CN212716580U - Gas pressure maintaining system for double-wheel stirring drilling machine - Google Patents

Gas pressure maintaining system for double-wheel stirring drilling machine Download PDF

Info

Publication number
CN212716580U
CN212716580U CN202020212196.1U CN202020212196U CN212716580U CN 212716580 U CN212716580 U CN 212716580U CN 202020212196 U CN202020212196 U CN 202020212196U CN 212716580 U CN212716580 U CN 212716580U
Authority
CN
China
Prior art keywords
monitoring device
double
drilling machine
half part
stirring drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020212196.1U
Other languages
Chinese (zh)
Inventor
林坚
谢添
姚锡均
张尚坤
金颖来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jintai Engineering Machinery Co Ltd
Original Assignee
Shanghai Jintai Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jintai Engineering Machinery Co Ltd filed Critical Shanghai Jintai Engineering Machinery Co Ltd
Application granted granted Critical
Publication of CN212716580U publication Critical patent/CN212716580U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a gas pressure maintaining system for a double-wheel stirring drilling machine; the method is characterized in that: the device comprises a monitoring device arranged in a milling head, wherein the head part of the monitoring device is connected with an air compression station through an air pipe, the tail part of the monitoring device is connected with the milling head, a floater is arranged in the monitoring device, and the floater divides the interior of the monitoring device into an upper half part and a lower half part; compressed air is input to the upper half part of the monitoring device through an air pipe, oil in the milling head enters the lower half part of the monitoring device, and the compressed air in the upper half part is isolated from the oil in the lower half part through a floater in the monitoring device; the pressure of oil in the lower half part of the monitoring device and the milling head of the double-wheel stirring drilling machine is indirectly adjusted by adjusting the numerical value of compressed air output by the air compression station, and when the double-wheel stirring drilling machine enters the ground and is positioned in slurry, the compressed air output by the air compression station is adjusted by pressure feedback, and the pressure between the oil in the double-wheel stirring drilling machine and the slurry outside the double-wheel stirring drilling machine is adjusted by the monitoring device.

Description

Gas pressure maintaining system for double-wheel stirring drilling machine
Technical Field
The utility model relates to an engineering machine tool field specifically is a gas pressure maintaining system for double round stirring rig.
Background
For a double-wheel stirring drilling machine, the working environment is often severe. For example, on the outside of a two-wheel mixer drill, there is a mud mixing material, and on the inside of the two-wheel mixer drill, there is a precision gear box and a hydraulic control motor. Since the cutterhead of the two-wheel mixer-drill rotates continuously during operation, a fixed sealing structure cannot be provided, and a dynamic sealing structure is created between the inner side and the outer side of the two-wheel mixer-drill. In order to ensure the reliability of the movable seal structure, it is common to provide oil injection on the inner side of the two-wheel mixer drill to balance the pressure between the inner side and the outer side of the two-wheel mixer drill. This ensures that the slurry mixture outside the two-wheel mixer drill does not enter the interior of the two-wheel mixer drill and damage the gearbox and hydraulic system.
However, as the drilling depth of the double-wheel stirring drilling machine is continuously deepened, the geological condition is more and more complicated, and the like. For the current double-wheel stirring drilling machine, higher requirements are put on the sealing device of the milling head. The original pressure balance and pressure maintaining systems on the inner side and the outer side are not very reliable, and meanwhile, with the development of the modern construction level, for the traditional method of adopting hydraulic oil as a key medium for pressure balance, long transmission time is needed for pumping the hydraulic oil from the ground into the double-wheel stirring drilling machine deep into the ground. That is, the current method for achieving the pressure balance by using hydraulic oil has many problems of unreliable pressure maintaining, untimely pressure maintaining feedback, inconvenient maintenance, and the like.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome above-mentioned defect, provide a can establish the pressurize system fast and the pressure value can be adjusted in real time and the gas of the inside fluid state of real time monitoring double round stirring rig cutter head is protected the pressure system.
In order to achieve the above object, the present invention is realized as follows:
a gas pressure maintaining system for a double-wheel stirring drilling machine comprises one air compression station and a monitoring device arranged inside a milling head of the double-wheel stirring drilling machine, wherein the head of the monitoring device is connected with the air compression station through an air pipe, the tail of the monitoring device is connected with the milling head of the double-wheel stirring drilling machine, a floater is arranged in the monitoring device, and the inside of the monitoring device is divided into an upper half part and a lower half part by the floater; therefore, compressed air is input to the upper half part of the monitoring device through the air pipe in the air compression station, and the lower half part of the monitoring device is connected with the milling head of the double-wheel stirring drilling machine, so that oil in the milling head enters the lower half part of the monitoring device, and the compressed air in the upper half part is isolated from the oil in the lower half part through the floater in the monitoring device; the pressure of oil in the lower half part of the monitoring device and the milling head of the double-wheel stirring drilling machine is indirectly adjusted by adjusting the numerical value of compressed air output by the air compression station, and then when the double-wheel stirring drilling machine enters the underground and is positioned in slurry, the compressed air output by the air compression station is adjusted through pressure feedback, and the pressure between the oil and the external slurry in the double-wheel stirring drilling machine is adjusted through the monitoring device.
The method for judging the working condition in the double-wheel stirring drill by the gas pressure maintaining system comprises the following steps
Step 1, arranging a moisture sensor in a milling head of a double-wheel stirring drilling machine, and connecting the moisture sensor, a monitoring device and an air compressor compressed air pressure numerical sensor with a host control computer;
step 2, feeding back various numerical values in a host control computer through a monitoring device and the sensors, and calculating through a controller algorithm to establish pressure balance inside and outside the milling head;
and 3, judging whether the oil in the head washing is leaked or invalid or not by the moisture content in the oil in the head washing in real time through the moisture sensor and combining the floater position fed back by the monitoring device and the numerical value of the compressed air.
This gas protects pressure system adopts above-mentioned structural design, through set up a monitoring devices in the cutter head outside, makes it be linked together with the inside fluid of cutter head simultaneously with the isolated with outside compressed air, like this alright realize controlling the inside and outside pressure balance's of cutter head purpose through monitoring devices in real time according to the demand. Meanwhile, the monitoring device is matched with a water sensor and other sensors in the milling head, so that whether the sealing structure of the milling head and the state of oil in the milling head are normal or not can be judged easily and quickly; meanwhile, the pressure balance between the inside and the outside of the milling head can be easily and quickly adjusted by adjusting the data of the compressed air.
Drawings
Fig. 1 is a schematic diagram of the arrangement state of the gas pressure maintaining system.
Fig. 2 is a schematic structural diagram of a walking floor with an air compression station and the air compression station.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in fig. 1 and 2, an air pressure maintaining system for a two-wheeled stirring drilling machine comprises one air compression station 1 and further comprises a monitoring device 3 arranged inside a milling head 2 of the two-wheeled stirring drilling machine, wherein the head of the monitoring device 3 is connected with the air compression station 1 through an air pipe, the tail of the monitoring device 3 is connected with the milling head of the two-wheeled stirring drilling machine 2, a floater 4 is arranged in the monitoring device 3, and the floater 4 divides the inside of the monitoring device 3 into an upper half part and a lower half part; thus, the air compression station 1 inputs compressed air to the upper half part of the monitoring device 3 through an air pipe, and because the lower half part of the monitoring device 3 is connected with the milling head 2 of the double-wheel stirring drilling machine, oil in the milling head 2 enters the lower half part of the monitoring device 3, and the compressed air of the upper half part is isolated from the oil of the lower half part through the floater 4 in the monitoring device 3; the pressure of oil in the lower half part of the monitoring device 3 and the milling head 2 of the double-wheel stirring drilling machine is indirectly adjusted by adjusting the numerical value of compressed air output by the air compression station 1, and then when the double-wheel stirring drilling machine enters the underground and is positioned in slurry, the compressed air output by the air compression station 1 is adjusted by pressure feedback, and the pressure between the oil and the external slurry in the double-wheel stirring drilling machine is adjusted by the monitoring device 3.
The method for judging the working condition in the double-wheel stirring drill by the gas pressure maintaining system comprises the following steps
Step 1, arranging a moisture sensor in a milling head 2 of a double-wheel stirring drilling machine, and connecting the moisture sensor, a monitoring device 3 and an air compressor compressed air pressure numerical sensor with a host control computer;
step 2, feeding back various numerical values in a host control computer through the monitoring device 3 and the sensors, and calculating through a controller algorithm to establish pressure balance inside and outside the milling head 2;
and 3, judging whether the oil in the head washing is leaked or invalid or not by the moisture content in the oil in the head washing in real time through the moisture sensor and combining the floater position fed back by the monitoring device 3 and the numerical value of the compressed air.
This gas protects pressure system adopts above-mentioned structural design, through set up a monitoring devices in the cutter head outside, makes it be linked together with the inside fluid of cutter head simultaneously with the isolated with outside compressed air, like this alright realize controlling the inside and outside pressure balance's of cutter head purpose through monitoring devices in real time according to the demand. Meanwhile, the monitoring device is matched with a water sensor and other sensors in the milling head, so that whether the sealing structure of the milling head and the state of oil in the milling head are normal or not can be judged easily and quickly; meanwhile, the pressure balance between the inside and the outside of the milling head can be easily and quickly adjusted by adjusting the data of the compressed air.

Claims (1)

1. The utility model provides a gas pressure maintaining system for double round stirring rig, its includes one air compression station, characterized by: the monitoring device is arranged in the milling head of the double-wheel stirring drilling machine, the head of the monitoring device is connected with the air compression station through an air pipe, the tail of the monitoring device is connected with the milling head of the double-wheel stirring drilling machine, and a floater is arranged in the monitoring device and divides the inside of the monitoring device into an upper half part and a lower half part; therefore, the air compression station is connected with the upper half part of the monitoring device through the air pipe, the lower half part of the monitoring device is connected with the milling head of the double-wheel stirring drilling machine, and the compressed air in the upper half part is isolated from the oil liquid in the lower half part by the floater in the monitoring device.
CN202020212196.1U 2019-12-31 2020-02-26 Gas pressure maintaining system for double-wheel stirring drilling machine Active CN212716580U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2019224662651 2019-12-31
CN201922466265 2019-12-31

Publications (1)

Publication Number Publication Date
CN212716580U true CN212716580U (en) 2021-03-16

Family

ID=74904231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020212196.1U Active CN212716580U (en) 2019-12-31 2020-02-26 Gas pressure maintaining system for double-wheel stirring drilling machine

Country Status (1)

Country Link
CN (1) CN212716580U (en)

Similar Documents

Publication Publication Date Title
US10202807B2 (en) Vertical shaft drilling rig using novel drilling method
CN113123776A (en) Gas pressure maintaining system for double-wheel stirring drilling machine
CN111323331B (en) Coal seam gas content measuring device and method based on directional drilling machine
CN107101817B (en) Coal rock wall drilling tool drilling performance experiment table
CN103452526A (en) Electro-hydraulic bridge plug setting device
CN104405362A (en) Automatic bottom hole pressure control device for under-balanced drilling and using method of device
CN103912217A (en) Hydraulic drive deep hole core drilling machine for scientific drilling
CN212716580U (en) Gas pressure maintaining system for double-wheel stirring drilling machine
CN202866790U (en) Coal mine downhole drilling depth real-time detection device
CN110608005B (en) Gas lift reverse circulation drilling system and automatic control method
CN104018844B (en) Shield machine hydraulic pressure air pressure balance control system in water rich strata and control method thereof
CN103437754A (en) Pressurization control method and pressurization control system for rotary drilling rig
CN113236341B (en) Device for enhancing gas extraction in underground coal mine and using method
CN202832473U (en) Overload protective system of drilling machine
CN102748006A (en) Remote monitoring system of downhole operation
CN211549674U (en) Multifunctional automatic drilling hole diameter compensation device for monitoring large-diameter drilling hole deformation
CN205224140U (en) Double speed electric drive double round groove cutting machine
CN106368630B (en) A kind of sand washing method and specific purpose tool
CN214363463U (en) Integral multipurpose swivel joint
CN106223964A (en) A kind of main shaft seals of shield machine compress control method
US10573159B2 (en) Engine and transmission notification system using a J1939 data link interface
CN110821482A (en) Multifunctional automatic drilling hole diameter compensation device for monitoring large-diameter drilling hole deformation
CN103206197B (en) The automatically controlled commingled column of two pressure single valves and regulate and control method
CN206162166U (en) Coal -winning machine is with integration controller
CN105003206A (en) Rotary drilling rig, support leg extending or retracting control system of rotary drilling rig and control method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant