CN212561860U - A green building structure for housing engineering - Google Patents
A green building structure for housing engineering Download PDFInfo
- Publication number
- CN212561860U CN212561860U CN202020015455.1U CN202020015455U CN212561860U CN 212561860 U CN212561860 U CN 212561860U CN 202020015455 U CN202020015455 U CN 202020015455U CN 212561860 U CN212561860 U CN 212561860U
- Authority
- CN
- China
- Prior art keywords
- plate
- box
- cleaning
- water collecting
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
The utility model discloses a green building structure for housing engineering, which comprises a building main body, wherein the top of the building main body is connected with a first water collecting plate, the top of the first water collecting plate is provided with a water collecting tank, the inside of the water collecting tank is fixed with a building top, the bottom end of the water collecting tank is connected with a collecting elbow, the inside of the building main body is provided with a wind shielding box, the inside of the wind shielding box is provided with a collecting straight pipe, the bottom of the collecting straight pipe is connected with a water outlet pipe, the outer surface of the wind shielding box is connected with a protection plate, the green building structure for housing engineering is provided with a baffle plate, a first cleaning plate and a cleaning box, rainwater sundries enter a filter box when in use, the rainwater is separated from the sundries along the first cleaning plate, the rainwater falls over the cleaning box and passes through the cleaning box to enter the inside of the filter box, when the sundries on the top of the first cleaning plate are more, the, the filter box is cleaned, and the effect of conveniently cleaning impurities is achieved.
Description
Technical Field
The utility model relates to a green building technical field specifically is a green building structure for housing engineering.
Background
In the whole life cycle, resources are saved, the environment is protected, pollution is reduced, healthy, applicable and efficient use space is provided for people, high-quality buildings which are harmoniously symbiotic with the nature are realized to the maximum extent, green building evaluation follows the principle of adjusting according to the circumstances, and the comprehensive evaluation is performed on the performances of 5 types of indexes such as safety, durability, health, comfort, life convenience, resource saving and environmental amenity in the whole life cycle of the buildings by combining the characteristics of climate, environment, resources, economy, culture and the like of the regions where the buildings are located.
The prior art discloses a green building structure for housing engineering, application No. 201920431307.5, comprising a roof layer and a wall structure, the lower end of the roof layer is provided with a wall surface structure, the roof layer and the wall surface structure are fixedly connected through integral pouring, the inner sides of the roof layer and the wall surface structure are provided with a first water collecting tank, the left side and the right side of the lower end of the first water collecting tank are respectively provided with a vertical pipe, the lower end of the inner part of the second water collecting tank is provided with a filtering port, the rainwater collected by the second water collecting tank can be primarily filtered, so that the rainwater can not be doped with a large amount of impurities, and the impurities filtered by the filter opening can be cleaned manually, so that the impurities can not block the filter opening, therefore, the problem that rainwater in the existing green building structure is not filtered for many times, so that the rainwater in the purification pool can be blocked for a long time and the maintenance cost is increased is solved. But this green building structure, because only carry out filterable corruption groove to impurity, at long-term filterable in-process, impurity is the encapsulated situation, leads to impurity can't utilize excessively to pile up, makes the not good clearance of inside impurity, and the water pipe is in long-term the use simultaneously, receives the influence by surrounding environment easily, and the water pipe is fixed easily not hard up, makes the water pipe life-span significantly reduce.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green building structure for housing engineering to propose impurity and pile up not good clearance in solving above-mentioned background art, the water pipe receives the problem of external influence easily.
In order to achieve the above object, the utility model provides a following technical scheme: a green building structure for house engineering comprises a building main body, wherein a first water collecting plate is connected to the top of the building main body, a water collecting tank is formed in the top of the first water collecting plate, a building top is fixed inside the water collecting tank, a collecting elbow is connected to the bottom end of the water collecting tank, a wind blocking box is arranged inside the building main body, a collecting straight pipe is installed inside the wind blocking box, the bottom of the collecting straight pipe is connected with a water outlet pipe, a protection plate is connected to the outer surface of the wind blocking box, a filter box is fixed to the bottom of the building main body, a baffle and a second water collecting plate are respectively connected to the top of the filter box, a second cleaning plate is connected to the bottom of the second water collecting plate, filter holes are formed in the second cleaning plate, a flow guide block is connected to the top of the second cleaning plate, and a first cleaning plate is fixed inside the filter box, the cleaning box is fixed on two sides of the first cleaning plate, one side of the filter box is connected with a water collecting tank through a water pipe, the top of the water collecting tank is connected with a cover plate, a valve is mounted on the outer surface of the water pipe, and a faucet is connected to the top of the valve.
Preferably, the cleaning boxes are arranged in two, and the two cleaning boxes are distributed in a mirror image mode on the central axis of the first cleaning plate.
Preferably, the protection plate is provided with a plurality of, and a plurality of the protection plate is dismantled with the box that keeps out the wind and is set up.
Preferably, the number of the flow collecting straight pipes is two, and the two flow collecting straight pipes are arranged in parallel in the building main body.
Preferably, the bottom of the cleaning box is provided with an aperture.
Preferably, the second water collecting plate and the baffle are both detached from the filter box.
Preferably, the top of the guide block is provided with a plurality of protrusions.
Compared with the prior art, the beneficial effects of the utility model are that: the green building structure for the house engineering is provided with a baffle plate, a first cleaning plate and a cleaning box, when in use, rainwater and sundries enter the filter box, rainwater is separated from the sundries along the first cleaning plate, the rainwater falls above the cleaning box and enters the interior of the filter box through the cleaning box, when more sundries are accumulated on the top of the first cleaning plate, the baffle can be opened to clean the filter box, thereby achieving the effect of conveniently cleaning impurities, solving the problem that the impurities are not well cleaned under the sealing condition, meanwhile, the wind shield box and the protection plate are arranged, the collecting straight pipe is fixed in the wind shield box during installation, the protection plate is fixed on the outer surface of the wind shield box through a nut, if the mass flow straight pipe damages, the maintenance can be dismantled with corresponding guard plate, has reached the pipeline protection and has gone all to the effect of convenient maintenance, has solved the pipeline and has exposed the easy impaired problem outside.
Drawings
FIG. 1 is a schematic structural view of the main building body of the present invention;
FIG. 2 is a schematic view of the cross-sectional structure of the main building body of the present invention;
fig. 3 is an enlarged schematic view of the structure a of the present invention.
In the figure: 1. a building body; 2. a filter box; 3. a water collection tank; 4. a baffle plate; 5. a protection plate; 6. collecting flow bent pipe; 7. a water collection tank; 8. a first water collection sheet; 9. building top; 10. a valve; 11. a faucet; 12. a water pipe; 13. cleaning the box; 14. a first cleaning plate; 15. collecting straight pipes; 16. a wind shield box; 17. a water outlet pipe; 18. a cover plate; 19. a second cleaning plate; 20. a filtration pore; 21. a drainage block; 22. a second water collection sheet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," "fixed," "sleeved," and the like are to be construed broadly, e.g., as either a fixed connection, a removable connection, or an integral part; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, can be connected inside two elements or can be in an interaction relationship between the two elements, and the specific meaning of the terms in the present invention can be understood according to specific situations by those skilled in the art
Referring to fig. 1-3, the present invention provides a technical solution: a green building structure for house engineering comprises a building main body 1, a filter tank 2, a water collecting tank 3, a baffle 4, a protection plate 5, a flow-collecting bent pipe 6, a water collecting tank 7, a first water collecting plate 8, a building top 9, a valve 10, a faucet 11, a water pipe 12, a cleaning box 13, a first cleaning plate 14, a flow-collecting straight pipe 15, a wind shielding box 16, a water outlet pipe 17, a cover plate 18, a second cleaning plate 19, a filter hole 20, a flow guide block 21 and a second water collecting plate 22, wherein the top of the building main body 1 is connected with the first water collecting plate 8, the top of the first water collecting plate 8 is provided with the water collecting tank 7, the building top 9 is fixed inside the water collecting tank 7, the bottom end of the water collecting tank 7 is connected with the flow-collecting bent pipe 6, the wind shielding box 16 is arranged inside the building main body 1, the wind shielding box 16 is internally provided with the flow-collecting straight pipe 15, the bottom of the flow-collecting straight, building subject 1's bottom is fixed with rose box 2, rose box 2's top is connected with baffle 4 and second water collection sheet 22 respectively, second water collection sheet 22's bottom is connected with second clearance board 19, filtration pore 20 has been seted up to second clearance board 19's inside, second clearance board 19's top is connected with drainage piece 21, rose box 2's inside is fixed with first clearance board 14, first clearance board 14's both sides are fixed with clearance box 13, one side of rose box 2 is connected with header tank 3 through water pipe 12, header tank 3's top is connected with apron 18, water pipe 12's surface mounting has valve 10, valve 10's top is connected with tap 11, adjusting valve.
Referring to fig. 1-2, two cleaning boxes 13 are provided, and the two cleaning boxes 13 are distributed in a mirror image manner on the central axis of the first cleaning plate 14, so as to facilitate the processing, a plurality of protection plates 5 are provided, and the plurality of protection plates 5 are detached from the wind shielding box 16, so that the internal pipeline can be maintained.
Referring to fig. 1-3, two straight collecting pipes 15 are provided, and the two straight collecting pipes 15 are arranged in parallel in the building body 1 to collect more water, and the bottom of the cleaning box 13 is provided with a hole for facilitating the collection process.
Referring to fig. 1-3, the second water collecting plate 22 and the baffle 4 are both detachably installed with the filtering tank 2 so as to be cleaned, and a plurality of protrusions are installed on the top of the drainage block 21 to drain water.
The working principle is as follows: firstly, a building main body 1 is constructed and used after being installed, rainwater sundries fall down through a building roof 9 when the building main body is used, the rainwater sundries flow into a water collecting tank 7 in a first water collecting plate 8, flow into the interior of a flow collecting bent pipe 6, are discharged from a water outlet pipe 17 along a flow collecting straight pipe 15 and then enter a filter box 2, the rainwater separates the rainwater from the sundries along a first cleaning plate 14, the rainwater falls above a cleaning box 13 and enters the interior of the filter box 2 through the cleaning box 13, when the sundries on the top of the first cleaning plate 14 are accumulated more, a baffle 4 can be opened to clean the filter box 2, the cleaned water flows into the water collecting box 3 from a valve 10 to be collected, a cover plate can be opened for use, a faucet controls the drainage of the filter box 2, when the flow collecting straight pipe 15 is installed, the flow collecting straight pipe 15 is fixed in a wind blocking box 16, a protection plate 5 is fixed on the outer surface of the wind blocking box 16 through nuts, if the collecting straight pipe 15 is damaged, the corresponding protective plate 5 can be detached for maintenance.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. A green building structure for housing engineering, comprising a building body (1), characterized in that: the building comprises a building body (1), and is characterized in that a first water collecting plate (8) is connected to the top of the building body (1), a water collecting tank (7) is arranged at the top of the first water collecting plate (8), a building top (9) is fixed inside the water collecting tank (7), a collecting elbow (6) is connected to the bottom end of the water collecting tank (7), a wind shielding box (16) is arranged inside the building body (1), a collecting straight pipe (15) is installed inside the wind shielding box (16), a water outlet pipe (17) is connected to the bottom of the collecting straight pipe (15), a protection plate (5) is connected to the outer surface of the wind shielding box (16), a filter box (2) is fixed at the bottom of the building body (1), a baffle plate (4) and a second water collecting plate (22) are respectively connected to the top of the filter box (2), a second cleaning plate (19) is connected to the bottom of the second water collecting plate (22), and filter holes (20) are arranged inside the second, the top of second cleaning plate (19) is connected with drainage piece (21), the inside of rose box (2) is fixed with first cleaning plate (14), the both sides of first cleaning plate (14) are fixed with clearance box (13), one side of rose box (2) is connected with header tank (3) through water pipe (12), the top of header tank (3) is connected with apron (18), the surface mounting of water pipe (12) has valve (10), the top of valve (10) is connected with tap (11).
2. A green building structure for housing engineering according to claim 1, characterized in that: the cleaning boxes (13) are arranged in two, and the two cleaning boxes (13) are distributed on the central axis of the first cleaning plate (14) in a mirror image mode.
3. A green building structure for housing engineering according to claim 1, characterized in that: the protective plate (5) is provided with a plurality of protective plates, and the protective plates (5) and the wind shielding box (16) are detached.
4. A green building structure for housing engineering according to claim 1, characterized in that: the number of the flow collecting straight pipes (15) is two, and the two flow collecting straight pipes (15) are arranged in parallel on the building main body (1).
5. A green building structure for housing engineering according to claim 1, characterized in that: the bottom of the cleaning box (13) is provided with a pore.
6. A green building structure for housing engineering according to claim 1, characterized in that: the second water collecting plate (22) and the baffle (4) are both detached from the filter box (2).
7. A green building structure for housing engineering according to claim 1, characterized in that: the top of the flow guide block (21) is provided with a plurality of protrusions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020015455.1U CN212561860U (en) | 2020-01-06 | 2020-01-06 | A green building structure for housing engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020015455.1U CN212561860U (en) | 2020-01-06 | 2020-01-06 | A green building structure for housing engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212561860U true CN212561860U (en) | 2021-02-19 |
Family
ID=74619164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020015455.1U Expired - Fee Related CN212561860U (en) | 2020-01-06 | 2020-01-06 | A green building structure for housing engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212561860U (en) |
-
2020
- 2020-01-06 CN CN202020015455.1U patent/CN212561860U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210636507U (en) | Novel building rainwater is collected device | |
CN213653723U (en) | Municipal works drainage pipe filter equipment | |
CN213329592U (en) | Building curtain wall with function is collected to rainwater | |
CN212561860U (en) | A green building structure for housing engineering | |
CN219118893U (en) | Photovoltaic plate car canopy | |
CN216196090U (en) | Energy-saving building with rainwater collection system | |
CN216195307U (en) | Car as a house bathroom drainage filter equipment | |
CN215480117U (en) | High-efficient filter core for reverse osmosis system | |
CN213448657U (en) | Rainwater purification and recovery treatment equipment | |
CN211189250U (en) | Pretreatment device for wastewater treatment | |
CN208785938U (en) | A kind of flow instrument filter of Double-drain | |
CN219887098U (en) | Rain sewage drainage pipe network dirt collecting device | |
CN218492607U (en) | Office area roof rainwater and air conditioner condensate water collecting and utilizing system | |
CN217537162U (en) | Building structure for recycling rainwater | |
CN217175166U (en) | Sewage intercepting device reconstructed by combined system | |
CN212215000U (en) | Building engineering construction dust collector | |
CN217027270U (en) | Sponge city rainwater and sewage collecting pool | |
CN213868051U (en) | House rainwater collection device for city planning | |
CN215939277U (en) | Environment-friendly green building with sewage purification function | |
CN215211434U (en) | Prefabricated part of drainage inspection well | |
CN220228719U (en) | Efficient water drainage device | |
CN217988579U (en) | Rainwater collecting and filtering device | |
CN219471376U (en) | Building drainage device | |
CN217925132U (en) | Concrete test block curing room | |
CN218166221U (en) | Novel basket filter for collecting and discharging oil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210219 Termination date: 20220106 |
|
CF01 | Termination of patent right due to non-payment of annual fee |