CN212773425U - Cement is fixed with building templates mechanism - Google Patents

Cement is fixed with building templates mechanism Download PDF

Info

Publication number
CN212773425U
CN212773425U CN202020540698.7U CN202020540698U CN212773425U CN 212773425 U CN212773425 U CN 212773425U CN 202020540698 U CN202020540698 U CN 202020540698U CN 212773425 U CN212773425 U CN 212773425U
Authority
CN
China
Prior art keywords
threaded rod
cement
nut
building templates
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020540698.7U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yizhen Construction Technology Development Co ltd
Original Assignee
Shanghai Yizhen Construction Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yizhen Construction Technology Development Co ltd filed Critical Shanghai Yizhen Construction Technology Development Co ltd
Priority to CN202020540698.7U priority Critical patent/CN212773425U/en
Application granted granted Critical
Publication of CN212773425U publication Critical patent/CN212773425U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a building templates technical field discloses a cement is fixed and is used building templates mechanism, including building templates and threaded rod, the equal fixed mounting in four middle parts of upside of building templates has the link, the lower extreme fixed mounting of threaded rod has the backup pad, the outside cover of threaded rod is equipped with fixed plate and threaded rod swing joint. The utility model discloses a shaped cement board is arranged in to the backup pad on, then hang the couple on the link, then establish the spanner cover on the nut, then rotate the nut through handheld dwang, thereby can drive the fixed plate and shift up, thereby further can take off on the cement component of building templates through the stay cord, thereby setting up through the dwang is because lever principle, thereby can relax twist moving to the nut, and the spanner cover is established on the nut, thereby can take off on the spanner nut, adjust the position of dwang, thereby can prevent when rotating that the stay cord blocks the rotation of dwang.

Description

Cement is fixed with building templates mechanism
Technical Field
The utility model relates to a building templates technical field specifically is a cement is fixed and is used building templates mechanism.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost.
In the process of implementing the present invention, the inventor finds that at least the following problems exist in the prior art and are not solved: the cement board is a cement component frequently used in building engineering, a template needs to be built before the cement board is produced, then concrete is poured into the template, the cement board is formed after the concrete is dried, the building template is knocked and taken out manually after the existing cement board is formed, the labor amount is large, and the working efficiency is low, so that the building template mechanism for fixing cement is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cement is fixed with building templates mechanism has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a building template mechanism for cement fixation comprises a building template and a threaded rod;
four equal fixed mounting in end middle part of upside of building templates have the link, the lower extreme fixed mounting of threaded rod has the backup pad, the outside cover of threaded rod is equipped with fixed plate and threaded rod swing joint, threaded connection has the nut on the downside threaded rod of fixed plate, the outside cover of nut is equipped with the spanner, the right-hand member fixed mounting of spanner has the dwang, four equal fixedly connected with stay cords in end middle part, four of the downside of fixed plate the equal fixed mounting of lower extreme of stay cord has the couple, the outlet has been seted up to building templates's front end.
As a preferred embodiment of the present invention, the lower end of the supporting plate is fixedly installed with a protective pad.
As an optimized implementation manner of the utility model, the upper end fixed mounting of threaded rod has the limiting plate.
As an preferable embodiment of the present invention, a rubber pad is fixedly mounted on the rotating rod.
As a preferred embodiment of the present invention, four of the pulling ropes are made of steel material.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a cement is fixed and is used building templates mechanism, arrange fashioned cement slab in through the backup pad in, then hang the couple on the link, then establish the spanner cover on the nut, then rotate the nut through handheld dwang, thereby can drive the fixed plate and shift up, thereby further can take off on the cement component of building templates through the stay cord, thereby setting up through the dwang is because lever principle, thereby can relax twists moving to the nut, and the spanner cover is established on the nut, thereby can take off on the nut with the spanner, the position of adjustment dwang, thereby can prevent when rotating that the stay cord blocks the rotation of dwang.
2. The utility model relates to a cement is fixed with building templates mechanism can effectually prevent through the setting of protection pad that the backup pad from causing the damage to the cement component.
3. The utility model relates to a cement is fixed with building templates mechanism can effectually prevent through the setting of limiting plate that the fixed plate from breaking away from the use that influences the device from the threaded rod.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is a front view of a formwork mechanism for fixing cement according to the present invention;
FIG. 2 is a top view of a building template mechanism for fixing cement according to the present invention;
fig. 3 is a top view of the utility model relates to a fixed building templates mechanism spanner of using of cement.
In the figure: 1. building a template; 2. a water outlet; 3. hanging a ring; 4. hooking; 5. pulling a rope; 6. a fixing plate; 7. a nut; 8. a limiting plate; 9. a threaded rod; 10. rotating the rod; 11. a rubber pad; 12. a support plate; 13. a protective pad; 14. a wrench.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in provide only supply the reference with the model of electrical apparatus. For those skilled in the art, different types of electrical appliances with the same function can be replaced according to actual use conditions, and for those skilled in the art, the specific meaning of the above terms in the present invention can be understood in specific situations.
Referring to fig. 1-3, the present invention provides a technical solution: a cement fixation building template mechanism comprises a building template 1 and a threaded rod 9;
the building template is characterized in that hanging rings 3 are fixedly mounted in the middle of four ends of the upper side of the building template 1, a supporting plate 12 is fixedly mounted at the lower end of a threaded rod 9, a fixing plate 6 and a fixing plate 6 movably connected with the threaded rod 9 are sleeved on the outer side of the threaded rod 9, nuts 7 are screwed on the lower threaded rod 9 of the fixing plate 6, a wrench 14 is sleeved on the outer side of the nuts 7, a rotating rod 10 is fixedly mounted at the right end of the wrench 14, pull ropes 5 are fixedly connected with the middle of four ends of the lower side of the fixing plate 6, hooks 6 are fixedly mounted at the lower ends of the four pull ropes 5, a water outlet 2 is formed in the front end of the building template 1, the building template is placed on a formed cement plate through the supporting plate 12, the hooks 6 are hung on the hanging rings 3, the wrench 14 is sleeved on the, thereby further can take off building templates 1 on the cement component through stay cord 5, because lever principle through the setting of dwang 10 to can be relaxed twisting moving nut 7, and 14 covers of spanner are established on nut 7, thereby can take off on spanner 14 nut 7, adjust the position of dwang 10, thereby can prevent that stay cord 5 hinders the rotation of dwang 10 when rotating.
In this embodiment (as shown in fig. 1), the lower end of the supporting plate 12 is fixedly installed with a protection pad 13, and the supporting plate 12 can be effectively prevented from damaging the cement member by the protection pad 13.
In this embodiment (please refer to fig. 1), a limiting plate 8 is fixedly installed at the upper end of the threaded rod 9, and the use of the device can be effectively prevented from being affected by the separation of the fixing plate 6 from the threaded rod 9 through the arrangement of the limiting plate 8.
In this embodiment (please refer to fig. 1), a rubber pad 11 is fixedly installed on the rotating rod 10, and the comfort of the operator holding the rotating rod 10 by hand can be effectively increased by the arrangement of the rubber pad 11.
In this embodiment (see fig. 1), the four pull ropes 5 are made of steel, and the pull ropes 5 are made of steel, so that the strength of the pull ropes 5 can be increased.
It should be noted that the utility model relates to a building template mechanism for cement fixation, which comprises a building template 1, a water outlet 2, a hanging ring 3, a hook 4, a pull rope 5, a fixing plate 6, a nut 7, a limit plate 8, a threaded rod 9, a rotating rod 10, a rubber pad 11, a support plate 12, a protection pad 13 and a wrench 14, wherein the components are all universal standard components or components known by technicians in the field, the structure and the principle of the components can be known by technical manuals or conventional experimental methods, when in work, the support plate 12 is arranged on a formed cement plate, then the hook 6 is hung on the hanging ring 3, then the wrench 14 is sleeved on the nut 7, then the nut 7 is rotated by holding the rotating rod 10 by hand, thereby the fixing plate 6 can be driven to move upwards, further, the building template 1 can be taken down from a cement component by the pull rope 5, the lever principle is adopted by the rotating rod 10, thereby can relax twist screw 7 move, and 14 covers of spanner are established on nut 7, thereby can take off 14 nut 7 with spanner, the position of adjustment dwang 10, thereby can prevent that stay cord 5 from hindering the rotation of dwang 10 when rotating, setting up through protection pad 13 can effectually prevent that backup pad 12 from causing the damage to the cement component, setting up through limiting plate 8 can effectually prevent that fixed plate 6 from breaking away from the use that influences the device from threaded rod 9, setting up through rubber pad 11 can the effectual travelling comfort that increases the handheld dwang 10 of operating personnel, constitute by the steel material through stay cord 5, thereby can increase stay cord 5 intensity.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. A building template mechanism for cement fixation is characterized by comprising a building template (1) and a threaded rod (9);
equal fixed mounting in middle part has link (3) in four ends of upside of building templates (1), the lower extreme fixed mounting of threaded rod (9) has backup pad (12), the outside cover of threaded rod (9) is equipped with fixed plate (6) and threaded rod (9) swing joint, threaded connection has nut (7) on downside threaded rod (9) of fixed plate (6), the outside cover of nut (7) is equipped with spanner (14), the right-hand member fixed mounting of spanner (14) has dwang (10), equal fixedly connected with stay cord (5), four in four end middle parts of downside of fixed plate (6) the equal fixed mounting of lower extreme of stay cord (5) has couple (4), outlet (2) have been seted up to the front end of building templates (1).
2. The cement-fixing building formwork mechanism as claimed in claim 1, wherein: and a protective pad (13) is fixedly arranged at the lower end of the supporting plate (12).
3. The cement-fixing building formwork mechanism as claimed in claim 1, wherein: and a limiting plate (8) is fixedly mounted at the upper end of the threaded rod (9).
4. The cement-fixing building formwork mechanism as claimed in claim 1, wherein: and a rubber pad (11) is fixedly mounted on the rotating rod (10).
5. The cement-fixing building formwork mechanism as claimed in claim 1, wherein: the four pull ropes (5) are all made of steel materials.
CN202020540698.7U 2020-04-14 2020-04-14 Cement is fixed with building templates mechanism Expired - Fee Related CN212773425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020540698.7U CN212773425U (en) 2020-04-14 2020-04-14 Cement is fixed with building templates mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020540698.7U CN212773425U (en) 2020-04-14 2020-04-14 Cement is fixed with building templates mechanism

Publications (1)

Publication Number Publication Date
CN212773425U true CN212773425U (en) 2021-03-23

Family

ID=75025433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020540698.7U Expired - Fee Related CN212773425U (en) 2020-04-14 2020-04-14 Cement is fixed with building templates mechanism

Country Status (1)

Country Link
CN (1) CN212773425U (en)

Similar Documents

Publication Publication Date Title
CN111844360A (en) Automatic concrete pouring system
CN212773425U (en) Cement is fixed with building templates mechanism
CN211776071U (en) Concrete form strutting arrangement for building engineering
CN211393540U (en) Steel member hoist and mount auxiliary device
CN106992474A (en) 10kV ends dismount aid
CN208103776U (en) Building materials boom hoisting
CN217947437U (en) Novel multi-functional steel construction engineering support
CN201952742U (en) Suspension bridge cable changing device
CN207312948U (en) A kind of material transportation bucket for building
CN214611092U (en) Hoisting device for mechanical equipment maintenance
CN213011544U (en) Detachable sling
CN212450358U (en) Mechanical equipment that lifts by crane that construction was used
CN211444792U (en) Can dismantle civil air defense engineering protective apparatus hoist device
CN213011578U (en) Multifunctional sling
CN112723184B (en) Prevent rocking material lifting device for road and bridge construction that drops
CN213330301U (en) Cement pole of adjustable levelness is with righting device
CN211895663U (en) Scrap steel bucket hoisting structure
CN209668610U (en) A kind of small-sized PC prefabricated part hanging device based on BIM
CN113023572B (en) Blade lifting device and method for detaching blade and installing blade by using same
CN208932786U (en) Cover plate for side ditch demoulds component
CN212101660U (en) Steel bar vertical hoisting auxiliary device for house building
CN220578729U (en) Prefabricated component hoist device
CN211110611U (en) Transformer hoisting sleeve device
CN112194019A (en) Automatic dismouting maintenance device of unwrapping wire coaster
CN218879172U (en) Steel construction hoist and mount hoisting accessory safe in utilization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210323