CN104690665B - Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig - Google Patents

Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig Download PDF

Info

Publication number
CN104690665B
CN104690665B CN201510084675.3A CN201510084675A CN104690665B CN 104690665 B CN104690665 B CN 104690665B CN 201510084675 A CN201510084675 A CN 201510084675A CN 104690665 B CN104690665 B CN 104690665B
Authority
CN
China
Prior art keywords
loading
double
fixture
load
lotus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510084675.3A
Other languages
Chinese (zh)
Other versions
CN104690665A (en
Inventor
余芳
姚大立
鲍文博
黄志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang University of Technology
Original Assignee
Shenyang University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang University of Technology filed Critical Shenyang University of Technology
Priority to CN201510084675.3A priority Critical patent/CN104690665B/en
Publication of CN104690665A publication Critical patent/CN104690665A/en
Application granted granted Critical
Publication of CN104690665B publication Critical patent/CN104690665B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • G01N3/04Chucks

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention provides a double-layer jig for a fatigue elongation test of an ordinary steel bar and a prestressed steel bar, as well as a mounting technique for the double-layer jig, and aims to improve the test efficiency and prolong the service life of a test machine. The jig includes a jig head formed by a load reducing jig and a load holding jig, wherein the jig head is connected with the test machine through a connecting device. The double-layer jig for the steel strand fatigue test adopts the double anchoring technology, so that compared with the traditional jig, the double-layer jig achieves less clamping damage at the ends of a steel strand. Therefore, the difficult problem of end clamping damage in the steel strand fatigue test is successfully solved.

Description

Regular reinforcement and presstressed reinforcing steel fatigue tension test double-deck fixture and mounting process
Technical field
The present invention relates to a kind of regular reinforcement and presstressed reinforcing steel fatigue tension test double-deck fixture and mounting process, specifically Refer to reduces holding the load that lotus fixture is undertaken in steel strand wires fatigue tension test by arranging off-loading fixture, reduces steel strand wires Fatigue damage caused by the occlusion defect of end, and then reduce the destruction of invar twisted wire end and cause the risk of test failure.
Background technology
With the development of prestressing technique, prestressed structure is widely used in large scale structure engineering or science of bridge building.By Frequently undergo the effect of cyclic reverse loading during service in these structures so that the fatigue behaviour research of prestressed structure becomes mesh One big hot issue of front field of civil engineering.Currently, prestress wire fatigue test way is usually to provide in producer Carry out on hydraulic pressure length section fixture.Slippage problems that can be with effectively solving steel strand wires in test using long section fixture, but while Also the Clamping damage of steel strand wires end is increased, the broken end speed of steel strand wires is accelerated, success of the test probability is reduced.This Outward, because the hardness of steel strand wires is higher, hydraulically operated fixture directly clamps steel strand wires and easily causes holder contacts face there is bite mark phenomenon, Affect the service life of machine.In sum, the reliability of test data is not only affected using traditional experiment fixture, can be also accelerated Testing equipment it is aging.
The content of the invention
Goal of the invention:The invention provides a kind of regular reinforcement and presstressed reinforcing steel fatigue tension test double-deck fixture and peace Dress technique, its objective is to solve the problems, such as that the efficiency existing for conventional equipment is low inadequate with service life.
Technical scheme
The present invention is achieved through the following technical solutions:
A kind of regular reinforcement and presstressed reinforcing steel fatigue tension test with double-deck fixture, the fixture include by by off-loading fixture with The clamp head of lotus fixture composition is held, clamp head is connected by attachment means with testing machine.
Off-loading fixture includes off-loading clip jaw, off-loading clamp base and off-loading fixture bottom;Off-loading clip jaw is arranged On the inside of off-loading clamp base, off-loading clamp base is connected with attachment means, and off-loading fixture bottom is arranged on off-loading clamp base The one end being connected with attachment means;It is common steel strand tension moveable anchor to hold lotus fixture, lotus clamp base and is held including holding Lotus clip jaw, holds lotus clip jaw and is arranged on innermost layer, holds lotus clip jaw and is arranged on the inner side for holding lotus clamp base, holds lotus Clamp base is arranged on the inner side of off-loading clamp base.
Off-loading clip jaw includes aluminium set, steel bushing and the big intermediate plate of steel taper.
The face that off-loading clamp base is contacted with off-loading clip jaw is to be adapted with the tapered slope of off-loading clip jaw Inclined-plane, the inclination alpha on its inclined-plane takes 30 °, and aluminium set thickness Τ 2 takes 3mm, and aluminium set length L2 is not preferably less than 8mm.
Attachment means include double-deck fixture branch sleeve, connecting rod, pre-load nut one, pre-load nut two and testing machine connection Chassis;Connecting rod one end is connected by pre-load nut one and pre-load nut two with testing machine connecting base plate, and the other end is cased with bilayer Fixture branch sleeve;Off-loading clamp base is injected in double-deck fixture branch sleeve;Testing machine connecting base plate is connected with testing machine.
Contact surface between double-deck fixture branch sleeve and connecting rod is sphere, and spheric curvature is identical, and double-deck fixture connects Female connector cylinder is concave spherical surface, and connecting rod is convex spherical, and its spherical diameter D is not less than 2m.
As mentioned above regular reinforcement and the presstressed reinforcing steel fatigue tension test mounting process of double-deck fixture, formally install it Before need to be attached that device is installed, pretension is installed and pretension loading, its key step is as follows:
(1) installing and connecting apparatus on testing machine;
(2) pretension is installed, and auxiliary steel strand wires are fitted in clamp head first, then clamp head is installed to into attachment means On;
(3) pretension loading, first firing test machine, with the speed of 2kN/s steel strand wires are at the uniform velocity stretched, until pulling force exceedes examination The 20% of the design load upper limit is tested, then stops loading and holding load 5min, by tightening the He of pre-load nut one during load is held Pre-load nut two completes pretension work, finally unloads, and removes clamp head, closes testing machine;
(4) formal test is installed, and changes auxiliary steel strand wires, and auxiliary steel strand wires are taken out first from clamp head, and is replaced with Test steels twisted wire, then reinstalls clamp head by installation steps.
The regular reinforcement as described above and presstressed reinforcing steel fatigue tension test mounting process of double-deck fixture, it should be noted Following 3 points:(1) off-loading clamp base outer surface thread height L1, the inner surface thread depth L3 of double-deck fixture branch sleeve and The specification of pre-load nut one and pre-load nut two need to be that pretension load is true according to the anti-extrusion computing formula of screw thread pair by peak load It is fixed, and require while meeting shear strength check, self-locking property and checking;
(2) the wall thickness T1 of off-loading clamp base, the double-deck wall thickness T3 of the fixture branch sleeve and diameter T5 of connecting rod according to Peak load is determined by the axle center tensile strength formula of steel;
(3) the double-deck minimum thickness T4 of fixture branch sleeve concave spherical surface, the minimum thickness T6 of the convex spherical of connecting rod according to Peak load is determined by the axial compression strength formula of steel.
The regular reinforcement as described above and presstressed reinforcing steel fatigue tension test mounting process of double-deck fixture, the step of the technique It is rapid as follows:
(1) step concrete grammar is as follows:(1) connecting rod is inserted in sleeve;(2) by pre-load nut one and pre-load nut Two screw in connecting rod;(3) using the screw thread of connecting rod, connecting rod is connected with testing machine connecting base plate.
(2) method is as follows in step:The first step, installs auxiliary steel strand wires;First, auxiliary steel strand wires are inserted in into off-loading fixture In base;Secondly, aluminium set, steel bushing and the big intermediate plate of the steel taper composition that sequentially bonds together successively is subtracted with binding agent Lotus clip jaw;Again, the off-loading clip jaw for pasting is fixed on into auxiliary steel strand wires outer surface using adhesive tape, afterwards Off-loading intermediate plate is pushed into into off-loading base bottom;Finally, lotus clamp base will be held and lotus clip jaw is held and is sequentially arranged at off-loading Intermediate plate rear end, while screw bottom is closed in off-loading clamp base by off-loading intermediate plate with holding lotus clamp base and holding lotus clip jaw In;Second step, installs double-deck fixture;The double-deck fixture for installing steel strand wires is placed in the middle of attachment means as shown in Figure 11 and is turned Dynamic branch sleeve, makes being threaded in sleeve for off-loading base, and double-deck fixture is connected with testing machine;
(3) step is specific as follows:(1) firing test machine, using power control mode to aiding in steel strand wires to stretch; (2) at the uniform velocity loaded with the speed of 2kN/s, until after more than the 20% of the EXPERIMENTAL DESIGN load upper limit, stopping loading;(3) load is held 5min, during load is held, is successively tightened pre-load nut two, pre-load nut one with spanner;(4) 0kN is offloaded to, set is unclamped The screw thread of cylinder removes double-deck fixture, is then shut off testing machine.
Advantage and effect:
The present invention provides a kind of regular reinforcement and presstressed reinforcing steel fatigue tension test double-deck fixture and mounting process, purpose It is the service life for improving test efficiency and its extending testing machine.
Advantages of the present invention is as follows with good effect:
First, the risk of test specimen fatigue damage destruction is reduced, significantly improve success of the test probability.The Double-layer clamp of the present invention Tool, has on the one hand shared load action in fatigue test due to increased off-loading fixture, reduces to act on and single holds lotus folder Load on tool, effectively reduces the Clamping damage of steel strand wires end, on the other hand due to the aluminium set pair used in off-loading fixture Steel strand wires carry out flexible clamping, improve the stress concentration phenomenon of steel strand wires at gripping, significantly improve success of the test probability;
Second, extend the service life of testing machine.The pretension mounting process of the present invention, i.e., before formal installation, even Apply precompression on extension bar, the screw thread of testing machine terminal pad can be made all the time in pressured state, effectively prevent due to directly adding The screw thread fatigue damage that load may cause, extends the life-span of test terminal pad.
Steel strand wires fatigue test of the present invention adopts suspension cable anchorage technology with double-deck fixture, compared with conventional brace, alleviates The Clamping damage of steel strand wires end, successfully solves a difficult problem for steel strand wires fatigue test medial end portions Clamping damage.
Description of the drawings
Fig. 1 bilayer clamp head installation drawings
Fig. 2-1 off-loading clamp base detail drawing
Fig. 2-2 are the top view of Fig. 2-1
Fig. 3-1 off-loading clip jaw detail drawing
Fig. 3-2 are the top view of Fig. 3-1
Fig. 4 off-loading fixture bottom detail drawings
The attachment means figure of Fig. 5 bilayer fixtures
Fig. 6-1 bilayer fixture branch sleeve detail drawing
Fig. 6-2 are 6-1 top view
Fig. 7-1 connecting rod detail drawing
Fig. 7-2 are the top view of Fig. 7-1
Fig. 8-1 pre-load nut detail drawing
Fig. 8-2 are 8-1 top view
Fig. 9 installation steps one (install connecting rod and double-deck fixture branch sleeve)
Figure 10 bilayer fixture installations diagram
Figure 11 installation steps two, three (pretension is installed and formal installation)
Label and symbol description
1st, off-loading clip jaw;2nd, off-loading clamp base;3rd, lotus clamp base is held;4th, lotus clip jaw is held;5th, off-loading folder Tool bottom;6th, aluminium set;7th, steel bushing;8th, the big intermediate plate of steel taper;9th, double-deck fixture branch sleeve;10th, connecting rod;11st, pretension spiral shell Female one;12nd, pre-load nut two;13rd, testing machine connecting base plate;14th, steel strand wires are aided in;15th, steel strand wires are tested.
L1-off-loading base outer surface thread depth;Big intermediate plate height/aluminum (copper) the set height of L2-steel taper;L3-company The inner surface thread depth of female connector cylinder.
The wall thickness of T1-off-loading base;;Τ 2-aluminium set thickness;The wall thickness of T3-branch sleeve;T4-branch sleeve is 9. recessed The minimum thickness of sphere;The diameter of T5-connecting rod;The minimum thickness of the convex spherical of T6-connecting rod.
D-connecting rod and connection sleeve pipe contact surface diameter;α-off-loading base inclination angle of inclined plane.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention will be further described:
As depicted in figs. 1 and 2, the present invention provides a kind of regular reinforcement and presstressed reinforcing steel fatigue tension test Double-layer clamp Tool, the fixture includes passing through attachment means and testing machine phase with the clamp head that lotus fixture is constituted, clamp head is held by by off-loading fixture Even.
Off-loading fixture includes off-loading clip jaw 1, off-loading clamp base 2 and off-loading fixture bottom 5;Off-loading clip jaw 1 The inner side of off-loading clamp base 2 is arranged on, off-loading clamp base 2 is connected with attachment means, off-loading fixture bottom 5 is arranged on off-loading folder One end that tool base 2 is connected with attachment means;It is common steel strand tension moveable anchor to hold lotus fixture, including holding lotus fixture bottom Seat 3 and holds lotus clip jaw 4, holds lotus clip jaw 4 and is arranged on innermost layer, holds lotus clip jaw 4 and is arranged on and holds lotus clamp base 3 Inner side, hold the inner side that lotus clamp base 3 is arranged on off-loading clamp base 2.
Off-loading clip jaw 1 includes the big intermediate plate 8 of aluminium set 6, steel bushing 7 and steel taper.
The face that off-loading clamp base 2 is contacted with off-loading clip jaw 1 is to be adapted with the tapered slope of off-loading clip jaw 1 Inclined-plane, the inclination alpha on its inclined-plane takes 30 °, and aluminium set thickness Τ 2 takes 3mm, and aluminium set length L2 is not preferably less than 8mm.
Attachment means include double-deck fixture branch sleeve 9, connecting rod 10, pre-load nut 1, pre-load nut 2 12 and examination Test machine connecting base plate 13;The one end of connecting rod 10 is connected by pre-load nut 1 and pre-load nut 2 12 with testing machine connecting base plate 13 Connect, the other end is cased with double-deck fixture branch sleeve 9;Off-loading clamp base 2 is injected in double-deck fixture branch sleeve 9;Testing machine connects Connect chassis 13 to be connected with testing machine.
Contact surface between double-deck fixture branch sleeve 9 and connecting rod 10 is sphere, and spheric curvature is identical, double-deck fixture Branch sleeve 9 is concave spherical surface, and connecting rod 10 is convex spherical, and its spherical diameter D is not less than 2m.
This device in the design process completely using engagement thread connect, should be noted it is following some:(1) off-loading base appearance The specification of face thread depth L1, the inner surface thread depth L3 of branch sleeve and pre-load nut one, two need to be by peak load (pretension Load) determined according to the anti-extrusion computing formula of screw thread pair, and require while meeting shear strength check, self-locking property and checking; (2) the diameter T5 of the wall thickness T1 of off-loading base, the wall thickness T3 of branch sleeve and connecting rod need to according to peak load by steel axle Heart tensile strength formula determines;(3) the minimum thickness T6 of the minimum thickness T4 of the concave spherical surface of branch sleeve 9, the convex spherical of connecting rod Need to be determined by the axial compression strength formula of steel according to peak load.
As mentioned above regular reinforcement and the presstressed reinforcing steel fatigue tension test mounting process of double-deck fixture, formally install it Before need to be attached that device is installed, pretension is installed and pretension loading, its key step is as follows:
(1) installing and connecting apparatus on testing machine;
(2) pretension is installed, and auxiliary steel strand wires 14 are fitted in clamp head first, then clamp head is installed to into attachment means On;
(3) pretension loading, first firing test machine, with the speed of 2kN/s steel strand wires are at the uniform velocity stretched, until pulling force exceedes examination The 20% of the design load upper limit is tested, then stops loading and holding load 5min, by tightening pre-load nut 1 during load is held Pretension work is completed with pre-load nut 2 12, is finally unloaded, remove clamp head, close testing machine;
(4) formal test is installed, and changes auxiliary steel strand wires, and auxiliary steel strand wires are taken out first from clamp head, and is replaced with Test steels twisted wire, then reinstalls clamp head by installation steps 2.
The regular reinforcement as described above and presstressed reinforcing steel fatigue tension test mounting process of double-deck fixture, it should be noted Following 3 points:(1), the outer surface thread height L1 of off-loading clamp base 2, the inner surface thread depth of double-deck fixture branch sleeve 9 The specification of L3 and pre-load nut 1 and pre-load nut 2 12 need to be pretension load according to the anti-extrusion meter of screw thread pair by peak load Calculate formula to determine, and require while meeting shear strength check, self-locking property and checking;
(2), the diameter T5 roots of the wall thickness T1 of off-loading clamp base 2, the wall thickness T3 of double-deck fixture branch sleeve 9 and connecting rod Determined by the axle center tensile strength formula of steel according to peak load;
(3), minimum thickness T4, the minimum thickness T6 of the convex spherical of connecting rod 10 of the double-deck concave spherical surface of fixture branch sleeve 9 Determined by the axial compression strength formula of steel according to peak load.
Referring to Fig. 1-Figure 11, enforcement figure of the steel strand wires fatigue test of the present invention shown in double-deck fixture and its mounting process In main include double-deck grip device (Fig. 1), double-deck fixture attachment means (Fig. 5) and its mounting process (Fig. 9, Figure 11).
Concrete operations are as follows:1) installing and connecting apparatus, its step is as follows:(1) connecting rod 10 is inserted in sleeve 9;(2) will Pre-load nut 1 and pre-load nut 2 12 are screwed in connecting rod 10;(3) using the screw thread of connecting rod 10, by connecting rod and test Machine connecting base plate 13 is connected (referring to Fig. 9).
2) pretension is installed, and its step is as follows:The first step, installs auxiliary steel strand wires 14.First, auxiliary steel strand wires 14 are inserted in In off-loading clamp base 2;Secondly, with binding agent by the big intermediate plate 8 of aluminium set 6, steel bushing 7 and steel taper sequentially bonding successively Off-loading clip jaw 1 is constituted together;Again, the off-loading clip jaw 1 for pasting is fixed on into auxiliary steel using adhesive tape The outer surface of twisted wire 14, is pushed into the bottom of off-loading base 2 by off-loading intermediate plate 1 afterwards;Finally, lotus clamp base 3 will be held and lotus folder is held Tool intermediate plate 4 be sequentially arranged at the rear end of off-loading intermediate plate 1, while screw bottom 5 by off-loading intermediate plate 1 with hold lotus clamp base 3 and hold lotus Clip jaw 4 is closed in off-loading clamp base 2.Second step, installs double-deck fixture.The double-deck fixture of steel strand wires will be installed (Figure 10) it is placed in as shown in Figure 11 in the middle of attachment means 5 and rotates branch sleeve 9, make off-loading base 2 is threaded into sleeve 9 In, double-deck fixture is connected with testing machine.
3) pretension loading, its step is as follows:(1) firing test machine, using power control mode to aiding in steel strand wires 14 to carry out Stretching;(2) at the uniform velocity loaded with the speed of 2kN/s, until after more than the 20% of the EXPERIMENTAL DESIGN load upper limit, stopping loading;(3) hold 5min is carried, during load is held, is successively tightened pre-load nut 2 12, pre-load nut 1 with spanner;(4) 0kN is offloaded to, pine Open sleeve screw thread 9. and remove double-deck fixture, be then shut off testing machine.
4) formal test is installed, and changes auxiliary steel strand wires, is taken out from fixture, is replaced with test steels twisted wire, its installation Step installs 2) identical with pretension.
The present invention is advantageous in that relative to the hydraulically operated fixture of classic fatigue test:First, reduce test specimen fatigue damage The risk of destruction, improves success of the test probability.Due to traditional experiment fixture be realized using the gmatjpdumamicss produced by biting teeth it is right The clamping action of steel strand wires, but this method of clamping can cause bite mark phenomenon to the retaining part of steel strand wires, especially in fatigue In test, bite mark depth gradually increases with the increase of times of fatigue, so that there is phenomenon of rupture in steel strand wires end, causes Fatigue test fails.According to above-mentioned experimental phenomena, double-deck fixture proposed by the invention is mainly shared by off-loading fixture Fractional load suffered by lotus fixture is held, while also steel strand wires can be produced with flexible gripping by arranging smooth aluminium set in off-loading intermediate plate Effect, can so substantially reduce the Clamping damage of steel strand wires end, significantly improve the chance of success of fatigue test.Secondth, prolong The service life of testing machine is grown.The pretension mounting process of the present invention, i.e., before formal installation, apply precompressed in connecting rod Power, can make the screw thread of testing machine terminal pad all the time in pressured state, effectively prevent the spiral shell due to being loaded directly into causing Stricture of vagina fatigue damage, extends the life-span of test terminal pad.3rd, reduces cost.Conventional hydraulic fixture need to be special by testing machine producer Door customization, and fixture introduces hydraulic control, while fatigue test is also more serious to the damage of fixture, therefore, experimentation cost with Maintenance cost is higher.The present invention can both substantially reduce purchase only by the collective effect for holding lotus fixture and off-loading fixture Test equipment equipment needed thereby funds, can reduce steel strand wires to maintenance cost produced by holding the damage of lotus fixture again, reach very well Economic benefit.

Claims (8)

1. a kind of regular reinforcement and presstressed reinforcing steel fatigue tension test are with double-deck fixture, it is characterised in that:The fixture is included by subtracting Lotus fixture is connected by attachment means with the clamp head for holding lotus fixture composition, clamp head with testing machine;
Off-loading fixture includes off-loading clip jaw (1), off-loading clamp base (2) and off-loading fixture bottom (5);Off-loading clip jaw (1) off-loading clamp base (2) inner side is arranged on, off-loading clamp base (2) is connected with attachment means, and off-loading fixture bottom (5) sets Put the one end being connected with attachment means in off-loading clamp base (2);It is common steel strand tension moveable anchor to hold lotus fixture, bag Include and hold lotus clamp base (3) and hold lotus clip jaw (4), hold lotus clip jaw (4) and be arranged on innermost layer, hold lotus clip jaw (4) inner side for holding lotus clamp base (3) is arranged on, the inner side that lotus clamp base (3) is arranged on off-loading clamp base (2) is held.
2. regular reinforcement according to claim 1 and presstressed reinforcing steel fatigue tension test are with double-deck fixture, it is characterised in that: Off-loading clip jaw (1) includes aluminium set (6), steel bushing (7) and the big intermediate plate of steel taper (8).
3. regular reinforcement according to claim 2 and presstressed reinforcing steel fatigue tension test are with double-deck fixture, it is characterised in that: The face that off-loading clamp base (2) is contacted with off-loading clip jaw (1) is to be adapted with the tapered slope of off-loading clip jaw (1) Inclined-plane, the inclination alpha on its inclined-plane takes 30 °, and aluminium set thickness (T2) takes 3mm, and aluminium set length (L2) is not preferably less than 8mm.
4. regular reinforcement according to claim 2 and presstressed reinforcing steel fatigue tension test are with double-deck fixture, it is characterised in that: Attachment means include double-deck fixture branch sleeve (9), connecting rod (10), pre-load nut one (11), pre-load nut two (12) and examination Test machine connecting base plate (13);Connecting rod (10) one end is connected by pre-load nut one (11) and pre-load nut two (12) with testing machine Chassis (13) connects, and the other end is cased with double-deck fixture branch sleeve (9);Off-loading clamp base (2) injects double-deck fixture adapter sleeve In cylinder (9);Testing machine connecting base plate (13) is connected with testing machine.
5. regular reinforcement according to claim 4 and presstressed reinforcing steel fatigue tension test are with double-deck fixture, it is characterised in that: Contact surface between double-deck fixture branch sleeve (9) and connecting rod (10) is sphere, and spheric curvature is identical, double-deck fixture connection Sleeve (9) is concave spherical surface, and connecting rod (10) is convex spherical, and its spherical diameter D is not less than 2m.
6. the regular reinforcement as claimed in claim 1 and presstressed reinforcing steel fatigue tension test mounting process of double-deck fixture, it is special Levy and be:Need to be attached device installation, pretension installation and pretension loading before formal installation, its key step is as follows:
(1) installing and connecting apparatus on testing machine;
(2) pretension is installed, and during steel strand wires (14) will be aided in be fitted into clamp head first, then clamp head is installed to into attachment means On;
(3) pretension loading, first firing test machine, at the uniform velocity stretch steel strand wires, until pulling force sets more than test with the speed of 2kN/s Meter the load upper limit 20%, then stop load and hold load 5min, hold carry during by tighten pre-load nut one (11) and Pre-load nut two (12) completes pretension work, finally unloads, and removes clamp head, closes testing machine;
(4) formal test is installed, and changes auxiliary steel strand wires, and auxiliary steel strand wires are taken out first from clamp head, and is replaced with test With steel strand wires, then clamp head is reinstalled by installation steps (2).
7. the regular reinforcement according to claim 6 and presstressed reinforcing steel fatigue tension test mounting process of double-deck fixture, It is characterized in that:
(1) off-loading clamp base (2) outer surface thread height (L1), the inner surface thread depth of double-deck fixture branch sleeve (9) And the specification of pre-load nut one (11) and pre-load nut two (12) need to be that pretension load resists according to screw thread pair by peak load (L3) Extruding computing formula determines, and requires while meeting shear strength check, self-locking property and checking;
(2) diameter of the wall thickness (T1) of off-loading clamp base (2), the wall thickness (T3) of double-deck fixture branch sleeve (9) and connecting rod (T5) determined by the axle center tensile strength formula of steel according to peak load;
(3) minimum thickness (T4), the minimum thickness of the convex spherical of connecting rod (10) of double-deck fixture branch sleeve (9) concave spherical surface (T6) determined by the axial compression strength formula of steel according to peak load.
8. the regular reinforcement according to claim 6 and presstressed reinforcing steel fatigue tension test mounting process of double-deck fixture, It is characterized in that:The step of technique, is as follows:
(1) step concrete technology is as follows:(1) connecting rod (10) is inserted in sleeve (9);(2) by pre-load nut one (11) and Pre-load nut two (12) is screwed in connecting rod (10);(3) using the screw thread of connecting rod (10), connecting rod is connected with testing machine Chassis (13) is connected;
(2) technique is as follows in step:The first step, installs auxiliary steel strand wires (14);First, auxiliary steel strand wires (14) is inserted in into off-loading In clamp base (2);Secondly, with binding agent by aluminium set (6), steel bushing (7) and the big intermediate plate of steel taper (8) sequentially successively Bond together composition off-loading clip jaw (1);Again, it is using adhesive tape that the off-loading clip jaw (1) for pasting is fixed In auxiliary steel strand wires (14) outer surface, afterwards off-loading intermediate plate (1) is pushed into into off-loading base (2) bottom;Finally, lotus fixture will be held Base (3) and hold lotus clip jaw (4) and be sequentially arranged at off-loading intermediate plate (1) rear end, while screw off-loading fixture bottom (5) will subtract Lotus intermediate plate (1) is closed in off-loading clamp base (2) with holding lotus clamp base (3) and holding lotus clip jaw (4);Second step, peace The double-deck fixture of dress;The double-deck fixture for installing steel strand wires is placed in the middle of attachment means and branch sleeve (9) is rotated, off-loading bottom is made Being threaded in sleeve (9) for seat (2), double-deck fixture is connected with testing machine;
(3) step is specific as follows:(1) firing test machine, using power control mode to aiding in steel strand wires (14) to stretch; (2) at the uniform velocity loaded with the speed of 2kN/s, until after more than the 20% of the EXPERIMENTAL DESIGN load upper limit, stopping loading;(3) load is held 5min, during load is held, is successively tightened pre-load nut two (12), pre-load nut one (11) with spanner;(4) it is offloaded to 0kN, the screw thread for unclamping sleeve (9) removes double-deck fixture, is then shut off testing machine.
CN201510084675.3A 2015-02-16 2015-02-16 Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig Expired - Fee Related CN104690665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510084675.3A CN104690665B (en) 2015-02-16 2015-02-16 Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510084675.3A CN104690665B (en) 2015-02-16 2015-02-16 Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig

Publications (2)

Publication Number Publication Date
CN104690665A CN104690665A (en) 2015-06-10
CN104690665B true CN104690665B (en) 2017-04-19

Family

ID=53338415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510084675.3A Expired - Fee Related CN104690665B (en) 2015-02-16 2015-02-16 Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig

Country Status (1)

Country Link
CN (1) CN104690665B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105508357B (en) * 2015-12-22 2018-06-12 湖南大学 It is a kind of to reduce the axially eccentric assembling device of tensile test specimen and operating method
CN108362536A (en) * 2018-02-09 2018-08-03 广东省韶关市质量计量监督检测所 A kind of processing method of Ribbed Bar axial tension fatigue test sample
CN114965025B (en) * 2022-05-13 2023-04-14 哈尔滨工业大学 Test fixture for nondestructive compression test of double-layer hollow thin plate
CN116429573B (en) * 2023-04-17 2023-12-08 北京工业大学 Welding type IGBT module bonding wire tensile testing device and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87205634U (en) * 1987-03-25 1988-03-16 西南交通大学 Clamping apparatus for reinforcing bar fatigue test
CN201320727Y (en) * 2008-12-21 2009-10-07 大庆油田有限责任公司 Assembly device for PCCP pipelines
CN201331464Y (en) * 2008-12-30 2009-10-21 江阴法尔胜钢铁制品有限公司 Circular fixture for prestress steel strand detection
CN202705897U (en) * 2012-07-06 2013-01-30 安徽金星预应力工程技术有限公司 High strength low retracting anchorage device
CN103630443A (en) * 2013-12-20 2014-03-12 济南东测试验机技术有限公司 Anchorage clip for steel strand fatigue test
CN103835318A (en) * 2012-11-26 2014-06-04 昆山市建设工程质量检测中心 Quick connecting piece in pile foundation static load test

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT412564B (en) * 2003-12-22 2005-04-25 Burtscher Stefan L Dipl Ing Dr Anchoring for pre-tensioned and/or stressed tensile elements comprises a wedge and anchoring body formed by at least two wedge-shaped layers lying over each other

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87205634U (en) * 1987-03-25 1988-03-16 西南交通大学 Clamping apparatus for reinforcing bar fatigue test
CN201320727Y (en) * 2008-12-21 2009-10-07 大庆油田有限责任公司 Assembly device for PCCP pipelines
CN201331464Y (en) * 2008-12-30 2009-10-21 江阴法尔胜钢铁制品有限公司 Circular fixture for prestress steel strand detection
CN202705897U (en) * 2012-07-06 2013-01-30 安徽金星预应力工程技术有限公司 High strength low retracting anchorage device
CN103835318A (en) * 2012-11-26 2014-06-04 昆山市建设工程质量检测中心 Quick connecting piece in pile foundation static load test
CN103630443A (en) * 2013-12-20 2014-03-12 济南东测试验机技术有限公司 Anchorage clip for steel strand fatigue test

Also Published As

Publication number Publication date
CN104690665A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN104690665B (en) Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig
CN107575257B (en) The anchoring process of anchor tool system for fibre-reinforced high molecular material bar
CN103048264B (en) Anchorage performance detection testing apparatus and method for carbon fiber adhesion reinforcement
CN101173505B (en) External pre-stress construction method for chamber type bridge maintaining
CN101235663A (en) Clip type anchorage applying to carbon fiber reinforced polymeric material prestressing force rib
CN203050133U (en) Prestressed steel structure drag cable tensioning device capable of accurately measuring tension force
CN104533018A (en) Prestress tensioning anchorage device for FRP (Fiber Reinforce Plastic) ribs
CN106639355A (en) Reinforced concrete beam structure
CN109653531B (en) External prestress steel strand connector and matched tensioning device
CN109267571A (en) There are the anchors and its construction method under cavity condition in a kind of slopes
CN106568646A (en) FRP reinforcement tension test apparatus and test method
CN107655755A (en) A kind of test method of drag-line cord clip assembly resistant slide bearing capacity
CN209760863U (en) External prestress steel strand connector and matched tensioning device
CN112647706A (en) Construction method for long-span concrete beam slow-bonding prestress
CN112942685B (en) Novel anchoring system and anchoring method for fiber reinforced resin composite material rod
CN213875389U (en) Test device for carbon fiber cloth interface bonding, shearing and peeling
CN207193776U (en) A kind of bridge prestress tensioning equipment
CN205483801U (en) Tensile fatigue test device of high tensile steel wire
CN105510132A (en) Sustained load application device and method for concrete chemically planted bar
CN203007855U (en) Stretch-draw anchoring system of pre-stress fiber composite plate
CN201335746Y (en) Concrete beam anchorage pre-stressing force detecting device
CN104234325A (en) Novel FRP rib adhesive type anchorage device with screw plug and mounting method of anchorage device
CN109060649A (en) Test the experimental rig and method of major diameter double limb reinforcing bars and Concrete Bond Strength
CN207761302U (en) One kind can be used in turn anchor pole tension tool
CN107503527B (en) Detachable anchorage device for prestressed carbon fiber plates

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yu Fang

Inventor after: Yao Dali

Inventor after: Bao Wenbo

Inventor after: Huang Zhiqiang

Inventor before: Yu Fang

Inventor before: Yao Dali

Inventor before: Bao Wenbo

Inventor before: Huang Zhiqiang

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170419

Termination date: 20210216