CN217925132U CN202221573611.1U CN202221573611U CN217925132U CN 217925132 U CN217925132 U CN 217925132U CN 202221573611 U CN202221573611 U CN 202221573611U CN 217925132 U CN217925132 U CN 217925132U
Authority
CN
China
Prior art keywords
test block
curing room
concrete test
casing
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221573611.1U
Other languages
Chinese (zh)
Inventor
张雪侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji Dongdayang Concrete Co ltd
Original Assignee
Baoji Dongdayang Concrete Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Dongdayang Concrete Co ltd filed Critical Baoji Dongdayang Concrete Co ltd
Priority to CN202221573611.1U priority Critical patent/CN217925132U/en
Application granted granted Critical
Publication of CN217925132U publication Critical patent/CN217925132U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Abstract

The utility model discloses a concrete test block curing room, which relates to the technical field of concrete curing and solves the problems that most concrete curing rooms are not provided with rainwater collection devices generally, a large amount of water sources are needed to be used when curing concrete, and the water resources are not beneficial to saving; the top fixed mounting of maintenance room body has the collection casing, collect the casing and set up to the lopsidedness of storage water tank, the inside fixed mounting that the collection casing is close to storage water tank one end has the installation framework, the equal fixed mounting in both sides of installation framework inside has the filter screen, two be provided with the active carbon between the filter screen and purify the layer, collect through communicating pipe intercommunication between casing and the storage water tank. The utility model discloses can collect and utilize the rainwater, when carrying out the maintenance to the concrete test block, be favorable to the water economy resource.

Description

Concrete test block curing room
Technical Field
The utility model belongs to the technical field of the concrete maintenance and specifically relates to a concrete test block curing chamber is related to.
Background
With the continuous development of concrete technology and the use of high-performance concrete and additives, the attention degree of people on the performance of concrete materials is gradually improved, and a plurality of concrete performance test indexes are gradually known. Especially, the strength of concrete is a progressive process, the degree and speed of development of which depend on the hydration state of cement, and the temperature and humidity are important factors influencing the hydration speed and degree of cement. Therefore, after the concrete is formed, the concrete must be maintained at a proper temperature and sufficient humidity for a certain period of time to fully hydrate the cement, which is the curing of the concrete. The proper temperature and humidity are necessary conditions for cement water curing, and the cement hydration reaction can be smoothly carried out only when the humidity of the surrounding environment is proper, so that the strength of concrete is fully developed.
At the realization the utility model discloses in-process, the inventor finds to have following problem in this technique at least, and at present, most of concrete curing rooms generally do not set up the device that the rainwater was collected, when curing the concrete, need use a large amount of water sources, are unfavorable for the saving of water resource. Therefore, a concrete block curing room is now proposed.
SUMMERY OF THE UTILITY MODEL
In order to improve the device that most concrete curing rooms generally do not set up the rainwater and collect, when curing the concrete, need use a large amount of water sources, be unfavorable for the problem of the saving of water resource, the utility model provides a concrete test block curing room.
The utility model provides a concrete test block curing room adopts following technical scheme:
a concrete test block curing room comprises a bottom frame and a curing room body fixedly arranged on the bottom frame, wherein a water storage tank is arranged on one side, located on the curing room body, of the upper surface of the bottom frame;
the top fixed mounting of maintenance room body has the collection casing, collect the casing and set up to the lopsidedness of storage water tank, the inside fixed mounting that the collection casing is close to storage water tank one end has the installation framework, the equal fixed mounting in both sides of installation framework inside has the filter screen, two be provided with the active carbon between the filter screen and purify the layer, collect through communicating pipe intercommunication between casing and the storage water tank.
Through adopting above-mentioned technical scheme, collect the rainwater through collecting the casing, the rainwater of collecting flows into the inside of storage water tank after the filtration of filter screen and the absorption purification on active carbon purification layer, realizes the collection and the utilization to the rainwater to when carrying out the maintenance to the concrete test block, be favorable to the water economy resource.
Optionally, an intercepting net is installed on the top of the collecting shell.
Through adopting above-mentioned technical scheme, the setting of interception net is difficult for making outside great piece debris get into the inside of collecting the casing.
Optionally, the mounting groove has all been seted up to the both sides of collecting the casing, the equal fixedly connected with connecting plate in both sides of interception net, the connecting plate is located the inside of mounting groove, the connecting plate passes through connecting bolt and collects casing fixed connection.
By adopting the technical scheme, the arrangement of the structure facilitates the assembly, disassembly and replacement of the interception net.
Optionally, an overflow pipe is fixedly mounted on one side of the top of the water storage tank.
Through adopting above-mentioned technical scheme, the setting of overflow pipe, when the inside water level of storage water tank reachd the take the altitude, rivers pass through the overflow pipe and discharge.
Optionally, a water level observation window is installed on the front surface of the water storage tank.
Through adopting above-mentioned technical scheme, the setting of water level observation window can conveniently observe the inside water level of storage water tank.
Optionally, the U-shaped pipe is installed at the interior top of curing room body, the sprinkler bead is all installed to the bottom of U-shaped pipe both sides, the top fixed mounting of storage water tank has the water pump, the input fixed mounting of water pump has the inlet tube, the inlet tube is located the inside of storage water tank, communicate through the outlet pipe between the output of water pump and the U-shaped pipe.
Through adopting above-mentioned technical scheme, the water pump is taken the inside water of storage water tank out through the inlet tube, then enters into the inside to the U-shaped pipe through the outlet pipe, finally spouts the surface to the maintenance room body by the sprinkler bead, is favorable to adjusting the temperature on maintenance room body surface.
Optionally, a drainage shell is mounted on the upper surface of the bottom frame, and the drainage shell is fixedly mounted at the bottom of the curing chamber body.
Through adopting above-mentioned technical scheme, the drainage casing can be collected and discharge away the water of sprinkler bead spun, is difficult for making the condition that ponding appears around the chassis.
Optionally, solar cell panels are mounted on two sides of the top of the curing room body.
Through adopting above-mentioned technical scheme, solar cell panel can be with solar energy transformation electric energy storage in the battery to supply the consumer to use, practice thrift the electric energy source.
To sum up, the utility model discloses following beneficial effect has:
1. the utility model collects the rainwater through the collecting shell, and the collected rainwater flows into the water storage tank after being filtered by the filter screen and adsorbed and purified by the activated carbon purification layer, so as to realize the collection and utilization of the rainwater, thereby being beneficial to saving water resources when the concrete test block is maintained;
2. the utility model discloses a water pump is taken the inside water of storage water tank out, then enters into the inside to the U-shaped pipe through the outlet pipe, finally spouts the surface to the curing chamber body by the sprinkler bead, is favorable to adjusting the temperature on curing chamber body surface, and simultaneously, the drainage casing can be collected and is discharged sprinkler bead spun water, is difficult for the condition that the ponding appears around making the chassis.
Drawings
Fig. 1 is a schematic view of the structure of the present invention.
Fig. 2 is a schematic view of the top view structure of the collecting case of the present invention.
Fig. 3 is a schematic view of the top-view cross-sectional structure of the mounting frame body of the present invention.
Description of reference numerals:
1. a chassis; 2. a curing chamber body; 3. a water storage tank; 4. a collection housing; 5. installing a frame body; 6. filtering with a screen; 7. an activated carbon purification layer; 8. an intercepting net; 9. mounting grooves; 10. a connecting plate; 11. a connecting bolt; 12. an overflow pipe; 13. a water level observation window; 14. a U-shaped tube; 15. a sprinkler head; 16. a water pump; 17. a water inlet pipe; 18. a drain housing; 19. a solar panel; 20. a communicating pipe; 21. and (5) discharging a water pipe.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Referring to fig. 1, a concrete test block curing room comprises a bottom frame 1 and a curing room body 2 fixedly installed on the bottom frame 1, wherein a water storage tank 3 is installed on one side, located on the curing room body 2, of the upper surface of the bottom frame 1. An overflow pipe 12 is fixedly installed at one side of the top of the water storage tank 3, and when the water level inside the water storage tank 3 reaches a certain height, the water flow is discharged through the overflow pipe 12 by the arrangement of the overflow pipe 12. The water level observation window 13 is installed on the front of the water storage tank 3, and the water level inside the water storage tank 3 can be conveniently observed due to the arrangement of the water level observation window 13.
Referring to fig. 1, solar cell panels 19 are installed on two sides of the top of the curing room body 2, and the solar cell panels 19 can convert solar energy into electric energy to be stored in a storage battery, so that electric equipment can be used, and electric energy sources are saved.
Referring to fig. 1 and 2, a collection housing 4 is fixedly installed on the top of the curing chamber body 2, and the collection housing 4 can collect rainwater. The interception net 8 is installed at the top of the collecting shell 4, and due to the arrangement of the interception net 8, the large foreign matters outside the collecting shell 4 cannot enter the collecting shell easily. Collecting the both sides of casing 4 and all having seted up mounting groove 9, the equal fixedly connected with connecting plate 10 in both sides of interception net 8, connecting plate 10 are located the inside of mounting groove 9, and connecting plate 10 passes through connecting bolt 11 and collects casing 4 fixed connection, and the setting of this kind of structure is conveniently carried out dismouting and change to interception net 8.
Referring to fig. 1-3, collect casing 4 and set up to the lopsidedness of storage water tank 3, the inside fixed mounting that collects casing 4 and be close to storage water tank 3 one end has installation framework 5, the equal fixed mounting in both sides of installation framework 5 inside has filter screen 6, be provided with activated carbon between two filter screens 6 and purify layer 7, collect through communicating pipe 20 intercommunication between casing 4 and the storage water tank 3, the rainwater of collecting casing 4 collection flows into the inside of storage water tank 3 after the filtration of filter screen 6 and the absorption of activated carbon purification layer 7 purify the back, realize the collection and the utilization of rainwater, thereby when carrying out the maintenance to the concrete test block, be favorable to the water economy resource.
Referring to fig. 1, the U-shaped pipe 14 is installed at the inside top of curing room body 2, sprinkler bead 15 is all installed to the bottom at U-shaped pipe 14 both sides, the top fixed mounting of storage water tank 3 has water pump 16, the input fixed mounting of water pump 16 has inlet tube 17, inlet tube 17 is located the inside of storage water tank 3, communicate through outlet pipe 21 between the output of water pump 16 and the U-shaped pipe 14, water pump 16 takes the inside water of storage water tank 3 out through inlet tube 17, then get into the inside to U-shaped pipe 14 through outlet pipe 21, finally spout the surface to curing room body 2 by sprinkler bead 15, be favorable to adjusting the temperature on curing room body 2 surface.
Referring to fig. 1, a drainage housing 18 is mounted on the upper surface of the bottom frame 1, the drainage housing 18 is a solid shell with a porous structure on the surface and hollow inside, the drainage housing 18 is fixedly mounted at the bottom of the curing chamber body 2, the drainage housing 18 can collect and drain water sprayed by the sprinkler head 15, and the situation that water is accumulated around the bottom frame 1 is not easy to occur.
The utility model discloses an implement the principle and do: collect the rainwater through collecting casing 4, the rainwater of collecting flows into the inside of storage water tank 3 after the filtration of filter screen 6 and the absorption purification of active carbon purification layer 7, the realization is to the collection and the utilization of rainwater, thereby when carrying out the maintenance to the concrete test block, be favorable to the water economy resource, and, water pump 16 takes the inside water of storage water tank 3 out through inlet tube 17, then get into to the inside of U-shaped pipe 14 through outlet pipe 21, finally spout the surface to maintenance room body 2 by sprinkler bead 15, be favorable to adjusting the temperature on maintenance room body 2 surface, and simultaneously, drainage casing 18 can be collected and discharge sprinkler bead 15 spun water, the difficult condition that appears ponding around making chassis 1.
The above is the preferred embodiment of the utility model, not limit according to this the utility model discloses a protection scope, the event: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a concrete test block curing room, includes that chassis (1) and fixed mounting maintain room body (2) on chassis (1), its characterized in that: a water storage tank (3) is arranged on one side, located on the curing room body (2), of the upper surface of the underframe (1);
the top fixed mounting of maintenance room body (2) has collection casing (4), it sets up to the lopsidedness of storage water tank (3) to collect casing (4), the inside fixed mounting that collection casing (4) are close to storage water tank (3) one end has installation framework (5), the equal fixed mounting in both sides of installation framework (5) inside has filter screen (6), two be provided with activated carbon between filter screen (6) and purify layer (7), it communicates through communicating pipe (20) to collect between casing (4) and storage water tank (3).
2. The concrete test block curing room of claim 1, wherein: the top of the collecting shell (4) is provided with an intercepting net (8).
3. The concrete test block curing room of claim 2, wherein: mounting groove (9) have all been seted up to the both sides of collecting casing (4), the equal fixedly connected with connecting plate (10) in both sides of intercepting net (8), connecting plate (10) are located the inside of mounting groove (9), connecting plate (10) are through connecting bolt (11) and collection casing (4) fixed connection.
4. The concrete test block curing room of claim 1, wherein: an overflow pipe (12) is fixedly arranged on one side of the top of the water storage tank (3).
5. The concrete test block curing room of claim 1, wherein: the front surface of the water storage tank (3) is provided with a water level observation window (13).
6. The concrete test block curing room of claim 1, wherein: u-shaped pipe (14) are installed at the interior top of maintenance room body (2), sprinkler bead (15) are all installed to the bottom of U-shaped pipe (14) both sides, the top fixed mounting of storage water tank (3) has water pump (16), the input fixed mounting of water pump (16) has inlet tube (17), inlet tube (17) are located the inside of storage water tank (3), communicate through outlet pipe (21) between the output of water pump (16) and U-shaped pipe (14).
7. The concrete test block curing room of claim 6, wherein: the upper surface of the underframe (1) is provided with a drainage shell (18), and the drainage shell (18) is fixedly arranged at the bottom of the curing room body (2).
8. The concrete test block curing room of claim 1, wherein: and solar panels (19) are mounted on two sides of the top of the curing room body (2).
CN202221573611.1U 2022-06-22 2022-06-22 Concrete test block curing room Active CN217925132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221573611.1U CN217925132U (en) 2022-06-22 2022-06-22 Concrete test block curing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221573611.1U CN217925132U (en) 2022-06-22 2022-06-22 Concrete test block curing room

Publications (1)

Publication Number Publication Date
CN217925132U true CN217925132U (en) 2022-11-29

Family

ID=84183262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221573611.1U Active CN217925132U (en) 2022-06-22 2022-06-22 Concrete test block curing room

Country Status (1)

Country Link
CN (1) CN217925132U (en)

Similar Documents

Publication Publication Date Title
CN211926019U (en) Outdoor wall capable of purifying air
CN213329592U (en) Building curtain wall with function is collected to rainwater
CN217925132U (en) Concrete test block curing room
CN209740846U (en) Rainwater is collected and is used filter equipment convenient to renew cartridge more
CN209900864U (en) Landscape automatic circulation purification reservoir
CN212534290U (en) Green energy-saving building capable of recycling rainwater
CN217299124U (en) Construction rainfall drainage structures
CN219931103U (en) Automatic rainwater collecting device for building energy-saving protection
CN218437857U (en) Building roof eaves mouth waterproof construction
CN220080271U (en) Environment-friendly green building structure
CN218843235U (en) Environment-friendly and energy-saving water saving device for house building
CN213060472U (en) Overflow type drainage structure for green building
CN218597446U (en) Rainwater collection and recycling construction design environment-friendly curtain wall
CN216920522U (en) Whole-plant rainwater recycling system
CN218149310U (en) Energy-saving house building drainage device
CN215211497U (en) But rainwater recycle's green building
CN213266135U (en) Rainwater purification device of building
CN212914701U (en) Water source recycle device that construction was used
CN220434072U (en) Green building rainwater collection and filtration structure
CN217975090U (en) Rainwater collecting device for photovoltaic tiles
CN215855418U (en) Municipal administration low-lying area rainwater is collected, is extracted filtration processing system
CN212561860U (en) A green building structure for housing engineering
CN211499142U (en) Energy-saving building drainage structure
CN218794430U (en) Sponge city drainage structures
CN211735593U (en) Sponge city water storage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant