CN212714887U - Soil sampling equipment for building construction - Google Patents

Soil sampling equipment for building construction Download PDF

Info

Publication number
CN212714887U
CN212714887U CN202020911308.2U CN202020911308U CN212714887U CN 212714887 U CN212714887 U CN 212714887U CN 202020911308 U CN202020911308 U CN 202020911308U CN 212714887 U CN212714887 U CN 212714887U
Authority
CN
China
Prior art keywords
fixedly connected
lateral wall
side wall
borrowing
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202020911308.2U
Other languages
Chinese (zh)
Inventor
郭红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Senwang Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020911308.2U priority Critical patent/CN212714887U/en
Application granted granted Critical
Publication of CN212714887U publication Critical patent/CN212714887U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model relates to a borrowing equipment technical field, and disclose a borrowing equipment for construction, including fixed frame and base, the socket has been seted up to the last lateral wall of fixed frame, it has the borrowing ware body to peg graft in the socket, the direction mouth has been seted up to the right side wall of fixed frame, the lateral wall fixedly connected with fixed plate of borrowing ware body, the lateral wall fixedly connected with lantern ring of borrowing ware body one end is kept away from to the fixed plate, the last lateral wall fixedly connected with mounting panel of base, the lateral wall fixedly connected with backup pad of mounting panel, lateral wall between backup pad and the mounting panel is connected with same reciprocal lead screw through the bearing rotation, the last lateral wall fixedly connected with driving motor. The utility model discloses can push down the equipment of fetching earth automatically at the equipment of fetching earth during operation, reduce operating personnel's work load, avoid making things convenient for operating personnel's transportation because operating personnel tired out the process of the follow-up work of shadow and the dismouting the device that can convenient and fast.

Description

Soil sampling equipment for building construction
Technical Field
The utility model relates to a borrowing equipment technical field especially relates to a borrowing equipment for construction.
Background
The soil sampler is used for lifting undisturbed soil of lower layer test soil as a sample to know the property of the undisturbed soil, and in order to know more properties of a base layer, the original soil is sometimes taken at a deeper position, so that a section of connecting rod is added in the middle of the soil sampler, and the soil sampler is called as a soil sampler.
When the existing soil sampling equipment works, two operators are required to support the two sides of the soil sampler to keep balance, the soil sampling equipment needs to be pressed downwards with force, the workload is large, and when the places needing soil sampling are more, the operators can be tired out very much, and the subsequent work of the operators is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art geotome and at the during operation, need two operating personnel to support the both sides keep balance at the geotome, and need press the geotome downwards hard, and work load is great, and when the place that needs the geotome is more, operating personnel can be tired out very much, influences the problem of the follow-up work question of operating personnel, and the geotome for construction who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the soil sampling device for building construction comprises a fixed frame and a base, wherein a socket is formed in the upper side wall of the fixed frame, a soil sampler body is inserted in the socket, a guide opening is formed in the right side wall of the fixed frame, a fixed plate is fixedly connected to the side wall of the soil sampler body, a lantern ring is fixedly connected to the side wall of one end, away from the soil sampler body, of the fixed plate, a mounting plate is fixedly connected to the upper side wall of the base, a supporting plate is fixedly connected to the side wall of the mounting plate, the side wall between the supporting plate and the mounting plate is rotatably connected with a same reciprocating lead screw through a bearing, a driving motor is fixedly connected to the upper side wall of the supporting plate, the output end of the driving motor penetrates through the side wall of the supporting plate and is fixedly connected with the reciprocating lead screw, a threaded cylinder matched with, the side walls of the two opposite sides of the connecting plate are rotatably connected with the same press rod through a rotating shaft, the side wall of the mounting plate is provided with a through hole, one end of the press rod, far away from the connecting plate, penetrates through the mounting plate through the through hole, the side walls of the fixing frame and the base are fixedly connected with inserting barrels, the same bearing plate is movably inserted in the two inserting barrels, the upper side wall of the bearing plate is symmetrically and fixedly connected with two limiting plates, a supporting rod is arranged between the two limiting plates, the limiting plates and the side wall of the supporting rod are respectively provided with a limiting hole, a limiting pin is inserted in the limiting hole, one end of the limiting pin, extending out of the limiting hole, is provided with a clamping groove, a clamping pin is inserted in the clamping groove, the upper end of the supporting rod is fixedly connected with a connecting frame, the side walls, the slide bar is positioned in the slide hole, and one end of the press bar, which is far away from the threaded cylinder, is positioned in the sleeve ring.
Preferably, the lower side walls of the fixing frame and the base are fixedly connected with inserting nails.
Preferably, a protective cover is fixedly connected to the upper side wall of the supporting plate.
Preferably, the spout has been seted up to the left side inner wall of fixed frame and the lateral wall of the equal fixedly connected with fixed block of last lateral wall and fixed block, the lateral wall fixedly connected with and the spout assorted slider of geotome body.
Preferably, a power supply cavity is formed in the base, a power supply is fixedly connected to the power supply cavity, and the power supply is electrically connected with the driving motor.
Preferably, the lateral wall fixedly connected with button of base, button and power and driving motor all electric connection.
Compared with the prior art, the utility model provides a borrowing equipment for construction possesses following beneficial effect:
1. this equipment of fetching earth for construction, through the fixed frame that sets up, a pedestal, the socket, the geotome body, the direction mouth, the fixed plate, the lantern ring, the mounting panel, the backup pad, reciprocal lead screw, driving motor, a screw section of thick bamboo, the connecting plate, the depression bar, wear the mouth, insert a section of thick bamboo, the loading board, the carriage, draw bail, slide opening and slide bar, can push down the equipment of fetching earth automatically when the equipment of fetching earth is worked, operating personnel's work load has been reduced, avoid because the progress of the continuous work of operating personnel tired out of the shadow.
2. This equipment of fetching earth for construction, through the section of thick bamboo of inserting, loading board, limiting plate, bracing piece, spacing hole, spacer pin, screens groove and the screens round pin that sets up, dismouting the device that can convenient and fast makes things convenient for operating personnel's transportation.
And the part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses can push down the geotome automatically at the geotome during operation, reduce operating personnel's work load, avoid because operating personnel tired out the process of continuous work after the picture with can convenient and fast's dismouting the device, make things convenient for operating personnel's transportation.
Drawings
Fig. 1 is a schematic structural view of the soil sampling device for building construction provided by the utility model;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is an enlarged schematic view of a portion B in fig. 1.
In the figure: the soil sampler comprises a fixed frame 1, a base 2, a socket 3, a soil sampler body 4, a guide opening 5, a fixing plate 6, a lantern ring 7, an installation plate 8, a support plate 9, a reciprocating screw rod 10, a driving motor 11, a connecting plate 12, a pressure rod 13, a penetrating opening 14, an inserting barrel 15, a bearing plate 16, a limiting plate 17, a supporting rod 18, a limiting hole 19, a limiting pin 20, a clamping groove 21, a clamping pin 22, a connecting frame 23, a sliding hole 24, a sliding rod 25, an inserting nail 26, a protective cover 27, a sliding groove 28, a sliding block 29, a power supply cavity 30, a power supply 31, a button 32 and a threaded barrel 33.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a soil sampling device for building construction comprises a fixed frame 1 and a base 2, wherein the upper side wall of the fixed frame 1 is provided with a socket 3, a soil sampler body 4 is inserted in the socket 3, the right side wall of the fixed frame 1 is provided with a guide port 5, the side wall of the soil sampler body 4 is fixedly connected with a fixed plate 6, the side wall of the fixed plate 6 far away from one end of the soil sampler body 4 is fixedly connected with a lantern ring 7, the upper side wall of the base 2 is fixedly connected with a mounting plate 8, the side wall of the mounting plate 8 is fixedly connected with a support plate 9, the side wall between the support plate 9 and the mounting plate 8 is rotatably connected with a same reciprocating screw rod 10 through a bearing, the upper side wall of the support plate 9 is fixedly connected with a driving motor 11, the output end of the driving motor 11 penetrates through the side wall, the side wall of the threaded cylinder 33 is symmetrically and fixedly connected with two connecting plates 12, the side wall of one opposite side of the two connecting plates 12 is rotatably connected with the same press rod 13 through a rotating shaft, the side wall of the mounting plate 8 is provided with a through opening 14, one end of the press rod 13 far away from the connecting plate 12 passes through the mounting plate 8 through the through opening 14, the side walls of the fixing frame 1 and the base 2 are both fixedly connected with inserting cylinders 15, the same bearing plate 16 is movably inserted in the two inserting cylinders 15, the upper side wall of the bearing plate 16 is symmetrically and fixedly connected with two limiting plates 17, a supporting rod 18 is arranged between the two limiting plates 17, the side walls of the limiting plates 17 and the supporting rod 18 are both provided with limiting holes 19, limiting pins 20 are inserted in the limiting holes 19, one end of the limiting pins 20 extending out of the limiting holes 19 is provided with clamping grooves 21, clamping pins 22 are inserted in the clamping grooves, two sliding rods 25 are symmetrically and fixedly connected to the rod wall of the pressing rod 13, the sliding rods 25 are located in the sliding holes 24, and one end, far away from the threaded cylinder 33, of the pressing rod 13 is located in the lantern ring 7.
The lower side walls of the fixed frame 1 and the base 2 are fixedly connected with inserting nails 26, so that the stability of the fixed frame 1 and the base 2 is improved.
The upper side wall of the supporting plate 9 is fixedly connected with a protective cover 27, so that the driving motor 11 is prevented from being damaged by external impact.
The left side inner wall of fixed frame 1 and the equal fixedly connected with fixed block of last lateral wall and the lateral wall of fixed block have seted up spout 28, and the lateral wall fixedly connected with of geotome body 4 and spout 28 assorted slider 29 through mutually supporting of spout 28 and slider 29, make geotome body 4 can always with perpendicular to the ground.
A power supply cavity 30 is arranged in the base 2, a power supply 31 is fixedly connected in the power supply cavity 30, the power supply 31 is electrically connected with the driving motor 11, and the power supply 31 supplies energy to the driving motor 11
The button 32 is fixedly connected to the side wall of the base 2, the button 32 is electrically connected to both the power source 31 and the driving motor 11, and the driving motor 11 can be controlled to work through the button 32.
In the utility model, when in use, the pressure lever 13 is rotated to a proper position, so that one end of the pressure lever 13 is positioned in the lantern ring 7, then the bearing plate 16 is inserted into the insertion cylinder 15, then the limit pin 20 is inserted into the limit hole 19, the position-locking pin 22 is inserted into the position-locking groove 21, the device can be installed, the soil sampler body 4 is started, then the driving motor 11 is started, the driving motor 11 drives the reciprocating screw rod 10 to rotate, the threaded cylinder 33 is driven to move upwards through thread matching, the threaded cylinder 33 drives one end of the pressure rod 13 to move upwards, one end of the pressure rod 13, which is far away from the threaded cylinder 33, drives the lantern ring 7 to move downwards, the lantern ring 7 drives the soil sampler body 4 to move downwards through the fixing plate 6 to perform soil sampling operation, the device can be at the automatic equipment that will borrow of equipment during operation that fetches earth push down, has reduced operating personnel's work load, avoids because operating personnel's process of following work of tired out the shadow.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a borrowing equipment for building construction, includes fixed frame (1) and base (2), its characterized in that, socket (3) have been seted up to the last lateral wall of fixed frame (1), it has borrowing ware body (4) to peg graft in socket (3), guide opening (5) have been seted up to the right side wall of fixed frame (1), the lateral wall fixedly connected with fixed plate (6) of borrowing ware body (4), the lateral wall fixedly connected with lantern ring (7) of borrowing ware body (4) one end is kept away from in fixed plate (6), the last lateral wall fixedly connected with mounting panel (8) of base (2), the lateral wall fixedly connected with backup pad (9) of mounting panel (8), the lateral wall between backup pad (9) and mounting panel (8) is connected with same reciprocating screw rod (10) through the bearing rotation, the last lateral wall fixedly connected with driving motor (11) of backup pad (9), the output end of the driving motor (11) penetrates through the side wall of the supporting plate (9) and is fixedly connected with the reciprocating screw rod (10), the outer thread sleeve of the reciprocating screw rod (10) is provided with a thread cylinder (33) matched with the outer thread sleeve, the side wall of the thread cylinder (33) is symmetrically and fixedly connected with two connecting plates (12), the two opposite side walls of the two connecting plates (12) are rotatably connected with the same pressing rod (13) through a rotating shaft, the side wall of the mounting plate (8) is provided with a through opening (14), one end, far away from the connecting plates (12), of the pressing rod (13) penetrates through the mounting plate (8) through the through opening (14), the side walls of the fixing frame (1) and the base (2) are fixedly connected with inserting cylinders (15), the two inserting cylinders (15) are movably inserted with the same bearing plate (16), and the upper side wall of the bearing plate, two be equipped with bracing piece (18) between limiting plate (17), spacing hole (19) have all been seted up to the lateral wall of limiting plate (17) and bracing piece (18), it has spacing pin (20) to peg graft in spacing hole (19), screens groove (21) have been seted up to the one end that spacing pin (20) stretched out spacing hole (19), it has screens round pin (22) to peg graft in screens groove (21), the upper end fixedly connected with link frame (23) of bracing piece (18), slide opening (24) have all been seted up to the lateral wall of link frame (23) both sides, two slide bar (25) of pole wall symmetry fixedly connected with of depression bar (13), slide bar (25) are located slide opening (24), the one end that threaded section of thick bamboo (33) was kept away from in depression bar (13) is located lantern ring (7).
2. The earth sampling equipment for building construction according to claim 1 is characterized in that the lower side walls of the fixing frame (1) and the base (2) are fixedly connected with inserted nails (26).
3. A soil sampling device for building construction according to claim 1 characterized in that a protective cover (27) is fixedly connected to the upper side wall of the support plate (9).
4. The soil sampling device for building construction according to claim 1, wherein the left inner wall and the upper side wall of the fixing frame (1) are fixedly connected with fixing blocks, the side wall of each fixing block is provided with a sliding groove (28), and the side wall of the soil sampler body (4) is fixedly connected with a sliding block (29) matched with the sliding groove (28).
5. The soil sampling equipment for building construction according to claim 1, wherein a power supply cavity (30) is formed in the base (2), a power supply (31) is fixedly connected in the power supply cavity (30), and the power supply (31) is electrically connected with the driving motor (11).
6. The soil sampling device for building construction according to claim 1, wherein a button (32) is fixedly connected to the side wall of the base (2), and the button (32) is electrically connected with both the power supply (31) and the driving motor (11).
CN202020911308.2U 2020-05-26 2020-05-26 Soil sampling equipment for building construction Withdrawn - After Issue CN212714887U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020911308.2U CN212714887U (en) 2020-05-26 2020-05-26 Soil sampling equipment for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020911308.2U CN212714887U (en) 2020-05-26 2020-05-26 Soil sampling equipment for building construction

Publications (1)

Publication Number Publication Date
CN212714887U true CN212714887U (en) 2021-03-16

Family

ID=74947490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020911308.2U Withdrawn - After Issue CN212714887U (en) 2020-05-26 2020-05-26 Soil sampling equipment for building construction

Country Status (1)

Country Link
CN (1) CN212714887U (en)

Similar Documents

Publication Publication Date Title
CN210893500U (en) Detection device for glass production
CN210253674U (en) Pretreatment straightening device for numerical control punching production line of angle steel
CN212714887U (en) Soil sampling equipment for building construction
CN213233387U (en) Highway construction detects sampling device with highway basic unit degree of compaction
CN210737560U (en) Foundation pit protection frame
CN215518888U (en) Whole basement tower crane foundation and raft joint structure
CN213731545U (en) Automatic assembling equipment for assembly type building connecting piece
CN212294719U (en) Pile foundation construction platform
CN211735805U (en) Combined steel structure frame
CN210376361U (en) Concrete chloride ion content detection device
CN219751737U (en) Platform connection structure for tower crane installation
CN218563066U (en) Template bearing structure convenient to concatenation
CN215631524U (en) A consolidate bearing structure for building engineering
CN218098399U (en) Soil analysis sampling equipment
CN214353012U (en) Multifunctional woodworking fixture with adjustable wood planing depth
CN213796263U (en) Fork truck lift cylinder piston rod assembly and disassembly tools
CN210989175U (en) Portable drawing frame for architectural design
CN217325409U (en) Gardens bank protection brick of easy assembly
CN216552418U (en) Steel house room convenient to concatenation
CN220285334U (en) Template supporting structure for building engineering construction
CN218374698U (en) But combination truss of high-speed joint
CN214892604U (en) Special tool for building refractory bricks and adding wedges
CN215292373U (en) Combined drilling rig drill frame for mine
CN219840052U (en) Semi-automatic sounding instrument
CN215907891U (en) Novel device for lengthening cylinder bottom of jack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220608

Address after: 334000 room 4302, Pohu Mingjun, Renmin South Road, Poyang Town, Poyang County, Shangrao City, Jiangxi Province

Patentee after: Jiangxi senwang Construction Engineering Co.,Ltd.

Address before: 110400 kaisalanwan community, Faku County, Shenyang City, Liaoning Province

Patentee before: Guo Hong

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20210316

Effective date of abandoning: 20220704

AV01 Patent right actively abandoned

Granted publication date: 20210316

Effective date of abandoning: 20220704