CN212714338U - Structure brick of mating formation and structure of mating formation of permeating water - Google Patents

Structure brick of mating formation and structure of mating formation of permeating water Download PDF

Info

Publication number
CN212714338U
CN212714338U CN202020952432.3U CN202020952432U CN212714338U CN 212714338 U CN212714338 U CN 212714338U CN 202020952432 U CN202020952432 U CN 202020952432U CN 212714338 U CN212714338 U CN 212714338U
Authority
CN
China
Prior art keywords
edge
paving
brick
bricks
folded edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020952432.3U
Other languages
Chinese (zh)
Inventor
徐大可
曹炳轩
叶向强
张涛
崔易梦
肖云飞
蒋至毅
冉呈程
刘雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Urban Construction Design and Research Institute Co Ltd
Original Assignee
China Urban Construction Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Urban Construction Design and Research Institute Co Ltd filed Critical China Urban Construction Design and Research Institute Co Ltd
Priority to CN202020952432.3U priority Critical patent/CN212714338U/en
Application granted granted Critical
Publication of CN212714338U publication Critical patent/CN212714338U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a structure of mating formation brick and structure of mating formation that permeates water, this structure of mating formation of should permeating water is laid by a plurality of structure bricks of mating formation on the rubble bed course and is formed, wherein, the first limit of the structure brick of one of mating formation and the first limit matched connection of the structure brick of adjacent mating formation or mutual parallel arrangement form first interval, and the second limit of the structure brick of one of mating formation and the second limit intercrossing of the structure brick of adjacent mating formation form the second interval, it has the rubble to fill in the above-mentioned interval space. According to the permeable pavement structure provided by the embodiment, the plurality of pavement structure bricks form the first interval and the second interval after being paved on the broken stone cushion layer, broken stones are filled in the first interval and the second interval, and the broken stones can be mixed with the broken stones in the broken stone cushion layer, so that the whole pavement structure formed by combining the broken stones is more attractive, and the requirement of visual enjoyment is met; in addition, the water permeation of the water permeable pavement structure is realized through the first interval and the second interval which are filled with the broken stones.

Description

Structure brick of mating formation and structure of mating formation of permeating water
Technical Field
The utility model relates to a road pavement technical field especially relates to a structure brick of mating formation and the structure of mating formation of permeating water.
Background
With the continuous promotion of economy in China, the modernization development of cities is continuously improved, the hard pavement area of the cities is continuously increased, and most of hard materials are impermeable materials such as common concrete, asphalt, granite and the like. Due to the fact that the hardness is lack of water permeability and air permeability, rainwater cannot directly seep into soil during rainfall, a large amount of surface runoff is formed, urban ponding and waterlogging are prone to occur, and traveling of residents is affected; meanwhile, the scouring of rainwater brings serious water source pollution, and pollutes the water quality of the downstream receiving water body.
In order to alleviate the problems, people research and develop water permeable bricks, and common water permeable bricks in the market, such as ceramic water permeable bricks, silica sand water permeable bricks, water permeable concrete bricks and the like, play a positive role in alleviating the urban drainage problem. The common permeable brick realizes the permeation and purification effects through the permeation of the material per se, the double guarantee of the permeability and the strength is difficult to realize on the premise of low cost, and the permeable material is easy to block and has poor reversibility basically in a short time. In addition, the infiltration structure is paved on the market in a permeable way through brick joints, the structural form and the appearance are relatively single and stiff, corners and bulges are easy to collide and damage in transportation, and the integral use function and the landscape paving effect are reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a paving structure brick and a permeable paving structure, solving the technical problems existing in the prior art, wherein the permeable paving structure is formed by paving a plurality of paving structure bricks on a broken stone cushion layer, the paving structure bricks form an interval space after being paved on the broken stone cushion layer, the interval space can be filled with broken stones, and the paving structure formed by the whole combination is more beautiful and meets the requirement of visual enjoyment; in addition, the permeable pavement structure is permeable through the space filled with the broken stones.
In order to achieve the above object, the present invention provides the following technical solutions:
the utility model provides a structure brick of mating formation, this structure brick of mating formation includes end to end's four limit portions, every limit portion is equipped with first limit and second limit, first limit with second limit cross connection, four limit portions about the central annular matrix of structure brick of mating formation arranges the setting.
Further, the first edge comprises a first folded edge, a second folded edge and a third folded edge which are sequentially connected, the first folded edge is connected with the second folded edge in a crossed mode, the second folded edge is connected with the third folded edge in a crossed mode, and the third folded edge is connected with the second edge in a crossed mode.
Further, the four edges are connected in a smooth transition manner.
Further, the first edge and the second edge are connected in a smooth transition manner.
Further, the first folded edge is connected with the second folded edge in a smooth transition mode, the second folded edge is connected with the third folded edge in a smooth transition mode, and the third folded edge is connected with the second edge in a smooth transition mode.
Further, the paving structure bricks are concrete bricks.
The paving structure brick comprises two sub-paving structure bricks, wherein each sub-paving structure brick comprises four edge parts which are connected end to end, each edge part is provided with a first edge and a second edge, the first edge and the second edge are connected in a cross mode, and the four edge parts are arranged in a central annular matrix of the paving structure brick; the two sub-paving structure bricks are integrally formed, or the two sub-paving structure bricks are connected into a whole through the respective edge parts.
The utility model provides a permeable pavement structure, this permeable pavement structure is laid by a plurality of above-mentioned structure bricks of mating formation on the rubble bed course and is formed, wherein, one of the structure brick of mating formation first limit with adjacent the structure brick of mating formation first limit accordant connection, and one of the structure brick of mating formation the second limit with adjacent the structure brick of mating formation the second limit is intercrossed to form the space, it has the rubble to fill in the space.
The utility model provides a permeable pavement structure, permeable pavement structure is laid by a plurality of above-mentioned structure bricks of mating formation on the rubble bed course and is formed, wherein, one of the structure brick of mating formation first limit with adjacent the structure brick of mating formation first limit parallel arrangement each other forms first interval, and one of the structure brick of mating formation the second limit with adjacent the structure brick of mating formation the second limit intercrossing forms the second interval, first interval with it has the rubble to fill in the second interval.
The utility model has the advantages that:
the utility model provides a permeable pavement structure should permeate water and mat formation structure is laid by a plurality of structure bricks of mating formation on the rubble bed course and forms, wherein, the one of which mat formation the first edge of structure brick and the adjacent first edge accordant connection or the mutual parallel arrangement who mats formation the structure brick form first interval, and the second limit of the structure brick of mat formation of one of which and the adjacent second limit intercrossing formation second interval of the structure brick of mat formation, it has the rubble to fill in the above-mentioned space between.
The permeable pavement structure is formed by paving a plurality of pavement structure bricks on a broken stone cushion layer, the pavement structure bricks form a first interval and a second interval after being paved on the broken stone cushion layer, broken stones are filled in the first interval and the second interval, and the broken stones can be mixed with the broken stones in the broken stone cushion layer, so that the pavement structure formed by the whole combination is more attractive, and the requirement of visual enjoyment is met; in addition, the water permeation of the water permeable pavement structure is realized through the first interval and the second interval which are filled with the broken stones.
Drawings
Fig. 1 is a schematic structural view of a paving structure brick in a first embodiment of the present invention;
fig. 2 is a schematic structural view of a permeable pavement structure in a first embodiment of the present invention;
FIG. 3 is a schematic structural view of a second embodiment of the present invention;
fig. 4 is a schematic structural view of a permeable pavement structure in the second embodiment of the present invention;
fig. 5 is a schematic structural view of a third embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1 and fig. 2, fig. 1 is the embodiment of the present invention, i.e., the structural schematic diagram of the structural brick is paved, and fig. 2 is the embodiment, i.e., the structural schematic diagram of the structure of permeable pavement.
The utility model provides a structure of mating formation brick and structure of mating formation that permeates water, refer to figure 2 specifically, should permeate water the structure of mating formation, by a plurality of structure of mating formation brick 10 lay on the rubble bed course, a plurality of structure of mating formation brick 10 have formed the interval space 30 after laying on the rubble bed course, and fill the rubble in above-mentioned interval space 30, this rubble can mix with the rubble in the rubble bed course each other, the whole structure of mating formation that makes up is more pleasing to the eye, satisfy the vision and enjoy the requirement; in addition, the permeable pavement structure is permeable by filling the crushed stone space 30.
Referring specifically to fig. 1, the paving structure brick 10 provided in this embodiment, specifically, the paving structure brick 10 includes four edge portions connected end to end, specifically, the four edge portions include a first edge portion, a second edge portion, a third edge portion and a fourth edge portion, each edge portion is provided with a first edge and a second edge, the first edge and the second edge are connected in a cross manner, the four edge portions are arranged and disposed in relation to a central annular matrix of the paving structure brick 10, and the structural design of the paving structure brick 10 makes the appearance thereof beautiful, and is more convenient for being combined with each other to form a water permeable paving structure.
In the present embodiment, as shown in fig. 1, the first edge portion is in a bent shape, specifically, the first edge portion includes a bent first edge, and the first edge includes a first folded edge 11-1, a second folded edge 11-2, and a third folded edge 11-3 connected in sequence, the first folded edge 11-1 and the second folded edge 11-2 are connected in a crossing manner, the second folded edge 11-2 and the third folded edge 11-3 are connected in a crossing manner, and the third folded edge 11-3 and the second edge 11-4 are connected in a crossing manner.
Similarly, the second edge part comprises a bent first edge, the first edge comprises a first folded edge 12-1, a second folded edge 12-2 and a third folded edge 12-3 which are connected in sequence, the first folded edge 12-1 is connected with the second folded edge 12-2 in a crossed manner, the second folded edge 12-2 is connected with the third folded edge 12-3 in a crossed manner, and the third folded edge 12-3 is connected with the second edge 12-4 in a crossed manner; the third edge comprises a bent first edge, the first edge comprises a first folded edge 13-1, a second folded edge 13-2 and a third folded edge 13-3 which are connected in sequence, the first folded edge 13-1 is connected with the second folded edge 13-2 in a crossed manner, the second folded edge 13-2 is connected with the third folded edge 13-3 in a crossed manner, and the third folded edge 13-3 is connected with the second edge 13-4 in a crossed manner; the fourth edge comprises a bent first edge which comprises a first folding edge 14-1, a second folding edge 14-2 and a third folding edge 14-3 which are connected in sequence, wherein the first folding edge 14-1 is connected with the second folding edge 14-2 in a crossed mode, the second folding edge 14-2 is connected with the third folding edge 14-3 in a crossed mode, and the third folding edge 14-3 is connected with the second edge 14-4 in a crossed mode.
In this embodiment, with reference to fig. 1, four edges are connected in a smooth transition manner, specifically, connected through rounded corners, so that the paving structural brick 10 has an attractive appearance, and meanwhile, the phenomenon that the corner design is easily damaged is avoided.
In this embodiment, with reference to fig. 1, taking the first edge as an example, the first folded edge 11-1 is connected to the second folded edge 11-2 in a smooth transition manner, the second folded edge 11-2 is connected to the third folded edge 11-3 in a smooth transition manner, and the third folded edge 11-3 is connected to the second edge 11-4 in a smooth transition manner.
Preferably, in this embodiment, the paving structure bricks 10 are concrete bricks, which are easy to be processed and low in cost.
Referring to fig. 2, in detail, the paving structure is formed by paving a plurality of paving structure bricks 10 on the gravel cushion layer two by two, wherein a first folded edge 12-1, a second folded edge 12-2 and a third folded edge 12-3 of a first edge of a second edge of one paving structure brick 10 are in fit connection with a first folded edge 14-3, a second folded edge 14-2 and a third folded edge 14-1 of a first edge of a fourth edge of the adjacent paving structure brick 10, a first folded edge 13-1, a second folded edge 13-2 and a third folded edge 13-3 of a first edge of a third edge of one paving structure brick 10 are in fit connection with a first folded edge 11-3, a second folded edge 11-2 and a third folded edge 11-1 of a first edge of the other adjacent paving structure brick 10, so as to ensure the stability and strength of the adjacent paving structure bricks 10, at the moment, the second edge 11-4, the second edge 12-4, the second edge 13-4 and the second edge 14-4 are connected in a crossed manner to form a spacing space 30, and the spacing space 30 is filled with broken stones which can be mixed with broken stones in a broken stone cushion layer, so that the whole combined pavement structure is attractive and meets the requirement of visual enjoyment; in addition, the permeable pavement structure is permeable by filling the crushed stone space 30.
Example two:
referring to fig. 3 and fig. 4, fig. 3 is a schematic structural diagram of a paving structure brick in the second embodiment of the present invention, and fig. 4 is a schematic structural diagram of a permeable paving structure in the second embodiment of the present invention.
Referring specifically to fig. 3, the paving structure brick 20 includes four edges connected end to end, a first folded edge 21-1 (22-1, 23-1, 24-1) and a second folded edge 21-2(22-2, 23-2, 24-2) of any one edge are connected in a crossing manner, the second folded edge 21-2(22-2, 23-2, 24-2) and a third folded edge 21-3(22-3, 23-3, 24-3) are connected in a crossing manner, and the third folded edge 21-3(22-3, 23-3, 24-3) is connected in a crossing manner with the second edge 21-4(22-3, 23-3, 24-3).
Referring to fig. 4, in detail, the paving structure is formed by paving a plurality of paving structure bricks 20 on the gravel cushion layer two by two, a first folded edge 22-1, a second folded edge 22-2 and a third folded edge 22-3 of a first edge of a second edge of one paving structure brick 20 are arranged in parallel with and at intervals from a first folded edge 24-3, a second folded edge 24-2 and a third folded edge 24-1 of a first edge of a fourth edge of the adjacent paving structure brick 20 to form a first interval 40, a first folded edge 23-1, a second folded edge 23-2 and a third folded edge 23-3 of a first edge of a third edge of one paving structure brick 20 are in fit connection with a first folded edge 21-3, a second folded edge 21-2 and a third folded edge 21-1 of a first edge of another adjacent paving structure brick 20 to ensure the stability and strength of two adjacent paving structure bricks 20, at the moment, the second edge 21-4, the second edge 22-4, the second edge 23-4 and the second edge 24-4 are connected in a crossed manner to form a second interval 50, and in the two interval spaces, the first interval 40 and the second interval 50 are filled with broken stones which can be mixed with broken stones in a broken stone cushion layer, so that the whole combined pavement structure is more attractive and meets the requirement of visual enjoyment; in addition, the first interval 40 and the second interval 50 are communicated with each other, so that the water passing section is increased, the water permeation of the water permeable pavement structure is realized through the first interval 40 and the second interval 50 filled with the broken stones, and the water permeability is improved.
Example three:
referring to fig. 5, fig. 5 is a schematic structural diagram of a third embodiment of the present invention.
The present embodiment provides a paving structure brick, the paving structure brick 60 includes two sub-paving structure bricks 61, wherein each sub-paving structure brick 61 is arranged in the same way as the paving structure brick 10 provided in the first embodiment, as shown in fig. 5, the two sub-paving structure bricks 61 are connected into a whole by respective one edge portion, so as to form the paving structure brick 60 and increase the strength of the brick; of course, the two sub-paving structure bricks 61 may be the paving structure brick 60 formed by integral molding, which is more beautiful and has higher strength than the former except the middle connecting edge.
The above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, the present invention has been described in detail with reference to the preferred embodiments, and those skilled in the art should understand that modifications or equivalent substitutions can be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions, and all the solutions should be covered in the scope of the claims of the present invention.

Claims (9)

1. The utility model provides a structure brick of mating formation which characterized in that: the paving structure brick comprises four edge portions which are connected end to end, wherein each edge portion is provided with a first edge and a second edge, the first edge and the second edge are connected in a cross mode, and the four edge portions are arranged in a central annular matrix of the paving structure brick.
2. The paving structure brick of claim 1, wherein: the first edge comprises a first folded edge, a second folded edge and a third folded edge which are sequentially connected, the first folded edge is connected with the second folded edge in a crossed mode, the second folded edge is connected with the third folded edge in a crossed mode, and the third folded edge is connected with the second edge in a crossed mode.
3. The paving structure brick of claim 2, wherein: the four edges are connected in a smooth transition way.
4. The paving structure brick according to claim 3, characterized in that: the first edge and the second edge are connected in a smooth transition mode.
5. The paving structure brick as claimed in claim 4, wherein: the first folded edge is connected with the second folded edge in a smooth transition mode, the second folded edge is connected with the third folded edge in a smooth transition mode, and the third folded edge is connected with the second edge in a smooth transition mode.
6. The paving structure brick according to any one of claims 1-5, characterized in that: the paving structure bricks are concrete bricks.
7. The utility model provides a structure brick of mating formation which characterized in that: the paving structure brick comprises two sub-paving structure bricks, wherein each sub-paving structure brick comprises four side parts which are connected end to end, each side part is provided with a first side and a second side, the first side and the second side are connected in a cross mode, and the four side parts are arranged in a central annular matrix of the paving structure brick; the two sub-paving structure bricks are integrally formed, or the two sub-paving structure bricks are connected into a whole through the respective edge parts.
8. The utility model provides a permeable pavement structure which characterized in that: the permeable pavement structure is formed by paving a plurality of paving structural bricks according to claim 1 on a gravel cushion, wherein the first edges of the paving structural bricks are matched and connected with the first edges of the adjacent paving structural bricks, the second edges of the paving structural bricks and the second edges of the adjacent paving structural bricks are intersected to form a spacing space, and gravel is filled in the spacing space.
9. The utility model provides a permeable pavement structure which characterized in that: the permeable pavement structure is formed by paving a plurality of paving structural bricks according to claim 1 on a gravel cushion, wherein the first edges of the paving structural bricks and the first edges of the adjacent paving structural bricks are arranged in parallel to form first intervals, the second edges of the paving structural bricks and the second edges of the adjacent paving structural bricks are crossed with each other to form second intervals, and gravel is filled in the first intervals and the second intervals.
CN202020952432.3U 2020-05-29 2020-05-29 Structure brick of mating formation and structure of mating formation of permeating water Active CN212714338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020952432.3U CN212714338U (en) 2020-05-29 2020-05-29 Structure brick of mating formation and structure of mating formation of permeating water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020952432.3U CN212714338U (en) 2020-05-29 2020-05-29 Structure brick of mating formation and structure of mating formation of permeating water

Publications (1)

Publication Number Publication Date
CN212714338U true CN212714338U (en) 2021-03-16

Family

ID=74948129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020952432.3U Active CN212714338U (en) 2020-05-29 2020-05-29 Structure brick of mating formation and structure of mating formation of permeating water

Country Status (1)

Country Link
CN (1) CN212714338U (en)

Similar Documents

Publication Publication Date Title
CN106049217B (en) Fabricated permeable paving method and block and paving structure
CN103669145B (en) A kind of paving method of permeable pavement structure
CN106758638A (en) A kind of city sponge brick and its construction technology
CN103669167B (en) A kind of permeable pavement structure
CN204875442U (en) Pavement ceramic tile and pavement
CN204039856U (en) Row's water-seepage type is mated formation combining structure
CN107090758A (en) A kind of ecological permeable road tooth and its laying structure and preparation method thereof
CN111072333A (en) Permeable concrete structure and preparation process thereof
CN212714338U (en) Structure brick of mating formation and structure of mating formation of permeating water
CN206189241U (en) Concrete permeable pavement
CN210797161U (en) Municipal administration pavement ceramic tile
CN212714337U (en) Special-shaped brick and permeable pavement structure
CN214089284U (en) Permeable pavement structure
CN201092649Y (en) Road paving tile
CN205741824U (en) A kind of Pavement surface drainage system
CN205741827U (en) A kind of anti-pressure and abrasion-proof type drainage pavement brick
CN212582322U (en) Polyurethane-based permeable ecological road
CN211688840U (en) Concrete structure permeates water
CN211340262U (en) Inorganic artificial stone structure paved in overhead manner
CN207699976U (en) A kind of curb, the road paving structure using the curb
CN2534222Y (en) Cement broken stone porous paving tiles
CN217438598U (en) Multi-functional landscape stone-like water-permeable embedded brick
CN212052157U (en) Polyurethane rubble permeable pavement
CN210561543U (en) Colored rubble road surface structure of polyurethane
CN211621045U (en) Ecological road surface in gardens

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant