CN212716709U - Ventilation and cooling system based on high-ground-temperature tunnel - Google Patents

Ventilation and cooling system based on high-ground-temperature tunnel Download PDF

Info

Publication number
CN212716709U
CN212716709U CN202020974143.3U CN202020974143U CN212716709U CN 212716709 U CN212716709 U CN 212716709U CN 202020974143 U CN202020974143 U CN 202020974143U CN 212716709 U CN212716709 U CN 212716709U
Authority
CN
China
Prior art keywords
tunnel
wind
main tunnel
main
storage device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020974143.3U
Other languages
Chinese (zh)
Inventor
王永伟
周君
吴忠仕
周洋
钟亚
林佳
文鑫鑫
王瑶
王冬兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN202020974143.3U priority Critical patent/CN212716709U/en
Application granted granted Critical
Publication of CN212716709U publication Critical patent/CN212716709U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The utility model discloses a ventilation cooling system based on high ground temperature tunnel, the high ground temperature tunnel includes the main tunnel and the inclined shaft that communicates with the main tunnel, still includes the circuitous pilot tunnel that communicates with the main tunnel, the ventilation cooling system includes, set up the wind storage device in the communicating junction of the main tunnel and the inclined shaft, and convey the wind-force to the wind storage device through the inclined shaft, and export the wind-force circulation to the main tunnel through the wind storage device; the wind power relay devices are arranged at equal intervals along the output direction of the wind storage device in the space of the main tunnel and are used for enabling wind power to be uniformly transmitted to each section of the main tunnel; and the cooling device is arranged in the air storage device and used for reducing the temperature of the wind power input into the air storage device. The utility model discloses have each construction operation face ventilation in messenger's tunnel and evenly, the good technological effect of cooling measure, but wide application in tunnel construction technical field.

Description

Ventilation and cooling system based on high-ground-temperature tunnel
Technical Field
The utility model relates to a tunnel construction technical field. More specifically, the utility model relates to a ventilation cooling system based on high ground temperature tunnel.
Background
With the vigorous development of railway tunnel industry, the problem of tunnel ventilation design has become an important issue of railway tunnel development, the railway tunnel ventilation design generally adopts two forms of natural ventilation and mechanical ventilation, and in the specific design, reasonable ventilation design is required according to actual conditions.
When the high-temperature construction environment passes through a high-ground-temperature area in the plateau underground engineering construction under special geographic and geological conditions, great influence is brought to constructors, and measures for comprehensively reducing the temperature and ensuring safe and efficient construction under the high-ground-temperature condition are very important.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a make each construction operation face ventilation in main tunnel even, the good aeration cooling system based on high ground temperature tunnel of cooling measure.
To achieve these objects and other advantages in accordance with the purpose of the invention, there is provided an aeration cooling system based on a high ground temperature tunnel including a pilot tunnel and a slant well communicating with the pilot tunnel, and further including a circuitous pilot tunnel communicating with the pilot tunnel, the aeration cooling system including,
arranging a wind storage device at the communicated junction of the main tunnel and the inclined shaft, conveying wind power into the wind storage device through the inclined shaft, and outputting the wind power to the main tunnel through the wind storage device;
the wind power relay devices are arranged at equal intervals along the output direction of the wind storage device in the space of the main tunnel and are used for enabling wind power to be uniformly transmitted to each section of the main tunnel;
and the cooling device is arranged in the air storage device and used for reducing the temperature of the wind power input into the air storage device.
Preferably, the end of the wind storage device outputting wind power transmits the wind power to each segment of the main hole through a plurality of flexible wind pipes.
Preferably, the roundabout pit is provided with a plurality of through connection points along the length direction of the main tunnel, the flexible duct comprises a first duct which is arranged along the length of the roundabout pit, a branch duct is arranged at each connection point of the roundabout pit and the main tunnel in a communication manner, and an outlet of each branch duct is communicated with the main tunnel.
Preferably, a plurality of the wind relays include:
and each axial flow fan is correspondingly arranged on each section of the first air pipe corresponding to the branch pipe and used for uniformly conveying wind power to each section of the main tunnel.
Preferably, the wind storage device comprises:
the air storage chamber is a three-dimensional chamber with a sealing structure and is arranged on one side in the main hole;
the inside of the air storage chamber is supported by section steel, and the outside of the air storage chamber is formed by welding sealing steel plates.
Preferably, the cooling device comprises:
the water storage tank is arranged at the bottom in the air storage chamber;
and the refrigerating device is arranged in the air storage chamber in the direction close to the inclined shaft.
Preferably, the plurality of wind relays further comprises:
the jet flow fans are arranged on one side, far away from the air storage chamber, in the main tunnel at equal intervals, and the wind guiding direction of each jet flow fan is opposite to the direction of the air storage chamber and used for discharging high-temperature airflow in the main tunnel out of the main tunnel.
Preferably, the reservoir is provided with a water inlet pipeline communicated with the outside and used for delivering water;
the water outlet pipeline is arranged along the length direction of the main hole, is positioned on the segment in the main hole, and is provided with water outlet spray heads at equal intervals for spraying clean water into the main hole.
The utility model discloses at least, include following beneficial effect:
1. the ventilation effect is good, and a plurality of wind force relay devices are additionally arranged between the air storage chamber and the main tunnel, so that each construction working face in the high-ground-temperature tunnel keeps a uniform ventilation environment.
2. The cooling effect is good, and the temperature of the output wind power in the air storage chamber is reduced by arranging the water storage tank and the cooling device in the air storage chamber, so that the working environment of reducing the high temperature of the main tunnel is achieved.
3. The jet fans are arranged on all the sections in the main tunnel, and the guide direction of the jet fans is opposite to the direction of the air storage chamber, so that the circulation of the wind environment in the main tunnel is guided, and the good air environment in the main tunnel is further ensured.
4. The dust fall effect is good, and in extending to the main tunnel through setting up outlet conduit, and set up out the water shower nozzle along each festival section of outlet conduit, the water smoke that sprays has good dust fall effect.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
FIG. 1 is a schematic structural view of a middle aeration cooling system of the present invention;
the specification reference numbers indicate: 1. the device comprises a main tunnel, 2, an inclined shaft, 3, a circuitous pilot tunnel, 4, an air storage chamber, 5, an axial flow fan, 6, a jet flow fan, 7 and a soft air pipe.
Detailed Description
The present invention is further described in detail below with reference to the drawings so that those skilled in the art can implement the invention with reference to the description.
In the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
As shown in figure 1, the utility model relates to an aeration cooling system based on a high-ground-temperature tunnel, the high-ground-temperature tunnel comprises a main tunnel 1, an inclined shaft 2 communicated with the main tunnel 1, and a circuitous pilot tunnel 3 communicated with the main tunnel 1, the aeration cooling system comprises,
arranging a wind storage device at the communicated junction of the main tunnel 1 and the inclined shaft 2, conveying wind power into the wind storage device through the inclined shaft 2, and outputting the wind power to the main tunnel 1 through the wind storage device;
the wind power relay devices are arranged at equal intervals along the output direction of the wind storage device in the space of the main tunnel 1 and are used for enabling wind power to be uniformly transmitted to each section of the main tunnel 1;
and the cooling device is arranged in the air storage device and used for reducing the temperature of the wind power input into the air storage device.
In the technical scheme, the inclined shaft 2 is used for continuously inputting wind power into the wind storage device, then the temperature of airflow is reduced through the cooling device in the wind storage device, and then the cooled airflow is input into the main tunnel 1, so that the internal temperature environment of the high-ground-temperature tunnel is reduced, the flowing air in the tunnel is formed, and a proper construction environment is further achieved;
the wind power relay devices are arranged at the positions of all sections of the main tunnel 1, when the wind power output is far away from a wind source, the wind speed of the wind power relay devices is inevitably reduced, and the wind power relay devices are installed once through presetting installation point positions of the wind power relay devices, so that the wind power output frequency in the tunnel is synchronous.
In another technical scheme, the end part of the wind storage device outputting wind power transmits the wind power to each segment of the main hole 1 through a plurality of flexible wind pipes 7.
In the above technical scheme, the flexible air pipe 7 has good ductility and is applicable to the effect of different terrains of each segment in the tunnel.
In another technical solution, the roundabout pit 3 is provided with a plurality of through connection points along the length direction of the main tunnel 1, the flexible duct 7 includes a first duct which is provided along the length of the roundabout pit 3 and is provided with a branch duct at each connection point between the roundabout pit 3 and the main tunnel 1, and an outlet of each branch duct is communicated with the main tunnel 1.
In another aspect, the plurality of wind force relay devices comprise:
and each axial flow fan 5 is correspondingly arranged on each section of the first air pipe corresponding to the branch pipe and used for uniformly conveying wind power to each section of the main tunnel 1.
In the technical scheme, the length of the roundabout pilot tunnel 3 is adapted to the length of a section under construction in the main tunnel 1, a first air pipe is arranged along the length direction of the roundabout pilot tunnel 3, communication points communicated with the roundabout pilot tunnel 3 are arranged according to the air volume required by each tunnel face in the main tunnel 1, each communication point forms a channel penetrating through the roundabout pilot tunnel 3 and the main tunnel 1, and each branch pipe is communicated with the first air pipe and the main tunnel 1 through the corresponding communication point;
wherein, each branch pipe and the channel of the corresponding communicating point of the circuitous pilot tunnel 3 have ventilation gaps, and the high-temperature airflow in the main tunnel 1 can flow back to the direction of the wind storage device through the gaps and then be discharged from the inclined shaft 2.
In another technical solution, the wind storage device includes:
the air storage chamber 4 is a three-dimensional chamber with a sealed structure and is arranged on one side in the main hole 1;
the inside of the air storage chamber 4 is supported by section steel, and the outside of the air storage chamber 4 is formed by welding sealing steel plates.
In another aspect, the cooling device includes:
the water storage tank is arranged at the bottom in the air storage chamber 4;
and the refrigerating device is arranged in the air storage chamber 4 in the direction close to the inclined shaft 2.
In the above technical solution, the construction of the air storage chamber 4 comprises the following steps:
s1, presetting the building area of the air storage chamber 4, and digging a water storage tank;
s2, building supporting section steel on the periphery of the water storage pool to form the outer contour of the air storage chamber 4;
s3, installing a refrigerating device at the air inlet of the air storage chamber 4;
s4, setting a fan platform at the air outlet of the air storage chamber 4 and installing a fan;
s, the outside of the outer contour of the wind storage chamber 4 is seal-welded with a steel plate in step S2 to form a sealed wind storage environment.
Wherein, dig and get the cistern and include, establish waterproof geotechnological cloth with the inside pad of cistern, prevent the seepage to and install outside inlet channel, conduit, the water pump of intercommunication.
Furthermore, the interior of the air storage chamber 4 is supported by section steel, the bottom and the top of the air storage chamber are supported transversely by I18 at a distance of 2m, and the total number of the air storage chambers is 32; the front part and the rear part adopt I18 steel for vertical support, the distance is 3m, and the total number is 22; the side parts adopt I18 steel as vertical supports, the distance is 1.5m, and the total number is 4; the interior of the steel tube is provided with I16 steel struts with a longitudinal distance of 3m, and the total number of the struts is 22.
Furthermore, the refrigerating device can select a plurality of high-power air conditioners as refrigerating sources.
In another technical solution, the plurality of wind power relay devices further include:
the jet flow fans 6 are arranged on one side, far away from the air storage chamber 4, in the main tunnel 1 at equal intervals, and the wind power guiding direction of each jet flow fan 6 is opposite to the air storage chamber 4, so that high-temperature air flow in the main tunnel 1 is discharged out of the main tunnel 1.
In the technical scheme, the airflow guiding direction of the plurality of jet flow fans 6 is opposite to the air storage direction of the air storage chamber 4, and the airflow guiding direction is used for replacing turbid high-temperature air in the main tunnel 1 to form a good indoor circulating air environment of the main tunnel 1.
In another technical scheme, the reservoir is provided with a water inlet pipeline communicated with the outside and used for delivering water;
the water outlet pipeline is arranged along the length direction of the main hole 1, is positioned on a segment in the main hole 1, and is provided with water outlet nozzles at equal intervals for spraying clean water into the main hole 1.
In the technical scheme, each segment of the water outlet pipeline is provided with a water blowing nozzle, the water blowing nozzles compress water flow into fine water mist, the fine water mist is sprayed into the main hole 1, and dust attached to the air falls to the ground, so that the dust falling purpose is achieved.
While the embodiments of the invention have been described above, it is not intended to be limited to the details shown, or described, but rather to cover all modifications, which would come within the scope of the appended claims, and all changes which come within the meaning and range of equivalency of the art are therefore intended to be embraced therein.

Claims (8)

1. An aeration cooling system based on a high-ground-temperature tunnel, the high-ground-temperature tunnel comprises a main tunnel, an inclined shaft communicated with the main tunnel and a circuitous pilot tunnel communicated with the main tunnel, and is characterized in that the aeration cooling system comprises,
arranging a wind storage device at the communicated junction of the main tunnel and the inclined shaft, conveying wind power into the wind storage device through the inclined shaft, and outputting the wind power to the main tunnel through the wind storage device;
the wind power relay devices are arranged at equal intervals along the output direction of the wind storage device in the space of the main tunnel and are used for enabling wind power to be uniformly transmitted to each section of the main tunnel;
and the cooling device is arranged in the air storage device and used for reducing the temperature of the wind power input into the air storage device.
2. The high-geothermal tunnel-based aeration cooling system according to claim 1, wherein the wind-output end of the wind storage device delivers wind power to each segment of the main tunnel through a number of flexible ducts.
3. The high-ground-temperature tunnel-based aeration cooling system according to claim 2, wherein the roundabout pit is provided with a plurality of through connection points along the length direction of the main tunnel, the flexible duct comprises a first duct which is provided along the length direction of the roundabout pit and is provided with a branch duct in communication with each connection point of the roundabout pit and the main tunnel, and an outlet of each branch duct is communicated with the main tunnel.
4. The high ground temperature tunnel-based aeration cooling system of claim 3, wherein the plurality of wind relays comprise:
and each axial flow fan is correspondingly arranged on each section of the first air pipe corresponding to the branch pipe and used for uniformly conveying wind power to each section of the main tunnel.
5. The high-ground-temperature tunnel-based aeration cooling system according to claim 1, wherein the air storage device comprises:
the air storage chamber is a three-dimensional chamber with a sealing structure and is arranged on one side in the main hole;
the inside of the air storage chamber is supported by section steel, and the outside of the air storage chamber is formed by welding sealing steel plates.
6. The high-ground-temperature tunnel-based aeration cooling system according to claim 5, wherein the cooling device comprises:
the water storage tank is arranged at the bottom in the air storage chamber;
and the refrigerating device is arranged in the air storage chamber in the direction close to the inclined shaft.
7. The high ground temperature tunnel-based aeration cooling system of claim 5, wherein the plurality of wind relay devices further comprise:
the jet flow fans are arranged on one side, far away from the air storage chamber, in the main tunnel at equal intervals, and the wind guiding direction of each jet flow fan is opposite to the direction of the air storage chamber and used for discharging high-temperature airflow in the main tunnel out of the main tunnel.
8. The high-geothermal-tunnel-based aeration cooling system according to claim 6, wherein the reservoir has an inlet pipe communicating with the outside for water delivery;
the water outlet pipeline is arranged along the length direction of the main hole, is positioned on the segment in the main hole, and is provided with water outlet spray heads at equal intervals for spraying clean water into the main hole.
CN202020974143.3U 2020-06-01 2020-06-01 Ventilation and cooling system based on high-ground-temperature tunnel Active CN212716709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020974143.3U CN212716709U (en) 2020-06-01 2020-06-01 Ventilation and cooling system based on high-ground-temperature tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020974143.3U CN212716709U (en) 2020-06-01 2020-06-01 Ventilation and cooling system based on high-ground-temperature tunnel

Publications (1)

Publication Number Publication Date
CN212716709U true CN212716709U (en) 2021-03-16

Family

ID=74948599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020974143.3U Active CN212716709U (en) 2020-06-01 2020-06-01 Ventilation and cooling system based on high-ground-temperature tunnel

Country Status (1)

Country Link
CN (1) CN212716709U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113446042A (en) * 2021-07-21 2021-09-28 上海市政工程设计研究总院(集团)有限公司 Ventilation method for water delivery tunnel in steel pipe transportation and welding process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113446042A (en) * 2021-07-21 2021-09-28 上海市政工程设计研究总院(集团)有限公司 Ventilation method for water delivery tunnel in steel pipe transportation and welding process
CN113446042B (en) * 2021-07-21 2022-09-20 上海市政工程设计研究总院(集团)有限公司 Ventilation method for water delivery tunnel in steel pipe transportation and welding process

Similar Documents

Publication Publication Date Title
CN210599068U (en) Cooling and heat insulating system suitable for high geothermal tunnel construction
CN100595420C (en) Pressure regulating and distributing chamber ventilation construction method inside tunnel assist drift heading hole
CN212716709U (en) Ventilation and cooling system based on high-ground-temperature tunnel
CN105134278A (en) Ventilation heating system for tunnels in high-altitude and cold regions as well as ventilation heating construction method
CN111677539A (en) Ventilation and cooling system based on high-ground-temperature tunnel
CN108756989B (en) Tunnel ventilation system and tunnel ventilation method
CN214654707U (en) Injection type corner gas diluter with dust fall function
CN207297062U (en) The major long tunnel ventilation unit of air-supply over long distances
CN116378738A (en) Method for ventilating by using ultra-long distance of wind storage bin
CN220470007U (en) Adjustable dust suppression device
CN208089333U (en) A kind of aeration-cooling device for Tunnel Second Lining Construction operation
CN218117823U (en) Ventilation device for long-distance double-side-wall pit guiding method of underground excavation section of subway
CN220287913U (en) Be used for laboratory equipment facility high temperature waste water cooling discharging equipment
CN110185485A (en) Heat pressing type Tunnel Ventilation System for High aititude High-geotemperature long tunnel
CN218912938U (en) Tunnel ventilation system
CN220436684U (en) Cooling device suitable for large-scale underground cave depot
CN219869211U (en) Noise reduction device for air cooling island of power plant
CN216922196U (en) Tunnel cooling system
CN218882277U (en) Tunnel aeration cooling equipment
CN210107381U (en) Ash discharging device of water cooling air chamber of circulating fluidized bed boiler in thermal power plant
CN217340499U (en) Dust exhaust device of dust remover
CN109098747A (en) Aeration structure is isolated in narrow tunnel
CN221167913U (en) Underground road and utility tunnel co-construct structure
CN220170015U (en) Receive water machinery cooling tower
CN219848777U (en) Energy-saving air supply equipment for cable laying

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant