Engineering construction management information device Download PDFInfo
- Publication number
- CN212624139U CN212624139U CN202021683845.2U CN202021683845U CN212624139U CN 212624139 U CN212624139 U CN 212624139U CN 202021683845 U CN202021683845 U CN 202021683845U CN 212624139 U CN212624139 U CN 212624139U
- Authority
- CN
- China
- Prior art keywords
- management information
- platform
- engineering construction
- placing
- cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model relates to an engineering construction management field discloses an engineering construction management information device to the constructor of co-altitude carries out the information and reports, and effectively protects engineering construction management information equipment. The utility model discloses a mount table, the top of mount table is equipped with places the platform, the mount table with place and be equipped with between the platform and place a height adjusting mechanism, the top of placing the platform is equipped with protection mechanism place the platform with be provided with engineering construction management information equipment between the protection mechanism. The utility model is suitable for an engineering construction management information is filled and reported.
Description
Technical Field
The utility model relates to an engineering construction management field, in particular to engineering construction management information system and device.
Background
The engineering construction is a special subject for accounting of the integrated accounting engineering cost of a building installation enterprise, and is characterized in that the engineering construction is carried out by carrying out new construction, extension and reconstruction activities on a construction project according to the requirements of a construction project design file, and four particulars such as labor cost, material cost, mechanical cost and other direct cost are set under the engineering construction.
At present, in the project construction process of a building project, the construction process relates to the data before the start of work, quality acceptance data, test data, materials, products, construction accessories and other certification data, the construction process data and the like are many, the management is inconvenient, the data management and data processing flow is still in a rough management state, and managers and specific construction main bodies only communicate and process problems through instant communication equipment and software such as telephones, WeChat and the like, so that part of construction units manually collect information problems through personnel, the integrity of the problems cannot be guaranteed, and great uncertainty is brought to post inquiry and assessment, and therefore, the project construction management information system and the project construction management information device are provided.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is: an engineering construction management information system and device are provided to facilitate information filling for constructors of different heights and effective protection of engineering construction management information equipment.
In order to solve the above problem, the utility model adopts the following technical scheme: engineering construction management information system and device, including the mount table, the top of mount table is equipped with places the platform, the mount table with place and be equipped with between the platform and place a height adjusting mechanism, the top of placing the platform is equipped with protection mechanism place the platform with be provided with engineering construction management information equipment between the protection mechanism.
Specifically, the engineering construction management information equipment generally comprises a computer terminal and a computer peripheral.
According to an embodiment of the embodiment, the placing table height adjusting mechanism may include a telescopic rod and a driving motor fixedly connected to the top of the mounting table, an output end of the driving motor is fixedly connected to the bottom of the placing table, one end of the telescopic rod is fixedly connected to the top of the mounting table, and the other end of the telescopic rod is fixedly connected to the bottom of the placing table.
According to the embodiment of the embodiment, the protection mechanism can include that fixed connection is at the safety cover that is the quadrant setting of placing the bench top portion, the inside wall of safety cover is equipped with the slip mouth, the inside wall of slip mouth is seted up and is extended to the outside spread groove of safety cover, the inside wall sliding connection of slip mouth has the slip cover that is the quadrant setting, the one end side fixedly connected with fixed pin of slip cover, the inside wall sliding connection of fixed pin and spread groove, the fixed pin extends to the outside of safety cover.
Further, in order to guarantee the stability of the whole protection mechanism, the top of the placing table is also provided with a limiting groove corresponding to the end part of the sliding cover, and the end part of the sliding cover is clamped with the limiting groove.
The utility model has the advantages that: the utility model discloses a steerable platform of placing of cooperation work between the adjustment mechanism and the holistic height of computer terminal, the constructor of co-altitude not all can convenient completion information be filled and reported, and through the cooperation work between the protection mechanism, the slip cover is drawn out and the joint is placing the bench from the safety cover, makes slip cover and safety cover carry out effectual protection to computer terminal.
Drawings
Fig. 1 is a schematic diagram of software modules of an engineering construction management information system and apparatus provided by the present invention;
fig. 2 is a schematic diagram of a hardware structure of the engineering construction management information system and apparatus provided by the present invention;
fig. 3 is an enlarged view of a portion a in fig. 2.
Numbering in the figures: the computer protection device comprises an installation table 1, a telescopic rod 2, a driving motor 3, a placing table 4, a protection cover 5, a sliding cover 6, a computer terminal 7, a computer peripheral 8, a connecting groove 9 and a fixing pin 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
The embodiment provides an engineering construction management information device, as shown in fig. 2, a placing table 4 is arranged above a mounting table 1, a placing table height adjusting mechanism is arranged between the mounting table 1 and the placing table 4, a protecting mechanism is arranged at the top of the placing table 4, and engineering construction management information equipment is arranged between the placing table 4 and the protecting mechanism, wherein the engineering construction management information equipment comprises a computer terminal 7 and a computer peripheral arranged on the front side of the computer terminal 7, and the computer peripheral generally comprises a mouse and a keyboard.
As shown in fig. 2 and fig. 3, the height adjusting mechanism of the placing table includes a driving motor 3 fixedly connected to the top of the mounting table 1, an output end of the driving motor 3 is fixedly connected to the bottom of the placing table 4, the top of the mounting table 1 is fixedly connected to a plurality of telescopic rods 2, and one end of each telescopic rod 2 far away from the mounting table 1 is fixedly connected to the bottom of the placing table 4; the protection mechanism comprises a protective cover 5 which is fixedly connected with the top of a placing table 4 and is arranged in a quarter circle, the inner side wall of the protective cover 5 is provided with a sliding opening, the inner side wall of the sliding opening is provided with a connecting groove 9 extending to the outside of the protective cover 5, the inner side wall of the sliding opening is slidably connected with a sliding cover 6 which is arranged in a quarter circle, one end side face of the sliding cover 6 is fixedly connected with a fixed pin 10, the fixed pin 10 is slidably connected with the inner side wall of the connecting groove 9, the fixed pin 10 extends to the outside of the protective cover 5, the top of the placing table 4 is provided with a limiting groove corresponding to the end part of the sliding cover 6, the end part of the sliding cover 6 is clamped with the limiting groove, the height of the placing table 4 and the height of the whole computer terminal 7 can be controlled through the matching work between adjusting mechanisms, so that constructors with different heights can complete information filling, through the, the sliding cover 6 and the protective cover 5 effectively protect the computer terminal 7.
The engineering construction management information equipment is provided with an engineering construction management information system, the software structure of the system is shown in figure 1 and comprises a database, a management module, a checking module, a filling module, an uploading module, a data processing module and a printing module, the output end of the database is electrically connected with the input end of the management module, the output end of the management module is respectively electrically connected with the input ends of the checking module, the filling module and the uploading module, the output ends of the filling module and the uploading module are electrically connected with the human input end of the data processing module, the output end of the data processing module is electrically connected with the input end of the printing module, the management module comprises a manager login unit and a constructor login unit, the manager login unit comprises the checking module, the output end of the manager login unit is electrically connected with the input end of the checking module, and the constructor login unit comprises the filling module and the uploading module, the output end of the constructor login unit is electrically connected with the input ends of the filling module and the uploading module, the data processing module comprises a verification unit, and through the matching work between the whole systems, the filling module and the uploading module of a constructor on the system can directly fill and upload information including groove checking information, construction process pictures, assessment information specialties, quality process information including material inspection reports, concrete test reports and rolling test report related information, and finally, the construction process information can be seen at any time on a terminal display at the background, so that various information flows can be checked and approved and collected conveniently, the loss, incompleteness, wrong numbering and the like of paper information are avoided, and the transmission rate of the construction process information and the integrity of transmission problems are greatly improved.
The utility model discloses when using, the constructor logs in the unit login system through the constructor, then fill in the module and upload the module on the system and directly fill in and upload including examining the groove data, the work progress photo, it divides the specialty to examine the evaluation data, the quality process data has the material inspection report, the concrete test report, roll the relevant data of test report, the data after uploading is through the unit processing of examining on the data processing module, obtain the accuracy and the authenticity of data, then the data that obtain is printed through print module, then print and upload through uploading module scanning behind the seal, the work progress data can both be seen at any time through the terminal display of backstage, the administrator logs in the unit and can directly logs in and look over corresponding data of module check.
The constructor finishes information filling on computer terminal 7 through computer peripheral 8 input information, and the height that the platform 4 was whole is placed to the height control of accessible regulation driving motor 3 this moment, makes the height adaptation constructor of placing computer terminal 7 on the platform 4, and slidable sliding cover 6 after the information input is accomplished makes sliding cover 6 follow safety cover 5 roll-off, and sliding cover 6 is spacing at the top of placing platform 4, accomplishes the protection to computer terminal 7.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. Engineering construction management information device, including mount table (1), its characterized in that: the construction platform is characterized in that a placing platform (4) is arranged above the mounting platform (1), a placing platform height adjusting mechanism is arranged between the mounting platform (1) and the placing platform (4), a protecting mechanism is arranged at the top of the placing platform (4), and engineering construction management information equipment is arranged between the placing platform (4) and the protecting mechanism.
2. The construction work management information device according to claim 1, wherein: the engineering construction management information equipment comprises a computer terminal (7) and a computer peripheral (8).
3. The construction work management information device according to claim 1, wherein: the placing table height adjusting mechanism comprises a telescopic rod (2) and a driving motor (3) fixedly connected to the top of the mounting table (1), the output end of the driving motor (3) is fixedly connected with the bottom of the placing table (4), one end of the telescopic rod (2) is fixedly connected with the top of the mounting table (1), and the other end of the telescopic rod (2) is fixedly connected with the bottom of the placing table (4).
4. The construction work management information device according to claim 1, wherein: protection mechanism includes that fixed connection is at the safety cover (5) that are the quadrant setting of placing platform (4) top, the inside wall of safety cover (5) is equipped with the slip mouth, spread groove (9) that extend to safety cover (5) outside are seted up to the inside wall of slip mouth, the inside wall sliding connection of slip mouth has slip cover (6) that are the quadrant setting, the one end side fixedly connected with fixed pin (10) of slip cover (6), the inside wall sliding connection of fixed pin (10) and spread groove (9), fixed pin (10) extend to the outside of safety cover (5).
5. The construction work management information device according to claim 4, wherein: the top of the placing table (4) is provided with a limiting groove corresponding to the end of the sliding cover (6), and the end of the sliding cover (6) is clamped with the limiting groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021683845.2U CN212624139U (en) | 2020-08-13 | 2020-08-13 | Engineering construction management information device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021683845.2U CN212624139U (en) | 2020-08-13 | 2020-08-13 | Engineering construction management information device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212624139U true CN212624139U (en) | 2021-02-26 |
Family
ID=74713780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021683845.2U Active CN212624139U (en) | 2020-08-13 | 2020-08-13 | Engineering construction management information device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212624139U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482546A (en) * | 2022-02-10 | 2022-05-13 | 大连职业技术学院 | Controlling means for construction |
-
2020
- 2020-08-13 CN CN202021683845.2U patent/CN212624139U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482546A (en) * | 2022-02-10 | 2022-05-13 | 大连职业技术学院 | Controlling means for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69531719T2 (en) | Portable test and communication device | |
DE69532601T2 (en) | Troubleshooting system for telephone system | |
CN105155599B (en) | Remote information monitoring and analyzing device and method for cement soil mixing pile | |
CN212624139U (en) | Engineering construction management information device | |
DE3203781A1 (en) | DEVICE FOR CORRECTING A MEASURED UNIT VOLUME OF A GAS TO A BASE VOLUME | |
CA2083669A1 (en) | Method for matching color prints to color images on a monitor screen | |
CN106404001A (en) | Precision installation alignment device for star sensor and dynamic photostar simulator and testing method | |
CN111242902A (en) | Method, system and equipment for identifying and detecting parts based on convolutional neural network | |
CN112903077B (en) | Cargo weight remote monitoring system and monitoring method | |
CN110356441A (en) | Cab signal vehicular equipment surveys system, the method and device of operation in car test | |
CN116319081B (en) | Electronic signature security management system based on big data cloud platform | |
JPS5819111B2 (en) | Authenticity testing device for identification documents | |
DE2928463C2 (en) | Remote diagnostic system for locally distributed service requirement systems | |
CN111552625A (en) | Online integrated management platform of IT equipment | |
CN216246582U (en) | Air volume calibration device based on backrest pipe | |
CN110598875A (en) | Method and system for monitoring overhauling quality of inflatable life raft | |
CN109272674A (en) | A kind of self-service device malfunction elimination system for supporting to use under offline and on-line environment | |
CN111914621B (en) | Architecture design method of panoramic platform | |
CN104535948B (en) | A kind of electric energy quality on-line monitoring device batch check system and method for calibration | |
CN210042026U (en) | Electric power safety inspection monitoring tool | |
CN113011855A (en) | Operation ticket intelligent management system | |
CN111507693A (en) | Intelligent project supervision system and supervision method | |
CN113091873A (en) | Automatic weighing system based on enameled wire | |
CN106875295B (en) | On-site sample collection system and on-site sample collection method | |
CN212300307U (en) | Can dismantle intelligent guiding ruler controller and intelligent guiding ruler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |