CN209668610U - A kind of small-sized PC prefabricated part hanging device based on BIM - Google Patents
A kind of small-sized PC prefabricated part hanging device based on BIM Download PDFInfo
- Publication number
- CN209668610U CN209668610U CN201920326189.1U CN201920326189U CN209668610U CN 209668610 U CN209668610 U CN 209668610U CN 201920326189 U CN201920326189 U CN 201920326189U CN 209668610 U CN209668610 U CN 209668610U
- Authority
- CN
- China
- Prior art keywords
- wirerope
- suspension hook
- sized
- cape
- device based
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model belongs to hanging apparatus technical field, in particular a kind of small-sized PC prefabricated part hanging device based on BIM, including hoisting machine, one end of the hoisting machine is installed by wired roller, the outer surface of the line roller is equipped with the first wirerope, one end of first wirerope is fixedly connected with connection chain, the lower section of the connection chain is equipped with support cape, the both ends of the connection chain are fixedly connected with the upper surface of the support cape, the upper surface of the support cape is equipped with wrapping post, and the surface of the wrapping post is fixedly connected with the second wirerope;In use, by the way that four wrapping posts are arranged, wrapping post is for the second wirerope-winding, when not in use, by the second wirerope-winding on wrapping post, prevent from mutually winding between idle second wirerope and other second wirerope, the design of line gauge inner wall arc, so that the second wirerope is more smooth when by line gauge, solve the problems, such as mutually to wind between multiple second wirerope.
Description
Technical field
The utility model belongs to hanging apparatus technical field, and in particular to a kind of small-sized PC prefabricated components based on BIM are hung
Assembling device.
Background technique
There are many kinds of prefabricated components, common are concrete member mould, element mold, hexagonal reservoir slope protection mold, bridge
Beam die for cover plate, urban road kerbstone, cement components mold, cement products element mold, lifting refer to crane or lifting machine
Installation of the structure to equipment, general designation in place, in maintenance or maintenance process using various hoisting machine tools by equipment, workpiece, utensil,
Material etc. is sling, and change in location is brought it about.
(patent No.: CN201820139923.9 discloses a kind of massive casting steel construction mold lifting dress to Chinese patent
Set), which can be fixed large-sized object with four first wirerope, largely avoid, to large-scale object
Part is not fixed firmly to the danger that falls off, ensure that the personal safety of staff, at the same can also to small article into
The handling together of row more than one piece, improves work efficiency, but there are some problems.
Existing technology has the following problems:
1, the wirerope that original hanging apparatus is not involved in hoist in four wirerope in use is easy to happen winding,
Wirerope-winding will affect lifting, or even cause peril;
Although 2, the suspension hook of original hanging apparatus can lift most of objects, if lift some tubing or
It can be more troublesome when rod-like articles.
Utility model content
To solve the problems mentioned above in the background art.It is pre- that the utility model provides a kind of small-sized PC based on BIM
Lifting component device processed has the characteristics that wirerope is antiwind and can lift to rod-like articles.
To achieve the above object, the utility model provides the following technical solutions:
A kind of small-sized PC prefabricated part hanging device based on BIM, including hoisting machine, one end of the hoisting machine are equipped with
Line roller, the outer surface of the line roller are equipped with the first wirerope, and one end of first wirerope is fixedly connected with connection chain, institute
The lower section for stating connection chain is equipped with support cape, and the both ends of the connection chain are fixedly connected with the upper surface of the support cape, institute
The upper surface for stating support cape is equipped with wrapping post, and the surface of the wrapping post is fixedly connected with the second wirerope, the support
The upper surface of cape offers through-hole at the position of the wrapping post, and is equipped with line gauge at the position of the through-hole, institute
The bottom that the second wirerope is through to the support cape by the line gauge is stated, and is extended outwardly, the one of second wirerope
End is equipped with link block, and the lower surface of the link block is fixedly connected with third wirerope, sets below the third wirerope
There is suspension hook connector, the suspension hook connector is fixedly connected with the third wirerope, and the lower surface of the suspension hook connector is solid
Surely it is connected with suspension hook, the outer surface of the suspension hook is equipped with self-locking body, and the inside of the suspension hook connector is equipped with tube body fixed link,
And the inside of the suspension hook connector offers thread groove, the tube body fixed link is threadedly coupled with the suspension hook connector.
Further, the quantity of the wrapping post is four, is arranged at the upper surface of the support cape, and is located at institute
State the outside of connection chain.
Further, second wirerope is wound around on the outer surface of the wrapping post.
Further, the quantity of the link block is four, and the bottom surface of the link block is respectively mounted that there are two described the
Three wirerope.
Further, the top of the suspension hook connector is fixedly connected with two third wirerope.
Further, turning handle is installed at the top of the tube body fixed link.
Further, the bottom end of the tube body fixed link is equipped with cushion.
Further, the inner wall of the line gauge is arc at the position of upper and lower ends.
Compared with prior art, the utility model has the beneficial effects that
1, in use, by the way that four wrapping posts are arranged, wrapping post is not using for the second wirerope-winding
When, by the second wirerope-winding on wrapping post, prevent between idle second wirerope and other second wirerope mutually
Winding, the design of line gauge inner wall arc solve multiple second steel wires so that the second wirerope is more smooth when by line gauge
The problem of mutually being wound between rope.
2, tubing can be fixed on suspension hook by tube body fixed link when advancing downwardly, and the cushion of tube body bottom of fixed is also
It can prevent tube body fixed link from grinding away during rotation and material or damage material by pressure, tubing and suspension hook have the folder of tube body fixed link
It holds, that fixes between the two is even closer, and by setting cushion, tubular articles pressure can be prevented excessive and be deformed, from
And fixation of more convenient suspension hook to tubular material.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this
Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of wrapping post and line gauge in the utility model;
Fig. 3 is the structural schematic diagram of suspension hook in the utility model;
Fig. 4 is the side structure schematic view of suspension hook in the utility model;
In figure: 1- hoisting machine, 2- line roller, the first wirerope of 3-, 4- connection chain, 5- support cape, 6- wrapping post, 7- second
Wirerope, 8- line gauge, 9- link block, 10- third wirerope, 11- suspension hook, 12- suspension hook connector, 13- self-locking body, 14- tube body
Fixed link.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be noted that term " up/down end ", "inner", "outside" " front end ", " after
The orientation or positional relationship of the instructions such as end ", " both ends ", " one end ", " other end " is that orientation based on the figure or position are closed
System, is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning are necessary
It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition,
Term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " be arranged/be arranged with ", " socket ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, can also
To be to be detachably connected, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also
Indirectly connected through an intermediary, can be the connection inside two elements.For the ordinary skill in the art,
The concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment 1
Please refer to Fig. 1-4, the utility model the following technical schemes are provided:
One end installation of a kind of small-sized PC prefabricated part hanging device based on BIM, including hoisting machine 1, hoisting machine 1 is wired
Roller 2, the outer surface of line roller 2 are equipped with the first wirerope 3, and one end of the first wirerope 3 is fixedly connected with connection chain 4, connection chain 4
Lower section be equipped with support cape 5, the both ends of connection chain 4 are fixedly connected with the upper surface of support cape 5, the upper table of support cape 5
Face is equipped with wrapping post 6, and the surface of wrapping post 6 is fixedly connected with the second wirerope 7, supports the upper surface of cape 5 close to coiling
Through-hole is offered at the position of column 6, and line gauge 8 is installed at the position of through-hole, and the second wirerope 7 is through to support by line gauge 8
The bottom of cape 5, and extend outwardly, one end of the second wirerope 7 is equipped with link block 9, and the lower surface of link block 9 is fixedly connected
There is third wirerope 10, the lower section of third wirerope 10 is equipped with suspension hook connector 12, suspension hook connector 12 and third wirerope 10
It is fixedly connected, the lower surface of suspension hook connector 12 is fixedly connected with suspension hook 11, and the outer surface of suspension hook 11 is equipped with self-locking body 13, hangs
The inside of hook connects part 12 is equipped with tube body fixed link 14, and the inside of suspension hook connector 12 offers thread groove, tube body fixed link
14 are threadedly coupled with suspension hook connector 12.
In the present embodiment: the second wirerope 7 not used can be wrapped on wrapping post 6, prevent multiple second steel
Cord 7 is mutually wound, and after adjusting, the material lifted can will be needed to fix by suspension hook 11 to it, if desired be lifted tubulose
When material, tubing can be inserted into suspension hook 11 or be put into tubing in suspension hook 11 by self-locking body 13, after the completion of placement, passed through
The turning handle in tube body fixed link 14 is turned, to drive tube body fixed link 14 to rotate in suspension hook connector 12, since suspension hook connects
There is screw thread, tubing can be fixed on suspension hook 11 by tube body fixed link 14 when advancing downwardly, tube body fixed link 14 in fitting 12
The cushion of bottom can also prevent tube body fixed link 14 from grinding away during rotation and material or damage material by pressure, tubing and suspension hook 11
There is the clamping of tube body fixed link 14, that fixes between the two is even closer, when using self-locking body 13, can first fix tube body
Bar 14 is boosted, and prevents 14 bottom end of tube body fixed link from self-locking body 13 being stopped to can not work normally.
Specifically, the quantity of wrapping post 6 is four, it is arranged at the upper surface of support cape 5, and be located at connection chain 4
Outside;By the way that four wrapping posts 6 are arranged, wrapping post 6 winds for the second wirerope 7, when not in use, by the second wirerope 7
It is wrapped on wrapping post 6, prevents from mutually winding between idle second wirerope 7 and other second wirerope 7.
Specifically, the second wirerope 7 is wound around on the outer surface of wrapping post 6;Coiling can be wound around according to the second wirerope 7
Length on column 6 adjusts the length that the second wirerope 7 is located at support 5 bottom of cape.
Specifically, the quantity of link block 9 is four, and the bottom surface of link block 9 is respectively mounted there are two third wirerope 10;It is logical
Two third wirerope 10 of setting are crossed, can prevent third wirerope 10 from rotating.
Specifically, the top of suspension hook connector 12 is fixedly connected with two third wirerope 10;It can turn in use
Dynamic tube body fixed link 14, rises tube body fixed link 14, and suspension hook connector 12 is located at the two sides of tube body fixed link 14, will not influence
To tube body fixed link 14.
Specifically, the top of tube body fixed link 14 is equipped with turning handle;By the way that turning handle, more convenient staff is arranged
Rotate tube body fixed link 14.
Specifically, the bottom end of tube body fixed link 14 is equipped with cushion;By the way that cushion is arranged, tubular articles pressure can be prevented
Power is excessive and is deformed.
Specifically, the inner wall of line gauge 8 is arc at the position of upper and lower ends;So that the second wirerope 7 is passing through line
It advises more smooth when 8.
The working principle and process for using of the utility model: in use, first the second wirerope 7 not used is twined
It is wound on wrapping post 6, prevents multiple mutually windings of second wirerope 7, after adjusting, the material lifted can will be needed by hanging
Hook 11 fixes it, and when if desired lifting tubular material, tubing can be inserted into suspension hook 11 or by tubing by self-locking body 13
It is put into suspension hook 11, after the completion of placement, by turning the turning handle in tube body fixed link 14, to drive tube body fixed link 14 hanging
Rotation in hook connects part 12, due to having screw thread in suspension hook connector 12, tube body fixed link 14 can be by tubing when advancing downwardly
It is fixed on suspension hook 11, the cushion of 14 bottom of tube body fixed link can also prevent tube body fixed link 14 from grinding away during rotation material
Expect or damage by pressure material, tubing and suspension hook 11 have the clamping of tube body fixed link 14, and that fixes between the two is even closer.
Finally, it should be noted that the above is only the preferred embodiment of the utility model, it is not limited to practical
It is novel, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art,
It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc.
With replacement.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all include
It is within the protection scope of the utility model.
Claims (8)
1. a kind of small-sized PC prefabricated part hanging device based on BIM, including hoisting machine (1), one end peace of the hoisting machine (1)
Equipped with line roller (2), the outer surface of the line roller (2) is equipped with the first wirerope (3), and one end of first wirerope (3) is solid
Surely it is connected with connection chain (4), the lower section of the connection chain (4) is equipped with support cape (5), the both ends of the connection chain (4) and institute
The upper surface for stating support cape (5) is fixedly connected, it is characterised in that: the upper surface of support cape (5) is equipped with wrapping post
(6), the surface of the wrapping post (6) is fixedly connected with the second wirerope (7), and the upper surface of support cape (5) is close to institute
It states and offers through-hole at the position of wrapping post (6), and line gauge (8) are installed at the position of the through-hole, second wirerope
(7) it is through to the bottom of support cape (5) by the line gauge (8), and extends outwardly, the one of second wirerope (7)
End is equipped with link block (9), and the lower surface of the link block (9) is fixedly connected with third wirerope (10), the third steel wire
The lower section of rope (10) is equipped with suspension hook connector (12), the suspension hook connector (12) and the fixed company of the third wirerope (10)
It connects, the lower surface of the suspension hook connector (12) is fixedly connected with suspension hook (11), and the outer surface of the suspension hook (11) is equipped with certainly
The inside of latch fitting (13), the suspension hook connector (12) is equipped with tube body fixed link (14), and the suspension hook connector (12) is interior
Portion offers thread groove, and the tube body fixed link (14) is threadedly coupled with the suspension hook connector (12).
2. a kind of small-sized PC prefabricated part hanging device based on BIM according to claim 1, it is characterised in that: described
The quantity of wrapping post (6) is four, is arranged at the upper surface of support cape (5), and is located at the outer of the connection chain (4)
Side.
3. a kind of small-sized PC prefabricated part hanging device based on BIM according to claim 1, it is characterised in that: described
Second wirerope (7) is wound around on the outer surface of the wrapping post (6).
4. a kind of small-sized PC prefabricated part hanging device based on BIM according to claim 1, it is characterised in that: described
The quantity of link block (9) is four, and the bottom surface of the link block (9) is respectively mounted there are two the third wirerope (10).
5. a kind of small-sized PC prefabricated part hanging device based on BIM according to claim 1, it is characterised in that: described
The top of suspension hook connector (12) is fixedly connected with two third wirerope (10).
6. a kind of small-sized PC prefabricated part hanging device based on BIM according to claim 1, it is characterised in that: described
Tube body fixed link is equipped with turning handle at the top of (14).
7. a kind of small-sized PC prefabricated part hanging device based on BIM according to claim 1, it is characterised in that: described
The bottom end of tube body fixed link (14) is equipped with cushion.
8. a kind of small-sized PC prefabricated part hanging device based on BIM according to claim 1, it is characterised in that: described
The inner wall of line gauge (8) is arc at the position of upper and lower ends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920326189.1U CN209668610U (en) | 2019-03-15 | 2019-03-15 | A kind of small-sized PC prefabricated part hanging device based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920326189.1U CN209668610U (en) | 2019-03-15 | 2019-03-15 | A kind of small-sized PC prefabricated part hanging device based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209668610U true CN209668610U (en) | 2019-11-22 |
Family
ID=68571592
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920326189.1U Active CN209668610U (en) | 2019-03-15 | 2019-03-15 | A kind of small-sized PC prefabricated part hanging device based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209668610U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112919304A (en) * | 2021-02-05 | 2021-06-08 | 上海城建预制构件有限公司 | Hoisting sling and hoisting method for prefabricated part |
-
2019
- 2019-03-15 CN CN201920326189.1U patent/CN209668610U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112919304A (en) * | 2021-02-05 | 2021-06-08 | 上海城建预制构件有限公司 | Hoisting sling and hoisting method for prefabricated part |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209957260U (en) | Hoisting frame for mechanical equipment | |
CN209668610U (en) | A kind of small-sized PC prefabricated part hanging device based on BIM | |
CN106315400A (en) | Internal expanding type three-claw lifting tool | |
CN208182486U (en) | Construction lifting mechanical device | |
CN218841459U (en) | Adjustable lifting appliance | |
CN210133816U (en) | Pneumatic lifting appliance for prestressed high-strength concrete pipe pile | |
CN103287966A (en) | Hanging tool for guide wheel of slicing machine | |
CN215626337U (en) | Mould overhead hoist suitable for automobile parts processing | |
CN203699679U (en) | Lifting appliance for lifting wire coil | |
CN209113378U (en) | A kind of novel on-vehicle hanging apparatus | |
CN213622872U (en) | Be used for hoist wire rope rigging of being convenient for to fix | |
CN104609293B (en) | A kind of stator hoisting frock | |
CN221587810U (en) | Lifting protection device for power plant boiler top support and hanger | |
CN209797244U (en) | Automatic lifting appliance of bridge crane | |
CN206901583U (en) | Core suspender | |
CN212609103U (en) | Hoisting accessory is used in chemical industry equipment maintenance | |
CN206278835U (en) | A kind of detachable adjustable hoisting balance beam | |
CN221116658U (en) | Steel plate hanging and unloading balancing device | |
CN207973424U (en) | Portable small suspension transferring machine | |
CN209193493U (en) | A kind of supporting tool convenient for the lifting of small-sized tube shape component | |
CN211393557U (en) | Wire rod reinforcing bar lifting device | |
CN211920607U (en) | Equipment hoisting device for mechanical inspection | |
CN214828378U (en) | Safety hook for tower crane | |
CN220376091U (en) | Steel hoisting mechanism | |
CN220334607U (en) | Suspension type folding arm and crane |
Legal Events