CN103835318A CN201210488591.2A CN201210488591A CN103835318A CN 103835318 A CN103835318 A CN 103835318A CN 201210488591 A CN201210488591 A CN 201210488591A CN 103835318 A CN103835318 A CN 103835318A
Authority
CN
China
Prior art keywords
sub
connector
reinforcing steel
presstressed reinforcing
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210488591.2A
Other languages
Chinese (zh)
Other versions
CN103835318B (en
Inventor
洪鑫
龚朝龙
王鹏飞
陈可君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER
Original Assignee
KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER filed Critical KUNSHAN CONSTRUCTION ENGINEERING QUALITY TESTING CENTER
Priority to CN201210488591.2A priority Critical patent/CN103835318B/en
Publication of CN103835318A publication Critical patent/CN103835318A/en
Application granted granted Critical
Publication of CN103835318B publication Critical patent/CN103835318B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a quick connecting piece in a foundation static load test. The quick connecting piece comprises a connecting prestressing tendon and sub-connectors. At least one end of the connecting prestressing tendon can be in axial locking connection with the sub-connectors. The ends, back on to the connecting prestressing tendon, of the sub-connectors are provided with positioning holes, the diameter of the positioning holes can be decreased, the positioning holes are provided with adjusting pieces, and the diameter of the positioning holes can be adjusted through the adjusting pieces. The quick connecting piece can be in quickly detachable connection with a pile foundation rebar through the sub-connectors connected to one end of the prestressing tendon, the connecting speed is high, the junction between the rebar and the sub-connectors is convenient to adjust, and therefore it is guaranteed that the rebar on the top of a pile is stressed evenly. Furthermore, as the quick connecting piece is convenient to connect, high-lift operation can be avoided, work difficulty and work risks are lowered, materials are saved, material waste is avoided, repeated testing can be achieved, and the success probability of testing can be enhanced.

Description

Quick connection part during static load of pile foundation detects
Technical field
The present invention relates to a kind of static load of pile foundation checkout equipment, particularly Quick connection part in a kind of static load of pile foundation detection.
Background technology
It is to detect of paramount importance project as foundation that static load of pile foundation provides an important means of parameter and measurement pile foundation construction quality as Pile Foundations Design all the time, in recent years, along with the fast development of China's economy, be subject to the restriction in soil and the needs of civil air defense constructions and installations, China's building has presented upwards more and more higher, downward deeper and deeper developing state, correspondingly more and more to pile foundation engineering amount, and vertically pulling-resistant bearing capacity and vertical compression requirement for bearing capacity to single pile are more and more higher, in single pile vertical resistance pressure bearing capacity, adopt in anchored pile-testing method detection and unit for single-pile vertical anti-pulling loading test, how the stake for bearing resistance to plucking is connected with the girder of test, the power that success applies uplift resistance and jack is carried out balance, the speed of pile foundation detection and the successful of test will directly be affected, two kinds of conventional detection methods are respectively anchored pile-testing method detection and uplift pile detection at present, below these two kinds of detection methods are introduced:
According to " architecture foundation pile detection technique code ", anchored pile-testing method in single pile vertical resistance pressure loading test is to provide counter-force by anchoring pile, anchoring pile is by being delivered to power on girder, provide counter-force for applying the load of test pile by girder, (typical force diagram is shown in Fig. 1), its key whether testing successfully is whether the uplift resistance of anchoring pile meets the demands and how anchoring pile effectively offers girder by counter-force.
For the anchored pile-testing method in single pile vertical resistance pressure loading test, it is relatively simple that the detection of uplift pile loads, its general principle is the counter-force that resistance to plucking is provided by two piers, pass through girder, by jack load application, jack is arranged by two kinds of modes conventionally: two ends jack loads; Middle jack loads, and (typical force diagram is shown in Fig. 2) its key whether testing successfully is whether the bearing capacity of foundation soil of buttress point meets the demands and how uplift pile effectively offers girder by counter-force.
By to two kinds of test method introductions, can find that a general character is exactly girder and how to be effectively connected and whether successfully directly to determine to detect for the stake that resistance to plucking is provided.
According in recent years anchored pile-testing method being detected and uplift pile detection finding, test in two kinds of detection methods is by stake top reinforcing bar and the welding of connecting reinforcement one end or mechanical connection with girder and the stake power transmission that uplift effect is provided, the other end of connecting reinforcement correspondingly with girder on (or jack top, this kind of situation appears at load mode in the middle of the jack of uplift pile in detecting) the blue welding of extension or adopt nut mechanical connection.
This kind of method connects the following problem that mainly exists:
1, when load application, owing to being all rigidly connected, the reinforcing bar that there will be part to connect is long, part reinforcing bar is short, and stake top reinforcing steel bar bear is inhomogeneous, thereby can cause part reinforcing bar to destroy in advance, thereby causes detecting unsuccessfully;
2,, for being welded to connect, need to consume a large amount of welding rod and artificial, especially in the detection of high tonnage, often this just needs cost multiple artificial, especially in the time carrying out that extension on girder is blue to be connected with reinforcing bar, owing to belonging to senior engineer's operation, also can cause the accident generations such as falling of employee.
3,, for mechanical connection, for welding, reduced welding, also corresponding can minimizing much manually, but must reserve silking at stake top reinforcing bar and connecting reinforcement, for mechanical connection, and these reserved silkings all will can not use in follow-up use, also cause certain waste.
4, no matter be mechanical connection or be welded to connect, all need to use connecting reinforcement, these reinforcing bars, after the complete pile of every detection, because welding section is all cut, thereby make substantially all cannot be reused while once detecting upper again, thereby lot of materials and the wasting of resources are also caused, and for mechanical connection, if reserved silking design is bad, also can cause connection not highly to be inconsistent, cause again and make, produce unnecessary waste
5, in above connection, all adopt and hung indigo plant, especially in being welded to connect, hang blue dead weight larger, often all needing when mounted to use crane just can install, increase difficulty, on the other hand, due to frequent welding, part is hung indigo plant and is just damaged after use several times, on the other hand, be to be all directly placed on girder owing to hanging indigo plant, and sectional dimension is greater than girder, if a side reinforcing bar destroys, can cause that the blue imbalance of extension is stressed, thereby cause the generation quality accident of dropping of hanging indigo plant, also cause the failure detecting.
Summary of the invention
In order to make up above deficiency, the invention provides Quick connection part in a kind of static load of pile foundation detection, during this static load of pile foundation detects, Quick connection part has been realized pile foundation reinforcing bar and has been connected with detection the quick of girder, has reduced work risk, has saved material, and the success that is conducive to static loading test is carried out.
The present invention for the technical scheme that solves its technical problem and adopt is: Quick connection part during a kind of static load of pile foundation detects, comprise and connecting by presstressed reinforcing steel and sub-connector, described connection can axial retention be connected with sub-connector with at least one end of presstressed reinforcing steel, sub-connector connects dorsad and is provided with the locating hole that a diameter can shrink with one end of presstressed reinforcing steel, be provided with an adjustment part, this adjustment part can be adjusted locating hole diameter.
As a further improvement on the present invention, it is flexible connecting with presstressed reinforcing steel, and its two ends are connected with a sub-connector axial retention respectively.
As a further improvement on the present invention, described connection by the structure that presstressed reinforcing steel and sub-connector can axial retention be connected is: described sub-connector is also provided with the locating hole that a diameter can shrink towards connecting with one end of presstressed reinforcing steel, also be provided with the adjustment part that can adjust this locating hole diameter, connection can be dismantled stop with presstressed reinforcing steel and is inserted in locating hole.
As a further improvement on the present invention, the structure that described adjustment part can be adjusted locating hole diameter is: the end of described sub-connector is provided with the first voussoir of an axial retention, locating hole is positioned at the first voussoir inner side, this the first voussoir sidewall offers at least one cracking along generatrix direction, described voussoir lateral wall is provided with screw thread, adjustment part is the wedged hole that inside wall mates with the first voussoir, in this wedged hole, is provided with internal thread, and described adjustment part is threaded with wedged hole.
As a further improvement on the present invention, in described sub-connector, be also provided with the second voussoir of an axial retention, this the second voussoir outside is arranged with a wedge-shaped sleeve matching, in sub-connector, be also installed with one and tighten up platform, the described platform that tightens up is provided with the through hole that presstressed reinforcing steel wears for connection, tighten up platform and be positioned at the second voussoir towards the side connecting with presstressed reinforcing steel, also be provided with a spanner, handle and the wrench body of described spanner are axially arranged with angle along sub-connector, and described wrench body is located in wedge-shaped sleeve and tightens up between platform.
As a further improvement on the present invention, the little one end of described first and second voussoir diameter is large one end relative diameter is towards sub-connector axial inner.
As a further improvement on the present invention, described connection by the structure that presstressed reinforcing steel and sub-connector can axial retention be connected is: sub-connector is provided with a connecting hole towards connecting with one end of presstressed reinforcing steel, described connection is inserted in this connecting hole with presstressed reinforcing steel, and connects with passing through connector backstop in the end wall inner side of this end of sub-connector in one end that presstressed reinforcing steel stretches in connecting hole.
As a further improvement on the present invention, connection is only connected with sub-connector axial retention one end with presstressed reinforcing steel, also be provided with an extension indigo plant, hang indigo plant and be provided with some perforation, described connection is inserted in this perforation one end of sub-connector dorsad with presstressed reinforcing steel, and connection is passed through connector backstop outside hanging the sidewall of blue sub-connector dorsad with the end that presstressed reinforcing steel stretches out perforation.
As a further improvement on the present invention, two rows are lined up in the blue upper perforation of described extension, and this two row is corresponding and be arranged in parallel one by one.
As a further improvement on the present invention, be also provided with flexible steel plate, described flexible steel plate surface is coated with lubrication oil, connects the surface of walking around flexible steel plate and scribble lubrication oil with presstressed reinforcing steel.
Useful technique effect of the present invention is: the present invention is connected with the quick distachable of pile foundation reinforcing bar by the sub-connector realization that connects presstressed reinforcing steel end, its connection speed is fast, the link position of reinforcing bar and sub-connector is easy to adjust, guarantees that a top reinforcing steel bar bear is even, and it is easy to connect, can avoid work high above the ground, reduce work difficulty and work risk, saved material, avoided waste of material, can duplicate detection, improve the chance of success detecting.
Brief description of the drawings
Fig. 1 is that anchored pile-testing method detects schematic diagram;
Fig. 2 is that uplift pile detects schematic diagram;
Fig. 3 is the detection principle schematic that sub-connector is all established at this connection presstressed reinforcing steel two ends;
Fig. 4 is the detection principle schematic that sub-connector is established in this connection presstressed reinforcing steel one end;
Fig. 5 is sub-connector the first syndeton schematic diagram;
Fig. 6 be in Fig. 5 A-A to cutaway view Amplified image;
Fig. 7 is sub-connector the second syndeton schematic diagram;
Fig. 8 is for hanging blue front view;
Fig. 9 is for hanging blue top view.
Detailed description of the invention
Embodiment: Quick connection part during a kind of static load of pile foundation detects, comprise and connecting by presstressed reinforcing steel 1 and sub-connector 2, described connection can axial retention be connected with sub-connector 2 with at least one end of presstressed reinforcing steel 1, sub-connector 2 connects dorsad and is provided with the locating hole 3 that a diameter can shrink with one end of presstressed reinforcing steel 1, be provided with an adjustment part 4, this adjustment part 4 can be adjusted locating hole 3 diameters, when use, connect with presstressed reinforcing steel 1 and be connected with detection girder 12 and (connect with presstressed reinforcing steel 1 in the time selecting, select than the high reinforcing bar of the 13 thick intensity of reinforcing bar in pile foundation, avoid it to destroy in advance), connection is connected with sub-connector 2 with presstressed reinforcing steel 1 end, then in the locating hole 3 reinforcing bar in pile foundation being inserted, with adjustment part 4 by locating hole 3 reduced, and then clamping reinforcing bar, this has just realized fast pile foundation reinforcing bar and has detected being connected of girder 12, in connection procedure, can determine clamped position according to the length of different reinforcing bars, guarantee that every reinforcing bar is all stressed even, and the mode that this kind is fixedly clamped, the a large amount of connection work in welding and screw fixation method are avoided, can not destroy end reinforced, pile foundation can be carried out repeated detection, it is high that guarantee is detected as power, accuracy in detection is high.
Described connection is flexible with presstressed reinforcing steel 1, its two ends are connected with sub-connector 2 axial retention respectively, a connection forms a combination by presstressed reinforcing steel 1 and two sub-connectors 2, when use, connection is hung over and detected on girder 12 with presstressed reinforcing steel 1, hanging down the reinforcing bar pile foundation connected from detection girder 12 both sides in its two ends, has avoided like this workman's work high above the ground, improved the safety of workman's work.
Described connection by the structure that presstressed reinforcing steel 1 and sub-connector 2 can axial retention be connected is: described sub-connector 2 is also provided with the locating hole 3 that a diameter can shrink towards connecting with one end of presstressed reinforcing steel 1, also be provided with the adjustment part 4 that can adjust these locating hole 3 diameters, connection can be dismantled stop with presstressed reinforcing steel 1 and is inserted in locating hole 3.
The structure that described adjustment part 4 can be adjusted locating hole 3 diameters is: the end of described sub-connector 2 is provided with the first voussoir 5 of an axial retention, locating hole 3 is positioned at the first voussoir 5 inner sides, these the first voussoir 5 sidewalls offer at least one cracking along generatrix direction, described voussoir lateral wall is provided with screw thread, the wedged hole that adjustment part 4 mates with the first voussoir 5 for inside wall, in this wedged hole, be provided with internal thread, described adjustment part 4 is threaded with wedged hole, adjustment part 4 is by rotating along the first voussoir 5 axial feeds or exiting, just realize the radial clamping to the first voussoir 5 or unclamped, because the first voussoir 5 sidewalls are provided with cracking along generatrix direction, the contraction of locating hole 3 is realized in the first voussoir 5 gap that is subject to will reducing after radial clamping power cracking, contrary adjustment part 4 exits, the first voussoir 5 sidewall clamping forces reduce, cracking on the first voussoir 5 sidewalls recovers under the effect of the first voussoir 5 self material elastic force, realize the expansion of locating hole 3, this is simple in structure, easy to operate, clamping force is large, reinforcing bar effectively can be clamped, certainly except this kind of structure, it can also be other structure, as locating hole 3 sidewalls are two halves formula structure, adjustment part 4 is eccentric wheel apparatus, eccentric wheel apparatus drives locating hole 3 two halves formula sidewall move toward one another to realize the contraction of locating hole 3, also or sub-connector 2 sidewalls are provided with the radial hole being communicated with locating hole 3, in radial hole, be provided with the spheroid that radially slide in hole, spherical part sidewall can reach in locating hole 3, but spheroid can not fall in locating hole 3 completely, adjustment part 4 axially can Elastic Sliding be sheathed on locating hole 3 sidewall outsides along sub-connector 2, adjustment part 4 inside walls are taper surface, this taper surface is tight against spheroid and is exposed to the surface of sub-connector 2 outsides, as long as make like this adjustment part 4 inner side taper surfaces hold out against spheroid, spheroid just to the interior motion of locating hole 3 by steel bar clamping, for increasing blessing power, can also the structure such as texture or sawtooth be set at spherome surface, this class formation be all those skilled in the art be easy to expect according to the art of this patent be equal to replacing structure, belong to this patent protection domain.
In described sub-connector 2, be also provided with the second voussoir 6 of an axial retention, these the second voussoir 6 outsides are arranged with a wedge-shaped sleeve matching 7, in sub-connector 2, be also installed with one and tighten up platform 8, the described platform 8 that tightens up is provided with the through hole that presstressed reinforcing steel 1 wears for connection, tighten up platform 8 and be positioned at the second voussoir 6 towards the side connecting with presstressed reinforcing steel 1, also be provided with a spanner 9, the handle of described spanner 9 and spanner 9 bodies are axially arranged with angle along sub-connector 2, described spanner 9 bodies are located in wedge-shaped sleeve 7 and tighten up between platform 8, when connection is connected with sub-connector 2 with presstressed reinforcing steel 1, first connection is inserted in the second voussoir 6 with presstressed reinforcing steel 1, then the handle on moving wrench 9, spanner 9 rotates in the situation that tightening up platform 8 as fulcrum like this, just heading on wedge-shaped sleeve 7 slides axially, and then the second voussoir 6 is tightened up connection presstressed reinforcing steel 1 is clamped, the second voussoir 6 only tightens up with presstressed reinforcing steel 1 connection, need only strain, must be not stressed yet, then be used in connection presstressed reinforcing steel 1 is clamped fixing by the first voussoir 5, can avoid like this connection presstressed reinforcing steel 1 to shake in the time of work and get loose, further ensure to connect the connective stability with sub-connector 2 with presstressed reinforcing steel 1.
The little one end of one end relative diameter that described first and second voussoir diameter is large is towards sub-connector 2 axial inner, like this, connect when with the reinforcing steel bar bear in presstressed reinforcing steel 1 and pile foundation, to sub-connector, 2 generations pull, under frictional force effect, 2 of sub-connectors can be pressed from both sides tighter and tighter to them, and can not produce loosening, guarantee connect stability.
Described connection by the structure that presstressed reinforcing steel 1 and sub-connector 2 can axial retention be connected is: sub-connector 2 is provided with a connecting hole towards connecting with one end of presstressed reinforcing steel 1, described connection is inserted in this connecting hole with presstressed reinforcing steel 1, and connect with passing through connector backstop in the end wall inner side of sub-connector 2 these ends in one end that presstressed reinforcing steel 1 stretches in connecting hole, connector can be nut, can be also Wedge gripping.
Described connection is only connected with sub-connector 2 axial retention one end with presstressed reinforcing steel 1, also be provided with an extension indigo plant 10, hang blue 10 and be provided with some perforation 11, described connection is inserted in this perforation 11 one end of sub-connector 2 dorsad with presstressed reinforcing steel 1, connect with presstressed reinforcing steel 1 stretch out perforation 11 end by connector backstop in hanging indigo plant 10 dorsad outside the sidewall of sub-connector 2, if stake top reinforcing bar is odd number row, also can adopt a sub-connector 2, now set up on the top of girder 12 and hang blue 10, utilize and hang blue 10 and connect with presstressed reinforcing steel 1 with being connected, wherein connector can be nut, also can be Wedge gripping.
On described extension blue 10, bore a hole and 11 line up two rows, this two row is corresponding and be arranged in parallel one by one.
Also be provided with flexible steel plate 11, described flexible steel plate surface is coated with lubrication oil, connect the surface of walking around flexible steel plate and scribble lubrication oil with presstressed reinforcing steel 1, can reduce like this friction of presstressed reinforcing steel and steel plate and steel plate and girder 12, especially in the corner of girder 12, adopt flexible steel plate to carry out transition.

Claims (10)

1. Quick connection part in a static load of pile foundation detection, it is characterized by: comprise and connecting by presstressed reinforcing steel (1) and sub-connector (2), described for connection at least one end of presstressed reinforcing steel (1) can axial retention be connected with sub-connector (2), sub-connector (2) connects dorsad and is provided with the locating hole (3) that a diameter can shrink with one end of presstressed reinforcing steel (1), be provided with an adjustment part (4), this adjustment part (4) can be adjusted locating hole (3) diameter.
2. Quick connection part in static load of pile foundation detection according to claim 1, is characterized by: it is flexible connecting with presstressed reinforcing steel (1), and its two ends are connected with a sub-connector (2) axial retention respectively.
3. Quick connection part in static load of pile foundation detection according to claim 1 and 2, it is characterized by: the described structure that for connection, presstressed reinforcing steel (1) and sub-connector (2) can axial retention be connected is: described sub-connector (2) is also provided with the locating hole (3) that a diameter can shrink towards connecting with one end of presstressed reinforcing steel (1), also be provided with the adjustment part (4) that can adjust this locating hole (3) diameter, connection can be dismantled stop with presstressed reinforcing steel (1) and is inserted in locating hole (3).
4. Quick connection part in detecting according to the static load of pile foundation described in claim 1 or 3, it is characterized by: the structure that described adjustment part (4) can be adjusted locating hole (3) diameter is: the end of described sub-connector (2) is provided with first voussoir (5) of an axial retention, locating hole (3) is positioned at the first voussoir (5) inner side, this the first voussoir (5) sidewall offers at least one cracking along generatrix direction, described voussoir lateral wall is provided with screw thread, adjustment part (4) is the wedged hole that inside wall mates with the first voussoir (5), in this wedged hole, be provided with internal thread, described adjustment part (4) is threaded with wedged hole.
5. Quick connection part in static load of pile foundation detection according to claim 4, it is characterized by: the second voussoir (6) that is also provided with an axial retention in described sub-connector (2), this the second voussoir (6) outside is arranged with a wedge-shaped sleeve matching (7), in sub-connector (2), be also installed with one and tighten up platform (8), the described platform (8) that tightens up is provided with the through hole that presstressed reinforcing steel (1) wears for connection, tighten up platform (8) and be positioned at the second voussoir (6) towards the side connecting with presstressed reinforcing steel (1), also be provided with a spanner (9), the handle of described spanner (9) and spanner (9) body are axially arranged with angle along sub-connector (2), described spanner (9) body is located in wedge-shaped sleeve (7) and tightens up between platform (8).
Static load of pile foundation according to claim 5 detect in Quick connection part, it is characterized by: the little one end of one end relative diameter that described first and second voussoir diameter is large is towards sub-connector (2) axial inner.
7. Quick connection part in static load of pile foundation detection according to claim 1 and 2, it is characterized by: the described structure that for connection, presstressed reinforcing steel (1) and sub-connector (2) can axial retention be connected is: sub-connector (2) is provided with a connecting hole towards connecting with one end of presstressed reinforcing steel (1), described for connection presstressed reinforcing steel (1) be inserted in this connecting hole, and connect with presstressed reinforcing steel (1) stretch into one end in connecting hole by connector backstop inside the end wall of this end of sub-connector (2).
8. Quick connection part in static load of pile foundation detection according to claim 1, it is characterized by: connect and use presstressed reinforcing steel (1) to be only connected with sub-connector (2) axial retention one end, also be provided with an extension indigo plant (10), hang blue (10) and be provided with some perforation (11), described for connection presstressed reinforcing steel (1) be inserted in this perforation (11) one end of sub-connector (2) dorsad, connect the end of stretching out perforation (11) with presstressed reinforcing steel (1) by connector backstop in extension indigo plant (10) dorsad outside the sidewall of sub-connector (2).
Static load of pile foundation according to claim 8 detect in Quick connection part, it is characterized by: two rows are lined up in described extensions blue (10) upper perforation (11) this two row correspondence being arranged in parallel one by one.
Static load of pile foundation according to claim 1 detect in Quick connection part, it is characterized by: be also provided with flexible steel plate (11), described flexible steel plate surface is coated with lubrication oil, connect the surface of walking around flexible steel plate and scribble lubrication oil with presstressed reinforcing steel (1).
CN201210488591.2A 2012-11-26 2012-11-26 Quick connection part during static load of pile foundation detects Expired - Fee Related CN103835318B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210488591.2A CN103835318B (en) 2012-11-26 2012-11-26 Quick connection part during static load of pile foundation detects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210488591.2A CN103835318B (en) 2012-11-26 2012-11-26 Quick connection part during static load of pile foundation detects

Publications (2)

Publication Number Publication Date
CN103835318A true CN103835318A (en) 2014-06-04
CN103835318B CN103835318B (en) 2016-03-30

Family

ID=50799183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210488591.2A Expired - Fee Related CN103835318B (en) 2012-11-26 2012-11-26 Quick connection part during static load of pile foundation detects

Country Status (1)

Country Link
CN (1) CN103835318B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104690665A (en) * 2015-02-16 2015-06-10 沈阳工业大学 Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig
CN110106928A (en) * 2019-05-22 2019-08-09 北京城建勘测设计研究院有限责任公司 A kind of adjustable trestle set on pit mouth protective fence

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2150269Y (en) * 1993-02-11 1993-12-22 蔡顺景 Quick-acting strong connector for concrete bar
CN2214986Y (en) * 1994-09-29 1995-12-13 李媖瑛 Structure-improved steel bar continuous connector
CN101525886A (en) * 2009-01-14 2009-09-09 关喜才 Major diameter uplift pile loading test method and device thereof
KR20100031167A (en) * 2008-09-12 2010-03-22 김형남 Apparatus for pile load test
CN202265942U (en) * 2011-10-19 2012-06-06 荣盛建设工程有限公司 Steel bar connector
CN202925578U (en) * 2012-11-26 2013-05-08 昆山市建设工程质量检测中心 Rapid connecting piece for use in pile foundation static load detection

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2150269Y (en) * 1993-02-11 1993-12-22 蔡顺景 Quick-acting strong connector for concrete bar
CN2214986Y (en) * 1994-09-29 1995-12-13 李媖瑛 Structure-improved steel bar continuous connector
KR20100031167A (en) * 2008-09-12 2010-03-22 김형남 Apparatus for pile load test
CN101525886A (en) * 2009-01-14 2009-09-09 关喜才 Major diameter uplift pile loading test method and device thereof
CN202265942U (en) * 2011-10-19 2012-06-06 荣盛建设工程有限公司 Steel bar connector
CN202925578U (en) * 2012-11-26 2013-05-08 昆山市建设工程质量检测中心 Rapid connecting piece for use in pile foundation static load detection

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104690665A (en) * 2015-02-16 2015-06-10 沈阳工业大学 Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig
CN104690665B (en) * 2015-02-16 2017-04-19 沈阳工业大学 Double-layer jig for fatigue elongation test of ordinary steel bar and prestressed steel bar, as well as mounting technique for double-layer jig
CN110106928A (en) * 2019-05-22 2019-08-09 北京城建勘测设计研究院有限责任公司 A kind of adjustable trestle set on pit mouth protective fence
CN110106928B (en) * 2019-05-22 2023-11-24 北京城建勘测设计研究院有限责任公司 Adjustable support arranged on shaft mouth guard rail

Also Published As

Publication number Publication date
CN103835318B (en) 2016-03-30

Similar Documents

Publication Publication Date Title
US8402837B1 (en) System for field testing helical piles
CN108086155B (en) Adjustable external prestressed cable anchoring device
GB2433125A (en) A pile test apparatus
CN102071651A (en) Sling replacement method for suspension bridge
CN101831925A (en) Detection method for static load of pile foundation
CN102296605A (en) Device and method for compensating or unloading prestress loads of anchor cable
CN110907152B (en) Rotary cable clamp test device and test method
WO2020191916A1 (en) Anchorage device with anchoring force graded early warning and reciprocating flexible deformation yielding characteristics, and method therefor
CN202925578U (en) Rapid connecting piece for use in pile foundation static load detection
CN103835318B (en) Quick connection part during static load of pile foundation detects
CN202194135U (en) Anchor cable prestress load-compensating or unloading device
CN213358709U (en) Uplift pile detection device
CN207863441U (en) A kind of assembled overhanging scaffold pedestal
US11060947B2 (en) Top loaded bidirectional testing system and method of using the same
JP4297234B2 (en) Anchor material fixing force measurement method
CN107246034A (en) Pile crown for pile bearing capacity static test stretches out reinforcing steel bar connecting device
CN205329738U (en) Novel umbelliform ground bearing capacity detecting device
CN207017322U (en) One kind is used for pile for prestressed pipe resistance to plucking static-load testing device
CN111947913A (en) Steel truss constructional engineering quality detection method
CN208486297U (en) The anchor connection method anti-pulling device of unit for single-pile vertical anti-pulling static test
CN101942835B (en) Heavy-load composite function anchoring device for scaffold
CN108343561B (en) Goaf site wind turbine generator system deviation correcting device and deviation correcting method thereof
CN102051890A (en) Detection vehicle for static load test of single pile in foundation piles
CN209837123U (en) Pile foundation static load test device
CN207063012U (en) Pile crown for pile bearing capacity static test stretches out reinforcing steel bar connecting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160330

Termination date: 20181126