CN212582595U - Ecological bank protection bearing structure of hydraulic engineering - Google Patents

Ecological bank protection bearing structure of hydraulic engineering Download PDF

Info

Publication number
CN212582595U
CN212582595U CN202021092272.6U CN202021092272U CN212582595U CN 212582595 U CN212582595 U CN 212582595U CN 202021092272 U CN202021092272 U CN 202021092272U CN 212582595 U CN212582595 U CN 212582595U
Authority
CN
China
Prior art keywords
groove
slope protection
connecting plate
connecting portion
hydraulic engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021092272.6U
Other languages
Chinese (zh)
Inventor
黄海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhanjiang Construction Hydropower Engineering Co ltd
Original Assignee
Zhanjiang Construction Hydropower Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhanjiang Construction Hydropower Engineering Co ltd filed Critical Zhanjiang Construction Hydropower Engineering Co ltd
Priority to CN202021092272.6U priority Critical patent/CN212582595U/en
Application granted granted Critical
Publication of CN212582595U publication Critical patent/CN212582595U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model relates to a technical field of ecological bank protection, more specifically say, it relates to an ecological bank protection bearing structure of hydraulic engineering, and this ecological bank protection bearing structure of hydraulic engineering lays on the slope, and it includes a plurality of slope protection brick, and a plurality of slope protection brick is the rectangle array and distributes, and two horizontal adjacent slope protection bricks pass through connecting block fixed connection, and vertically a plurality of slope protection brick passes through connecting plate fixed connection, and it is fixed that the fastener is passed through at the both ends of connecting plate. The utility model discloses have the effect of being convenient for change the bank protection brick.

Description

Ecological bank protection bearing structure of hydraulic engineering
Technical Field
The utility model belongs to the technical field of the technique of ecological bank protection and specifically relates to an ecological bank protection bearing structure of hydraulic engineering.
Background
At present, the ecological slope protection is a slope protection technology for supporting a slope or a side slope by basic knowledge of subjects such as comprehensive engineering mechanics, soil science, ecology, botany and the like to form a comprehensive slope protection system consisting of plants or engineering and plants. After the excavation side slope is formed, the surface layer of the side slope is protected and reinforced by planting plants and utilizing the interaction (root anchoring effect) of the plants, rocks and soil bodies, so that the requirement on the stability of the surface layer of the side slope can be met, the slope protection mode of the damaged natural ecological environment can be recovered, and the method is an effective slope protection and slope fixing means.
The existing Chinese patent with the publication number of CN206784316U discloses a novel water conservancy slope protection structure, which can also be called as a water conservancy engineering ecological slope protection supporting structure, and comprises slope protection bricks and connecting pieces, wherein the slope protection bricks are formed by pouring concrete, the slope protection bricks are provided with rectangular base bodies and four clamping blocks connected to the base bodies, and a plurality of slope protection bricks can be clamped and connected with each other through the clamping blocks; a through hole penetrating through one of the clamping blocks is formed, the axis direction of the through hole is perpendicular to the laying direction of the slope protection brick, a first groove is formed in the back of the slope protection brick, and a second groove is formed in the front of the slope protection brick; the first groove is communicated with the through hole; two first recesses can be linked together when two bank protection bricks joint each other, and the connecting piece is the U type, and the connecting piece includes two relative connecting portion, and the distance between two connecting portions is the twice of through-hole to fixture block side distance.
The above prior art solutions have the following drawbacks: slope protection brick adopts concrete placement to form, when the slope protection brick damages, is not convenient for change the slope protection brick.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing an ecological bank protection bearing structure of hydraulic engineering has the effect of being convenient for change the slope protection brick.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides an ecological slope protection bearing structure of hydraulic engineering, this ecological slope protection bearing structure of hydraulic engineering lays on the slope, including a plurality of slope protection brick, a plurality of slope protection brick is the rectangle array and distributes, and horizontal two adjacent slope protection bricks pass through connecting block fixed connection, and fore-and-aft a plurality of slope protection brick passes through connecting plate fixed connection, and it is fixed that the fastener is passed through at the both ends of connecting plate.
Through adopting above-mentioned technical scheme, when needs are changed the slope protection brick, through the joint action of relieving the connecting block to two adjacent slope protection bricks, simultaneously through relieving the fixed action of fastener to the connecting plate to relieve the fixed action of connecting plate to fore-and-aft a plurality of slope protection brick, compare in the concrete placement of background art, have the effect of being convenient for change the slope protection brick.
The present invention may be further configured in a preferred embodiment as: the connecting block includes fixed connection's first connecting portion and second connecting portion, first spread groove and second spread groove have been seted up respectively to two relative lateral walls of slope protection brick, first connecting portion with first spread groove joint cooperation, the second connecting portion with second spread groove joint cooperation.
Through adopting above-mentioned technical scheme, the connecting block can prevent to take place relative slip on vertical between two horizontal adjacent slope protection bricks, has increased the fastness of installation between two horizontal adjacent slope protection bricks.
The present invention may be further configured in a preferred embodiment as: the cross section of the first connecting portion and the cross section of the second connecting portion are both trapezoidal, the edge of one side, away from the second connecting portion, of the first connecting portion is larger than the edge of one side, close to the second connecting portion, of the first connecting portion, and the edge of one side, away from the first connecting portion, of the second connecting portion is larger than the edge of one side, close to the first connecting portion, of the second connecting portion.
Through adopting above-mentioned technical scheme, the connecting block can prevent to slide in the direction of keeping away from each other of horizontal direction orientation between two horizontal adjacent slope protection bricks, has further increased the fastness of installation between two horizontal adjacent slope protection bricks.
The present invention may be further configured in a preferred embodiment as: the connecting block is fixedly provided with a pulling block, and the pulling block is provided with a pulling hole.
Through adopting above-mentioned technical scheme, the staff will point and go deep into the trombone, through holding the drawing piece to the realization is to the installation and the dismantlement of connecting block, has increased the convenience of staff's operation.
The present invention may be further configured in a preferred embodiment as: the third spread groove has been seted up on the surface of bank protection brick, and the length direction of third spread groove is vertical, the both ends of third spread groove all are the opening setting, and fore-and-aft a plurality of third spread groove is linked together, connecting plate and a plurality of the cooperation of third spread groove joint, the thickness of connecting plate with the degree of depth of third spread groove is the same.
Through adopting above-mentioned technical scheme, the connecting plate can prevent to take place relative slip between the vertical a plurality of slope protection brick, has increased the fastness of installation between vertical a plurality of slope protection brick.
The present invention may be further configured in a preferred embodiment as: the both ends of connecting plate are all fixed and are provided with the mounting panel, two the joint groove has all been seted up on the mounting panel, the both ends of connecting plate respectively with two the cooperation of joint groove joint, the thickness of connecting plate with the degree of depth in joint groove is the same, the groove of sliding has been seted up on the surface of connecting plate, the length direction in groove of sliding with the length direction of connecting plate is the same, the fastener is the bolt, the bolt passes the groove of sliding with mounting panel threaded connection.
Through adopting above-mentioned technical scheme, be fixed in two mounting panels respectively through the bolt with the both ends of connecting plate on, be fixed in the mounting panel with the connecting plate to the realization is fixed to fore-and-aft a plurality of slope protection brick.
The present invention may be further configured in a preferred embodiment as: and a gasket is arranged between the bolt and the sliding groove.
Through adopting above-mentioned technical scheme, the gasket has increased the area of contact of the nut of bolt and connecting plate, has increased the fixed action of bolt to the connecting plate.
The present invention may be further configured in a preferred embodiment as: and a handle is fixedly arranged on the connecting plate.
Through adopting above-mentioned technical scheme, thereby realize the installation and the dismantlement to the connecting plate through holding the handle, increased the convenience that the staff installed and dismantled the connecting plate.
To sum up, the utility model discloses a following at least one useful technological effect:
1. when the slope protection bricks need to be replaced, the connecting effect of the connecting blocks on the two adjacent slope protection bricks is relieved, and the fixing effect of the connecting plates on the connecting plates is relieved simultaneously, so that the fixing effect of the connecting plates on the longitudinal slope protection bricks is relieved, and compared with the concrete pouring in the background art, the concrete pouring device has the effect of facilitating the replacement of the slope protection bricks;
2. the connecting block can prevent the two slope protection bricks which are adjacent in the transverse direction from sliding towards the direction which is far away from each other in the horizontal direction, so that the firmness of installation between the two slope protection bricks which are adjacent in the transverse direction is improved;
3. on being fixed in two mounting panels respectively with the both ends of connecting plate through the bolt, be fixed in the mounting panel with the connecting plate on to the realization is fixed to fore-and-aft a plurality of slope protection brick.
Drawings
Fig. 1 is a schematic structural view of an ecological slope protection supporting structure of a hydraulic engineering according to an embodiment of the present invention;
fig. 2 is a schematic view of an assembly relationship of slope protection bricks in an embodiment of the present invention;
fig. 3 is a partially enlarged schematic view of a portion a in fig. 1.
In the figure, 1, slope protection bricks; 101. a first connecting groove; 102. a second connecting groove; 103. a third connecting groove; 2. connecting blocks; 201. a first connection portion; 202. a second connecting portion; 3. a connecting plate; 301. a sliding groove; 4. pulling the block; 401. hole drawing; 5. mounting a plate; 501. a clamping groove; 6. a bolt; 7. a gasket; 8. a handle.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses an ecological slope protection bearing structure of hydraulic engineering, this ecological slope protection bearing structure of hydraulic engineering lay on the slope, including a plurality of slope protection brick 1, a plurality of slope protection brick 1 is the rectangle array and distributes, and two horizontal adjacent slope protection bricks 1 are through connecting block 2 fixed connection, and vertically a plurality of slope protection brick 1 is through connecting plate 3 fixed connection, and the shape of connecting plate 3 is the cuboid, and it is fixed that the fastener is passed through at the both ends of connecting plate 3. So set up, increased the fastness of installation between a plurality of connecting plate 3.
Referring to fig. 2 and 3, a first connecting groove 101 and a second connecting groove 102 are respectively formed on two opposite side walls of the slope protection brick 1, and the depth of the first connecting groove 101 and the second connecting groove 102 is the same as the thickness of the slope protection brick 1. Connecting block 2 includes integrated into one piece's first connecting portion 201 and second connecting portion 202, first connecting portion 201 and first connecting groove 101 joint cooperation, second connecting portion 202 and second connecting groove 102 joint cooperation. Specifically, the cross sections of the first connection portion 201 and the second connection portion 202 are both trapezoidal, the side of the first connection portion 201 away from the second connection portion 202 is larger than the side of the first connection portion 201 close to the second connection portion 202, and the side of the second connection portion 202 away from the first connection portion 201 is larger than the side of the second connection portion 202 close to the first connection portion 201. A pulling block 4 is fixedly arranged on the connecting block 2, and a pulling hole 401 is formed in the pulling block 4. So set up, connecting block 2 can prevent to slide in the direction of keeping away from each other of horizontal direction orientation between two horizontal adjacent slope protection bricks 1, has further increased the fastness of installation between two horizontal adjacent slope protection bricks 1. The staff deepens into the trompil 401 with the finger, through holding pull block 4 to the realization is to the installation and the dismantlement of connecting block 2, has increased the convenience of staff's operation.
Referring to fig. 2 and 3, third connecting groove 103 has been seted up on slope protection brick 1's surface, and the degree of depth of third connecting groove 103 is less than slope protection brick 1's thickness, and the length direction of third connecting groove 103 is vertical, and the both ends of third connecting groove 103 all are the opening setting. When a plurality of slope protection brick 1 splices together, fore-and-aft a plurality of third spread groove 103 is linked together, and connecting plate 3 cooperates with a plurality of third spread groove 103 joint, and the thickness of connecting plate 3 is the same with the degree of depth of third spread groove 103. The both ends of connecting plate 3 are all fixed and are provided with mounting panel 5, and the shape of mounting panel 5 is the cuboid, and the length direction of mounting panel 5 is horizontal, has all seted up a plurality of joint groove 501 on two mounting panels 5, and a plurality of joint groove 501 is arranged along the equidistant length direction of mounting panel 5, and the both ends of connecting plate 3 respectively with two corresponding joint groove 501 joint cooperations, the thickness of connecting plate 3 is the same with the degree of depth in joint groove 501. The groove 301 that slides that runs through is seted up on the surface of connecting plate 3, and the length direction in groove 301 that slides is the same with the length direction of connecting plate 3, and the fastener is bolt 6, is provided with gasket 7 between bolt 6 and the groove 301 that slides. The bolt 6 penetrates through the gasket 7 and the sliding groove 301 in sequence to be in threaded connection with the mounting plate 5. A handle 8 is fixedly arranged on the connecting plate 3. So set up, connecting plate 3 can prevent to take place relative slip between vertical a plurality of slope protection brick 1, has increased the fastness of installation between vertical a plurality of slope protection brick 1
The implementation principle of the embodiment is as follows: when the hydraulic engineering ecological slope protection supporting structure needs to be installed, a plurality of slope protection bricks 1 are distributed according to a rectangular array, then a first connecting part 201 is in clamping fit with a first connecting groove 101, a second connecting part 202 is in clamping fit with a second connecting groove 102, two adjacent slope protection bricks 1 are connected together, then a connecting plate 3 is in clamping fit with a plurality of longitudinal third connecting grooves 103, two ends of the connecting plate 3 are respectively in clamping fit with two clamping grooves 501, then bolts 6 sequentially penetrate through a gasket 7, a sliding groove 301 and are in threaded connection with a mounting plate 5, fixing of the connecting plate 3 is achieved, and installation of the hydraulic engineering ecological slope protection supporting structure is completed; when hydraulic engineering ecological slope protection bearing structure is dismantled to needs, through removing the fixed action of bolt 6 to connecting plate 3, thereby realize the dismantlement to connecting plate 3 through pulling handle 8, then through stretching into the trompil 401 with the finger in, thereby draw the dismantlement of piece 4 realization to connecting block 2 through the pulling to the realization has the effect of being convenient for change slope protection brick 1 to the dismantlement of connecting plate 3.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides an ecological slope protection bearing structure of hydraulic engineering, this ecological slope protection bearing structure of hydraulic engineering lay on the slope, including a plurality of slope protection brick (1), a plurality of slope protection brick (1) are the rectangular array and distribute, its characterized in that: horizontal two adjacent slope protection bricks (1) pass through connecting block (2) fixed connection, and connecting plate (3) fixed connection is passed through in fore-and-aft a plurality of slope protection brick (1), and the fastener is passed through at the both ends of connecting plate (3) fixed.
2. The ecological bank protection bearing structure of hydraulic engineering of claim 1, its characterized in that: connecting block (2) are including fixed connection's first connecting portion (201) and second connecting portion (202), first connecting groove (101) and second connecting groove (102) have been seted up respectively to two relative lateral walls of slope protection brick (1), first connecting portion (201) with first connecting groove (101) joint cooperation, second connecting portion (202) with second connecting groove (102) joint cooperation.
3. The ecological bank protection bearing structure of hydraulic engineering of claim 2, its characterized in that: the cross sections of the first connecting portion (201) and the second connecting portion (202) are both trapezoidal, the edge of one side, away from the second connecting portion (202), of the first connecting portion (201) is larger than the edge of one side, close to the second connecting portion (202), of the first connecting portion (201), of the second connecting portion (202), is larger than the edge of one side, close to the first connecting portion (201), of the second connecting portion (202).
4. The ecological bank protection bearing structure of hydraulic engineering of claim 1, its characterized in that: the connecting block (2) is fixedly provided with a pulling block (4), and the pulling block (4) is provided with a pulling hole (401).
5. The ecological bank protection bearing structure of hydraulic engineering of claim 1, its characterized in that: third spread groove (103) have been seted up on the surface of slope protection brick (1), and the length direction of third spread groove (103) is vertical, the both ends of third spread groove (103) all are the opening setting, and fore-and-aft a plurality of third spread groove (103) are linked together, connecting plate (3) and a plurality of third spread groove (103) joint cooperation, the thickness of connecting plate (3) with the degree of depth of third spread groove (103) is the same.
6. The ecological bank protection bearing structure of hydraulic engineering of claim 1, its characterized in that: the both ends of connecting plate (3) are all fixed and are provided with mounting panel (5), two joint groove (501) have all been seted up on mounting panel (5), the both ends of connecting plate (3) respectively with two joint groove (501) joint cooperation, the thickness of connecting plate (3) with the degree of depth in joint groove (501) is the same, groove (301) of sliding has been seted up on the surface of connecting plate (3), the length direction in groove (301) of sliding with the length direction of connecting plate (3) is the same, the fastener is bolt (6), bolt (6) are passed groove (301) of sliding with mounting panel (5) threaded connection.
7. The ecological bank protection bearing structure of hydraulic engineering of claim 6, characterized in that: and a gasket (7) is arranged between the bolt (6) and the sliding groove (301).
8. The ecological bank protection bearing structure of hydraulic engineering of claim 1, its characterized in that: and a handle (8) is fixedly arranged on the connecting plate (3).
CN202021092272.6U 2020-06-13 2020-06-13 Ecological bank protection bearing structure of hydraulic engineering Active CN212582595U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021092272.6U CN212582595U (en) 2020-06-13 2020-06-13 Ecological bank protection bearing structure of hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021092272.6U CN212582595U (en) 2020-06-13 2020-06-13 Ecological bank protection bearing structure of hydraulic engineering

Publications (1)

Publication Number Publication Date
CN212582595U true CN212582595U (en) 2021-02-23

Family

ID=74650532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021092272.6U Active CN212582595U (en) 2020-06-13 2020-06-13 Ecological bank protection bearing structure of hydraulic engineering

Country Status (1)

Country Link
CN (1) CN212582595U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216088A (en) * 2021-05-26 2021-08-06 河南华安水利工程有限公司 River course slope protection laying construction method for hydraulic engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216088A (en) * 2021-05-26 2021-08-06 河南华安水利工程有限公司 River course slope protection laying construction method for hydraulic engineering

Similar Documents

Publication Publication Date Title
CN212582595U (en) Ecological bank protection bearing structure of hydraulic engineering
CN108425341B (en) Stepped landscape retaining wall for ecological river channel and construction method thereof
DE112021000151T5 (en) Method of supporting the construction pit in the geological condition of the soil layer mixed with stone blocks
CN106284348B (en) The construction method of pile sinking is carried out based on assembly mobile platform
CN206768861U (en) A kind of reinforcement ring retaining wall
CN214363515U (en) Supporting construction of drainage pipe foundation ditch
CN214613597U (en) Bridge deck structure of steel trestle
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN211446799U (en) Be applied to ecological slope protection structure among channel treatment project
CN211690364U (en) Steel sheet pile strutting arrangement
CN110984168B (en) Combined foundation pit supporting pile structure
CN105178365A (en) Deformation-resisting construction method for underground waterproof plate
CN105133664B (en) Combined frame type isolation protection system and construction method thereof
RU161890U1 (en) DEVICE FOR POSITIONING OF THE THREAD PILES AT THE ESTABLISHMENT OF THE THREAD DOORS
CN211047931U (en) Ecological vegetation ordered growth comprehensive treatment device
KR200416567Y1 (en) Pile chamber type trench shoring apparatus
CN109457909B (en) Construction device for quickly spliced reinforced cast-in-place concrete terrace and use method
CN109281296B (en) Construction method of irrigation water delivery channel
CN207659926U (en) A kind of concrete segment being laid with for ecological sloping bank
CN102409682B (en) Pre-stressed anchor rod type steel internal support structure of continuous arched slope protection piles and construction method of pre-stressed anchor rod type steel internal support structure
CN221001030U (en) Assembled recoverable waist rail for anchor rope
CN220768079U (en) Underground foundation pit supporting device
CN218990217U (en) Slope protection brick and ecological slope protection
CN215715395U (en) Assembled slope protection structure
CN212001046U (en) Underground continuous wall structure