CN212775377U - Fixing device for end of steel wire rope of winch with nail - Google Patents

Fixing device for end of steel wire rope of winch with nail Download PDF

Info

Publication number
CN212775377U
CN212775377U CN202021710103.4U CN202021710103U CN212775377U CN 212775377 U CN212775377 U CN 212775377U CN 202021710103 U CN202021710103 U CN 202021710103U CN 212775377 U CN212775377 U CN 212775377U
Authority
CN
China
Prior art keywords
nail
shadow
wire rope
pipeline
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021710103.4U
Other languages
Chinese (zh)
Inventor
黄琳
包信宏
徐纪寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longan Power Equipment Co ltd
Original Assignee
Jiangsu Longan Power Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Longan Power Equipment Co ltd filed Critical Jiangsu Longan Power Equipment Co ltd
Priority to CN202021710103.4U priority Critical patent/CN212775377U/en
Application granted granted Critical
Publication of CN212775377U publication Critical patent/CN212775377U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a hoist engine wire rope end nail fixing device along with shadow, including the main part pipeline, main part pipeline side externally mounted has the reinforcement pipeline, and consolidates the pipeline and be round platform shape structure, the inside all through connection of reinforcement pipeline and main part pipeline has the wire rope main part, and the laminating of wire rope main part outer wall and main part pipeline inner wall, consolidate along with the shadow nail including along with shadow nail mortgage portion, and be connected with along with shadow nail mortgage portion outer end and follow the shadow nail fixed part, along with shadow nail fixed part outer wall be the helicitic texture, and be the toper structure along with shadow nail fixed part outer end, the maximum width along with shadow nail mortgage portion is greater than along with shadow nail fixed part diameter, and follows the shadow nail mortgage portion and constitute "T" type structure along with shadow nail fixed part. This fixing device is followed to shadow nail in hoist steel wire rope end can effectually consolidate steel wire rope's installation, effectively reduces the hidden danger of steel wire rope slippage, improves the fixed security performance of steel wire rope.

Description

Fixing device for end of steel wire rope of winch with nail
Technical Field
The utility model relates to a fixed technical field of wire rope specifically is a fixing device is followed shadow nail in hoist engine wire rope end.
Background
A winch, a light and small hoisting device for hoisting or pulling heavy objects by winding a steel wire rope or a chain on a winding drum, which is also called a winch. Mainly an electric winch. Can be used independently, can also be used as a component part in machinery such as hoisting, road building, mine hoisting and the like, and is widely applied due to simple operation, large rope winding amount and convenient displacement. The device is mainly applied to material lifting or horizontal dragging of buildings, hydraulic engineering, forestry, mines, wharfs and the like, a steel wire rope is required to be used on a winch roller to roll and lift other articles, and the end position of the steel wire rope is required to be fixed.
The fixed mode of wire rope inlet wire in current hoist cylinder is for running through wire rope and insert cyclic annular pipe, supports through the bolt of four sides of outer lane and presses fixedly, appears the wire rope slippage after long-time the use easily, the condition of potential safety hazard appears.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hoist engine wire rope end is along with shadow nail fixing device to solve the fixed problem that has certain slippage hidden danger of wire rope who proposes in the above-mentioned background art in the pipe.
2. In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a hoist engine wire rope end is along with shadow nail fixing device, includes the main part pipeline, main part pipeline side externally mounted has the reinforcement pipeline, and consolidates the pipeline and be round platform shape structure, reinforcement pipeline and main part pipeline inside all through connection have the wire rope main part, and wire rope main part outer wall and main part pipeline inner wall laminating, consolidate inside through reinforcement along with the shadow nail of pipeline, and consolidate along with inside the outside wire rope main part that inserts of shadow nail tip, consolidate along with the shadow nail include along with shadow nail mortgage portion, and be connected with along with shadow nail fixed part along with shadow nail mortgage portion outer end, along with shadow nail fixed part outer wall be helicitic texture, and be the toper structure along with shadow nail fixed part outer end, the maximum width of along with shadow nail mortgage portion is greater than along with shadow nail fixed part diameter, and along with shadow nail mortgage portion and constitute "T" type structure.
Preferably, the four sides inside the main pipeline are all provided with fixing through holes, and the fixing through holes are distributed along the axis of the main pipeline in a staggered manner.
Preferably, the inner wall of the fixing through hole is of a threaded structure, and the inside of the fixing through hole is connected with a positioning and mounting bolt through the threaded structure.
Preferably, a force application slot is formed in the end face of the pressing portion of the photographic nail, and the force application slot is of a prismatic structure.
Preferably, the film nail-following mortgage part is of a rectangular structure, and the length and the width of the film nail-following mortgage part are not larger than the maximum inner diameter of the reinforced pipeline.
Compared with the prior art, the beneficial effects of the utility model are that: this fixing device is followed to shadow nail in hoist steel wire rope end can effectually consolidate steel wire rope's installation, effectively reduces the hidden danger of steel wire rope slippage, improves the fixed security performance of steel wire rope. This hoist engine wire rope end is provided with the reinforcement pipe way of horn mouth form along with shadow nail fixing device, and the user can insert the reinforcement along with the shadow nail and support in the wire rope and expand fixedly in reinforcement pipe way, can effectively prescribe a limit to the position of wire rope main part, avoids the wire rope main part the condition of slippage in the main part pipeline to appear following, improves the security performance of this device.
Drawings
Fig. 1 is a schematic structural view of a fixing device for a video nail at the end of a steel wire rope of a winch according to the present invention;
fig. 2 is a left side view structural diagram of a reinforced pipeline of the fixing device for the video nail at the end of the steel wire rope of the winch of the present invention;
fig. 3 is a right side view structural diagram of a main body pipeline of the fixing device for the video nail at the end of the steel wire rope of the winch of the present invention;
fig. 4 is a schematic view of the main view structure of the reinforcing shadow-following nail of the fixing device for the end of the steel wire rope of the winch.
In the figure: 1. the device comprises a reinforcing pipeline, 2, a main pipeline, 3, a fixing through hole, 4, a positioning mounting bolt, 5, a reinforcing shadow following nail, 501, a shadow following nail pressing part, 502, a shadow following nail fixing part, 6, a steel wire rope main body, 7 and a force application groove hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a fixing device for a steel wire rope end of a winch along with a shadow nail comprises a main body pipeline 2, a reinforcing pipeline 1 is arranged on the outer side of the side edge of the main body pipeline 2, the reinforcing pipeline 1 is of a round table-shaped structure, fixing through holes 3 are formed in four sides of the inner portion of the main body pipeline 2, the fixing through holes 3 are distributed along the axis of the main body pipeline 2 in a staggered mode, the fixing through holes 3 can be located on different positions of the side surface of the main body pipeline 2 so as to reinforce the side surfaces of steel wire rope main bodies 6 at different positions, the inner wall of each fixing through hole 3 is of a threaded structure, positioning mounting bolts 4 are connected to the inner portion of each fixing through hole 3 through the threaded structure, the positioning mounting bolts 4 can be meshed with the fixing through holes 3 to abut against the side surface of the steel wire rope main body 6 so as to mount and reinforce the, the outer wall of the steel wire rope main body 6 is attached to the inner wall of the main body pipeline 2, the reinforcing pipeline 1 penetrates through the reinforcing shadow following nail 5, the outer part of the end face of the reinforcing shadow following nail 5 is inserted into the steel wire rope main body 6, the reinforcing shadow following nail 5 comprises a shadow following nail pressing part 501, the outer end of the shadow following nail pressing part 501 is connected with a shadow following nail fixing part 502, the end face of the shadow following nail pressing part 501 is internally provided with a force application slotted hole 7, the force application slotted hole 7 is of a prism structure, so that a user can insert a tool such as a wrench and the like into the force application slotted hole 7 to apply force to the shadow following nail pressing part 501, the use is more convenient, the shadow following nail pressing part 501 is of a rectangular structure, the length and the width of the shadow following nail pressing part 501 are not more than the maximum inner diameter of the reinforcing pipeline 1, the structure enables the shadow following nail pressing part 501 to be pressed on the inner wall of the reinforcing pipeline 1 to reinforce the installation of the steel wire rope main body 6, and the shadow, the outer end of the image-following nail fixing portion 502 is of a conical structure, the maximum width of the image-following nail pressing portion 501 is larger than the diameter of the image-following nail fixing portion 502, the image-following nail pressing portion 501 and the image-following nail fixing portion 502 form a T-shaped structure, the reinforcing image-following nail 5 can be inserted into the steel wire rope body 6 in the reinforcing pipeline 1 through the image-following nail fixing portion 502 to be expanded and fixed through the structure, the reinforcing image-following nail 5 can be limited and fixed for the image-following nail fixing portion 502 and the steel wire rope body 6 outside the image-following nail fixing portion 502, the stability of the steel wire rope body 6 is improved, the phenomenon that the steel wire rope body 6 slips is avoided, and safety performance is improved.
The working principle is as follows: when the fixing device for the video-following nail at the end of the steel wire rope of the winch is used, firstly, a user can penetrate the steel wire rope main body 6 through the reinforcing pipeline 1 and clamp the steel wire rope main body into the main pipeline 2 for preliminary positioning, then the user can insert the positioning and mounting bolt 4 into the fixing through hole 3 at the position of the brother and support the steel wire rope main body 6, so that the side wall of the steel wire rope main body 6 can be supported and pressed by the positioning and mounting bolt 4 for reinforcement, then the user can insert a wrench and other objects into the force application slotted hole 7 to enable the video-following nail fixing part 502 for reinforcing the video-following nail 5 to enter the main pipeline 2 from the direction of the reinforcing pipeline 1 and be inserted into the steel wire rope main body 6, so that the steel wire rope main body 6 is fixed and clamped inside the main pipeline 2 in an expansion manner, the video-following nail pressing part 501 for, the wire rope body 6 is then firmly installed in the reinforced pipe 1 and the main pipe 2 to be positioned, thereby completing a series of works.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a hoist engine wire rope end is along with shadow nail fixing device, includes main part pipeline (2), its characterized in that: the reinforced pipeline (1) is installed on the outer portion of the side edge of the main pipeline (2), the reinforced pipeline (1) is of a round table-shaped structure, the steel wire rope main body (6) is connected to the inner portions of the reinforced pipeline (1) and the main pipeline (2) in a penetrating mode, the outer wall of the steel wire rope main body (6) is attached to the inner wall of the main pipeline (2), the reinforced nail (5) with the shadow is connected to the inner portion of the reinforced pipeline (1) in a penetrating mode, the outer portion of the end face of the reinforced nail (5) with the shadow is inserted into the steel wire rope main body (6), the reinforced nail (5) with the shadow comprises a nail mortgage portion (501) with the shadow, the outer end of the nail mortgage portion (501) with the shadow is connected with a nail fixing portion (502) with the shadow, the outer wall of the nail fixing portion (502) with the shadow is of a threaded structure, the outer end of the nail fixing portion (502), and the film-coated nail pressing part (501) and the film-coated nail fixing part (502) form a T-shaped structure.
2. The fixing device for the video-follow nail at the end of the steel wire rope of the winch according to claim 1, wherein: fixing through holes (3) are formed in four sides of the inner portion of the main pipeline (2), and the fixing through holes (3) are distributed in a staggered mode along the axis of the main pipeline (2).
3. The fixing device for the video-follow nail at the end of the steel wire rope of the winch according to claim 2, wherein: the inner wall of the fixing through hole (3) is of a threaded structure, and the inside of the fixing through hole (3) is connected with a positioning and mounting bolt (4) through the threaded structure.
4. The fixing device for the video-follow nail at the end of the steel wire rope of the winch according to claim 1, wherein: a force application slotted hole (7) is formed in the end face of the nail-along-track mortaring portion (501), and the force application slotted hole (7) is of a prism-shaped structure.
5. The fixing device for the video-follow nail at the end of the steel wire rope of the winch according to claim 1, wherein: the film nail-following mortgage part (501) is of a rectangular structure, and the length and the width of the film nail-following mortgage part (501) are not larger than the maximum inner diameter of the reinforced pipeline (1).
CN202021710103.4U 2020-08-17 2020-08-17 Fixing device for end of steel wire rope of winch with nail Expired - Fee Related CN212775377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021710103.4U CN212775377U (en) 2020-08-17 2020-08-17 Fixing device for end of steel wire rope of winch with nail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021710103.4U CN212775377U (en) 2020-08-17 2020-08-17 Fixing device for end of steel wire rope of winch with nail

Publications (1)

Publication Number Publication Date
CN212775377U true CN212775377U (en) 2021-03-23

Family

ID=75052525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021710103.4U Expired - Fee Related CN212775377U (en) 2020-08-17 2020-08-17 Fixing device for end of steel wire rope of winch with nail

Country Status (1)

Country Link
CN (1) CN212775377U (en)

Similar Documents

Publication Publication Date Title
CN204781898U (en) A buried bolt plastics clamp combination formula outrigger fixing device that encorbelments in advance
CN212775377U (en) Fixing device for end of steel wire rope of winch with nail
CN212376240U (en) Novel steel pipe safety pile of adjustable base width of assembled
CN204225471U (en) A kind of cantilever steel girder structure through walls
CN1086433C (en) Construction method to recover end pressure bolt support
CN201301448Y (en) Clamp-type recoverable anchor rod
CN107677551B (en) Anti-pulling test device and test method for U-shaped beam embedded channel
CN217760052U (en) Convenient-to-dismount template pull bolt for house construction engineering
CN214940252U (en) A side slope reinforcerment system for basic building engineering
CN211573982U (en) Detachable split nut
CN210236958U (en) Be fixed in portable hoist that is used for hanging chain block on H shaped steel roof beam
CN110820588A (en) Bridge prestress tensioning and locking mechanism
CN214996129U (en) Round steel hoisting ring
CN215292483U (en) Duct piece suitable for large-diameter shaft
CN221073065U (en) Waterproof integrated advanced plugging assembly for outer wall post-pouring belt
CN215854650U (en) Precast concrete component lifting device
CN211078142U (en) Pipeline hoisting device
CN212356250U (en) Pre-buried device suitable for large-scale prefabricated panel hoist and mount
CN221521816U (en) Hoisting auxiliary structure for hoisting reinforced concrete pipeline
CN211849455U (en) Pile foundation construction card cage frame stop device
CN214033705U (en) Large-angle prestressed anchor cable reeving device
CN218951966U (en) Anticorrosion structure for cable strand at anchoring position of bridge main cable
CN209740494U (en) Quick low tube device of precast concrete drain pipe
CN217676374U (en) Building construction material transporting device
CN219018427U (en) Submarine cable protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210323

Termination date: 20210817

CF01 Termination of patent right due to non-payment of annual fee