Slat conveyer integral solder intermediate channel
Technical field
The utility model relates to slat conveyer, especially a kind of slat conveyer integral solder intermediate channel.
Background technology
The The middle pan of scraper conveyor that traditional comprehensive mechanical coal-face uses adopts split retaining, ramp plate structure, its spillplate, ramp plate and middle link slot are by bolted connection together, plate and two sections ledges during link slot comprises wherein, two sections ledges are integral by middle plate assembly welding, and ledge adopts ∑ shaped steel usually.
In borehole operation, intermediate channel needs regular moving, in this course, the bolt that connects between spillplate, ramp plate and the middle link slot is loosening easily, must in time tighten, and be engaged in its working strength of this work and danger in the down-hole all very big, also caused descend the service life of intermediate channel thus.
Summary of the invention
The utility model proposes a kind of slat conveyer integral solder intermediate channel, it is the work of the tight bolt of intermediate channel that its purpose is to have avoided in the down-hole, has prolonged the service life of intermediate channel accordingly.
Slat conveyer integral solder intermediate channel comprises ramp plate, spillplate, middle link slot, and wherein ramp plate and spillplate are integral by middle link slot assembly welding.
After adopting slat conveyer integral solder intermediate channel, having avoided fully in the down-hole is this work of the tight bolt of intermediate channel, has correspondingly prolonged the service life of intermediate channel.
Description of drawings
Accompanying drawing 1 is the structural representation of middle link slot
Accompanying drawing 2 is a structural representation of the present utility model
The specific embodiment
Come the specific embodiment of the present utility model is described in further detail below in conjunction with accompanying drawing, middle link slot 3 as shown in Figure 1, the ledge 5 of plate 6 and both sides in comprising, the ledge 5 of both sides is integral by middle plate 6 assembly weldings, has constituted whole middle link slot 3; As shown in Figure 2, ramp plate 1 and spillplate 2 are integral by middle link slot 3 assembly weldings, a side of link slot 3 in the middle of ramp plate 1 and spillplate 2 are positioned at separately, constituted the whole middle groove, dumbbell pin 4 is equipped with at separately two ends on ramp plate 1 and the spillplate 2, can easily two intermediate channel be coupled together like this, also be easy to dismounting simultaneously.