CN207699976U - A kind of curb, the road paving structure using the curb - Google Patents

A kind of curb, the road paving structure using the curb Download PDF

Info

Publication number
CN207699976U
CN207699976U CN201721550203.3U CN201721550203U CN207699976U CN 207699976 U CN207699976 U CN 207699976U CN 201721550203 U CN201721550203 U CN 201721550203U CN 207699976 U CN207699976 U CN 207699976U
Authority
CN
China
Prior art keywords
ontology
curb
road
block body
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721550203.3U
Other languages
Chinese (zh)
Inventor
尹龙斌
朱彤
徐铭华
单靖
何卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou New Building Materials Co Ltd
Original Assignee
Hangzhou New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou New Building Materials Co Ltd filed Critical Hangzhou New Building Materials Co Ltd
Priority to CN201721550203.3U priority Critical patent/CN207699976U/en
Application granted granted Critical
Publication of CN207699976U publication Critical patent/CN207699976U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model is related to technical field of road engineering, and in particular to a kind of curb, road paving structure and construction method using the curb, wherein curb, including:The ontology being made of substrate and block body, the substrate is below the block body, the width of the substrate is more than the block body width, part of the base widths beyond the block body is respectively formed outer side stage and interior side stage in the both sides of the ontology, the substrate is identical in length direction length as the block body so that the both ends of the surface of the body length direction form two mounting surfaces being mutually parallel;The ontology using seepy material be made or the ontology on be provided with water-permeable passage, described two mounting surfaces are provided with straight slot on the ontology.

Description

A kind of curb, the road paving structure using the curb
Technical field
The utility model is related to technical field of road engineering, and in particular to a kind of curb, the road surface using the curb Paving structure.
Background technology
The curb that market uses at present is generally Kerb of concrete or marble kerbstone, wherein concrete curb Stone is made of over-the-counter precasting process, and marble kerbstone cuts rear surface polishing process using former stone and is made.But it is either mixed Solidifying dirt road kerb or marble kerbstone, do not have permeable performance, therefore, in rain and snow when, Kerb of concrete Or marble curb will all stop infiltration of the ponding to underground, the phenomenon that be easy to causeing surface gathered water.And due to present gas Acutely as condition variation, often heavy rain even extra torrential rain, the abruptly increase of short time precipitation occur in summer can cause city to arrange Water system causes larger challenge, and how to improve the drainage performance of road is the important problem faced in the prior art.
In addition, Kerb of concrete and marble curb do not have the function of filtering water purification, under rainwash, The loss of silt, road pavement is often caused to bring pollution, and huge in rainfall, greenbelt and pavement It equally will appear and drain too late situation.
And while municipal curb is constructed, it is usually associated with the construction of ground cable, how by cable construction and road Construction along stone is carried out at the same time and completes, and has a very important significance.
Utility model content
The purpose of this utility model is to provide a kind of curb, using the curb to solve the problems in background technology The road paving structure of stone.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of curb, including:The ontology being made of substrate and block body;
The ontology direction consistent with road direction of travel when mating formation is its length direction, and the ontology is when mating formation The direction for leading to greenbelt/pavement from road side is its width direction, and vertical direction of the ontology when mating formation is that it is high Spend direction;
The substrate is below the block body, and the width of the substrate is more than the block body width, and the base widths are super The part for going out the block body is respectively formed outer side stage and interior side stage in the both sides of the ontology;
The outer side stage is disposed towards road side when in use, and the outer side stage includes the face and towards road of being filled with water at top The outer end face of direction setting;
The interior side stage includes the firming face at top towards greenbelt/pavement side setting;
The block body towards outer side stage side be outer block face, the block body towards interior side stage side be internal retaining surface;
The substrate is identical in length direction length as the block body so that the both ends of the surface of the body length direction are formed Two mounting surfaces being mutually parallel;
The ontology using seepy material be made or the ontology on be provided with water-permeable passage, through described on the ontology Two mounting surfaces are provided with straight slot.
In above structure, according to Fig.4, the design of straight slot structure makes the route of ponding infiltration greatly shorten, and improves The speed of infiltration, and straight slot plays the role of water storage during ponding is unable to rapid osmotic to ground end, ensure that road The drainage effect in face.In addition, municipal pipeline can also be accommodated in straight slot, the construction of town road is greatly facilitated.
Preferably, the straight slot be semicircle, it is easy to process and make entire curb have good intensity.
Preferably, the straight slot wall surface is provided with filtering supporting network, plays the support to straight slot and filter the work of sundries With.
Preferably, the body interior is additionally provided with through the second straight slot hole of described two mounting surfaces, by municipal line Road is separated from each other with draining, and mode circuit is excessively damp.
Preferably, the ontology is additionally provided with outlet hole, the outlet hole and the straight slot or second straight slot hole Connection, outlet hole are used to draw circuit or introduce in curb ontology.
Preferably, the water-permeable passage in the body length direction, is set between two mounting surfaces, The top of the water-permeable passage is arranged on the outer block face, and the bottom of the water-permeable passage is arranged on the substrate, in this way Design when so that road depth of accumulated water is larger, outer block face equally has drainage water permeable ability.
Preferably, gap is provided between the water-permeable passage and the outer end face, since drainage body material is opposite originally It is more fragile for body material, it is easy to cause notch, to influence its drainage effect, originally due to colliding with during installation Structure design protects drainage body and the connecting portion of road side by gap site, ensure that the globality of curb Energy.
Preferably, the water-permeable passage includes the first inclined-plane and the second inclined-plane, first inclined-plane is from outer block face to institute Substrate bottom angled is stated, second inclined-plane is filled with water described in towards the substrate bottom angled.
Preferably, width of the water-permeable passage in the body length direction, from the outer body inwardly by Decrescence small, since the distance permeated compared with distal end ponding is long, larger width can the balanced speed to seep water.
Preferably, the ontology is provided with one or more water-permeable passages second thoroughly in the side of the interior side stage side Aquaporin is played by the way that the second water-permeable passage is arranged in the weather of huge precipitation, to the drainage of greenbelt side.
Preferably, the face that is filled with water is continuously decreased from outside its height of block face direction of outer body, to form one Be filled with water region.
Preferably, the face that is filled with water is connected with the outer block face, the two constitutes a cambered surface, and the cambered surface, which is located at, to be filled with water The segmental arc of face part is provided with depressed area, and the minimum point of the depressed area is less than road plane, and road planar line uses in figure Broken line representation.
A kind of road paving structure, including any one of the above curb, greenbelt/pavement area and road area, institute It states curb to be spaced from each other the greenbelt/pavement area and the road area, face and the road area top of being filled with water Concordantly, the greenbelt/pavement area bottom is provided with water reserve.
Preferably, at the top of the block body at the top of the greenbelt/pavement area, the firming face is set to described green Change below band/pavement area soil layer.
A kind of construction method of road paving structure, concrete mode are the boundary in greenbelt/pavement area and road area At line, the ontology of the curb is put into installation successively so that the mounting surface of adjacent curb is against each other and reserved one Municipal electric wire is passed through straight slot by flexible gap surely while putting installation curb.
Preferably, carrying out fill compaction to firming face in greenbelt/pavement area side.
In conclusion the beneficial effects of the utility model:
1. a kind of curb described in the utility model can be effectively relieved surface gathered water, and can bury municipal cable and put In its body interior, the municipal cable construction of solution needs the process of grooving.
2. road ponding effectively can be penetrated into water reserve by a kind of road paving structure described in the utility model.
3. using a kind of road paving structure described in the utility model, can cancel in traditional curb pavement process Cement builds side technique for fixing, and using flooring mode is directly put, the difficulty of construction greatly simplified improves speed of application, and It can be completed at the same time and burying for municipal cable is put, further decrease municipal construction cost.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the utility model embodiment 1;
Fig. 3 is the structural schematic diagram of the utility model embodiment 2;
Fig. 4 is the principles of the present invention schematic diagram;
Fig. 5-Figure 11 is the schematic diagram of the utility model embodiment 4
Figure 12 is the structural schematic diagram of the utility model embodiment 5.
Specific implementation mode
Following specific examples is only the explanation to the utility model, is not limitations of the present invention, this Field technology personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, But as long as all being protected by Patent Law in the right of the utility model.
The utility model is described in detail with embodiment below in conjunction with the accompanying drawings.
Embodiment 1:
According to Fig. 1, a kind of curb, including:The ontology 100 being made of substrate 1 and block body 2.The ontology 100 exists The direction consistent with road direction of travel is its length direction when mating formation, and the ontology 100 leads to when mating formation from road side green The direction for changing band/pavement is its width direction, and vertical direction of the ontology 100 when mating formation is its short transverse.
The substrate 1 is below the block body 2, and the width of the substrate 1 is more than 2 width of the block body, and the substrate 1 is wide Part of the degree beyond the block body 2 is respectively formed outer side stage 11 and interior side stage 12 in the both sides of the ontology 100.The outer side stage 11 dispose towards road side when in use, and the outer side stage 11 includes that being filled with water for top and is arranged towards road direction face 111 Outer end face 112.The interior side stage 12 includes the firming face 121 at top towards greenbelt/pavement side setting.2 court of the block body Outside 11 side of side stage is outer block face 21, the block body 2 towards 12 side of interior side stage be internal retaining surface 22.The substrate 1 with it is described Block body 2 is identical in length direction length so that the both ends of the surface of 100 length direction of the ontology form two installations being mutually parallel Face 101.
Ontology 100 is made of seepy material, and described two mounting surfaces 101 are provided with straight slot 5, institute on ontology 100 It is semicircle to state straight slot 5, and 5 wall surface of the straight slot is provided with filtering supporting network.
Embodiment 2:
The difference is that, according to Fig.2, the ontology 100 is additionally provided with outlet hole 52, institute with above-described embodiment 1 Outlet hole 52 is stated to be connected to the straight slot 5.
Embodiment 3:
The difference is that, according to Fig.3, it is additionally provided with inside the ontology 100 through described with above-described embodiment 2 Second straight slot hole 51 of two mounting surfaces 101, the ontology 100 are additionally provided with outlet hole 52, the outlet hole 52 and described the Two-way slot 51 is connected to.
Embodiment 4:
With above-described embodiment 1-3 the difference is that, it is permeable logical according to shown in Fig. 5-11, being provided on the ontology 100 Road 3, the water-permeable passage 3 is interior to be filled with drainage body 4, and the ontology 100 is the impermeable materials such as concrete or marble, described Drainage body 4 is provided in water-permeable passage 3, the drainage body 4 uses cement stabilized macadam material or the comprehensive cement in polyurethane crushed stone material lake Ceramic material is made.
Ontology 100, water-permeable passage 3 and 4 shaped position relationship of drainage body include following several:
According to Fig.5, the water-permeable passage 3 is set to two installations on 100 length direction of the ontology Between face 101, the top of the water-permeable passage 3 is arranged on the outer block face 21, and the bottom of the water-permeable passage 3 is arranged in institute It states in substrate 1, when such design so that road depth of accumulated water is larger, outer block face 21 equally has drainage water permeable ability.
According to Fig.6, gap 1121 is provided between the water-permeable passage 3 and the outer end face 112, due to drainage body It is more fragile for 4 material opposing body, 100 material, it is easy notch to be caused, due to colliding with to influence during installation Its drainage effect, this structure design protect drainage body 4 and the connecting portion of road side by 1121 position of gap, ensure The overall performance of curb.
According to Fig.7, the water-permeable passage 3 includes the first inclined-plane 31 and the second inclined-plane 32, and first inclined-plane 31 is certainly For outer block face 21 to 1 bottom angled of the substrate, second inclined-plane 32 is filled with water face 111 to 1 bottom angled of the substrate described in.
According to Fig.8, the water-permeable passage 3 100 length direction of the ontology width, from outside the ontology 100 Lateral inside is gradually reduced, and since the distance permeated compared with distal end ponding is long, larger width can the balanced speed to seep water.
According to Fig.9, the ontology 100 is provided with one or more permeable logical in the side of 12 side of interior side stage 3 second water-permeable passage 3 ' of road is played by the way that the second water-permeable passage 3 ' is arranged in the weather of huge precipitation, to greenbelt one The drainage of side.
According to Fig.10, from 100 outside of ontology, its height of 21 direction of block face continuously decreases outward in the face 111 that is filled with water, To form the region that is filled with water.
According to Figure 11, the face 111 that is filled with water is connected with the outer block face 21, and the two constitutes a cambered surface, the arc The segmental arc that face is located at 111 part of face that is filled with water is provided with depressed area 1111, and the minimum point of the depressed area 1111 is less than road plane, Road planar line uses broken line representation in figure.
Embodiment 5:
According to Figure 12, a kind of road paving structure, including the curb of any one of the above structure, greenbelt/people Trade area 6 and road area 7, the greenbelt/pavement area 6 and the road area 7 are spaced from each other by the curb, described Being filled with water, face 111 is concordant with 7 top of the road area, and the greenbelt/6 bottom of pavement area is provided with water reserve 61
6 top of the greenbelt/pavement area and 2 top of the block body, the firming face 121 is set to the greening Below 6 soil layer of band/pavement area.
Embodiment 6:
A kind of construction method of road paving structure, concrete mode are point in greenbelt/pavement area 6 and road area 7 At boundary line, the ontology 100 of the curb is put into installation successively so that the mounting surface 101 of adjacent curb is against each other simultaneously And municipal electric wire is passed through straight slot 5, in greenbelt/people's row by the reserved gap centainly stretched while putting installation curb 6 side of road area carries out fill compaction to firming face 121.

Claims (8)

1. a kind of curb, which is characterized in that including:By substrate(1)And block body(2)The ontology of composition(100);
The ontology(100)When mating formation, the direction consistent with road direction of travel is its length direction, the ontology(100) The direction for leading to greenbelt/pavement when mating formation from road side is its width direction, the ontology(100)It is vertical when mating formation Direction is its short transverse;
The substrate(1)In the block body(2)Lower section, the substrate(1)Width be more than the block body(2)Width, the base Bottom(1)Width exceeds the block body(2)Part in the ontology(100)Both sides be respectively formed outer side stage(11)With interior side stage (12);
The outer side stage(11)It is disposed when in use towards road side, the outer side stage(11)The face that is filled with water including top(111) With the outer end face being arranged towards road direction(112);
The interior side stage(12)Towards greenbelt/pavement side setting, include the firming face at top(121);
The block body(2)Towards outer side stage(11)Side is outer block face(21), the block body(2)Towards interior side stage(12)Side is Internal retaining surface(22);
The substrate(1)With the block body(2)It is identical in length direction length so that the ontology(100)The two of length direction End face forms two mounting surfaces being mutually parallel(101);
The ontology(100)It is upper to run through described two mounting surfaces(101)It is provided with straight slot(5).
2. a kind of curb according to claim 1, which is characterized in that the ontology(100)It is made of seepy material Or the ontology(100)On be provided with water-permeable passage(3).
3. a kind of curb according to claim 2, which is characterized in that the straight slot(5)For semicircle.
4. a kind of curb according to claim 1, which is characterized in that the straight slot(5)Wall surface is provided with filtering support Net.
5. a kind of curb according to claim 1, which is characterized in that the ontology(100)Inside, which is additionally provided with, to be run through Described two mounting surfaces(101)The second straight slot hole(51).
6. a kind of curb according to claim 5, which is characterized in that the ontology(100)It is additionally provided with outlet hole (52), the outlet hole(52)With the straight slot(5)Or second straight slot hole(51)Connection.
7. a kind of road paving structure, which is characterized in that including a kind of curb, green described in claim 1-6 any one Change band/pavement area(6)And road area(7), the curb is by the greenbelt/pavement area(6)With the road area (7)It is spaced from each other, the face that is filled with water(111)With the road area(7)Top is concordant, the greenbelt/pavement area(6)Bottom It is provided with water reserve(61).
8. a kind of road paving structure according to claim 7, which is characterized in that the greenbelt/pavement area(6)Top Portion and the block body(2)Top, the firming face(121)It is set to the greenbelt/pavement area(6)Below soil layer.
CN201721550203.3U 2017-11-20 2017-11-20 A kind of curb, the road paving structure using the curb Expired - Fee Related CN207699976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721550203.3U CN207699976U (en) 2017-11-20 2017-11-20 A kind of curb, the road paving structure using the curb

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721550203.3U CN207699976U (en) 2017-11-20 2017-11-20 A kind of curb, the road paving structure using the curb

Publications (1)

Publication Number Publication Date
CN207699976U true CN207699976U (en) 2018-08-07

Family

ID=63023011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721550203.3U Expired - Fee Related CN207699976U (en) 2017-11-20 2017-11-20 A kind of curb, the road paving structure using the curb

Country Status (1)

Country Link
CN (1) CN207699976U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869102A (en) * 2017-11-20 2018-04-03 杭州京兆岩新型建材有限公司 A kind of curb, road paving structure and construction method using the curb

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869102A (en) * 2017-11-20 2018-04-03 杭州京兆岩新型建材有限公司 A kind of curb, road paving structure and construction method using the curb

Similar Documents

Publication Publication Date Title
CN205420946U (en) Novel ecology that prevents surface gathered water road structure of permeating water
CN105239485B (en) Water drainage curb and the asphalt roads with discharge structure
CN205171305U (en) Bituminous paving with drainage structures
CN107386048A (en) Underground heat snow melt, noise reduction suitable for the north cut dirty rainwater-collecting ecological pavement
CN107386054A (en) A kind of urban road filtration, purification and collection drainage systems
CN205347914U (en) Interlocking formula ecology concrete road surface brick that permeates water with water conservancy diversion hole
CN103981785A (en) Pervious concrete paving system with penetration and drainage guide tubes
CN205115949U (en) Drainage curb and have drainage structures's asphalt roads
CN207362616U (en) A kind of paving structure of water-permeable brick
CN204875442U (en) Pavement ceramic tile and pavement
CN216712589U (en) Water permeability cement concrete road surface
CN207176440U (en) A kind of discharge structure for the water-permeable pavement of pavement half
CN215210279U (en) Modular permeable pavement system
CN207699976U (en) A kind of curb, the road paving structure using the curb
CN206173762U (en) Urban road dewatering system
CN214656073U (en) Natural permeable quarrying paving structure for sponge city
CN111535098A (en) Rainwater drainage system for green belts and sidewalks of town roads and construction method
CN203866664U (en) Permeable concrete pavement system with permeation and drainage guide pipes
CN203546559U (en) Reverse seepage preventing sidewalk brick capable of draining water
CN202202393U (en) Comprehensive road surface drainage system
CN105421647A (en) Step building block for collecting and utilizing rainwater
CN213740415U (en) Porous permeable pavement system
CN207699975U (en) A kind of drainage type curb
CN206090204U (en) Height ecological road surface structure of permeating water
CN214033246U (en) A road seepage prevention structure for sponge city design

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180807

Termination date: 20181120