CN212612916U - Module brick formula inspection pit shaft concrete placement device - Google Patents
Module brick formula inspection pit shaft concrete placement device Download PDFInfo
- Publication number
- CN212612916U CN212612916U CN202021337337.9U CN202021337337U CN212612916U CN 212612916 U CN212612916 U CN 212612916U CN 202021337337 U CN202021337337 U CN 202021337337U CN 212612916 U CN212612916 U CN 212612916U
- Authority
- CN
- China
- Prior art keywords
- frame
- adjusting
- water conservancy
- conservancy diversion
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a module brick formula inspection pit shaft concrete placement device, the shape including water conservancy diversion frame and water conservancy diversion frame is umbelliform, and coupling mechanism wears to be equipped with on water conservancy diversion frame upper portion, and water conservancy diversion frame lower part is provided with supporting mechanism, and supporting mechanism cooperatees with the pit shaft, and coupling mechanism is connected with supporting mechanism through adjustment mechanism. The utility model discloses structural design is simple, and the installation is dismantled conveniently, and whole easy operation is swift, and the efficiency of construction is high, and is with low costs, has solved the problem that module brick class inspection pit shaft concrete easily scatters, is difficult for pouring into in the module brick in concrete placement process.
Description
Technical Field
The utility model relates to a technical field of construction especially relates to a module brick formula inspection pit shaft concrete placement device.
Background
At present, in the process of municipal road construction, a cylinder is required to be arranged on an inspection well embedded deeply with rainwater, sewage and the like for facilitating the entering and exiting of the inspection well, an inspection shaft is generally cylindrical, and is built by module bricks and is poured with concrete, but the concrete of the module bricks of the traditional pouring inspection shaft is mostly poured by adopting a chute, and because the wall thickness of the shaft limits the general small size of the brick holes of the module bricks, the concrete is easy to spill during pouring, the concrete is not easy to pour, and the time, the labor and the materials are wasted; if the concrete pump truck is adopted, the cost is high and the method is not economical.
SUMMERY OF THE UTILITY MODEL
The method aims at the problems that the traditional pouring inspection shaft module brick concrete is poured by adopting a chute, and because the wall thickness of a shaft limits that the brick holes of the module are generally small, the concrete is easy to spill and not easy to pour, and the time, the labor and the materials are wasted; if adopt the concrete pump truck, the expense is high, uneconomic technical problem, the utility model provides a module brick formula inspection pit shaft concrete placement device.
In order to solve the above problem, the technical scheme of the utility model is so realized:
the utility model provides a module brick formula inspection pit shaft concrete placement device, is umbelliform including the shape of water conservancy diversion frame and water conservancy diversion frame, and coupling mechanism is worn to be equipped with on water conservancy diversion frame upper portion, and water conservancy diversion frame lower part is provided with supporting mechanism, and supporting mechanism cooperatees with the pit shaft, and coupling mechanism is connected with supporting mechanism through adjustment mechanism.
Preferably, coupling mechanism includes the connecting rod, and the connecting rod runs through water conservancy diversion frame and connecting rod both ends all are connected with supporting mechanism through adjustment mechanism.
Preferably, the supporting mechanism comprises a supporting frame, the supporting frame is arranged at the lower part of the diversion frame and is installed in the shaft through a reinforcing frame, and the reinforcing frame is connected with a connecting rod in the connecting mechanism through an adjusting mechanism.
Preferably, braced frame's shape is cylindrical, and the reinforcement frame includes first strengthening rod and second strengthening rod, and first strengthening rod and second strengthening rod wear to establish in braced frame and first strengthening rod and second strengthening rod are whole to be the cross form, and first strengthening rod and second strengthening rod all are connected with the connecting rod through adjustment mechanism.
Preferably, the adjusting mechanism comprises an adjusting rod, a plurality of adjusting holes are formed in the adjusting rod, and the first reinforcing rod, the second reinforcing rod and the connecting rod respectively penetrate through the corresponding adjusting holes to be connected with the adjusting fastener.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses utilize the umbelliform water conservancy diversion of integral type frame to place on the pit shaft to utilize cylindrical braced frame to support the water conservancy diversion frame, utilize the anchor strut to carry out reinforcement installation on the pit shaft to braced frame, utilize the connecting rod, adjust pole and anchor strut whole and form a reinforcement system, the stability of water conservancy diversion frame concreting in-process has been improved greatly, the overall structure design is simple, the installation is dismantled conveniently, the bulk operation is simple swift, the efficiency of construction is high, low cost, the problem of module brick class inspection pit shaft concrete in concrete placement in-process easily scatter, be difficult for pouring into the module brick is solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a top view of fig. 1.
In the figure, 1 is a shaft, 2 is a flow guiding frame, 3 is a supporting frame, 4 is an adjusting rod, 5 is a connecting rod, 6 is a first reinforcing rod, and 7 is a second reinforcing rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in figure 1, a module brick formula inspection pit shaft concrete placement device, the shape that includes water conservancy diversion frame 2 and water conservancy diversion frame 2 is umbelliform, the diameter of water conservancy diversion frame bottom is greater than pit shaft diameter 5CM, coupling mechanism wears to be equipped with on 2 upper portions of water conservancy diversion frame, coupling mechanism includes connecting rod 5, connecting rod 5 runs through water conservancy diversion frame 2, 2 lower parts of water conservancy diversion frame are provided with supporting mechanism, and 5 both ends of connecting rod are all connected with supporting mechanism through adjustment mechanism, supporting mechanism and 1 cooperation of pit shaft utilize supporting mechanism to place the water conservancy diversion frame on the pit shaft and support, coupling mechanism is connected with supporting mechanism through adjustment mechanism.
The supporting mechanism comprises a supporting frame 3, the supporting frame 3 is cylindrical, the cylindrical supporting frame is used for providing circumferential support for the flow guide frame, the supporting frame 3 is arranged at the lower part of the flow guide frame 2, the supporting frame 3 is arranged in the shaft 1 through a reinforcing frame, and the reinforcing frame is connected with a connecting rod 5 in the connecting mechanism through an adjusting mechanism; as shown in fig. 2, the reinforcing frame includes a first reinforcing rod 6 and a second reinforcing rod 7, the first reinforcing rod 6 and the second reinforcing rod 7 are inserted into the support frame 3, the first reinforcing rod 6 and the second reinforcing rod 7 are integrally crossed, the support frame is supported on the shaft by the first reinforcing rod and the second reinforcing rod, and the first reinforcing rod 6 and the second reinforcing rod 7 are both connected with the connecting rod 5 through an adjusting mechanism.
The adjusting mechanism comprises an adjusting rod 4, a plurality of adjusting holes are formed in the adjusting rod 4, a first reinforcing rod 6, a second reinforcing rod 7 and a connecting rod 5 respectively penetrate through the corresponding adjusting holes to be connected with an adjusting fastener, a reinforcing system is integrally formed by the connecting rod, the adjusting rod and the reinforcing frame, the stability of the guide frame in the concrete pouring process is greatly improved, the adjusting rod is pushed by rotating the adjusting fastener, the connecting rod and the reinforcing frame are clamped and fixed on a shaft by the two groups of corresponding adjusting rods, the utility model discloses utilize the integral umbrella-shaped guide frame to be placed on the shaft, and utilize the cylindrical support frame to support the guide frame, the integral structure is simple in design, convenient to install and disassemble, simple and fast in integral operation, high in construction efficiency and low in cost, and the problem that the concrete of the module brick inspection shaft is easy to fall off in the concrete pouring process, Not easy to be poured into the module brick.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. The utility model provides a module brick formula inspection pit shaft concrete placement device, its characterized in that, is umbelliform including the shape of water conservancy diversion frame (2) and water conservancy diversion frame (2), and coupling mechanism is worn to be equipped with on water conservancy diversion frame (2) upper portion, and water conservancy diversion frame (2) lower part is provided with supporting mechanism, and supporting mechanism cooperatees with pit shaft (1), and coupling mechanism is connected with supporting mechanism through adjustment mechanism.
2. The modular brick inspection shaft concrete placement device according to claim 1, characterized in that the connection means comprise a connecting rod (5), the connecting rod (5) penetrating the guide frame (2) and both ends of the connecting rod (5) being connected with the support means by means of an adjusting means.
3. The modular brick inspection shaft concrete pouring device according to claim 1 or 2, characterized in that the support means comprise a support frame (3), the support frame (3) being arranged at the lower part of the guide frame (2) and the support frame (3) being mounted in the shaft (1) by means of a reinforcement frame, which is connected with the connecting rods (5) in the connecting means by means of an adjusting means.
4. The modular brick inspection shaft concrete placement device according to claim 3, characterized in that the support frame (3) is cylindrical in shape, the reinforcement frame comprises a first reinforcement bar (6) and a second reinforcement bar (7), the first reinforcement bar (6) and the second reinforcement bar (7) are arranged in the support frame (3) in a penetrating manner, the first reinforcement bar (6) and the second reinforcement bar (7) are in a cross-like shape as a whole, and the first reinforcement bar (6) and the second reinforcement bar (7) are connected with the connecting bar (5) through an adjusting mechanism.
5. The modular brick type inspection shaft concrete pouring device according to claim 4, characterized in that the adjusting mechanism comprises an adjusting rod (4), a plurality of adjusting holes are formed on the adjusting rod (4), and the first reinforcing rod (6), the second reinforcing rod (7) and the connecting rod (5) are respectively connected with the adjusting fastener through the corresponding adjusting holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021337337.9U CN212612916U (en) | 2020-07-09 | 2020-07-09 | Module brick formula inspection pit shaft concrete placement device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021337337.9U CN212612916U (en) | 2020-07-09 | 2020-07-09 | Module brick formula inspection pit shaft concrete placement device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212612916U true CN212612916U (en) | 2021-02-26 |
Family
ID=74746116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021337337.9U Active CN212612916U (en) | 2020-07-09 | 2020-07-09 | Module brick formula inspection pit shaft concrete placement device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212612916U (en) |
-
2020
- 2020-07-09 CN CN202021337337.9U patent/CN212612916U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205530344U (en) | Utility tunnel is pour to split type no mould | |
CN208668596U (en) | A kind of reinforced concrete girder slab system and prefabricated post assembly node | |
CN208586722U (en) | Precast concrete assembled piping shaft | |
CN101885208B (en) | System for manufacturing novel high-efficiency, energy-saving and environmentally-friendly centrifugal concrete pile | |
CN212612916U (en) | Module brick formula inspection pit shaft concrete placement device | |
CN109356185A (en) | A kind of prefabricated pier foundation of regeneration monolith and its construction method | |
CN209703510U (en) | A kind of template system suitable for the ring-like foundation pile of major diameter manually digging hole | |
CN208280038U (en) | A kind of arch culvert template system | |
CN109972657A (en) | Overall assembled steel reinforced concrete pipe gallery is contained in stake | |
CN110130271A (en) | A kind of construction method of side wall concrete single-sided formwork reinforcement | |
CN101831910B (en) | Construction method of reinforced concrete flange reaming type filling pile | |
CN211289237U (en) | Mounting structure for construction machinery | |
CN211340484U (en) | Road and bridge crack reinforced structure | |
CN209585109U (en) | The assembled piping lane of pile wall interaction | |
CN209636834U (en) | A kind of prefabricated pier foundation of regeneration monolith | |
CN209799529U (en) | communication tower prefabricated base convenient for wiring | |
CN205576904U (en) | Prestressing force high -strength concrete area stake point tubular pile | |
CN113152948A (en) | Novel rectangular reinforced concrete pool wall corner reinforcing steel bar configuration mode | |
CN205348170U (en) | In dig method prestressed concrete pipe pile | |
CN109577371A (en) | The assembled piping lane of pile wall interaction | |
CN217896505U (en) | Cross water concrete face flatness control device | |
CN218406469U (en) | Reusable suspended mold supporting system | |
CN214194658U (en) | Prefabricated concrete valve well | |
CN220266556U (en) | Watering positioner is used in municipal construction | |
CN217267952U (en) | Multifunctional tunnel intercepting well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |