CN210599068U - Cooling and heat insulating system suitable for high geothermal tunnel construction - Google Patents

Cooling and heat insulating system suitable for high geothermal tunnel construction Download PDF

Info

Publication number
CN210599068U
CN210599068U CN201921023657.4U CN201921023657U CN210599068U CN 210599068 U CN210599068 U CN 210599068U CN 201921023657 U CN201921023657 U CN 201921023657U CN 210599068 U CN210599068 U CN 210599068U
Authority
CN
China
Prior art keywords
tunnel
cooling
cold water
water
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921023657.4U
Other languages
Chinese (zh)
Inventor
杨永斌
王帅帅
吴江
张玉烽
李晓华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Highway Engineering Co Ltd
Original Assignee
CCCC Second Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Highway Engineering Co Ltd filed Critical CCCC Second Highway Engineering Co Ltd
Priority to CN201921023657.4U priority Critical patent/CN210599068U/en
Application granted granted Critical
Publication of CN210599068U publication Critical patent/CN210599068U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides a heat insulation system of cooling suitable for high geothermal tunnel construction comprises aeration cooling device, cold water supply device, high-pressure cold water spraying cooling mechanism, insulating layer and drainage facility. The ventilation cooling device presses air outside the tunnel into the tunnel through the blast pipe, and takes away a part of heat in the tunnel through air circulation inside and outside the tunnel; the cold water tank outside the tunnel conveys cold water into the tunnel through a longitudinal cold water pipe, after the cold water is pressurized by the high-pressure pump box, the cold water is conveyed to the high-pressure spray nozzle through the annular drain pipe to form high-pressure cold water mist, and the high-pressure cold water mist is sprayed into air in the tunnel to reduce the temperature of the air; the water spraying hose is connected with the longitudinal cold water pipe through an adjustable valve, and can spray high-pressure cold water to the tunnel face and the rock wall around the tunnel, so that the temperature of the tunnel face and the rock wall is reduced; the heat insulation layer between the primary support and the secondary lining can block a path for transmitting the heat deep in the stratum to the tunnel hole, so that the tunnel is ensured to be in a proper temperature environment, and the construction environment is kept to be good.

Description

Cooling and heat insulating system suitable for high geothermal tunnel construction
Technical Field
The utility model belongs to the underground works field, concretely relates to heat insulation system of cooling suitable for high geothermal tunnel construction.
Background
At present, according to related researches at home and abroad, it can be known that the high geothermal conditions have a plurality of adverse effects on the construction of underground engineering. The high heat not only deteriorates the tunnel construction environment, reduces the winter-raising productivity of the operation, but also seriously threatens the health and the safety of constructors; meanwhile, the temperature stress of the accessory generated by the high terrestrial heat can also cause the cracking of the lining, so that the safety and the durability of the lining structure are not good; in addition, the high-temperature and high-humidity environment of the tunnel cavern may cause increased failure of construction machinery, reduced work efficiency, and the like. Therefore, how to reduce the temperature in the tunnel chamber of the construction tunnel in the high geothermal area section and control the temperature under an environment condition suitable for personnel and mechanical construction operation has great significance for ensuring the safety, construction quality and construction progress of tunnel construction.
At present, the rapid cooling method comprises the steps of cooling ice blocks in holes, cooling by spraying in the holes, cooling fans in the holes, air conditioners in the holes and the like besides the conventional enhanced ventilation. The utility model discloses a method and heat sink for reducing ambient temperature in high-ground-temperature tunnel like utility model patent application number CN201810486654.8, wherein the heat sink method includes following step: placing ice blocks in holes at equal intervals in the longitudinal direction of the tunnel in the tunnel for cooling according to parameters of the tunnel construction environment; calculating the melting volume of ice blocks in the tunnel every hour, and adding ice blocks in the tunnel, which are consistent with the melting volume, every other hour; the tunnel is characterized in that an ice block placing cage is arranged outside the tunnel opening, ice blocks outside the tunnel are placed inside the ice block placing cage, the ice block placing cage is connected with the ventilator through a flexible pipe, and the ventilator is connected with a ventilation pipe leading to the inside of the tunnel, so that ventilation and cooling are performed on the tunnel. Wherein the heat sink includes the hole ice-cube that is equipped with along the tunnel vertical equidistant inside the tunnel to and the cage is placed to the ice-cube that is equipped with outside the tunnel entrance to a cave, and the ice-cube is placed the cage inside and is placed the hole outer ice-cube, and the ice-cube is placed the cage and is connected with the ventilation blower through the flexible tube, and the ventilation blower is connected with the ventilation pipe that accesss to in the tunnel.
The utility model discloses a utility model patent of application number CN200720073392.X relates to a temperature control structure in tunnel, is particularly useful for the longer, the alternating current gauge height of tunnel ventilation district section, the higher engineering of temperature in the tunnel, and this structure includes the tunnel inner wall, its characterized in that be provided with the spraying shower nozzle on the inner wall, the spraying particle diameter of shower nozzle is not more than 50 mu m, and its advantage is, effectively reduces the interior air dry bulb temperature of tunnel, improves the inside air quality in long tunnel greatly, guarantees that the vehicle normally passes.
The utility model patent application No. CN01279571.2 relates to a special air conditioning unit in tunnel, and it is mainly used in high altitude, high cold and high temperature area to and in the construction tunnel of the harsh natural environment of high humidity, extra dry. The unit is arranged in an air-conditioning heat preservation box body, a heating surface air cooler and a double-speed tunnel fan are arranged to form the air-conditioning unit, and a temperature control device is additionally arranged. The air conditioning unit can heat or cool ambient air, and in addition, after the tunnel is blasted, the unit can run at a high speed, so that smoke and dust in the tunnel can be rapidly removed. The electric control cabinet in the temperature control device retrieves signal data sent by each temperature sensor, feeds the signal data back to the steam inlet electric regulating valve, controls the opening degree of the valve, regulates the steam inlet quantity of the heating surface cooler, and realizes timely automatic control of the ventilation temperature and humidity by the air conditioning unit.
For the long and large tunnel in the high geothermal region, the ice blocks are arranged to only temporarily provide a local cooling effect, workers need to have a rest and rotate for many times in the operation, the team cost is increased, and meanwhile, the ice making cost is high and the energy consumption is high. Although air coolers, air conditioners and the like have good refrigeration effects, the energy consumption is high, and under the condition that the dust air environment in the tunnel is not good, the air conditioners are difficult to maintain and maintain, need to be cleaned frequently and are not suitable for large-scale refrigeration. The spraying cooling is applied to operating tunnels more, the cooling effect can reach about 4 degrees, but the application of the spraying cooling in the tunnel is not common, and the cooling effect is mainly limited by the ventilation air speed in the tunnel and the temperature of cold water spraying. For the tunnel with the terrestrial heat of over 50 degrees in the tunnel, such as some long and large tunnels in Yunnan and Tibet areas, the high temperature in the local tunnel can reach 70 degrees, and the terrestrial heat problem becomes a main factor for restricting the tunnel construction.
It can be seen that for high-grade geothermal tunnels, the cooling capacity of the methods is limited, mainly the cooling by air exchange is limited by the small specific heat capacity of air, and the geothermal heat can be transferred into the tunnel through rock walls and concrete behind the tunnel face.
SUMMERY OF THE UTILITY MODEL
In view of the problems in the prior art, the purpose of the present invention is to provide a convenient, fast, economical and effective method for quickly cooling;
the second purpose of the utility model is to effectively reduce the temperature of the operation area near the tunnel face through aeration cooling, high-pressure spraying and cold water spraying;
the utility model discloses a third purpose is through setting up the insulating layer between the lining cutting, has effectively blocked the diffusion of stratum heat in to the hole, and then has reduced the temperature in operation district in the high ground temperature area tunnel construction period hole.
For solving the technical problem, the utility model discloses the technical scheme who adopts as follows:
a cooling and heat insulating system suitable for high geothermal tunnel construction at least comprises a cold water supply device and a high-pressure cold water spray cooling mechanism, wherein the cold water supply device comprises a cold water tank and a longitudinal cold water pipe, the high-pressure cold water spray cooling mechanism comprises a working bench, a high-pressure pump box, an annular cold water pipe, a water spray nozzle and a water spray hose,
the cooling water tank is arranged outside the tunnel hole, the longitudinal cooling water pipes are longitudinally arranged on the secondary lining on one side in the tunnel hole along the tunnel, the annular cooling water pipes are arranged in the cooling area in the tunnel hole at intervals along the longitudinal direction of the tunnel, the water inlets of the longitudinal cooling water pipes are communicated with the cooling water tank, the water outlets of the longitudinal cooling water pipes comprise a first water outlet and a second water outlet, the first water outlet is sequentially communicated with one ends of the annular cooling water pipes through a high-pressure pump box, the annular cooling water pipes are laid on the working table frame along the periphery of the tunnel hole, the other ends of the annular cooling water pipes are arranged in a sealed mode, and a plurality of water mist spray heads are arranged on each annular cooling water pipe at intervals along the annular direction, so that water in the annular cooling water; and the second water outlet is communicated with a water inlet of a water spraying hose, and a water outlet of the water spraying hose is connected with a spray head and used for spraying high-pressure cold water to the tunnel face and the rock wall around the tunnel cave.
Furthermore, a traveling device is arranged at the bottom of the working rack, and the high-pressure cold water spray cooling mechanism freely moves in the tunnel along the longitudinal direction through the traveling device.
Furthermore, the running gear comprises guide rails arranged at the bottoms of the inner walls of the two sides of the tunnel along the length direction of the tunnel, and rail wheels matched with the guide rails, wherein the rail wheels are arranged at the bottom of the working rack.
Further, this heat-insulating system of cooling still includes drainage mechanism, drainage mechanism includes catch basin, drinking-water pipe, suction pump, drain pipe and escape canal, the catch basin sets up in the place ahead of face for collect the ground sewage in face operation district, in the one end of drinking-water pipe stretched into the catch basin, the other end and the suction pump of drinking-water pipe are connected, and the suction pump takes waste water out, and discharge in the escape canal of arranging in the tunnel both sides through the drain pipe.
Further, this cooling heat-insulating system still includes aeration cooling device, aeration cooling device includes axial compressor forced draught blower and blast pipe, and the axial compressor forced draught blower is arranged in outside the tunnel hole, and the blast pipe is arranged in tunnel hole inner wall or top, and blast pipe one end and axial compressor forced draught blower intercommunication, the other end of blast pipe stretch into the tunnel in the rear region of face.
Further, the cooling and heat insulation system also comprises a heat insulation layer arranged between the primary support and the secondary lining in the tunnel.
Preferably, the water spray hose is connected with the second outlet of the longitudinal cold water pipe through an adjustable valve.
Preferably, a circular cold water pipe is arranged in the cooling area in the tunnel hole at intervals of 3-5 meters along the longitudinal direction of the tunnel, each circular cold water pipe is fixed by a working table frame, and the working table frames are connected through longitudinal beams.
The utility model has the advantages as follows:
1. the utility model has the advantages of simple structure, the practicality is strong, can effectively reduce near tunnel face operation district temperature through strengthening ventilation, high pressure spraying and spraying cold water.
2. The utility model discloses a set up the insulating layer between the lining cutting, effectively blocked the diffusion of stratum heat in to the hole, not only reduced the temperature in operation district in the high ground temperature area tunnel construction period hole, make workman and machinery can normal work, practice thrift the cost, use manpower sparingly, keep construction environment good, in the tunnel operation period in addition, the setting of insulating layer also can completely cut off the transmission of stratum heat in to the hole, is in suitable temperature environment in the assurance tunnel.
3. The utility model discloses the quantity of whole length of cooling zone and required high pressure cold water spray cooling mechanism is confirmed according to the actual conditions in the tunnel in a flexible way, can increase at any time and reduce, can not cause too big influence to whole cooling system.
4. The utility model discloses a high pressure cold water mist spray cooling mechanism has can freely move in a flexible way, reuse and does not influence characteristics such as normal construction, can effectively reduce the cost of cooling.
Drawings
The following will further explain the implementation method of the present invention with reference to the drawings.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural diagram of the high-pressure cold water spray cooling mechanism.
Description of the reference numerals
1. High-pressure cold water spraying cooling mechanism, 2, work bench, 3, running gear, 4, longitudinal cold water pipe, 5, water mist spray nozzle, 6, annular cold water pipe, 7, cold water tank, 8, high-pressure pump box, 9, adjustable valve, 10, water spraying hose, 11, spray nozzle, 12, rock wall, 13, primary support, 14, heat insulating layer, 15, secondary lining, 16, water collecting tank, 17, water pumping pipe, 18, water pumping pump, 19, drain pipe, 20, drainage ditch, 21, longitudinal beam, 22, axial flow blower, 23 and blast pipe.
Detailed Description
In the description of the present invention, it should be noted that the terms "longitudinal", "circumferential", "length", "up", "down", "front", "back", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of the description, but do not indicate or imply that the device or member to which the reference is made must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The following description is provided for illustrative embodiments of the present invention, and other advantages and effects of the present invention will be readily apparent to those skilled in the art from the disclosure herein.
The exemplary embodiments of the present invention will now be described with reference to the accompanying drawings, which, however, may be embodied in many different forms and are not limited to the embodiments described herein, which are provided for complete and complete disclosure of the present invention and to fully convey the scope of the invention to those skilled in the art. The terminology used in the exemplary embodiments presented in the accompanying drawings is not intended to be limiting of the invention. In the drawings, the same units/elements are denoted by the same reference numerals.
Unless otherwise defined, terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. In addition, it is understood that the dictionary limits are commonly used
Certain terms should be interpreted as having a meaning that is consistent with their context in the relevant art and will not be interpreted in an idealized or overly formal sense.
Implementation mode one
As shown in fig. 1 and 2, the cooling and heat insulating system suitable for high geothermal tunnel construction at least comprises a cold water supply device and a high-pressure cold water spray cooling mechanism 1, wherein the cold water supply device comprises a cold water tank 7 and a longitudinal cold water pipe 4 and is responsible for conveying cold water into a tunnel hole; the high-pressure cold water spray cooling mechanism comprises a working bench 2, a high-pressure pump box 8, an annular cold water pipe 6, a water spray nozzle 5 and a water spray hose 10; the cooling water tanks 7 are arranged outside the tunnel, the longitudinal cooling water pipes 4 are longitudinally arranged on the secondary lining on one side in the tunnel along the tunnel, the annular cooling water pipes 6 are arranged in the cooling area in the tunnel at intervals along the longitudinal direction of the tunnel, the water inlets of the longitudinal cooling water pipes 4 are communicated with the cooling water tanks 7, the water outlets of the longitudinal cooling water pipes 4 comprise first water outlets and second water outlets, the first water outlets are sequentially communicated with one ends of the plurality of annular cooling water pipes 6 through high-pressure pump boxes 8, the annular cooling water pipes 6 are laid on the working table frame 2 along the periphery of the tunnel, the other ends of the annular cooling water pipes 6 are arranged in a sealed mode, and a plurality of water mist spray nozzles 5 are arranged on each annular cooling water pipe 6 at intervals along the annular direction, so that water in the annular cooling water pipes 6 is converted into an; the second water outlet is communicated with a water inlet of the water spraying hose 10, and a water outlet of the water spraying hose 10 is connected with a spray head 11 and used for spraying high-pressure cold water to the tunnel face and the rock wall 12 around the tunnel cave.
When the device is used, the cold water tank 7 outside the tunnel hole conveys cold water into the tunnel hole through the longitudinal cold water pipe 4, the cold water is pressurized by the high-pressure pump tank 8 and then conveyed to the water mist spray nozzle 5 through the annular cold water pipe 6 to form high-pressure cold water mist, and the high-pressure cold water mist is sprayed into air in the tunnel hole to reduce the air temperature; the water spraying hose 10 is connected with a second water outlet of the longitudinal cold water pipe 4 and can spray high-pressure cold water to the tunnel face and the rock wall 12 around the tunnel, so that the temperature of the tunnel face and the rock wall is reduced; the high-pressure cold water spray cooling mechanism 1 can freely move in the tunnel hole along the longitudinal direction through the lower walking device, closely follows the operation area in front of the tunnel face of the tunnel, and moves back to a safe area during blasting. The utility model discloses a high pressure spraying and spraying cold water can effectively reduce near tunnel face operation district temperature, make the workman can normally be under construction, practice thrift the cost, use manpower sparingly, keep the construction environment good.
Second embodiment
On the basis of embodiment 1, further, running gear 3 is provided with in the bottom of work bench 2, running gear 3 includes along tunnel length direction, sets up the guide rail in tunnel both sides inner wall bottom, and with guide rail matched with rail wheel, rail wheel sets up the bottom at work bench 2. The high-pressure cold water spray cooling mechanism 1 freely moves in the tunnel along the longitudinal direction through the traveling device 3, closely follows the operation area in front of the tunnel face of the tunnel, and moves back to a safe area during blasting.
Third embodiment
On the basis of the above embodiment, further, the cooling and heat insulating system further comprises a drainage mechanism, the drainage mechanism comprises a water collecting tank 16, a water pumping pipe 17, a water pumping pump 18, a drainage pipe 19 and a drainage ditch 20, the water collecting tank 16 is arranged in front of the working face and used for collecting ground sewage in the working area of the working face, one end of the water pumping pipe 17 extends into the water collecting tank 16, the other end of the water pumping pipe 17 is connected with the water pumping pump 18, and the water pumping pump 18 pumps the waste water out and discharges the waste water into the drainage ditch 20 arranged on two sides of the tunnel through the drainage pipe 19.
The sewage on the ground in front of the working face is naturally collected in the water collecting tank 16 and is discharged out of the hole through the drainage ditch 20 by the water suction pump 18 through the drainage pipe 19, so that the ground of the working area of the working face is ensured not to accumulate water.
Embodiment IV
On the basis of the above embodiment, further, the water spray hose 10 is connected with the second outlet of the longitudinal cold water pipe 4 through the adjustable valve 9, and can spray high-pressure cold water to the tunnel face and the rock wall around the tunnel, so as to reduce the temperature of the tunnel face and the rock wall;
preferably, annular cold water pipes 6 are arranged in the cooling area in the tunnel hole at intervals of 3-5 meters along the longitudinal direction of the tunnel, each annular cold water pipe 6 is fixed by one working table frame 2, and the working table frames 2 are connected into a whole through longitudinal beams 21.
Further, in order to block a transmission path of heat at the deep part of the stratum to the tunnel through the lining, a heat insulation layer 14 is arranged between the primary support 13 and the secondary lining 15, so that the temperature of the area, in which the tunnel is cooled in operation, is kept in a proper range. The utility model discloses whole length of cooling zone and required high pressure cold water spray cooling mechanism 1 quantity are confirmed according to the actual conditions in the tunnel is nimble, can increase at any time and reduce, can not cause too big influence to whole cooling system.
Fifth embodiment
Further, cooling heat insulation system still includes aeration cooling device, aeration cooling device includes axial compressor forced draught blower 22 and blast pipe 23, and outside axial compressor forced draught blower 22 arranged the tunnel hole in, inner wall or top in the tunnel hole are arranged in to blast pipe 23, 23 one end of blast pipe and axial compressor forced draught blower 22 intercommunication, and the other end of blast pipe 23 stretches into the tunnel in the rear region of face. In order to discharge high temperature air in the hole as early as possible, the utility model discloses set up axial fan 22 at the tunnel entrance to a cave, through blast pipe 23 that links to each other with it, send into the place ahead of tunnel face in the tunnel hole with the outer fresh air in hole, can provide fresh air in the hole on the one hand, on the other hand passes through the air convection, can take away some heat in the hole.

Claims (8)

1. The utility model provides a cooling heat-proof system suitable for high geothermal tunnel construction which characterized in that: at least comprises a cold water supply device and a high-pressure cold water spray cooling mechanism (1), wherein the cold water supply device comprises a cold water tank (7) and a longitudinal cold water pipe (4), the high-pressure cold water spray cooling mechanism (1) comprises a workbench stand (2), a high-pressure pump box (8), a circumferential cold water pipe (6), a water spray nozzle (5) and a water spray hose (10),
the cooling water tank (7) is arranged outside the tunnel hole, the longitudinal cooling water pipes (4) are longitudinally arranged on the secondary lining (15) on one side in the tunnel hole along the tunnel, the annular cooling water pipes (6) are arranged in the cooling area in the tunnel hole at intervals along the longitudinal direction of the tunnel, the water inlets of the longitudinal cooling water pipes (4) are communicated with the cooling water tank (7), the water outlets of the longitudinal cooling water pipes (4) comprise a first water outlet and a second water outlet, the first water outlet is sequentially communicated with one ends of the annular cooling water pipes (6) through a high-pressure pump box (8), the annular cooling water pipes (6) are laid on the working platform frame (2) along the periphery of the tunnel hole, the other ends of the annular cooling water pipes (6) are sealed, and a plurality of water mist spray nozzles (5) are arranged on each annular cooling water pipe (6) at intervals; and the second water outlet is communicated with a water inlet of a water spraying hose (10), and a water outlet of the water spraying hose (10) is connected with a spray head (11) and used for spraying high-pressure cold water to the tunnel face and the peripheral rock wall (12) of the tunnel cave.
2. The cooling and heat insulating system suitable for high geothermal tunnel construction according to claim 1, wherein: and a traveling device (3) is arranged at the bottom of the working table frame (2), and the high-pressure cold water spray cooling mechanism (1) freely moves in the tunnel along the longitudinal direction through the traveling device (3).
3. The cooling and heat insulating system suitable for high geothermal tunnel construction according to claim 2, wherein: the walking device (3) comprises guide rails arranged at the bottoms of the inner walls of the two sides of the tunnel along the length direction of the tunnel and track wheels matched with the guide rails, and the track wheels are arranged at the bottom of the working rack (2).
4. The cooling and heat insulating system suitable for high geothermal tunnel construction according to claim 1, wherein: this heat-insulating system of cooling still includes drainage mechanism, drainage mechanism includes catch basin (16), drinking-water pipe (17), suction pump (18), drain pipe (19) and escape canal (20), catch basin (16) set up in the place ahead of face for collect the ground sewage in face operation district, in the one end of drinking-water pipe (17) stretched into catch basin (16), the other end and the suction pump (18) of drinking-water pipe (17) are connected, and suction pump (18) are taken waste water out, and discharge in escape canal (20) of arranging in the tunnel both sides through drain pipe (19).
5. The cooling and heat insulating system suitable for high geothermal tunnel construction according to claim 1, wherein: the cooling and heat insulation system further comprises a ventilation and cooling device, the ventilation and cooling device comprises an axial flow blower (22) and an air supply pipe (23), the axial flow blower (22) is arranged outside the tunnel hole, the air supply pipe (23) is arranged on the inner wall or the top of the tunnel hole, one end of the air supply pipe (23) is communicated with the axial flow blower (22), and the other end of the air supply pipe (23) extends into the rear area of the tunnel face in the tunnel.
6. The cooling and heat insulating system suitable for high geothermal tunnel construction according to claim 1, wherein: the cooling and heat insulation system also comprises a heat insulation layer (14) arranged between the primary support (13) and the secondary lining (15) in the tunnel.
7. The cooling and heat insulating system suitable for high geothermal tunnel construction according to claim 1, wherein: the water spray hose (10) is connected with a second outlet of the longitudinal cold water pipe (4) through an adjustable valve (9).
8. The cooling and heat insulating system suitable for high geothermal tunnel construction according to claim 1, wherein: the method is characterized in that annular cold water pipes (6) are arranged in the cooling area in the tunnel at intervals of 3-5 meters along the longitudinal direction of the tunnel, each annular cold water pipe (6) is fixed by one working table frame (2), and the working table frames (2) are connected through longitudinal beams (21).
CN201921023657.4U 2019-07-03 2019-07-03 Cooling and heat insulating system suitable for high geothermal tunnel construction Active CN210599068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921023657.4U CN210599068U (en) 2019-07-03 2019-07-03 Cooling and heat insulating system suitable for high geothermal tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921023657.4U CN210599068U (en) 2019-07-03 2019-07-03 Cooling and heat insulating system suitable for high geothermal tunnel construction

Publications (1)

Publication Number Publication Date
CN210599068U true CN210599068U (en) 2020-05-22

Family

ID=70694430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921023657.4U Active CN210599068U (en) 2019-07-03 2019-07-03 Cooling and heat insulating system suitable for high geothermal tunnel construction

Country Status (1)

Country Link
CN (1) CN210599068U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927521A (en) * 2020-06-29 2020-11-13 中铁第一勘察设计院集团有限公司 Method for cooling working area at front end of tunnel face
CN111927545A (en) * 2020-06-29 2020-11-13 中铁第一勘察设计院集团有限公司 Cooling system for working area at front end of tunnel face
CN112610243A (en) * 2020-11-18 2021-04-06 山东大学 Movable arch center system and method suitable for drilling and blasting excavation tunnel at high ground temperature
CN112761703A (en) * 2020-12-30 2021-05-07 中铁十四局集团建筑工程有限公司 Tunnel spray cooling device and cooling method thereof
CN113047894A (en) * 2021-04-06 2021-06-29 中电建路桥集团有限公司 High ground temperature tunnel bottom plate rapid cooling system
CN113047893A (en) * 2021-04-06 2021-06-29 中电建路桥集团有限公司 High-ground-temperature tunnel cooling system
CN113389585A (en) * 2021-05-17 2021-09-14 中交第二公路工程局有限公司 Cooling system and method for air channel type ventilation of high geothermal tunnel
CN113431634A (en) * 2021-08-03 2021-09-24 中铁高新工业股份有限公司 Special thermal-insulated platform truck of underground space construction

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111927521A (en) * 2020-06-29 2020-11-13 中铁第一勘察设计院集团有限公司 Method for cooling working area at front end of tunnel face
CN111927545A (en) * 2020-06-29 2020-11-13 中铁第一勘察设计院集团有限公司 Cooling system for working area at front end of tunnel face
CN111927521B (en) * 2020-06-29 2023-02-28 中铁第一勘察设计院集团有限公司 Method for cooling working area at front end of tunnel face
CN112610243A (en) * 2020-11-18 2021-04-06 山东大学 Movable arch center system and method suitable for drilling and blasting excavation tunnel at high ground temperature
CN112761703A (en) * 2020-12-30 2021-05-07 中铁十四局集团建筑工程有限公司 Tunnel spray cooling device and cooling method thereof
CN113047894A (en) * 2021-04-06 2021-06-29 中电建路桥集团有限公司 High ground temperature tunnel bottom plate rapid cooling system
CN113047893A (en) * 2021-04-06 2021-06-29 中电建路桥集团有限公司 High-ground-temperature tunnel cooling system
CN113389585A (en) * 2021-05-17 2021-09-14 中交第二公路工程局有限公司 Cooling system and method for air channel type ventilation of high geothermal tunnel
CN113431634A (en) * 2021-08-03 2021-09-24 中铁高新工业股份有限公司 Special thermal-insulated platform truck of underground space construction
CN113431634B (en) * 2021-08-03 2022-07-01 中铁高新工业股份有限公司 Special thermal-insulated platform truck of underground space construction

Similar Documents

Publication Publication Date Title
CN210599068U (en) Cooling and heat insulating system suitable for high geothermal tunnel construction
CN205784091U (en) A kind of highly efficient cooling device of mould
CN103410549B (en) Utilize the System and method for that residual heat of electric power plant is lowered the temperature for mine ventilation
WO2015074100A1 (en) System and apparatus for mine face cooling
CN105134278A (en) Ventilation heating system for tunnels in high-altitude and cold regions as well as ventilation heating construction method
CN104806281B (en) Inclined shaft ventilation based high pressure air supply system in long tunnel hole
CN202970756U (en) Mining liquid nitrogen temperature reducing device
CN102031989B (en) Non-electric drive life support device
CN208763685U (en) A kind of shield machine construction cooling system
CN110656969B (en) Cooling method for construction of extra-long highway tunnel
CN109268055A (en) A kind of shield machine construction cooling system
CN212716709U (en) Ventilation and cooling system based on high-ground-temperature tunnel
CN111677539A (en) Ventilation and cooling system based on high-ground-temperature tunnel
CN219412653U (en) Cooling and dedusting system applied to long tunnel construction area
CN210422671U (en) Tunnel type aeration cooling system of high temperature area double-hole tunnel
CN201255485Y (en) Air conditioner ventilating system of tunnel shield machine
CN104501456B (en) A kind of mine cooling and heating system
CN206638056U (en) A kind of portable type freezes unit hot water cooling body
CN114483151A (en) Deep stope ventilation and refrigeration system utilizing return air
CN213063645U (en) Be applied to cooling equipment who combines to adopt working face
CN219953412U (en) Cooling device used in tunnel high-temperature environment
CN206191797U (en) Workshop circulation cooling system
CN110397465B (en) Full air volume cooling system and method for coal face
CN205558960U (en) Tunnel regional hypothermia device
CN213152674U (en) Air inlet cooling system for tunnel fan

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant