steel structure has the advantages of light dead weight, convenience in transportation and hoisting, particular suitability for a long-span cross beam and the like, but the problems that the joint between the steel cross beam and the pier stud is complex in stress, the steel-concrete connection structure is difficult to process, and how to ensure the rapid assembly between the steel cross beam and the pier stud and the like exist; meanwhile, if the steel beam and the pier stud of the frame pier are assembled at one time and form consolidation between the steel beam and the pier stud, the first-stage self weight of the upper beam body above the frame pier, the second-stage self weight of the bridge deck attachment and the like cause bending of the pier bottom, so that the stress of the foundation is increased, and the difficulty in designing the foundation is often caused. Therefore, it is an urgent problem to develop a frame pier connected with a concrete column through a steel beam.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information constitutes prior art already known to a person skilled in the art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a frame pier of being connected through steel crossbeam and concrete column to the realization is little to below railway, road influence, and construction safety risk is little, and the crossbeam is assembled fastly with the pier stud, the atress is reliable, with low costs, and can reduce basic atress.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pair of frame pier through steel crossbeam and concrete column connection, including steel crossbeam and pier stud, the steel crossbeam with the pier stud department of meeting establishes steel-concrete joint section, steel-concrete joint section includes top steel sheet, end steel sheet and riser, set up shear force nail, stiffening rib and floor in the steel-concrete joint section, the pier stud top sets up the pier stud changeover portion, and main muscle and strengthening rib stretch out the pier stud top and predetermine length, when assembling, main muscle and strengthening rib on the pier stud penetrate the steel crossbeam the preformed hole on the end steel sheet, again in pour the post-cast concrete in pouring hole on the top steel sheet, right post-cast concrete carries out the maintenance, treats it realizes after the post-cast concrete maintenance the steel crossbeam with connection between the pier stud.
Furthermore, the top steel plate is located the top surface of steel-concrete combined section, set up pouring hole and exhaust hole on the top steel plate.
Further, the end steel sheet is located the bottom surface of steel-concrete combination section, set up a plurality of preformed holes on the end steel sheet, it is a plurality of the preformed hole will a plurality of bar steel sheet regions are cut apart into to the end steel sheet, every the size in preformed hole is greater than the outline of owner muscle, every all be equipped with the floor in the bar steel sheet region and strengthen.
Furthermore, the riser is located the steel-concrete joint section with all around the pier stud meets, simultaneously pier stud center department sets up the riser, this department riser with temporary support in the pier stud corresponds, temporary support corresponds with temporary support column.
Furthermore, a transition plate is arranged at the transition section of the pier stud, the transition plate comprises a columnar structure formed by four vertical steel plates in a surrounding mode, the height of the columnar structure is the same as the stacking height of the temporary support column and the temporary support, the upper portion of the transition plate is connected with the steel cross beam, the lower portion of the transition plate is connected with the top of the pier stud, and a shear nail and a stiffening rib are arranged on the transition plate.
Further, the shear nails are dispersedly arranged on the top steel plate and the vertical plate; the stiffening ribs are dispersedly arranged on the top steel plate and the vertical plate of the steel beam; and at the joint of the steel beam and the pier stud, the shear nails and the stiffening ribs are connected with post-cast concrete.
Furthermore, the rib plates are arranged on the top steel plate, the vertical plates and the bottom steel plate of the steel cross beam, a plurality of rib plates are arranged along the inner contour of the steel cross beam, a plurality of reinforcing steel bar holes are formed in the rib plates, and the perforated reinforcing steel bars penetrate through the reinforcing steel bar holes and are welded and fixed with the vertical plates on two sides.
Furthermore, the pier stud is prefabricated or cast in place, a pier stud transition section is arranged at the top of the pier stud, the outer contour shape of the pier stud transition section is the same as that of a transition plate of the steel cross beam, and the outer contour size of the pier stud transition section is larger than that of other positions of the pier stud;
the main reinforcement adopts the reinforcing bar of pier stud self configuration, the strengthening rib anchor is in inside the pier stud.
Furthermore, a one-time consolidation mode is adopted between the steel cross beam and the pier stud, a transition plate, a temporary support column and a temporary support are not arranged, a splicing seam is laid at the top of the pier stud during construction, and high-strength mortar is adopted as the splicing seam.
Furthermore, the post-cast concrete is one of high-strength concrete, ultrahigh-performance concrete or self-compacting shrinkage-compensated concrete.
The utility model has the advantages that:
the utility model provides a pair of frame pier through steel crossbeam and concrete column are connected can obtain following effect:
1. through setting up the steel crossbeam, alleviateed the crossbeam weight, be convenient for transportation and hoist and mount, construction speed is fast, construction interference is little.
2. Through structures such as shear nails and perforated steel bar shear keys arranged in the steel cross beam, the strength of the connecting part is obviously increased, mutual force transmission between the steel cross beam and post-cast concrete is ensured, the load force transmission path is clear, and the quality is easy to guarantee.
3. The construction tolerance of assembling between steel crossbeam and pier stud is big, assemble simply fast, easily penetrates between pier stud owner muscle and the steel crossbeam, and the rigid connection is formed through the back concreting between the two, and the atress is safe, solves the problem of atress in coordination between steel crossbeam and pier stud.
4. The steel beam and the pier stud are connected in stages, namely the steel beam and the pier stud are hinged firstly and then are solidified, the steel beam and the pier stud are connected through the temporary support firstly, the upper beam body is erected, and then the steel beam and the pier stud are solidified. Thereby avoiding the foundation from being stressed greatly due to one-time consolidation and solving the problem of difficult foundation design.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic front view of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 2 is a schematic top view of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 3 is a schematic structural view of a pier of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 4 is a schematic structural view of a steel beam of a frame pier connected to a concrete column through the steel beam according to an embodiment of the present invention;
fig. 5 is a schematic structural view of a reinforced concrete joint section of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 6 is a schematic structural view of a section i-i in fig. 5 of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 7 is a schematic sectional view ii-ii of fig. 5 illustrating a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 8 is a schematic view of the sectional structure iii-iii of fig. 5 of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 9 is a schematic view of the section iv-iv structure of fig. 5 of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 10 is a schematic view of a temporary supporting structure of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention;
fig. 11 is a schematic structural view of a frame pier connected to a concrete column through a steel beam according to an embodiment of the present invention.
Icon:
1-a steel beam;
2-pier stud;
21-pier column transition section;
3-main reinforcement;
31-reinforcing ribs;
4-a steel-concrete combined section;
5-post-pouring concrete;
6-top steel plate;
61-a perfusion hole;
62-vent hole;
7-bottom steel plate;
71-preformed hole;
8-a vertical plate;
9-a transition plate;
10-shear pins;
11-a rib plate;
12-reinforcing steel bar holes;
13-punching reinforcing steel bars;
14-a stiffener;
15-temporary support columns;
16-a temporary support;
17-splicing seam.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example one
As shown in fig. 1 to 10, for a structural schematic diagram of a frame pier connected to a concrete column through a steel beam 1 provided in an embodiment of the present invention, the frame pier of the present invention is described with reference to fig. 1 to 10, and specific structures and steps are as follows.
The embodiment of the utility model provides a frame pier connected with a concrete column through a steel beam 1, as shown in fig. 1-9, a frame pier connected with a concrete column through a steel beam 1 comprises the steel beam 1 and the pier column 2, a steel-concrete joint section 4 is arranged at the joint of the steel beam 1 and the pier column 2, the steel-concrete joint section 4 comprises a top steel plate 6, a bottom steel plate 7 and a vertical plate 8, a shear nail 10, a stiffening rib 14 and a ribbed plate 11 are arranged on the steel-concrete joint section 4, a pier column transition section 21 is arranged above the pier column 2, a main rib 3 and a reinforcing rib 31 extend out of the top of the pier column 2 by a preset length, during assembly, the main reinforcement 3 and the reinforcing rib 31 on the pier stud 2 penetrate the preformed hole 71 on the bottom steel plate 7 of the steel beam 1, then the post-cast concrete 5 is poured in the pouring hole 61 on the top steel plate 6, and maintaining the post-cast concrete 5, and realizing the connection between the steel beam 1 and the pier stud 2 after the post-cast concrete 5 is maintained.
Specifically, the top steel plate 6 is positioned on the top surface of the steel-concrete combined section 4, and the top steel plate 6 is provided with a pouring hole 61 and an exhaust hole 62; the pouring holes 61 are used for pouring the post-cast concrete 5, and the exhaust holes 62 ensure exhaust in the construction process of the post-cast concrete 5 so as to ensure the pouring compactness.
Specifically, the bottom steel plate 7 is located at the bottom of the reinforced concrete combining section 4, a plurality of preformed holes 71 are formed in the bottom steel plate 7, the bottom steel plate 7 is divided into a plurality of strip-shaped steel plate areas through the preformed holes 71, the size of each preformed hole 71 is larger than the outer contour of the main rib 3, and a rib plate 11 is arranged on each strip-shaped steel plate area for reinforcement; the cross beam bottom steel plate 7 can be ensured to provide tensile capacity so as to bear the bending moment of the steel-concrete combined section 4.
Specifically, the riser 8 is located all around that steel-concrete combined section 4 and pier stud 2 meet, sets up riser 8 in pier stud 2 center department simultaneously, and this department riser 8 corresponds with the interim support 16 in the pier stud 2, guarantees that steel beam 1 supports on interim support 16 under the dead weight effect, and interim support 16 corresponds with interim support column 15.
Specifically, the transition plate 9 is arranged on the pier stud transition section 21, the transition plate 9 comprises a columnar structure formed by four vertical steel plates in a surrounding mode, the height of the columnar structure is the same as the stacking height of the temporary support columns 15 and the temporary support bases 16, the upper portion of the transition plate 9 is connected with the steel cross beam 1, the lower portion of the transition plate 9 is connected with the top of the pier stud 2 and serves as a construction template of post-cast concrete 5, and the temporary template does not need to be arranged when the post-cast concrete 5 is poured; the transition plate 9 is provided with shear nails 10 and stiffening ribs 14, so that force transmission between the transition plate and the post-cast concrete 5 is ensured, and when the frame pier is stressed, the stress is strengthened.
Specifically, (as shown in fig. 10) temporary support column 15 sets up at pier stud 2 top, temporary support 16 is set up above temporary support column 15, temporary support column 15 and temporary support 16 play the effect of supporting steel crossbeam 1, when steel crossbeam 1 supports on temporary support 16, be articulated between steel crossbeam 1 and pier stud 2, do not transmit the moment of flexure, when setting up the upper portion roof beam body on steel crossbeam 1, the first stage dead weight load of upper portion roof beam body does not produce moment of flexure effect to the basis, only after having constructed casting concrete 5, form just transmit the second stage dead weight after the knot between steel crossbeam 1 and pier stud 2, the moment of flexure that live load etc. produced, consequently, the atress of basis has been greatly reduced, be favorable to the design of basis.
Specifically, the shear nails 10 are dispersedly arranged on the top steel plate 6 and the vertical plate 8, so as to play a role in connecting the steel beam 1 with the post-cast concrete 5; at the joint of the steel beam 1 and the pier stud 2, the shear nails 10 are connected with post-cast concrete, when the steel beam 1 bears vertical force, the vertical force is transmitted to the post-cast concrete 5 through the shear nails 10, and when the steel beam 1 bears bending moment, load is transmitted to the post-cast concrete 5 through the tensile strength of the shear nails 10 at one side and the compressive strength of the shear nails 10 at the other side; the stiffening ribs 14 are dispersedly arranged on the top steel plate 6 and the vertical plate 8 of the steel beam 1 to ensure that the steel plates have enough stability, and the stiffening ribs 14 are connected with the post-cast concrete 5 at the joint of the steel beam 1 and the pier stud 2; the connection between the steel plate and the post-cast concrete 5 can be reinforced.
Specifically, the rib plates 11 are arranged on a top steel plate 6, a vertical plate 8 and a bottom steel plate 7 of the steel beam 1, a plurality of rib plates 11 are arranged along the inner contour of the steel beam 1, integrity and stability between the steel plates are guaranteed, a plurality of reinforcing steel bar holes 12 are arranged on the rib plates 11, and perforated reinforcing steel bars 13 penetrate through the reinforcing steel bar holes 12 and are welded and fixed with the vertical plates 8 on two sides; the rib plate 11, the perforated steel bar 13 and the post-cast concrete 5 in the steel bar hole 12 form a shear key, when the top steel plate 6, the vertical plate 8 and the bottom steel plate 7 on the steel beam 1 are stressed, tensile resistance is provided jointly through the shear resisting action of the perforated steel bar 13 and the post-cast concrete 5 poured in the perforated steel bar 13 and the steel bar hole 12, when the vertical plate 8 bears bending moment or the top steel plate 6 and the bottom steel plate 7 bear bending moment, the connection strength between the steel beam 1 and the post-cast concrete 5 is improved obviously through the joint stress of the shear nails 10, the rib plate 11 and the perforated steel bar 13.
Specifically, the pier stud 2 is prefabricated or cast in place, the pier stud transition section 21 is arranged at the top of the pier stud 2, the outer contour shape of the pier stud transition section 21 is the same as the shape of the transition plate 9 of the steel beam 1, the outer contour size of the pier stud transition section 21 is larger than that of other positions of the pier stud 2, connection between the pier stud transition section and the transition plate 9 is guaranteed, meanwhile, the end face of the pier stud transition section can be used as a bottom formwork of post-cast concrete 5, and a temporary formwork does not need to be erected during pouring.
Specifically, the reinforcing bar of main muscle 3 adoption pier stud 2 self configuration, reinforcing rib 31 anchor is inside pier stud 2, it has sufficient anchor length to guarantee that main muscle 3 and reinforcing rib 31 stretch into reinforced concrete combining section 4, when steel crossbeam 1 atress, pour into concrete 5 through the back and anchor and pass power to wearing the bond parcel of main muscle 3 and reinforcing rib 31 wherein, thereby guarantee and 2 load transmission within a definite time of pier stud, reinforcing rib 31 plays the effect that increases bending resistance and shear capacity, and simultaneously, preformed hole 71 sets up sufficient trompil space, main muscle 3 and reinforcing rib 31 penetrate conveniently, the greatly reduced construction degree of difficulty.
Specifically, the post-cast concrete 5 is one of high-strength concrete, Ultra High Performance Concrete (UHPC) or self-compacting shrinkage-compensated concrete.
The frame pier connected with the concrete column through the steel cross beam 1 has the following advantages: by arranging the steel beam 1, the weight of the beam is reduced, the beam is convenient to transport and hoist, the construction speed is high, and the construction interference is small; through the arrangement of the shear nails 10, the perforated steel bars 13, the shear keys and other structures in the steel beam 1, the strength of the connecting part is obviously increased, the mutual transmission of the force between the steel beam 1 and the post-cast concrete 5 is ensured, the load transmission path is clear, and the quality is easy to ensure; the assembly construction tolerance between the steel beam 1 and the pier stud 2 is large, the assembly is simple and quick, the main reinforcement 3 of the pier stud 2 is easy to penetrate into the steel beam 1, rigid connection is formed between the main reinforcement 3 and the steel beam 1 through post-pouring concrete, the stress is safe, and the problem of cooperative stress between the steel beam 1 and the pier stud 2 is solved; the steel beam 1 and the pier stud 2 are connected in stages, namely the steel beam 1 and the pier stud 2 are hinged and then are solidified, the steel beam 1 and the pier stud 2 are connected through the temporary support 16, an upper beam body is erected, and then the steel beam 1 and the pier stud 2 are solidified; thereby avoiding the foundation from being stressed greatly due to one-time consolidation and solving the problem of difficult foundation design.
Example two
As shown in fig. 11, for a frame pier connected to a concrete column through a steel beam 1 according to an embodiment of the present invention, when the force applied to the foundation is not controlled, a form of one-time consolidation may be adopted between the steel beam 1 and the pier column 2, including the connection features of the first embodiment except for the transition plate 9, the temporary support columns 15 and the temporary supports 16 and associated with the transition plate 9, the temporary support columns 15 and the temporary supports 16, which are not described herein again; during construction, the splicing seams 17 are laid at the tops of the pier studs 2, the splicing seams 17 are made of high-strength mortar, the steel beam 1 is hoisted and placed on the splicing seams 17 during construction, the main ribs 3 and the reinforcing ribs 31 penetrate into the steel-concrete combined section 4, the concrete 5 is poured after pouring, and the assembly between the steel beam 1 and the pier studs 2 is completed.
The frame pier connected with the concrete column through the steel cross beam 1 has the following advantages: by arranging the steel beam 1, the weight of the beam is reduced, the beam is convenient to transport and hoist, the construction speed is high, and the construction interference is small; through the arrangement of the shear nails 10, the perforated steel bars 13, the shear keys and other structures in the steel beam 1, the strength of the connecting part is obviously increased, the mutual transmission of the force between the steel beam 1 and the post-cast concrete 5 is ensured, the load transmission path is clear, and the quality is easy to ensure; the assembly construction tolerance between the steel beam 1 and the pier stud 2 is large, the assembly is simple and quick, the main reinforcement 3 of the pier stud 2 is easy to penetrate into the steel beam 1, rigid connection is formed between the main reinforcement 3 and the steel beam 1 through post-pouring concrete, the stress is safe, and the problem of cooperative stress between the steel beam 1 and the pier stud 2 is solved; when the foundation stress is not controlled, a one-time consolidation form is adopted between the steel beam 1 and the pier stud 2, the transition plate 9, the temporary support column 15 and the temporary support 16 are not arranged, the splicing seam 17 is laid at the top of the pier stud 2 during construction, high-strength mortar is adopted for the splicing seam 17, the steel beam 1 is hoisted and placed on the splicing seam 17 during construction, the main rib 3 and the reinforcing rib 31 penetrate into the steel-concrete combined section 4, the post-pouring concrete 5 is poured again, the assembly between the steel beam 1 and the pier stud 2 is completed, the assembly speed is high, the stress is reliable, the cost is low, and the foundation stress can be reduced.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the embodiments of the present invention.

Claims (10)

1. The utility model provides a frame pier through steel crossbeam and concrete column connection which characterized in that: including steel beam and pier stud, the steel beam with the pier stud department of meeting establishes the steel-concrete section that combines, the steel-concrete section that combines includes top steel sheet, end steel sheet and riser, set up shear force nail, stiffening rib and floor on the steel-concrete section that combines, the pier stud top sets up the pier stud changeover portion, and main muscle and strengthening rib stretch out the pier stud top and predetermine length, and during the assembly, main muscle and strengthening rib on the pier stud penetrate the steel beam the preformed hole on the end steel sheet, again pour the post-cast concrete in the pouring hole on the top steel sheet, right post-cast concrete carries out the maintenance, treats realize after the post-cast concrete maintenance the steel beam with be connected between the pier stud.
2. A frame pier connected with a concrete column through a steel beam according to claim 1, wherein: the top steel plate is positioned on the top surface of the reinforced concrete combining section, and the top steel plate is provided with a filling hole and an exhaust hole.
3. A frame pier connected with a concrete column through a steel beam according to claim 1, wherein: the end steel sheet is located the bottom surface of reinforced concrete joint section, set up a plurality of preformed holes on the end steel sheet, it is a plurality of the preformed hole will a plurality of bar steel sheet regions are cut apart into to the end steel sheet, every the size in preformed hole is greater than the outline of main muscle, every all be equipped with the floor in the bar steel sheet region and strengthen.
4. A frame pier connected with a concrete column through a steel beam according to claim 1, wherein: the riser is located the reinforced concrete joint section with all around the pier stud meets, simultaneously pier stud center department sets up the riser, this department riser with temporary support in the pier stud corresponds, temporary support corresponds with temporary support post.
5. A framed pier connected to a concrete column through a steel beam according to claim 4, wherein: the pier stud transition section is provided with a transition plate, the transition plate comprises a columnar structure formed by four vertical steel plates in a surrounding mode, the height of the columnar structure is equal to the stacking height of the temporary support column and the temporary support, the upper portion of the transition plate is connected with the steel cross beam, the lower portion of the transition plate is connected with the top of the pier stud, and the transition plate is provided with shear nails and stiffening ribs.
6. A frame pier connected with a concrete column through a steel beam according to claim 1, wherein: the shear nails are dispersedly arranged on the top steel plate and the vertical plate of the steel beam; the stiffening ribs are dispersedly arranged on the top steel plate and the vertical plate of the steel beam; and at the joint of the steel beam and the pier stud, the shear nails and the stiffening ribs are connected with post-cast concrete.
7. A frame pier connected with a concrete column through a steel beam according to claim 1, wherein: the rib plates are arranged on the top steel plate, the vertical plates and the bottom steel plate of the steel beam, a plurality of rib plates are arranged along the inner contour of the steel beam, a plurality of reinforcing steel bar holes are formed in the rib plates, and the perforated reinforcing steel bars penetrate through the reinforcing steel bar holes and are welded and fixed with the vertical plates on two sides.
8. A frame pier connected with a concrete column through a steel beam according to claim 1, wherein: the pier column is prefabricated or cast in place, a pier column transition section is arranged at the top of the pier column, the outer contour shape of the pier column transition section is the same as that of a transition plate of the steel cross beam, and the outer contour size of the pier column transition section is larger than that of other positions of the pier column; the main reinforcement adopts the reinforcing bar of pier stud self configuration, the strengthening rib anchor is in inside the pier stud.
9. The frame pier connected with the concrete column through the steel cross beam as claimed in claim 1, wherein a form of one-time consolidation is adopted between the steel cross beam and the pier column, a transition plate, a temporary support column and a temporary support are not arranged, a splicing seam is laid at the top of the pier column during construction, and high-strength mortar is adopted as the splicing seam.
10. A frame pier connected with a concrete column through a steel beam according to any one of claims 1 to 9, wherein: the post-cast concrete is one of high-strength concrete, ultrahigh-performance concrete or self-compacting shrinkage-compensating concrete.
CN202021229426.1U 2020-06-29 2020-06-29 Frame pier connected with concrete column through steel cross beam Active CN212801178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021229426.1U CN212801178U (en) 2020-06-29 2020-06-29 Frame pier connected with concrete column through steel cross beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021229426.1U CN212801178U (en) 2020-06-29 2020-06-29 Frame pier connected with concrete column through steel cross beam

Publications (1)

Publication Number Publication Date
CN212801178U true CN212801178U (en) 2021-03-26

Family

ID=75098592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021229426.1U Active CN212801178U (en) 2020-06-29 2020-06-29 Frame pier connected with concrete column through steel cross beam

Country Status (1)

Country Link
CN (1) CN212801178U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113832834A (en) * 2021-08-26 2021-12-24 广州市公用事业规划设计院有限责任公司 Fixed connection node of double-wall hollow pier stud and steel bridge and construction method
CN114525727A (en) * 2022-03-03 2022-05-24 长沙理工大学 Temporary pier locking device for steel box girder cable-stayed bridge and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113832834A (en) * 2021-08-26 2021-12-24 广州市公用事业规划设计院有限责任公司 Fixed connection node of double-wall hollow pier stud and steel bridge and construction method
CN113832834B (en) * 2021-08-26 2023-08-25 广州市城建规划设计院有限公司 Double-wall hollow pier column and steel bridge fixedly connected node and construction method
CN114525727A (en) * 2022-03-03 2022-05-24 长沙理工大学 Temporary pier locking device for steel box girder cable-stayed bridge and construction method

Similar Documents

Publication Publication Date Title
CN111827084A (en) Frame pier connected with concrete column through steel cross beam and construction method
CN104929034A (en) Small modularized steel-concrete rapid-construction box girder bridge and construction method thereof
CN109680835B (en) Self-supporting precast concrete wallboard, concrete wall, structural system and construction method
CN212801178U (en) Frame pier connected with concrete column through steel cross beam
CN105735541A (en) Steel structure girderless floor slab column structure
CN110004822A (en) The wet seam of precast concrete beam connects design
CN103046645A (en) Large span prefabricated monolithic casting structure and construction method
CN105064195B (en) The fish belly Wavelike steel webplate prestressing with bond steel reinforced concrete combination simply supported girder bridge and its construction method of precast assembly
CN211522899U (en) Long-span steel-concrete composite beam convenient to erect by bridge girder erection machine
CN110512800A (en) A kind of steel and concrete combined structure system and construction method
CN113356370A (en) Mutual anchoring connection construction method for shear wall, frame column and concrete beam bracket
CN108643395A (en) A kind of prefabricated prestressing Self-resetting shear wall structure and its construction method
CN203307719U (en) Large-cantilever steel web carinal box girder section
CN112746554A (en) Combined capping beam and bridge with same
CN112144412A (en) Construction method of prefabricated assembled intercolumnar tie beam
CN204112200U (en) Edge of a wing enhanced waveform steel web plate composite box girder
CN206503063U (en) Prefabricated assembled Wavelike steel webplate T beam bridges
CN212426706U (en) Fully-prefabricated light large cantilever preflex combined bent cap beam structure
CN215482231U (en) Assembled waffle bridge panel combination case roof beam structure
CN210216123U (en) Rigid hollow plate girder without longitudinal wet joint
CN208733810U (en) A kind of assembled overlapping beam and slab construction
CN111719417A (en) Fully-prefabricated light large cantilever pre-bending combined bent cap beam structure and construction method
CN101230676A (en) Force-bearing type template component for concrete building lid
CN101230671A (en) Force-bearing type template component
CN101230667A (en) Force-bearing type superposed component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant