CN212768045U - Integral frame of scraper conveyor - Google Patents

Integral frame of scraper conveyor Download PDF

Info

Publication number
CN212768045U
CN212768045U CN202021475164.7U CN202021475164U CN212768045U CN 212768045 U CN212768045 U CN 212768045U CN 202021475164 U CN202021475164 U CN 202021475164U CN 212768045 U CN212768045 U CN 212768045U
Authority
CN
China
Prior art keywords
shaft group
frame body
chain wheel
mounting hole
positioning pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021475164.7U
Other languages
Chinese (zh)
Inventor
高凯全
李平辉
张翅
董梦磊
李米哲
董鹏举
邹民赞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Coal Mining Machinery Longwall Equipment Co ltd
Original Assignee
Zhengzhou Coal Mining Machinery Longwall Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Coal Mining Machinery Longwall Equipment Co ltd filed Critical Zhengzhou Coal Mining Machinery Longwall Equipment Co ltd
Priority to CN202021475164.7U priority Critical patent/CN212768045U/en
Application granted granted Critical
Publication of CN212768045U publication Critical patent/CN212768045U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Chain Conveyers (AREA)

Abstract

The utility model provides an integral frame of a scraper conveyor, which comprises a frame body and a sprocket shaft group arranged in the frame body, wherein the sprocket shaft group comprises a shaft group and a sprocket arranged on the shaft group; the frame body is provided with chain wheel shaft group mounting holes corresponding to two ends of a shaft group of the chain wheel shaft group, and two ends of the shaft group are fixedly connected with the frame body. Two ends of the shaft group of the chain wheel shaft group are fixed on the frame body through positioning pins; the frame body is provided with a positioning pin mounting hole communicated with the sprocket shaft group mounting hole, the shaft group is provided with a positioning pin hole corresponding to the positioning pin mounting hole, and the positioning pin penetrates through the positioning pin mounting hole and the positioning pin hole to fix the frame body and the shaft group. The utility model discloses do not have the fastener of briquetting and fixed briquetting, only the support body. The sprocket shaft group mounting hole that sets up on the support body is a whole circle, and structural strength is higher, more can adapt to the work demand of sprocket shaft group high load high strength in the pit.

Description

Integral frame of scraper conveyor
Technical Field
The utility model belongs to scraper blade conveying equipment field, concretely relates to integral frame of scraper conveyor.
Background
Underground coal transportation equipment includes: scraper conveyors of coal mining working faces, reversed loaders of machine lanes, crushers, belt conveyors and the like. The scraper conveyor is arranged on the working face to provide a walking track for the coal mining machine, and is mutually staggered and propelled with the hydraulic support as a pivot, and the most important function is to convey the mined coal and gangue out of the working face and unload the coal and gangue onto the tail of the transfer conveyor. The reversed loader transports the coal unloaded from the conveyor head to the reversed loader tail from the reversed loader tail to the reversed loader head, and then unloads the coal from the reversed loader head to the belt conveyor self-moving tail below.
The machine head and the machine tail of the scraper conveyor are respectively provided with a power part, the power parts transmit power to the chain wheel shaft group, the chain wheel shaft group rotates to drive the scraper chain to rotate, and the scraper chain drives coal, gangue and the like to be conveyed from the machine tail to the machine head for unloading. The machine head chain wheel shaft group is fixed on the machine head frame, and the machine tail chain wheel shaft group is fixed in the machine tail frame. Because the sprocket shaft group is a power transmission medium between the power part and the scraper chain and bears large force, the structure and the strength of the headstock and the tailstock for fixing the sprocket shaft group are relatively high. The holes for mounting the chain wheel shaft group in the existing headstock or tailstock are two half circular holes which are respectively connected through a fastener after being processed. Therefore, the processing difficulty is high, the strength of the machine head frame part is reduced, and the machine head frame part is easy to damage in the using process.
SUMMERY OF THE UTILITY MODEL
The utility model provides an integral frame of scraper conveyor that intensity is high, not fragile, installation are dismantled conveniently.
The purpose of the utility model is realized with the following mode: an integral frame of a scraper conveyor comprises a frame body and a chain wheel shaft group arranged in the frame body, wherein the chain wheel shaft group comprises a shaft group and a chain wheel arranged on the shaft group; the frame body is provided with chain wheel shaft group mounting holes corresponding to two ends of a shaft group of the chain wheel shaft group, and two ends of the shaft group are fixedly connected with the frame body.
Two ends of the shaft group of the chain wheel shaft group are fixed on the frame body through positioning pins; the frame body is provided with a positioning pin mounting hole communicated with the sprocket shaft group mounting hole, the shaft group is provided with a positioning pin hole corresponding to the positioning pin mounting hole, and the positioning pin penetrates through the positioning pin mounting hole and the positioning pin hole to fix the frame body and the shaft group.
The frame body is provided with a stop pin for fixing the positioning pin; the locating pin is provided with a stop pin hole, a stop pin mounting hole corresponding to the stop pin hole is arranged on the frame body, the stop pin mounting hole is communicated with the locating pin mounting hole, and the stop pin penetrates through the stop pin mounting hole and the stop pin hole.
The chain wheel is a combined chain wheel and comprises at least two chain wheel pieces, the chain wheel pieces are arranged around the shaft group, and the adjacent chain wheel pieces are fixed together through chain wheel fasteners.
The utility model has the advantages that: the integral frame of the scraper conveyer has no pressing block and fastener for fixing the pressing block, and only has a frame body. The sprocket shaft group mounting hole that sets up on the support body is a whole circle, and structural strength is higher, more can adapt to the work demand of sprocket shaft group high load high strength in the pit. The sprocket shaft group mounting hole is formed by one-step machining, and the structure processing is simpler than the structure processing of two semicircular mounting hole combinations, and the precision is higher. Additionally, the utility model discloses the processing of briquetting location has been saved.
Drawings
Fig. 1 is a schematic view of an original scraper conveyor frame.
Fig. 2 is an exploded view of fig. 1.
Fig. 3 is a front view of the scraper conveyor frame of the present invention.
Fig. 4 is a schematic view of the inventive combination sprocket.
Fig. 5 is an enlarged view of a portion of the frame body of the present invention.
Fig. 6 is an exploded top view of the integral frame of the scraper conveyor of the present invention.
Wherein, 1 is the first support body, 2 is the first sprocket shaft group, 3 is the front opening, 4 is the briquetting, 5 is the first locating pin, 6 is the first fastener, 7 is the support body, 70 is the sprocket shaft group mounting hole, 71 is the locating pin mounting hole, 72 is the stop pin mounting hole, 8 is the sprocket shaft group, 80 is the axle group, 81 is the sprocket, 82 is the sprocket piece, 83 is the locating pin hole, 9 is the locating pin, 90 is the stop pin hole, 10 is the stop pin.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings and specific embodiments. In the present invention, unless explicitly stated or limited otherwise, the terms "connected," "fixed," "disposed," and the like are to be understood in a broad sense, either fixedly connected or detachably connected, or integrally formed; may be directly connected or indirectly connected through an intermediate, unless otherwise specifically limited. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Relational terms such as first, second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.
As shown in fig. 1-2, the conventional scraper conveyor frame, especially the headstock and tailstock portions, includes a first frame body 1, the first frame body 1 is of a front opening type, and a first sprocket shaft group 2 is inserted along a front opening 3 of the first frame body. Then, pressing blocks 4 which press two ends of the first chain wheel shaft group 2 are placed on the first frame body 1 through the front opening 3. A first positioning pin hole is formed in the first chain wheel shaft group 2, a corresponding second positioning pin hole is also formed in the first frame body 1 or the pressing block 4 and used for axially positioning the first chain wheel shaft group 2 on the first frame body 1, and the first chain wheel shaft group 2 and the pressing block 4 are positioned through a first positioning pin 5; the pressing block 4 and the first frame body 1 are fixed through a first fastening piece 6, and the first fastening piece 6 can be a bolt. Set up the rectangle locating piece on the briquetting 4, correspond the position and set up the rectangle constant head tank on the first support body 1, fix a position through rectangle locating piece and rectangle constant head tank between briquetting 4 and the first support body 1. Wherein the first sprocket shaft group 2 generally employs an integral sprocket. The disadvantages of this structure are: firstly, the method comprises the following steps: the space for accommodating the first chain wheel shaft group 2 is divided into two parts, the hole in the shape of a half arc is arranged on the pressing block 4, and the hole in the shape of the other half arc is arranged on the first frame body 1, so that the strength of the whole shaft group installation structure is reduced. Secondly, the method comprises the following steps: the processing that holds the hole of first sprocket shaft group 2 between briquetting 4 and the first support body 1 at first needs separately to be preprocessed, then needs the equipment back cooperation processing round hole to guarantee the concentricity of two semicircle arcs. Thirdly, the method comprises the following steps: the axial between briquetting 4 and the first support body 1 needs reliable location, and prior art adopts rectangle strip and groove to fix a position, and processing is complicated, the degree of difficulty is high. And fourthly, the headstock is in a front opening type, and the strength and the rigidity are poor.
As shown in fig. 3-6, the utility model relates to an integral frame of scraper conveyor, including support body 7 and the sprocket shaft group 8 of setting in support body 7, sprocket shaft group 8 includes axle group 80 and sets up the sprocket 81 on axle group 80. The frame body 7 is provided with sprocket shaft group mounting holes 70 corresponding to two ends of a shaft group 80 of the sprocket shaft group 8, and two ends of the shaft group 80 are fixedly connected with the frame body 7. The frame refers to a head frame or a tail frame of the scraper conveyor. The structure of the frame body 7 refers to the attached drawings. The structure of the head frame and the tail frame of the scraper conveyor, which is irrelevant to the invention of the patent, belongs to the prior art and is not described in detail. The sprocket shaft set mounting holes 70 are generally circular and correspond to the shape of a conventional shaft. Of course, the shape may be other shapes as long as the function of the scraper conveyor is not affected.
Furthermore, two ends of the shaft group 80 of the sprocket shaft group 8 are fixed on the frame body 7 through positioning pins; the frame body 7 is provided with a positioning pin mounting hole 71 communicated with the sprocket shaft group mounting hole 70, the shaft group 80 is provided with a positioning pin hole 83 corresponding to the positioning pin mounting hole 71, and the positioning pin 9 penetrates through the positioning pin mounting hole 71 and the positioning pin hole 83 to fix the frame body 7 and the shaft group 80. The fixing mode of the positioning pin 9 is convenient and quick to install and disassemble. Other conventional fastening means are also possible, for example by bolting. Any end of the sprocket shaft group 8 is fixed by the positioning pin 9, so that the fixing function can be realized, but the sprocket shaft group is not stable, and one end of the sprocket shaft group is easy to damage due to overlarge stress.
A stop pin 10 for fixing the positioning pin 9 is arranged on the frame body 7; the positioning pin 9 is provided with a stop pin hole 90 and a stop pin mounting hole 72 corresponding to the stop pin hole 90 on the frame body 7, the stop pin mounting hole 72 is communicated with the positioning pin mounting hole 71, and the stop pin 10 passes through the stop pin mounting hole 72 and the stop pin hole 90.
The scraper conveyer is stressed greatly in the working environment, and when the headstock or the tailstock receives impact, the pin shaft is easy to shake and has the possibility of separation. The stop pin 10 for fixing the positioning pin 9 is arranged on the frame body 7, so that the front and rear positions of the positioning pin 9 are not changed, and the shaft group 80 is fixed in position in the frame body 7. The stop pin 10 and the positioning pin 9 are convenient to mount and dismount, and the whole headstock is simple, convenient and quick in dismounting and mounting process.
The sprocket 81 is preferably a combination sprocket comprising at least two sprocket plates 82, the sprocket plates 82 being disposed about the shaft set 80 and adjacent sprocket plates 82 being secured together by sprocket fasteners. As shown in the drawings in the specification, in a specific embodiment, the sprocket 81 may include upper and lower sprocket plates that are identical in construction and disposed about the axle set 80 and secured together by sprocket fasteners. The sprocket fasteners may be conventional fasteners such as bolts. The combined chain wheel belongs to the prior art, and is not described in detail, and specific reference can be made to patents related to combined chain wheels such as patent CN 205592348U. Although the integrated sprocket can be mounted on the frame 7 of the present invention, the mounting manner is troublesome. The utility model discloses in, the structure of support body 7 decides sprocket shaft group 8's mounting means and dismantlement mode. It was further determined that the composite sprocket was the most suitable sprocket.
The utility model discloses 8 installation processes of well sprocket shaft group: the shaft assembly portion 80 of the sprocket shaft assembly 8 is first inserted through the sprocket shaft assembly mounting hole 70 on one side of the frame body 7, then moved and inserted through the sprocket shaft assembly mounting hole 70 on the other side of the frame body 7. The two positioning pin holes 83 on the shaft group 80 of the sprocket shaft group 8 are respectively aligned with the two positioning pin mounting holes 71 on the frame body 7, the positioning pins 9 are mounted, and the positions of the positioning pins 9 are adjusted so that the stop pin holes 90 on the positioning pins 9 are aligned with the stop pin mounting holes 72 on the frame body 7. The stop pin 10 is inserted through the stop pin mounting hole 72 of the frame body 7 and the stop pin hole 90 of the positioning pin 9. The stopper pin 10 restricts the movement of the positioning pin in the longitudinal direction of the positioning pin attachment hole 71.
After the sprocket shaft group 8 is fixed to the frame body 7, the sprocket pieces 82 of the combined sprockets are combined together around the shaft group 80 and fixed using sprocket fasteners.
The steps of the disassembly process and the installation process are opposite: the sprocket plate 82 is first removed, the stop pin 10 is then removed, the locating pin 9 is removed, and the axle set 80 is removed from the sprocket axle set mounting hole 70.
The utility model discloses an integral frame of scraper conveyor does not have briquetting 4 and first fastener 6, only support body 7. Wherein sprocket shaft group mounting hole 70 is a whole circle, and structural strength is higher, more can adapt to 8 work demands of high load high strength in the pit of sprocket shaft group. Moreover, the sprocket shaft group mounting hole 70 is formed by one-step machining, and compared with the structure of the combination of two semicircular mounting holes, the sprocket shaft group mounting hole is simpler to machine and has higher precision. Additionally, the utility model discloses the processing of briquetting location and the structure of first firm firmware has been saved.
It should be noted that the terms "central," "lateral," "longitudinal," "front," "rear," "left," "right," "upper" and "lower," "vertical," "horizontal," "top," "bottom," "inner" and "outer" used in the description refer to the orientation or positional relationship as shown in the drawings, merely for the purpose of slogan to describe the patent, and do not indicate or imply that the referenced device or element must have a particular orientation, configuration, and operation in a particular orientation. Therefore, should not be construed as limiting the scope of the invention.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features. When the technical solutions are contradictory or cannot be combined, the combination of the technical solutions should be considered to be absent, and is not within the protection scope of the present invention. Also, it will be apparent to those skilled in the art that various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the spirit of the principles of the invention.

Claims (4)

1. An integral frame of a scraper conveyor comprises a frame body and a chain wheel shaft group arranged in the frame body, wherein the chain wheel shaft group comprises a shaft group and a chain wheel arranged on the shaft group; the method is characterized in that: the chain wheel shaft group mounting holes corresponding to the two ends of the shaft group of the chain wheel shaft group are formed in the frame body, and the two ends of the shaft group are fixedly connected with the frame body.
2. The scraper conveyor integral frame of claim 1, wherein: two ends of the shaft group of the chain wheel shaft group are fixed on the frame body through positioning pins; the frame body is provided with a positioning pin mounting hole communicated with the sprocket shaft group mounting hole, the shaft group is provided with a positioning pin hole corresponding to the positioning pin mounting hole, and the positioning pin penetrates through the positioning pin mounting hole and the positioning pin hole to fix the frame body and the shaft group.
3. The scraper conveyor integral frame of claim 2, wherein: the frame body is provided with a stop pin for fixing the positioning pin; the locating pin is provided with a stop pin hole, a stop pin mounting hole corresponding to the stop pin hole is arranged on the frame body, the stop pin mounting hole is communicated with the locating pin mounting hole, and the stop pin penetrates through the stop pin mounting hole and the stop pin hole.
4. The integrated frame of a scraper conveyor according to any one of claims 1-3, characterized in that: the chain wheel is a combined chain wheel and comprises at least two chain wheel pieces, the chain wheel pieces are arranged around the shaft group, and the adjacent chain wheel pieces are fixed together through chain wheel fasteners.
CN202021475164.7U 2020-07-23 2020-07-23 Integral frame of scraper conveyor Active CN212768045U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021475164.7U CN212768045U (en) 2020-07-23 2020-07-23 Integral frame of scraper conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021475164.7U CN212768045U (en) 2020-07-23 2020-07-23 Integral frame of scraper conveyor

Publications (1)

Publication Number Publication Date
CN212768045U true CN212768045U (en) 2021-03-23

Family

ID=75038068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021475164.7U Active CN212768045U (en) 2020-07-23 2020-07-23 Integral frame of scraper conveyor

Country Status (1)

Country Link
CN (1) CN212768045U (en)

Similar Documents

Publication Publication Date Title
CN101737046B (en) Scraper type cantilever conveyer
CN212768045U (en) Integral frame of scraper conveyor
CN209761424U (en) conveyer for strip mine continuous mining equipment
CN204777184U (en) Bury scraper conveyor under ore deposit
CN210557319U (en) Mining 40T scraper conveyor
CN215927383U (en) Detachable main frame and heading machine
CN212402413U (en) Combined conveying device
CN218490707U (en) Upper opening type reversed loader tailstock
CN210527617U (en) Sprocket shaft group
CN211168541U (en) Elevating conveyor tongue and elevating conveyor tongue assembly
CN211109455U (en) Conveying structure of heavy plate type feeding machine
CN210557322U (en) Rolling friction transfer machine
CN216686309U (en) Coal receiving device with replaceable wear-resistant lining plate
CN213386774U (en) Removable buffering subassembly uninstallation groove for colliery crossheading elevating conveyor
CN218289194U (en) Foundation pit-free connecting and disassembling machine
CN220222513U (en) Reversed loader limiting device
CN219030890U (en) Transitional conveying device of chain conveyor
CN214084501U (en) Detachable chassis on picking and loading machine
CN201077657Y (en) Mining drag-flight conveyer
CN210854039U (en) Coal belt conveyor
CN2568597Y (en) Integrally welded middle part groove of drag-flight conveyer
CN221499469U (en) Side double-chain driving device convenient for replacing chain wheel, conveyor and heading machine
CN218087355U (en) Steel conveying and collecting belt
CN211594277U (en) Coal mine electromechanical conveying device
CN214086159U (en) Coal mining conveyer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant