CN107677551B - Anti-pulling test device and test method for U-shaped beam embedded channel - Google Patents

Anti-pulling test device and test method for U-shaped beam embedded channel Download PDF

Info

Publication number
CN107677551B
CN107677551B CN201710882228.1A CN201710882228A CN107677551B CN 107677551 B CN107677551 B CN 107677551B CN 201710882228 A CN201710882228 A CN 201710882228A CN 107677551 B CN107677551 B CN 107677551B
Authority
CN
China
Prior art keywords
connector
channel
jack
extension rod
threads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710882228.1A
Other languages
Chinese (zh)
Other versions
CN107677551A (en
Inventor
郭剑
丛义营
李宗田
周海灿
金红全
曹学农
张建民
王振
孙国富
董旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN201710882228.1A priority Critical patent/CN107677551B/en
Publication of CN107677551A publication Critical patent/CN107677551A/en
Application granted granted Critical
Publication of CN107677551B publication Critical patent/CN107677551B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0016Tensile or compressive
    • G01N2203/0017Tensile
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0042Pneumatic or hydraulic means

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention discloses a U-shaped beam embedded channel pulling-resistant test device and a test method, wherein the test device comprises a connector, an extension rod, a penetrating jack and an anchor, wherein the connector is of a steel sleeve structure with threads arranged inside, one end of the connector is in threaded connection with the exposed end of a T-shaped bolt arranged in a channel of a web plate of the U-shaped beam, the other end of the connector is connected with the extension rod through threads, one end of the extension rod is of deformed steel, threads matched with the connector are arranged at one end of the extension rod, the extension rod is connected with the connector through threads, the other end of the extension rod is exposed after penetrating through the penetrating jack, and the exposed end of the extension rod is anchored at the rear end of the jack through the anchor; the punching jack is a main device for providing drawing force for the test.

Description

Anti-pulling test device and test method for U-shaped beam embedded channel
Technical Field
The invention relates to the technical field of bridges in civil engineering, in particular to a device and a method for testing the pulling resistance of a U-shaped beam embedded channel.
Background
Along with the rapid development of urban mass transit in China, urban rail transit construction is correspondingly developed. The U-shaped beam is used as a novel urban rail transit bridge structural form, and the U-shaped thin-wall opening section formed by the bottom plate, the web plate and the flange plates has the advantages of light structure weight, good noise reduction effect, low building height, high space utilization rate, driving safety, attractive appearance and the like.
In order to adapt to the current call of energy conservation and emission reduction, the urban rail transit in China adopts electrified operation at present. In order to guarantee erection of power supply control cables, optical cables and cables in electrified operation of the U-beam of rail transit, special hanging pieces for placing the power supply control cables, the optical cables and the cables are required to be arranged inside the U-beam, and the special hanging pieces are fixed on a pre-buried cable channel of the U-beam. Therefore, the stress performance of the embedded cable channel directly influences the stability of power supply cables, optical cables and cable erection and the operation safety of urban rail transit. A pre-buried channel pullout test is generally employed to detect pullout resistance mechanical properties of the pre-buried channel.
Although the national railway industry standard TBT 3329-2013 embedded channel in the electrified railway contact network tunnel requires construction quality and detection projects, how to implement the test is not described in detail. In particular to a channel pulling test, as a T-shaped bolt connected with a channel is shorter, a penetrating jack providing pulling force cannot stretch the exposed end of the bolt, and an extension bar is welded at the end part of the exposed end of the bolt for assisting the jack in pulling the bolt. Although the method solves the problem of insufficient exposed length of the bolt, the method also puts strict requirements on welding work while increasing the welding workload, and is inconvenient in practical operation.
Under the background, the device and the method for testing the pulling resistance of the embedded channel of the U-shaped beam can be developed, and have great practical value.
Disclosure of Invention
The invention aims to overcome the defects in the prior art of the conventional pre-buried channel pulling-resistant test, and provides a device and a method for testing the pulling-resistant of a U-shaped beam pre-buried channel on the premise of the prior art.
In order to achieve the above object, the present invention adopts the following technical measures:
The utility model provides a U-shaped beam pre-buried channel anti-pulling test device, includes connector, extension bar, through heart jack and ground tackle, the connector be a steel sleeve structure that is provided with the screw thread inside, its one end is connected with the exposed end screw thread of the T type bolt that sets up in the channel of U-shaped beam web, the other end passes through the screw thread and is connected with the extension bar, the extension bar be the screw thread steel, one end has set up the screw thread with connector assorted, through screw thread and connector connection, the other end exposes after passing through heart jack, its exposed end is anchored at the heart jack rear end through the ground tackle; the punching jack is a main device for providing drawing force for the test; and (3) a jack is opened to apply drawing force to the extension bar, and the drawing force is transmitted to the T-shaped bolt and the channel through the connector to perform a drawing test.
Further, a cushion block is arranged between the U-shaped beam web plate and the jack to provide drawing counterforce; the cushion block is made of two hollow square steel with equal height.
Further, the connector is of a steel sleeve structure with threads arranged inside, the outer diameter of the connector is unchanged, and the inner diameter of the connector is changed in a step manner; the inner diameter of one end connected with the T-shaped bolt is smaller, the inner diameter is basically the same as the diameter of the T-shaped bolt, and the internal thread is matched with the thread of the bolt; the inner diameter of one end connected with the extension bar is larger, the inner diameter is basically the same as the diameter of the extension bar, and the internal thread is matched with the thread of the extension bar.
Furthermore, the setting range of the internal threads of the connector can meet the checking and calculating requirements of the anti-pulling force threads of the T-shaped bolt and the extension rod.
Furthermore, the diameter of the extension rod is larger than that of a screw rod of the T-shaped bolt, the diameter of the extension rod is required to meet the tensile strength of steel under the action of pulling resistance, and the setting range of threads is required to be slightly larger than that of the internal threads of the connecting end of the connector and the extension rod. The length of the extension rod is slightly larger than that of the through jack, and a certain length is ensured to be exposed.
Further, the anchor is a clamping piece type anchor, and the extension rod can be effectively anchored.
Furthermore, the wider side of the cushion block is tightly attached to the U-shaped web plate, the height of the cushion block is slightly larger than the sum of the length of the exposed T-shaped bolt and the length of the connector, and the two cushion blocks are arranged on two sides of the channel along the channel direction and are ensured to be arranged side by side without contacting with the channel.
The method for testing the anti-pulling of the U-shaped beam embedded channel comprises the following steps:
Step 1: after the T-shaped bolt is placed in the channel and fixed by the nut, the connector and the exposed bolt are screwed tightly by threads.
Step2: the end of the extension bar with the threads is screwed with the connector.
Step 3: and placing the cushion block, and ejecting the jack out by about 2cm to facilitate anchor withdrawal and anchor removal after the test is finished.
Step 4: the extension bar passes through the jack, and after the front end of the jack props against the cushion blocks at two sides, an anchor is used for anchoring the extension bar with the rear end exposed.
Step 5: the jack is started, the front end of the jack continues to be lifted, so that drawing force is generated on the extension rod, the drawing force is transmitted to the T-shaped bolt and the channel through the connector, and loading is stopped after the drawing force is designed.
Step 6: and (3) observing the deformation condition of the channel, and whether the design requirement of the embedded channel in the TBT 3329-2013 electrified railway contact network tunnel is met or not.
Step 7: and (5) withdrawing the anchor, removing the anchor, the extension bar and the connector, and finishing the channel pulling resistance test.
Compared with the prior art, the invention has the following advantages:
(1) The test device is simple to install and can be used repeatedly.
(2) The test process is simple to operate, and the test is safe and reliable.
(3) The invention has the advantages of less material consumption, greatly improved working efficiency, saved working time and good engineering economy.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a cross-sectional view of a U-beam web channel arrangement;
FIG. 2 is a schematic longitudinal cross-sectional view of a channel;
FIG. 3 is a schematic cross-sectional view of a channel;
FIG. 4 is a schematic plan view of a connector;
FIG. 5 is an assembly schematic diagram of a pre-buried channel tensile test device;
In the figure: the device comprises a 1-U-shaped beam, a 2-channel, a 3-anchor rod, a 4-cable hanger, a 5-T-shaped bolt, a 6-nut, 7-threads, an 8-connector, a 9-extension rod, a 10-penetrating jack, an 11-cushion block and a 12-anchor.
Detailed Description
It should be noted that the following detailed description is illustrative and is intended to provide further explanation of the application. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of exemplary embodiments according to the present application. As used herein, the singular is also intended to include the plural unless the context clearly indicates otherwise, and furthermore, it is to be understood that the terms "comprises" and/or "comprising" when used in this specification are taken to specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof.
As described in the background art, the conventional channel pullout test technology has the following problems: the national railway industry standard TBT 3329-2013 embedded channel in the contact network tunnel of the electrified railway requires construction quality and detection projects, but does not describe how to implement the test in detail. In particular to a channel pulling test, as a T-shaped bolt connected with a channel is shorter, a penetrating jack providing pulling force cannot stretch the exposed end of the bolt, and an extension bar is welded at the end part of the exposed end of the bolt for assisting the jack in pulling the bolt. Although the method solves the problem of insufficient exposed length of the bolt, the method also puts strict requirements on welding work while increasing the welding workload, and is inconvenient in practical operation. In order to solve the technical problems, the application provides a device and a method for testing the pulling resistance of a U-shaped beam embedded channel.
The structure of the present invention is further described below with reference to fig. 1,2, 3, 4, 5.
Compared with the traditional channel pulling-resistant test technology, the invention provides the test device and the test method which can meet the pulling-resistant test of the U-shaped beam embedded channel.
Referring to fig. 1 to 5, the anti-pulling test device for the pre-buried channel 2 of the U-shaped beam 1 specifically comprises a T-shaped bolt 5, a connector 8, an extension bar 9, a penetrating jack 10, a cushion block 11 and an anchor 12.
The connector 8 is of a steel sleeve structure with threads 7 arranged inside, one end of the connector is connected with the exposed end of the T-shaped bolt 5 through the threads 7, and the T-shaped bolt 5 is clamped in the embedded channel 2 of the web plate of the U-shaped beam 1; the other end is connected with an extension bar 9 through threads 7, the extension bar 9 is screw steel, threads 7 matched with the connector 8 are arranged at one end of the extension bar, the extension bar is connected with the connector 8 through the threads 7, the through jack 10 is a main device for providing drawing force for a test, the extension bar 9 passes through the front end of the jack 10, the exposed end is anchored at the rear end of the jack 10 through an anchorage device 12, the cushion block 11 is two hollow square steel blocks with equal height, and the cushion block is arranged between a web plate of the U-shaped beam 1 and the jack 10 to provide drawing counter force.
Referring to fig. 2 to 4, the connector 8 is a steel sleeve with a constant outer diameter and a stepwise-variable inner diameter, one end connected with the bolt 5 has a smaller inner diameter, the inner diameter is basically the same as the diameter of the bolt 5, and the internal thread is matched with the thread 7 of the bolt 5; the inner diameter of the end connected with the extension bar 9 is larger, the inner diameter is basically the same as the diameter of the extension bar 9, and the internal thread 7 is matched with the thread 7 of the extension bar 9.
With reference to fig. 4, the setting range of the internal thread 7 of the connector 8 should meet the requirement of checking the anti-pulling force threads of the T-shaped bolt 5 and the extension rod 9.
Referring to fig. 5, the diameter of the extension bar 9 is larger than that of the bolt 5, the diameter of the extension bar is required to meet the tensile strength of steel under the action of pulling resistance, and the setting range of the threads 7 is required to be slightly larger than that of the threads 7 inside the connecting end of the connector 8 and the extension bar 9. The length of the extension rod 9 is slightly longer than that of the through jack 10, and a certain length is exposed.
Referring to fig. 5, anchor 12 is a clip-type anchor that is effective to anchor extension 9.
With reference to fig. 5, the wider side of the spacer 11 is tightly attached to the web of the U-beam 1, and its height is slightly greater than the sum of the length of the exposed bolt 5 and the length of the connector 8, and two spacers 11 are arranged along the channel 2, on both sides of the channel 2, and are arranged side by side without contacting with the channel 2.
The method for carrying out the pulling-out test by using the pulling-out test device for the U-shaped beam embedded channel comprises the following steps:
step 1: after the T-bolts 5 are placed in the channels 2 and secured by nuts 6, the connectors 8 are screwed with the exposed bolts 5 by threads 7.
Step 2: the end of the extension rod 9 with the thread 7 is screwed with the connector 8 by the thread 7.
Step 3: and placing the cushion block 11, and ejecting the jack 10 by about 2cm to facilitate anchor withdrawal and anchor removal 12 after the test is finished.
Step 4: the extension bar 9 passes through the jack 10, and after the front end of the jack 10 props against the cushion blocks 11 at the two sides, an anchor 12 is used for anchoring the extension bar 9 with the rear end exposed.
Step 5: the jack 10 is started, the front end of the jack 10 continues to be lifted, so that drawing force is generated on the extension rod 9, the drawing force is transmitted to the T-shaped bolt 5 and the channel 2 through the connector 8, and loading is stopped after the drawing force is designed.
Step 6: and (3) observing the deformation condition of the channel 2, and whether the design requirement of the embedded channel in the TBT 3329-2013 electrified railway contact network tunnel is met.
Step 7: and (5) withdrawing the anchor, removing the anchor 12, the extension rod 9 and the connector 8, and completing the anti-pulling test of the channel 2.
While the foregoing description of the embodiments of the present invention has been presented in conjunction with the drawings, it should be understood that it is not intended to limit the scope of the invention, but rather, it is intended to cover all modifications or variations within the scope of the invention as defined by the claims of the present invention.

Claims (4)

1. The U-shaped beam embedded channel pulling resistance test device is characterized by comprising a connector, an extension rod, a penetrating jack and an anchor, wherein the connector is of a steel sleeve structure with threads arranged inside, one end of the connector is in threaded connection with the exposed end of a T-shaped bolt arranged in a channel of a web plate of the U-shaped beam, the other end of the connector is connected with the extension rod through threads, the extension rod is made of deformed steel bars, one end of the extension rod is provided with threads matched with the connector and is connected with the connector through threads, the other end of the extension rod is exposed after penetrating through the penetrating jack, and the exposed end of the extension rod is anchored at the rear end of the penetrating jack through the anchor; the punching jack is a main device for providing drawing force for the test;
A cushion block is arranged between the U-shaped beam web plate and the jack to provide drawing counterforce; the wider side of the cushion block is tightly attached to the U-shaped web plate, the height of the cushion block is slightly larger than the sum of the length of the exposed T-shaped bolt and the length of the connector, and the two cushion blocks are arranged on two sides of the channel along the channel direction and are ensured to be arranged side by side without contacting with the channel; the outer diameter of the connector is unchanged, and the inner diameter is changed in a step manner; the inner diameter of one end of the connector, which is connected with the T-shaped bolt, is smaller, the inner diameter is the same as the diameter of the T-shaped bolt, and the internal thread is matched with the thread of the bolt; the inner diameter of one end connected with the extension bar is larger, the inner diameter is the same as the diameter of the extension bar, and the internal thread is matched with the thread of the extension bar; the diameter of the extension rod is larger than that of a screw rod of the T-shaped bolt, and the diameter of the extension rod meets the tensile strength of steel under the action of pulling resistance; the length of the extension rod is longer than that of the through jack, and a certain length is ensured to be exposed; the anchor is a clamping piece type anchor, and can effectively anchor the extension bar;
And (3) a jack is opened to apply drawing force to the extension bar, and the drawing force is transmitted to the T-shaped bolt and the channel through the connector to perform a drawing test.
2. The device for testing the pullout resistance of the embedded channel of the U-shaped beam according to claim 1, wherein the setting range of the internal threads of the connector is required to meet the requirement of the test calculation of the pullout resistance threads of the T-shaped bolt and the extension rod.
3. The U-beam pre-buried channel pullout test apparatus of claim 2, wherein the extension bar thread setting range is greater than the connector and extension bar connection end internal thread setting range.
4. A method for carrying out a pullout test by using the pullout test device for a U-shaped beam embedded channel according to any one of claims 1 to 3, which is characterized by comprising the following steps:
Step 1: after the T-shaped bolt is placed in the channel and fixed through the nut, the connector and the exposed bolt are screwed tightly through threads;
Step 2: the end of the extension rod with threads is screwed tightly with the connector through threads;
Step 3: placing a cushion block, and ejecting the jack to about 2cm to facilitate anchor withdrawal and anchor removal after the test is finished;
Step 4: the extension bar passes through the jack, and after the front end of the jack props against the cushion blocks at two sides, an anchor is used for anchoring the extension bar with the rear end exposed;
Step 5: starting the jack, continuously lifting the front end of the jack, generating drawing force on the extension bar, transmitting the drawing force to the T-shaped bolt and the channel through the connector, and stopping loading after the drawing force is designed;
step 6: observing the deformation condition of the channel, and judging whether the deformation condition meets the design requirement of the embedded channel in the TBT 3329-2013 electrified railway contact network tunnel;
step 7: and (5) withdrawing the anchor, removing the anchor, the extension bar and the connector, and finishing the channel pulling resistance test.
CN201710882228.1A 2017-09-26 2017-09-26 Anti-pulling test device and test method for U-shaped beam embedded channel Active CN107677551B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710882228.1A CN107677551B (en) 2017-09-26 2017-09-26 Anti-pulling test device and test method for U-shaped beam embedded channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710882228.1A CN107677551B (en) 2017-09-26 2017-09-26 Anti-pulling test device and test method for U-shaped beam embedded channel

Publications (2)

Publication Number Publication Date
CN107677551A CN107677551A (en) 2018-02-09
CN107677551B true CN107677551B (en) 2024-04-30

Family

ID=61137272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710882228.1A Active CN107677551B (en) 2017-09-26 2017-09-26 Anti-pulling test device and test method for U-shaped beam embedded channel

Country Status (1)

Country Link
CN (1) CN107677551B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109946151B (en) * 2019-03-11 2023-10-27 江苏城工建设科技有限公司 Stretching detection combined device for embedded channel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674858A (en) * 2015-02-12 2015-06-03 广州市市政工程设计研究院 Foundation pit anti-floating anchor rod pull-out test tool
CN204514597U (en) * 2015-04-15 2015-07-29 中国科学院工程热物理研究所 A kind of wind power blade bolt pull-out test device
CN105004615A (en) * 2015-08-10 2015-10-28 河南理工大学 Device with telescopic base for improving drawing testing effect of coal road anchor rod
CN105699192A (en) * 2016-03-14 2016-06-22 安徽省建筑科学研究设计院 Pull-out test device of glass fiber rib anti-floating anchor and test method of pull-out test device
CN205369540U (en) * 2016-01-27 2016-07-06 福建省中孚检测技术有限公司 Connecting piece is pulled out to chemical anchor bolts tensile
WO2017107960A1 (en) * 2015-12-22 2017-06-29 广东中科华大工程技术检测有限公司 Connection device for use in vertical uplift resistance load of pre-buried foundation pile
CN207147894U (en) * 2017-09-26 2018-03-27 中铁十四局集团第五工程有限公司 A kind of U-shaped beam pre-buried channel flow pulling resistance testing device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674858A (en) * 2015-02-12 2015-06-03 广州市市政工程设计研究院 Foundation pit anti-floating anchor rod pull-out test tool
CN204514597U (en) * 2015-04-15 2015-07-29 中国科学院工程热物理研究所 A kind of wind power blade bolt pull-out test device
CN105004615A (en) * 2015-08-10 2015-10-28 河南理工大学 Device with telescopic base for improving drawing testing effect of coal road anchor rod
WO2017107960A1 (en) * 2015-12-22 2017-06-29 广东中科华大工程技术检测有限公司 Connection device for use in vertical uplift resistance load of pre-buried foundation pile
CN205369540U (en) * 2016-01-27 2016-07-06 福建省中孚检测技术有限公司 Connecting piece is pulled out to chemical anchor bolts tensile
CN105699192A (en) * 2016-03-14 2016-06-22 安徽省建筑科学研究设计院 Pull-out test device of glass fiber rib anti-floating anchor and test method of pull-out test device
CN207147894U (en) * 2017-09-26 2018-03-27 中铁十四局集团第五工程有限公司 A kind of U-shaped beam pre-buried channel flow pulling resistance testing device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
玻璃钢锚杆拉拔力测试试验方案研究;张杰;叶义成;邹常富;吴健飞;李丹青;;矿业研究与开发;20130430(第02期);全文 *

Also Published As

Publication number Publication date
CN107677551A (en) 2018-02-09

Similar Documents

Publication Publication Date Title
CN107941617B (en) System and method for testing mechanical properties of anchor rod and anchor cable under pulling and shearing action
CN204850414U (en) Shaped steel of encorbelmenting draws wire rope instrument formula anchor to one side
CN107677551B (en) Anti-pulling test device and test method for U-shaped beam embedded channel
CN201223881Y (en) Apparatus for measuring tensioning force of fine rolling screw-thread steel
CN104690665B (en) Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig
CN207147894U (en) A kind of U-shaped beam pre-buried channel flow pulling resistance testing device
CN202073094U (en) Prestress anchor cable connector
CN111395568A (en) Replaceable shape memory alloy composite shock insulation support
CN207537885U (en) The anchoring mechanism in inclined guy cable stretching stage
CN216891986U (en) Quick pull rod device of cable-stay bridge large-section pylon
CN203374000U (en) Welded tensioning device
CN205352648U (en) Shear force wall is anti -seismic performance test device under composite action is cut to stretch bending
CN213516682U (en) Bridge railing strength test device
CN110700095A (en) Stay cable anchoring traction device of large-span cable-stayed bridge and traction construction method thereof
CN111502274A (en) Pulling-on piece formula aluminum alloy template pulling-on piece clearing device
CN216586191U (en) Precast beam steel strand wires installation device
CN105155420A (en) Overall tensioning system for pre-tensioning method pre-cast beam plate
CN216842498U (en) Locking device for preventing piston rod of hydraulic oil cylinder from sliding downwards
CN218466602U (en) Concrete precast pile resistance to plucking detection device
CN215931138U (en) Bridge prestress detection device
CN214455880U (en) Quick elasticity anchor clamps are put in belt exhibition exclusively used in
CN217975339U (en) Scaffold drawknot point fixing device
CN218138861U (en) Concrete square pile tensioning device
CN202878161U (en) Fixing device used for tightening of steel rope driven by horizontal type loop
CN206971089U (en) Bridge floor hogging moment whole strand pricking device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant