CN212773559U - Building installation is with two-sided straightness controlling means that hangs down of combination - Google Patents

Building installation is with two-sided straightness controlling means that hangs down of combination Download PDF

Info

Publication number
CN212773559U
CN212773559U CN202021125321.1U CN202021125321U CN212773559U CN 212773559 U CN212773559 U CN 212773559U CN 202021125321 U CN202021125321 U CN 202021125321U CN 212773559 U CN212773559 U CN 212773559U
Authority
CN
China
Prior art keywords
connecting piece
guiding
guiding rule
verticality
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021125321.1U
Other languages
Chinese (zh)
Inventor
魏延磊
张飞
罗浩
李繁
李博
张倩倩
刘冠男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN202021125321.1U priority Critical patent/CN212773559U/en
Application granted granted Critical
Publication of CN212773559U publication Critical patent/CN212773559U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a combined double-sided verticality control device for building installation, which relates to the field of building construction and comprises a first guiding rule, wherein the side wall of the first guiding rule is fixedly connected with a first connecting piece, the tail end of the first connecting piece is fixedly connected with a second connecting piece, the tail end of the second connecting piece is fixedly connected with a second guiding rule, a round air level is arranged at the joint of the first connecting piece and the second connecting piece, and the verticality control of the prefabricated part is realized by matching the first guiding rule, the first connecting piece, the second connecting piece, the round air level, the second guiding rule and a scale instrument, compared with the traditional method for controlling the verticality by using a guiding rule or a suspension wire weight, on one hand, the verticality of the prefabricated part can be more accurately controlled, so that the construction quality of a building is ensured, on the other hand, the verticality requirements of two vertical planes can be simultaneously controlled, the installation efficiency is greatly improved.

Description

Building installation is with two-sided straightness controlling means that hangs down of combination
Technical Field
The utility model relates to a construction field especially relates to a two-sided straightness controlling means that hangs down of combination for building installation.
Background
With the rapid development of the economy of China, the infrastructure construction and the house construction of China are both rapidly developed, and in the middle of the construction, the construction of a building main body is very important, the building main body refers to the structural structure of a building entity, and comprises a roof, a floor, a beam, a column, a support, a wall body, a connecting joint, a foundation and the like, the main body structure is an organically-linked system which is based on a foundation, receives, bears and transmits all upper loads of the construction project, maintains the integrity, the stability and the safety of the upper structure, and is a complete structural system of the construction project which is jointly formed with the foundation, so that the building project is a safe and reliable foundation, and is a safe, stable and reliable carrier and an important component of the construction project structure;
during construction of a building main body structure, a steel bar column often needs to be poured, and a erected support is poured, so that a stable reinforced concrete column wall is formed, and therefore perpendicularity during installation of components and column templates directly influences construction quality of a building.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a combined double-sided verticality control device for building installation.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a two-sided straightness controlling means that hangs down of combination for construction installation, includes first guiding ruler, the first connecting piece of lateral wall fixedly connected with of first guiding ruler, the terminal fixedly connected with second connecting piece of first connecting piece, the terminal fixedly connected with second guiding ruler of second connecting piece, first connecting piece is provided with the circle air level with the junction of second connecting piece, a plurality of guiding feet of the equal fixedly connected with of lateral wall of first guiding ruler and second guiding ruler, the mounting groove has been seted up with the lateral wall of second guiding ruler to first guiding ruler, be provided with the scale instrument in the mounting groove.
Preferably, the first guiding rule and the second guiding rule have the specification of 1000mm × 50mm × 25 mm.
Preferably, the first connecting piece and the second connecting piece are 25mm × 25mm in specification.
Preferably, the first connecting piece and the second connecting piece are arranged in an L shape, and the angles at the corners are right angles.
Preferably, the first guiding rule is perpendicular to the first connecting piece, the first connecting piece is perpendicular to the second connecting piece, and the second connecting piece is perpendicular to the second guiding rule.
Preferably, the first guiding rule and the second guiding rule are both arranged in a rectangular shape.
Preferably, the first guiding rule, the first connecting piece, the second connecting piece and the second guiding rule are all made of stainless steel.
The utility model has the advantages that: the utility model discloses in, use through the cooperation between first guiding ruler, first connecting piece, second connecting piece, circle air level, second guiding ruler, the scale instrument, realized the control to the installation straightness that hangs down of prefabricated component, compare and use traditional guiding ruler or suspension wire weight to control the method of hanging down straightness, on the one hand, can be more accurate control prefabricated component's the installation straightness that hangs down, and then guarantee the construction quality of building, on the other hand, can the straightness requirement that hangs down of two perpendiculars of simultaneous control, very big degree's improvement the installation effectiveness.
Drawings
Fig. 1 is a position distribution diagram of the first guiding rule and the second guiding rule of the present invention.
Fig. 2 is a schematic connection diagram of the present invention.
Fig. 3 is a position distribution diagram of the first connecting member and the second guiding rule of the present invention.
Reference numbers in the figures: 1 first guiding rule, 2 first connecting pieces, 3 second connecting pieces, 4 round air level, 5 second guiding rules, 6 guiding feet and 7 graduated instruments.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a combined double-sided verticality control device for building installation comprises a first guiding rule 1, a first connecting piece 2 is fixedly connected to the side wall of the first guiding rule 1, a second connecting piece 3 is fixedly connected to the tail end of the first connecting piece 2, the specifications of the first connecting piece 2 and the second connecting piece 3 are both 25mm × 25mm, the first connecting piece 2 and the second connecting piece 3 are both in L-shaped arrangement, the angles at the corners are right angles, the right angles meet the construction requirements, a second guiding rule 5 is fixedly connected to the tail end of the second connecting piece 3, the specifications of the first guiding rule 1 and the second guiding rule 5 are both 1000mm × 50mm × 25mm, the first guiding rule 1 and the second guiding rule 5 are both in rectangular arrangement, the first guiding rule 1, the first connecting piece 2, the second connecting piece 3 and the second guiding rule 5 are all made of stainless steel, the use of the stainless steel can be avoided in the building construction process, the device can not rust when meeting water, the service life of the device is prolonged while the precision of the device is ensured, and the verticality of two vertical surfaces of the prefabricated part can be detected simultaneously by using the first guiding rule 1 and the second guiding rule 5, so that the mounting efficiency of the prefabricated part is improved;
first guiding rule 1 and first connecting piece 2 mutually perpendicular, first connecting piece 2 and 3 mutually perpendicular of second connecting piece, second connecting piece 3 and second guiding rule 5 mutually perpendicular, mutually perpendicular's the setting aim at guarantees the detection requirement to the straightness detection that hangs down, the junction of first connecting piece 2 and second connecting piece 3 is provided with circle air level 4, the equal fixedly connected with of lateral wall of first guiding rule 1 and second guiding rule 5 a plurality of backing feet 6, the mounting groove has been seted up with the lateral wall of second guiding rule 5 to first guiding rule 1, be provided with scale meter 7 in the mounting groove, through the use of circle air level 4 and scale meter 7, can carry out accurate detection to prefabricated component's installation straightness that hangs down, through follow-up processing to the component, realize the accurate control to the straightness that hangs down, guarantee the construction quality of building.
The working principle is as follows: during the use, when will controlling its straightness that hangs down of two directions in the small-size concrete accessory installation, construct the accessory hoist and mount the mounted position with small-size concrete on, make the lateral wall of first guiding rule 1 and second guiding rule 5 block two faces of prefabricated component post respectively, when concrete accessory and theme device are connected, earlier through setting up the straightness that hangs down of 4 rough control components of circle air level bubble at first connecting piece 2 and the 3 junction of second connecting piece, and carry out preliminary reinforcement to small-size concrete component, consolidate and carry out accurate control to the straightness that hangs down of two vertical direction installations of small-size concrete component according to first guiding rule 1 and second guiding rule 5 again after accomplishing, make it reach the design requirement.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a two-sided straightness controlling means that hangs down of combination for construction installation, includes first guiding ruler (1), its characterized in that, the first connecting piece of lateral wall fixedly connected with (2) of first guiding ruler (1), the terminal fixedly connected with second connecting piece (3) of first connecting piece (2), the terminal fixedly connected with second guiding ruler (5) of second connecting piece (3), first connecting piece (2) are provided with circle air level (4) with the junction of second connecting piece (3), a plurality of backing feet (6) of the equal fixedly connected with of lateral wall of first guiding ruler (1) and second guiding ruler (5), the mounting groove has all been seted up with the lateral wall of second guiding ruler (5) in first guiding ruler (1), be provided with scale (7) in the mounting groove.
2. The combined double-sided verticality control device for building installation according to claim 1, wherein the first guiding rule (1) and the second guiding rule (5) have the specification of 1000mm x 50mm x 25 mm.
3. The combined double-sided verticality control device for building installation according to claim 1, wherein the first connecting piece (2) and the second connecting piece (3) are both 25mm x 25mm in specification.
4. The device for controlling the verticality of the two sides of a building and installation assembly according to claim 1, wherein the first connecting member (2) and the second connecting member (3) are arranged in an L shape, and the angles at the corners are right angles.
5. The device for controlling the verticality of the two sides of a building and installation assembly according to claim 1, wherein the first guiding rule (1) is perpendicular to the first connecting piece (2), the first connecting piece (2) is perpendicular to the second connecting piece (3), and the second connecting piece (3) is perpendicular to the second guiding rule (5).
6. The combined double-sided verticality control device for building installation according to claim 1, wherein the first guiding rule (1) and the second guiding rule (5) are rectangular.
7. The combined double-sided verticality control device for building installation according to claim 1, wherein the first guiding rule (1), the first connecting piece (2), the second connecting piece (3) and the second guiding rule (5) are made of stainless steel.
CN202021125321.1U 2020-06-17 2020-06-17 Building installation is with two-sided straightness controlling means that hangs down of combination Expired - Fee Related CN212773559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021125321.1U CN212773559U (en) 2020-06-17 2020-06-17 Building installation is with two-sided straightness controlling means that hangs down of combination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021125321.1U CN212773559U (en) 2020-06-17 2020-06-17 Building installation is with two-sided straightness controlling means that hangs down of combination

Publications (1)

Publication Number Publication Date
CN212773559U true CN212773559U (en) 2021-03-23

Family

ID=75072715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021125321.1U Expired - Fee Related CN212773559U (en) 2020-06-17 2020-06-17 Building installation is with two-sided straightness controlling means that hangs down of combination

Country Status (1)

Country Link
CN (1) CN212773559U (en)

Similar Documents

Publication Publication Date Title
CN204059993U (en) A kind of assembled moulding bed
CN212773559U (en) Building installation is with two-sided straightness controlling means that hangs down of combination
CN210741327U (en) Building engineering quality detection device
CN202614235U (en) Ruler for measuring verticality of vertical member template
CN214333575U (en) Measuring point marking positioning ruler for individual household acceptance check
CN211452173U (en) Building construction stirrup interval detection device
CN210570387U (en) Retaining wall verticality and flatness detection device
CN210774082U (en) Template verticality measuring device
CN209802376U (en) Convenient measuring device of straightness that hangs down of wall post template for construction
CN202188814U (en) Verticality and flatness detecting device used in installation of shear wall template
CN211775792U (en) Be used for bridge structures thing template to observe and control positioner
CN210242675U (en) Construction equipment of composite wall column and verticality measuring tool thereof
CN207448776U (en) A kind of high ferro box beam catenary mast built-in fitting calibrating installation
CN217482388U (en) Portable template mounting straightness that hangs down detects support
CN220643862U (en) Cable-stayed bridge cable guide pipe positioning tool
CN110823204A (en) Fixed support for measuring point position projection and using method thereof
CN213455494U (en) Template verticality detection device
CN217276199U (en) Hidden point measurement prism support device
CN202008365U (en) Portable multifunctional measuring instrument
CN210893147U (en) Fixed bolster is thrown to measurement point location
CN205421871U (en) On --spot elevation measuring tool of construction
CN217687258U (en) Prefabricated wallboard center line position and straightness detection instrument that hangs down
CN210375149U (en) Engineering quality supervise is with straightness detection device that hangs down
CN214996105U (en) Novel thick control tool of concrete slab
CN205593533U (en) Portable template squareness measurement instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210323

CF01 Termination of patent right due to non-payment of annual fee