CN212772454U - Pre-buried fixing device in many cross-sections of tower crane - Google Patents

Pre-buried fixing device in many cross-sections of tower crane Download PDF

Info

Publication number
CN212772454U
CN212772454U CN202021214058.3U CN202021214058U CN212772454U CN 212772454 U CN212772454 U CN 212772454U CN 202021214058 U CN202021214058 U CN 202021214058U CN 212772454 U CN212772454 U CN 212772454U
Authority
CN
China
Prior art keywords
main limb
horizontal support
fixing device
tower crane
fixed connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021214058.3U
Other languages
Chinese (zh)
Inventor
杨志英
潘旭波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongjian Dafeng Mechanical Engineering Co ltd
Original Assignee
Jiangsu Zhongjian Dafeng Machinery Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongjian Dafeng Machinery Engineering Co ltd filed Critical Jiangsu Zhongjian Dafeng Machinery Engineering Co ltd
Priority to CN202021214058.3U priority Critical patent/CN212772454U/en
Application granted granted Critical
Publication of CN212772454U publication Critical patent/CN212772454U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a pre-buried fixing device of tower crane multisection, constitute including first main limb, first horizontal support bar, second main limb and lower margin, the first horizontal support bar of upper end fixedly connected with of first main limb, first horizontal support bar and first connecting plate fixed connection, first connecting plate and second main limb fixed connection, second main limb and second connecting plate fixed connection, second connecting plate and second horizontal support bar fixed connection, second horizontal support bar and first main limb fixed connection, the utility model discloses improve production efficiency in using, structural reliable and stable will be in order to guarantee the installation accuracy, this fixing device installation is firm, and it is convenient to dismantle, can have enough to meet the need repeatedly the use.

Description

Pre-buried fixing device in many cross-sections of tower crane
Technical Field
The utility model relates to an engineering equipment field, especially a pre-buried fixing device in tower crane many cross-sections.
Background
At present, along with the development of building industry, the use of tower crane is also more and more frequent, the essential tower crane to tens of using of every job site, in order to guarantee the operation safety of tower crane, the tower crane must have reliable basis to fix, and the basis atress of tower crane is complicated, bear great horizontal force simultaneously, vertical force and overturning bending moment, so must have strict requirement to the tower crane basis, it is more strict to the pre-buried size of lower margin, the levelness of requiring its installation can not be greater than thousandth, the pre-buried lower margin levelness of 2 meters cross-section that also can not exceed 2 millimeters. The sizes of standard sections are different due to different models of the on-site tower cranes, and the multi-size section pre-embedding fixing device is researched to adapt to pre-embedding of different tower crane sections for improving the installation efficiency and reducing the construction cost and the transportation cost.
Often only the pre-buried lower margin of tower crane arrives the job site earlier stage in the engineering start-up, and the tower crane standard festival does not arrive the job site, perhaps the position that does not have the crane truck on the scene can't hoist and mount the standard festival and carry out pre-buried fixed, and the pre-buried lower margin needs to be pour in advance to the tower crane basis, consequently guarantees that the pre-buried lower margin of tower crane fixes a position accurately, directly influences like this whether the later stage tower crane can in time install. In actual construction, because of concrete pouring, vibrating and other operations, the fixed embedded anchor is likely to displace, so that the deviation of the levelness and the installation size of the embedded anchor causes the whole foundation to be abandoned or needs to be converted by making an adjustment again, each remediation method needs more than one week and 2-5 ten thousands of time in cost, and the multi-section embedded fixing device is stable and reasonable in whole structure and can be used for quickly and accurately installing and positioning the anchor.
Disclosure of Invention
The utility model discloses need the location installation of the pre-buried lower margin that different tower machine standard cross sectional dimension used for solving, four pre-buried lower margin relative positions of protection are firm, the pre-buried fixing device in tower crane many cross-sections that different cross sectional dimension tower cranes can install smoothly.
For solving foretell technical problem, the utility model relates to a pre-buried fixing device of tower crane cross-section, constitute including first main limb, first horizontal support bar, second main limb and lower margin, the first horizontal support bar of upper end fixedly connected with of first main limb, first horizontal support bar and first connecting plate fixed connection, first connecting plate and second main limb fixed connection, second main limb and second connecting plate fixed connection, second connecting plate and second horizontal support bar fixed connection, second horizontal support bar and first main limb fixed connection.
Further, the lower part of first main limb is provided with two 65mm through-holes 65mm through-hole outside fixedly connected with first flitch, the downside of second main limb is provided with two 50mm through-holes, 50mm through-hole outside fixedly connected with second flitch.
Further, the 65mm through hole is movably connected with the connecting vertical pin, and the connecting vertical pin is movably connected with the connecting pin shaft.
Furthermore, the upper end of the first horizontal support rod is fixedly connected with a fixed steel plate, and the fixed steel plate is fixedly connected with the inclined support rod.
Furthermore, the first main limb and the ground foot are fixedly connected through a connecting vertical pin.
Compared with the prior art after adopting the above-mentioned structure, the utility model relates to a pre-buried fixing device in many cross-sections of tower crane, through main limb simulation mark vertebra festival mounting point, ensure that pre-buried lower margin and mark vertebra festival mounting point coincide, horizontal stay bar is formed by the channel-section steel welding, it is used for stabilizing whole firm frame structure to strengthen the diagonal stay, this device relative position and erection dimension satisfy the tower crane installation needs all the time, improve the pre-buried lower margin installation accuracy of tower crane, this patent adopts many sizes cross-section tower body and current a cross-section tower body technique to compare, can adapt to the pre-buried lower margin of two kinds of sizes tower body festival of 2 meters and 1.6 meters and use, also can use with the lower margin of two kinds of pre-buried sizes of needs when same basis, improve production efficiency in the use, structural reliable and stable will be in order to guarantee the installation accuracy, this fixing device installation.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Fig. 1 is a schematic structural diagram of a tower crane multi-section embedded fixing device.
Fig. 2 is a front view of a tower crane multi-section pre-buried fixing device.
Fig. 3 is a top view of a tower crane multi-section embedded fixing device.
In the figure: the structure comprises a first main limb 1, a first horizontal supporting rod 2, a first connecting plate 3, a second main limb 4, a connecting pin shaft 5, a connecting main pin 6, a second connecting plate 7, a second horizontal supporting rod 8, a ground foot 9, a fixing steel plate 10, an inclined supporting rod 11, a first flitch 12, a second flitch 13, a through hole 14 and a through hole 15, wherein the through hole 14 is a 65mm through hole, and the through hole 15 is a 50mm through hole.
Detailed Description
As shown in figure 1, the pre-buried fixing device of tower crane many cross-sections comprises first main limb 1, first horizontal support rod 2, second main limb 4 and lower margin 9, characterized by: the upper end of the first main limb 1 is fixedly connected with a first horizontal support rod 2, the first horizontal support rod 2 is fixedly connected with a first connecting plate 3, the first connecting plate 3 is fixedly connected with a second main limb 4, the first main limb 1 and the second main limb 4 are respectively connected with different ground feet according to different standard cross sections, the second main limb 4 is fixedly connected with a second connecting plate 7, the second connecting plate 7 is fixedly connected with a second horizontal support rod 8, the second horizontal support rod 8 is fixedly connected with the first main limb 1, 4 groups of the first main limb 1, 4 first horizontal support rods 2 and 4 second horizontal support rods 8 are connected to form an integral frame structure to form a double-layer stable fixed frame which can be used in a complex construction environment, the first main limb 1 is fixedly connected with the ground feet 9 through a connecting vertical pin 6, when using 2 meters to plant the first main limb 1 of face tower body on 2 meters cross-sectional position with diameter 65mm round pin axle with 4 lower feet and fixing device, when using 1.6 meters to plant the second main limb 4 of face tower body on 1.6 meters cross-sectional position with diameter 50mm round pin axle with 4 lower feet and fixing device, improved the flexibility and the convenience of installation like this.
As shown in fig. 2, the lower part of the first main limb 1 is provided with two 65mm through holes 14, the first flitch 12 is fixedly connected to the outer side of the 65mm through hole 14, the lower side of the second main limb 4 is provided with two 50mm through holes 15, the second flitch 13 is fixedly connected to the outer side of the 50mm through hole 15, the first flitch 12 and the second flitch 13 are used for enhancing the extrusion capability of the holes, the 65mm through hole 14 is movably connected with the connecting pin shaft 5, the connecting pin shaft 5 is movably connected with the connecting vertical pin 6, the connecting pin shaft 5 is simultaneously penetrated in two vertical directions at one corner, the vertical pin hole on the connecting pin shaft 5 is aligned with the vertical pin 6, the pin shaft is fixed and does not move, and the connecting pin shaft 5 can be penetrated in and out from two directions inside and outside, so that the flexibility of operation in the construction process is ensured.
As shown in fig. 3, a fixed steel plate 10 is fixedly connected to the upper end of the first horizontal support rod 2, the fixed steel plate 10 and the diagonal support rod 11 are fixedly connected to the diagonal support rod 11, so that a square surrounded by each second horizontal support rod 8 is divided into two triangular fixed structures in the upper frame, and the fixed steel plate 10 plays roles in fixing and transition.
Although specific embodiments of the present invention have been described above, it will be appreciated by those skilled in the art that these are merely examples and that many changes and modifications may be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined only by the appended claims.

Claims (5)

1. The utility model provides a pre-buried fixing device of tower crane cross-section, includes that first main limb (1), first horizontal support pole (2), second main limb (4) and lower margin (9) are constituteed, characterized by: the upper end fixedly connected with first horizontal support rod (2) of first main limb (1), first horizontal support rod (2) and first connecting plate (3) fixed connection, first connecting plate (3) and second main limb (4) fixed connection, second main limb (4) and second connecting plate (7) fixed connection, second connecting plate (7) and second horizontal support rod (8) fixed connection, second horizontal support rod (8) and first main limb (1) fixed connection.
2. The multi-section pre-buried fixing device of the tower crane according to claim 1, characterized in that: the lower part of first main limb (1) is provided with two 65mm through-holes (14) 65mm through-hole (14) outside fixedly connected with first flitch (12), the downside of second main limb (4) is provided with two 50mm through-holes (15), 50mm through-hole (15) outside fixedly connected with second flitch (13).
3. The multi-section pre-buried fixing device of the tower crane according to claim 2, characterized in that: the 65mm through hole (14) is movably connected with the connecting pin shaft (5), and the connecting pin shaft (5) is movably connected with the connecting vertical pin (6).
4. The multi-section pre-buried fixing device of the tower crane according to claim 1, characterized in that: the upper end of the first horizontal supporting rod (2) is fixedly connected with a fixed steel plate (10), and the fixed steel plate (10) is fixedly connected with an inclined supporting rod (11).
5. The multi-section pre-buried fixing device of the tower crane according to claim 1, characterized in that: the first main limb (1) and the ground feet (9) are fixedly connected through a connecting vertical pin (6).
CN202021214058.3U 2020-06-28 2020-06-28 Pre-buried fixing device in many cross-sections of tower crane Active CN212772454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021214058.3U CN212772454U (en) 2020-06-28 2020-06-28 Pre-buried fixing device in many cross-sections of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021214058.3U CN212772454U (en) 2020-06-28 2020-06-28 Pre-buried fixing device in many cross-sections of tower crane

Publications (1)

Publication Number Publication Date
CN212772454U true CN212772454U (en) 2021-03-23

Family

ID=75085743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021214058.3U Active CN212772454U (en) 2020-06-28 2020-06-28 Pre-buried fixing device in many cross-sections of tower crane

Country Status (1)

Country Link
CN (1) CN212772454U (en)

Similar Documents

Publication Publication Date Title
CN102127966B (en) Fixing device for template of cast-in-place reinforced concrete column
CN111851565B (en) Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
CN203247603U (en) High-position foundation bolt positioning device
CN111119071A (en) Construction method for assembling precast concrete segment box girder
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN103343639A (en) Efficiently-adjusting module sliding system
CN103031892A (en) Steel truss brace and manufacturing method for steel truss platform
CN212772454U (en) Pre-buried fixing device in many cross-sections of tower crane
CN202265906U (en) Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN109989590B (en) Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
CN208280128U (en) Operating platform for cast-in-situ bored pile more piece steel reinforcement cage straight thread abutting joint
CN109797964A (en) A kind of lifting platform system of integrated tower crane
CN211849438U (en) Device for pile connection and perpendicularity adjustment
CN203238967U (en) Large steel structure frame whole lifting device
CN103334584B (en) Template regulating system for sliding form system
CN113846572B (en) Holding system for bridge capping beam construction and construction method
CN113737661B (en) Construction method for steel-concrete combined section of tower base of cable-stayed bridge
CN215053064U (en) Lattice column verticality correction device
CN214883824U (en) Pre-leveling tower foundation
CN215055273U (en) A assembled template for installing support bracket embedded box
CN212532088U (en) Tower crane stabilizing frame
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN110080271B (en) Construction method for embedded quality control of foundation bolt embedded part
CN203008232U (en) Steel truss strut

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 213200 room 223, 168 Huacheng Middle Road, Jintan District, Changzhou City, Jiangsu Province

Patentee after: Jiangsu Zhongjian Dafeng Mechanical Engineering Co.,Ltd.

Address before: 213200 room 223, 168 Huacheng Middle Road, Jintan District, Changzhou City, Jiangsu Province

Patentee before: JIANGSU ZHONGJIAN DAFENG MACHINERY ENGINEERING CO.,LTD.

CP01 Change in the name or title of a patent holder