CN212715945U - Replacement, reinforcement and support device for concrete building shear wall - Google Patents

Replacement, reinforcement and support device for concrete building shear wall Download PDF

Info

Publication number
CN212715945U
CN212715945U CN202020774900.2U CN202020774900U CN212715945U CN 212715945 U CN212715945 U CN 212715945U CN 202020774900 U CN202020774900 U CN 202020774900U CN 212715945 U CN212715945 U CN 212715945U
Authority
CN
China
Prior art keywords
support
wall
supporting
replacement
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020774900.2U
Other languages
Chinese (zh)
Inventor
宋飞
纪永刚
宋广慧
高红利
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xilin Golengshan Jinbaiyin Hubu Mining Co ltd
Original Assignee
Xilin Golengshan Jinbaiyin Hubu Mining Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xilin Golengshan Jinbaiyin Hubu Mining Co ltd filed Critical Xilin Golengshan Jinbaiyin Hubu Mining Co ltd
Priority to CN202020774900.2U priority Critical patent/CN212715945U/en
Application granted granted Critical
Publication of CN212715945U publication Critical patent/CN212715945U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a strutting arrangement is consolidated in replacement of concrete building shear force wall, the dashpot has been seted up in the support sleeve supporting sleeve, be equipped with buffer gear in the dashpot, buffer gear includes the elasticity post, the one end of elasticity post articulates there is first articulated piece, the one end fixed mounting who keeps away from the elasticity post of support sleeve has the installation piece, adjustment mechanism sets up in one side of installation piece, adjustment mechanism includes the set casing, the one end of set casing articulates there is the articulated piece of second, adjustment mechanism is assembled for can changing the distance between the articulated piece of support sleeve and second, support mechanism is located between the articulated piece of wall body and second, support mechanism includes first support rectangular board and second support rectangular board. The utility model provides a pair of strutting arrangement is consolidated in replacement of concrete building shear force wall can adapt to the hoist and mount wall body of co-altitude not, can maximize play the supporting role, can make holding power keep even state moreover, increases the stability of device.

Description

Replacement, reinforcement and support device for concrete building shear wall
Technical Field
The utility model relates to a building engineering technical field relates to a strutting arrangement is consolidated in replacement of concrete construction shear force wall particularly.
Background
The storey building refers to a house with the building height of more than 27 meters, a non-single-storey factory building with the building height of more than 24 meters, a warehouse and other civil buildings, while a common urban high-rise residential building mostly adopts a shear wall structure, and the shear wall is a main bearing structure in the building.
In building engineering, at the in-process of building the shear force wall, generally all can install the reinforcing bar at first, then hoist and mount the wall body to subsequent concrete placement, then after installing the hoist and mount wall body, utilize strutting arrangement to support the reinforcement, the strong point of general hoist and mount wall body all can be installed in the two-thirds department of wall body total height, then the bracing piece is in about 50 with the contained angle of horizontal plane, installation strutting arrangement like this, can the maximize play the supporting role to the wall body.
However, although the existing supporting device can support the hoisted wall body, the position of installation is in the best installation position, the existing supporting device belongs to rigid support, and a buffer structure is not arranged, so that the supporting effect can be reduced, the existing supporting and reinforcing device cannot adapt to the wall bodies with different heights, the adaptability is poor, and the supporting effect of the existing supporting and reinforcing device is poor.
SUMMERY OF THE UTILITY MODEL
In view of the above-mentioned problem that prior art exists, an aspect of the utility model aims at providing a strutting arrangement is consolidated in replacement of concrete building shear force wall, aims at solving and has now to get strutting arrangement and belong to the rigidity and support, does not set up buffer structure to can reduce the supporting effect, current support reinforcing apparatus can not adapt to the not wall body of co-altitude moreover, and adaptability is relatively poor, the current poor problem of support reinforcing apparatus supporting effect of supporting moreover.
Technical scheme
In order to realize the above-mentioned purpose, the utility model provides a pair of strutting arrangement is consolidated in replacement of concrete construction shear wall, include:
the supporting sleeve is internally provided with a buffer groove, a buffer mechanism is arranged in the buffer groove, the buffer mechanism comprises an elastic column, one end of the elastic column is hinged with a first hinge block, and one end of the supporting sleeve, which is far away from the elastic column, is fixedly provided with an installation block;
the adjusting mechanism is arranged on one side of the mounting block and comprises a fixed shell, one end of the fixed shell is hinged with a second hinge block, and the adjusting mechanism is assembled to change the distance between the supporting sleeve and the second hinge block;
the supporting mechanism is positioned between the wall body and the second hinging block and comprises a first supporting long plate and a second supporting long plate, a rectangular groove is formed in the upper surface of the second supporting long plate, and the hinging block is positioned in the rectangular groove;
the L-shaped long plate is horizontally arranged on the wall body.
Preferably, the buffering mechanism further comprises a return spring, and the return spring is movably sleeved on the outer wall of the elastic column.
Preferably, the adjusting mechanism further comprises an extension column and a limit pin, one end of the fixing shell is fixedly installed on the outer wall of one side of the installation block, the extension column is inserted into a rectangular groove formed in the fixing shell, the extension column is of a rectangular structure, a plurality of limit holes which are linearly arranged are formed in the outer wall of one side of the extension column, and the limit pin penetrates through the installation block and the fixing shell and is inserted into any limit hole.
Preferably, the support mechanism further comprises a rotating nut and an extension nut, the rotating nut is movably mounted on the outer wall of one side of the first support long plate, the extension nut is in threaded connection with the second support long plate, and the extension nut is fixedly connected with the rotating nut.
Preferably, the first hinge block is connected to the L-shaped long plate by a screw.
Advantageous effects
Compared with the prior art, the utility model provides a pair of strutting arrangement is consolidated in replacement of concrete construction shear force wall possesses following beneficial effect:
1. the utility model discloses an at inside elastic column and the return spring that sets up of support sleeve to can make the device have the function of buffering, set up L type long slab through the installation department at first articulated piece moreover, thereby can make the holding power of first articulated piece keep even state, increase the stability of device.
2. The utility model discloses a set up the installation piece in support sleeve's one end to and set up the extension post that can adjust in one side of installation piece, then will extend the post through the locating pin that sets up and fix, the user can adjust the extension of extension post according to the height of hoist and mount wall body, thereby can adapt to the hoist and mount wall body of co-altitude not, can install first articulated piece and the articulated piece of second in the optimum position moreover, the supporting role that plays that can maximize.
3. The utility model discloses a set up the supporting mechanism that can adjust in the bottom of hoist and mount wall body, then with the articulated piece of second place the rectangle recess in, with the fix with screw, can keep fixed between articulated piece of second and the hoist and mount wall body, can adjust the elongation of extension nut according to the height of hoist and mount wall body moreover to can adapt to the hoist and mount wall body of co-altitude not.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.
This document provides an overview of various implementations or examples of the technology described in this disclosure, and is not a comprehensive disclosure of the full scope or all features of the disclosed technology.
Drawings
FIG. 1 is a schematic sectional view of the present invention;
FIG. 2 is an enlarged structural diagram of the utility model at A;
FIG. 3 is a schematic structural view of the mounting block and the elongate column of the present invention;
fig. 4 is a schematic structural view of the supporting mechanism of the present invention;
fig. 5 is a schematic structural view of the L-shaped long plate of the present invention.
The main reference numbers:
1. a support sleeve; 2. a return spring; 3. an elastic column; 4. a first hinge block; 5. an L-shaped long plate; 6. hoisting the wall body; 7. a first support long plate; 8. rotating the nut; 9. extending the nut; 10. a second supporting long plate; 12. A rectangular groove; 13. a second hinge block; 14. a stationary case; 15. a limiting hole; 16. extending the column; 17. a buffer tank; 18. a spacing pin; 19. mounting blocks; 20. a support mechanism; 21. an adjustment mechanism; 22. a buffer mechanism.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present disclosure more clear, the technical solutions of the embodiments of the present disclosure will be described below clearly and completely with reference to the accompanying drawings of the embodiments of the present disclosure. It is to be understood that the described embodiments are only a few embodiments of the present disclosure, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the described embodiments of the disclosure without any inventive step, are within the scope of protection of the disclosure.
Unless otherwise defined, technical or scientific terms used herein shall have the ordinary meaning as understood by one of ordinary skill in the art to which this disclosure belongs. The use of the word "comprising" or "comprises", and the like, in this disclosure is intended to mean that the elements or items listed before that word, include the elements or items listed after that word, and their equivalents, without excluding other elements or items. The terms "connected" or "coupled" and the like are not restricted to physical or mechanical connections, but may also include electrical connections, whether direct or indirect. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships may also be changed accordingly.
To maintain the following description of the embodiments of the present disclosure clear and concise, a detailed description of known functions and known components have been omitted from the present disclosure.
Referring to fig. 1-5, a replacement and reinforcement support device for a concrete building shear wall, which can make the device have a buffering function by installing an elastic column 3 and a return spring 2 inside a support sleeve 1, and can make the supporting force of a first hinge block 4 maintain a uniform state by installing an L-shaped long plate 5 at the installation position of the first hinge block 4, thereby increasing the stability of the device, the present invention can adjust the elongation of an elongation column 16 according to the height of a hanging wall 6 by installing an installation block 19 at one end of the support sleeve 1 and an adjustable elongation column 16 at one side of the installation block 19, and then fixing the elongation column 16 by the installed positioning pin, so that a user can adjust the elongation of the elongation column 16 according to the height of the hanging wall 6, thereby adapting to hanging walls 6 with different heights, and can install the first hinge block 4 and a second hinge block 13 at an optimal position, the supporting role that plays that can maximize sets up the supporting mechanism 20 that can adjust through the bottom at hoist and mount wall body 6, then goes on with the screw in placing rectangle recess 12 with the articulated piece 13 of second, can keep fixed between articulated piece 13 of second and the hoist and mount wall body 6, can adjust the elongation of extension nut 9 according to the height of hoist and mount wall body 6 moreover to can adapt to not hoist and mount wall body 6 of co-altitude.
The utility model provides a pair of strutting arrangement is consolidated in replacement of concrete building shear force wall, seted up dashpot 17 in the support sleeve 1, be equipped with buffer gear 22 in the dashpot 17, buffer gear 22 includes elastic column 3, and elastic column 3's one end articulates there is first articulated piece 4, and support sleeve 1's the one end fixed mounting who keeps away from elastic column 3 has installation piece 19.
Furthermore, an adjusting mechanism 21 is provided at one side of the mounting block 19, the adjusting mechanism 21 includes a fixed housing 14, one end of the fixed housing 14 is hinged to the second hinge block 13, and the adjusting mechanism 21 is assembled to be able to change a distance between the support sleeve 1 and the second hinge block 13.
Further, the supporting mechanism 20 is located between the wall body and the second hinged block 13, the supporting mechanism 20 comprises a first supporting long plate 7 and a second supporting long plate 10, a rectangular groove 12 is formed in the upper surface of the second supporting long plate 10, the hinged block is located in the rectangular groove 12, and the second hinged block 13 is mounted in the rectangular groove 12 through screws.
Furthermore, the L-shaped long plate 5 is horizontally arranged on the wall body 5.
In this embodiment, it is preferable that the buffer mechanism 22 further includes a return spring 2, and the return spring 2 is movably sleeved on the outer wall of the elastic column 3.
Furthermore, the utility model discloses in, adjustment mechanism 21 is still including extending post 16 and spacer pin 18, and the one end fixed mounting of set casing 14 is on the outer wall of installation piece 19 one side, and in the rectangular channel that extends post 16 grafting and set casing 14 seted up, and extend post 16 for the rectangle structure, has seted up a plurality of spacing holes 15 that are linear arrangement on the outer wall of extending post 16 one side, and spacer pin 18 runs through in installation piece 19 and set casing 14 to peg graft and arbitrary spacing downthehole 15.
The utility model discloses among the further technical scheme that provides, its characterized in that, supporting mechanism 20 still includes swivel nut 8 and extension nut 9, and swivel nut 8 movable mounting is on the outer wall of first support long slab 7 one side, and extension nut 9 supports long slab 10 threaded connection with the second, and extends nut 9 and swivel nut 8 fixed connection.
Furthermore, a further proposed solution is characterized in that the first hinge block 4 is connected to the L-shaped long plate 5 by means of screws.
The utility model discloses an installation method: firstly, two-thirds of the height of a hoisting wall body 6 is measured, then an L-shaped long plate is horizontally arranged at the two-thirds of the height of the hoisting wall body 6 through nuts, then a second hinged block 13 is arranged in a rectangular through groove, at the moment, the included angle between the second long supporting plate 10 and a fixed shell 14 is kept at 50 degrees, then under the condition that the included angle between the second long supporting plate 10 and the fixed shell 14 is kept at 50 degrees, the extension amount of an extension column 16 is adjusted through adjusting a limiting pin 18, a first hinged block 4 is arranged on an L-shaped long plate 5 through a screw, at the moment, the first long supporting plate 7 is in contact with the hoisting wall body 6 through adjusting a rotating nut 8, then the first long supporting plate 7 is arranged on the side wall of the hoisting wall body 6 through the screw, and then other first hinged blocks 4 and other second hinged blocks 13 are sequentially arranged according to the installation sequence.
The utility model discloses a through set up elasticity post 3 and return spring 2 in the support sleeve 1 inside, thereby can make the device have the function of buffering, and through set up L type long slab 5 in the installation department of first articulated piece 4, thereby can make the holding power of first articulated piece 4 keep even state, increase the stability of device, the utility model discloses through set up installation piece 19 in one end of support sleeve 1, and set up the extension post 16 that can adjust in one side of installation piece 19, then fix extension post 16 through the locating pin that sets up, the user can adjust the elongation of extension post 16 according to the height of hoist and mount wall body 6, thereby can adapt to hoist and mount wall body 6 of different heights, and can install first articulated piece 4 and second articulated piece 13 in the optimum position, can maximize play the supporting role, through set up adjustable supporting mechanism 20 in the bottom of hoist and mount wall body 6, then, the second hinge block 13 is placed in the rectangular groove 12 and screwed, the second hinge block 13 and the hoisting wall 6 can be fixed, and the elongation of the elongation nut 9 can be adjusted according to the height of the hoisting wall 6, so that the second hinge block can adapt to the hoisting walls 6 with different heights.
It will be appreciated by those skilled in the art that other similar connections may be used to implement the present invention. Such as welding, bonding, or screwing.
The elastic coefficient of the return spring 2 in the utility model meets the corresponding technical requirements in the specific implementation process.
The above embodiments are merely exemplary embodiments of the present invention, which is not intended to limit the present invention, and the scope of the present invention is defined by the appended claims. Various modifications and equivalents may be made by those skilled in the art to the present invention without departing from the spirit and scope of the invention, and such modifications and equivalents should be considered to be within the scope of the invention.

Claims (5)

1. The utility model provides a strutting arrangement is consolidated in replacement of concrete construction shear wall which characterized in that includes:
the elastic support comprises a support sleeve (1), wherein a buffer groove (17) is formed in the support sleeve (1), a buffer mechanism (22) is arranged in the buffer groove (17), the buffer mechanism (22) comprises an elastic column (3), one end of the elastic column (3) is hinged with a first hinge block (4), and one end, far away from the elastic column (3), of the support sleeve (1) is fixedly provided with a mounting block (19);
an adjusting mechanism (21), wherein the adjusting mechanism (21) is arranged on one side of the mounting block (19), the adjusting mechanism (21) comprises a fixed shell (14), one end of the fixed shell (14) is hinged with a second hinged block (13), and the adjusting mechanism (21) is assembled to change the distance between the supporting sleeve (1) and the second hinged block (13);
the supporting mechanism (20) is located between the wall and the second hinged block (13), the supporting mechanism (20) comprises a first supporting long plate (7) and a second supporting long plate (10), a rectangular groove (12) is formed in the upper surface of the second supporting long plate (10), and the hinged block is located in the rectangular groove (12);
the L-shaped long plate (5) is horizontally arranged on the wall body.
2. The concrete building shear wall replacement, reinforcement and support device according to claim 1, wherein the buffer mechanism (22) further comprises a return spring (2), and the return spring (2) is movably sleeved on the outer wall of the elastic column (3).
3. The concrete building shear wall replacement, reinforcement and support device according to claim 1, wherein the adjusting mechanism (21) further comprises an extension column (16) and a limiting pin (18), one end of the fixing shell (14) is fixedly mounted on the outer wall of one side of the mounting block (19), the extension column (16) is inserted into a rectangular groove formed in the fixing shell (14), the extension column (16) is of a rectangular structure, a plurality of limiting holes (15) which are linearly arranged are formed in the outer wall of one side of the extension column (16), and the limiting pin (18) penetrates through the mounting block (19) and the fixing shell (14) and is inserted into any one of the limiting holes (15).
4. The concrete building shear wall replacement, reinforcement and support device according to claim 1, characterized in that the support mechanism (20) further comprises a rotating nut (8) and an extension nut (9), the rotating nut (8) is movably mounted on the outer wall of one side of the first long support plate (7), the extension nut (9) is in threaded connection with the second long support plate (10), and the extension nut (9) is fixedly connected with the rotating nut (8).
5. The concrete building shear wall replacement, reinforcement and support device according to claim 1, characterized in that the first hinge block (4) is connected with the L-shaped long plate (5) through screws.
CN202020774900.2U 2020-05-12 2020-05-12 Replacement, reinforcement and support device for concrete building shear wall Active CN212715945U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020774900.2U CN212715945U (en) 2020-05-12 2020-05-12 Replacement, reinforcement and support device for concrete building shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020774900.2U CN212715945U (en) 2020-05-12 2020-05-12 Replacement, reinforcement and support device for concrete building shear wall

Publications (1)

Publication Number Publication Date
CN212715945U true CN212715945U (en) 2021-03-16

Family

ID=74944839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020774900.2U Active CN212715945U (en) 2020-05-12 2020-05-12 Replacement, reinforcement and support device for concrete building shear wall

Country Status (1)

Country Link
CN (1) CN212715945U (en)

Similar Documents

Publication Publication Date Title
CN201490637U (en) Fixing frame for mounting cable bridge on wall body
CN212715945U (en) Replacement, reinforcement and support device for concrete building shear wall
CN212153855U (en) Building curtain wall structure
CN214739078U (en) Building curtain wall mounting and fixing support
CN214368885U (en) Finished product support convenient to use
CN215484886U (en) Adjustable strutting arrangement for building
CN210857658U (en) Building curtain wall mounting and fixing support
CN101710640B (en) Power supply terminal antenna erection tower
CN113882692A (en) Steel column positioning device and positioning method thereof
CN211371499U (en) Metal pipeline support for steel structure engineering construction
CN220686444U (en) Curtain wall installation framework structure
CN219622060U (en) Support auxiliary device for building curtain wall installation
CN220358734U (en) Integrated power transmission line mounting bracket
CN219569294U (en) Building decoration curtain wall fixing mechanism
CN217897079U (en) Concatenation formula ripple side fascia
CN213550889U (en) Auxiliary adjusting frame for constructional engineering
CN217683637U (en) Double-end shockproof support for preventing mounting surface from bending failure
CN218294746U (en) Better assembled gallows of stability
CN214760799U (en) Adjusting mechanism
CN219384577U (en) Tower crane attaches wall structure
CN216640876U (en) Fast-assembling integrated house with interconnection mechanism
CN217734448U (en) Energy-saving prefabricated shear wall for building construction
CN216665079U (en) Shockproof framework for mounting shear wall
CN201826514U (en) Overhanging type scaffold on corner
CN220042793U (en) Auxiliary installation structure for power distribution box with labor saving installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant