CN212561126U - Hollow pier is assembled in prefabrication suitable for high earthquake district - Google Patents

Hollow pier is assembled in prefabrication suitable for high earthquake district Download PDF

Info

Publication number
CN212561126U
CN212561126U CN202020318137.2U CN202020318137U CN212561126U CN 212561126 U CN212561126 U CN 212561126U CN 202020318137 U CN202020318137 U CN 202020318137U CN 212561126 U CN212561126 U CN 212561126U
Authority
CN
China
Prior art keywords
section
prestressed
pier
steel strand
coarse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020318137.2U
Other languages
Chinese (zh)
Inventor
孙树礼
苏伟
张帅
杜宝军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
China Railway Design Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp filed Critical China Railway Design Corp
Priority to CN202020318137.2U priority Critical patent/CN212561126U/en
Application granted granted Critical
Publication of CN212561126U publication Critical patent/CN212561126U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a hollow pier is assembled in prefabrication suitable for high earthquake district relates to bridge construction technical field. The foundation comprises a foundation, a bottom section, a middle section and a top section from bottom to top in sequence, wherein the foundation and the bottom section are completed by adopting one-time in-situ concrete pouring; the bottom section, the middle section and the top section are assembled in a prefabricating way; the top of the bottom section is embedded with a thick steel bar anchoring end; the top surface of the bottom section, the top surface and the bottom surface of the middle section and the bottom surface of the top section are all provided with annular shear keys; the top surface of the bottom section is pre-embedded with prestressed thick steel bars; the middle section and the top section are pre-embedded with coarse steel bar channels which are arranged in a penetrating way, prestressed coarse steel bars penetrate through the coarse steel bar channels, and the prestressed coarse steel bars are tensioned and anchored; and after the sections are assembled, penetrating the prestressed steel strand from the top surface of the top section, tensioning the prestressed steel strand through a steel strand tensioning end, wherein the steel strand tensioning end is respectively positioned on the top section and the bottom section. The energy consumption capability and the ductility of the assembled pier are improved.

Description

Hollow pier is assembled in prefabrication suitable for high earthquake district
Technical Field
The utility model relates to a bridge construction technical field especially relates to a hollow pier is assembled in prefabrication suitable for high earthquake district.
Background
At present, in projects such as roads, sea-crossing bridges and the like at home and abroad, when the pier height is high, hollow piers are often adopted, section-by-section templates need to be erected, steel bars are bound and concrete is poured during construction of the hollow piers, the construction procedures are multiple, the speed is low, a prefabrication and assembly method is adopted for construction, sections are prefabricated in a factory and then assembled on site, the advantages of high construction speed and efficiency, construction period saving, labor force saving and the like are achieved, and the requirements of rapid construction and construction are met.
The prefabricated assembled hollow pier is most commonly connected by adopting a prestress method, and all the sections are bonded by adopting epoxy resin glue. The prestressing force usually adopts thick steel bars or steel strands. When the thick steel bars are adopted, the number of the thick steel bars is often required to be more according to the stress requirement due to lower strength of the thick steel bars, so that the construction is inconvenient; the assembled pier is poor in self-resetting capability and large in residual deformation, the structure after an earthquake is large in residual deformation and cannot be repaired, and the assembled pier often has to be dismantled and rebuilt. When the steel strand is adopted, a U-shaped arrangement mode is often adopted, namely, prestress penetrates through the top of a bridge pier and then penetrates out of the top of the bridge pier, the prestress penetration is difficult, the number of the prestress bundles which are arranged in a mutual interference mode is limited, and the connection effect is influenced; and the assembled pier has insufficient energy consumption and low ductility and cannot be applied to high-seismic regions. Meanwhile, the bottom of the assembled pier is stressed greatly and is a plastic hinge area, when the assembled pier is applied to a high-earthquake area, how to ensure the performance of the bottom area becomes a concern point often limits the application of the prestressed connection prefabricated assembled pier in the high-earthquake area.
The information disclosed in this background section is only for enhancement of understanding of the general background of the invention and should not be taken as an acknowledgement or any form of suggestion that this information constitutes prior art already known to a person skilled in the art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hollow pier is assembled in prefabrication suitable for high earthquake district to alleviate the above-mentioned problem that exists among the prior art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a hollow pier is assembled in prefabrication suitable for high earthquake district, by down and go up to include basis, end festival section, middle festival section and top festival section in proper order, still include: the foundation and the bottom segment are finished by adopting one-time cast-in-place concrete; the bottom section, the middle section and the top section are assembled in a prefabricating way; the top of the bottom section is embedded with a thick steel bar anchoring end; the top surface of the bottom section, the top surface and the bottom surface of the middle section and the bottom surface of the top section are all provided with annular shear keys; the top surface of the bottom section is pre-embedded with prestressed thick steel bars; coarse steel bar channels are pre-embedded in the middle section and the top section, prestressed coarse steel bars penetrate through the coarse steel bar channels, and the prestressed coarse steel bars are tensioned and anchored; after the sections are assembled, a prestressed steel strand penetrates through the top surface of the top section, the prestressed steel strand is tensioned through a steel strand tensioning end, and the steel strand tensioning end is located on the top section and the bottom section respectively.
On the basis of the scheme, furthermore, the height of the bottom section is not less than 1-1.5 times of the length of the short side of the pier column, and in addition, dense steel bars are arranged in the bottom section, so that the bottom section and the foundation are integrated.
In addition to any one of the above aspects, the annular shear key has a trapezoidal structure, the bottom width is at least 1/2 of the wall thickness of the pier column, and the height is 1/3-1/2 of the wall thickness of the pier column.
On the basis of any one of the above schemes, further, the annular shear key is arranged along the periphery of the pier wall of the pier, and the shear key steel bars are arranged in the annular shear key.
By combining the two schemes, the upper and lower shear keys have enough lap joint length, and the mutual shear resistance effect is ensured; the annular shear keys are arranged along the periphery of the pier wall, and shear key steel bars are arranged inside the annular shear keys; compare general concrete shear force key and follow the isolated arrangement of mound wall direction, and highly less, the reinforcing bar can't be arranged to inside, for plain concrete structure, cyclic annular shear force key size is great, and inside can lay the reinforcing bar, and the cyclic annular ability of shearing of arranging is stronger, and the die block board is more regular, and it is convenient to make.
It needs to be supplemented that the thick steel bar pipelines and the steel strand pipelines are arranged in a full-length mode, and the pipelines between the segments correspond to one another.
It needs to be supplemented that the prestressed thick steel bars adopt a bonding mode to carry out grouting on the pipeline, so that the cooperative stress between the thick steel bars and the sections is enhanced, and the connection performance is improved.
On the basis of any one of the above schemes, further, the prestressed thick steel bars are anchored in sections, the prestressed thick steel bars are tensioned through thick steel bar tensioning ends, the thick steel bar tensioning ends are located on the top surfaces of the sections, and after the middle section is installed, a part of the thick steel bars can be tensioned and anchored; and lengthening the other part of the thick steel bars, connecting the lengthened thick steel bars through a connector, anchoring after installing an intermediate section until the top section is installed, and tensioning the pier top of the pier. Therefore, the stress of the structure is gradually increased along the bottom section and upwards to the top section, the number of the thick steel bars passing through the sections is gradually increased, the structural arrangement is matched with the stress, and the economy is improved.
It needs to be supplemented that the prestressed steel strand adopts an unbonded mode, the pipeline is not subjected to grouting, self-resetting capability is provided for the assembly pier through the steel strand, residual deformation is reduced, and the post-earthquake restoration capability is improved.
On the basis of any above-mentioned scheme, it is further, steel strand wires stretch-draw end is provided with stretch-draw end anchor groove, set up the protective cover on the stretch-draw end anchor groove, the protective cover passes through the bolt and links to each other with each festival section, makes things convenient for the dismouting, and the operation process can be inspected the prestressing force steel strand wires to can change as required, be applicable to the condition that the prestressing force steel strand wires need not be changed greatly when shaking back structural loss.
On the basis of any one of the above schemes, further, a tensioning end anchor groove is reserved during bottom section cast-in-place construction, the prestressed steel strand below is anchored in the tensioning end anchor groove, two-end tensioning is adopted, the tensioning end anchor groove of the bottom section is located at the pier bottom part, tensioning is convenient, the stretching is convenient, the penetrating is convenient, the arrangement is flexible, and the defect of arrangement of U-shaped prestressed tendons is avoided.
On the basis of any one of the above schemes, further, the prestressed thick steel bars and the prestressed steel strands are respectively arranged on the inner side and the outer side of the pier wall of the pier, and compared with the traditional arrangement in the middle of the pier wall, the connecting effect of the whole section is favorably ensured.
On the basis of any one of the above schemes, further, the prestressed steel strand adopts an unbonded steel strand, no grouting is performed in the anchor groove at the tensioning end, and the prestressed steel strand can be replaced.
The utility model has the advantages that:
the utility model provides a hollow pier is assembled in prefabrication suitable for high earthquake district can obtain following effect:
1. the prestressed coarse steel bars and the prestressed steel strands are connected together, so that the energy consumption capability and ductility of the assembled pier are improved, the self-resetting capability is realized, and the residual deformation is small; the prestressed coarse steel bars and the prestressed steel strands are convenient to construct, flexible in arrangement and small in mutual interference, multiple groups can be arranged, the stress requirement is met, and the prestressed coarse steel bars and the prestressed steel strands can be applied to high-intensity seismic areas;
2. the stress of the plastic hinge area at the bottom of the assembled pier is enhanced by integrally pouring the bottom section and the foundation at one time, and the stress requirement of a high-vibration area is met;
3. the annular shear keys are arranged among the segments, and the segments are of a reinforced concrete structure and have strong shear resistance;
4. the anchor groove at the tensioning end of the prestressed steel strand is not poured with anchor sealing concrete, the protective cover is arranged on the anchor groove and is connected through bolts, so that the anchor groove is convenient to disassemble and assemble, the prestressed steel strand is convenient to check in the operation process and can be replaced according to needs, and the anchor groove is suitable for the condition that the prestressed steel strand needs to be replaced when the structural loss is small after an earthquake;
5. the prestressed thick steel bars are anchored in sections, and joints can be pre-pressed in the construction process and the stability of the sections is ensured; along bottom section upwards to top section, the structure atress crescent, the thick reinforcing bar quantity that passes through in the section increases gradually, and the structure is arranged and is forced the phase-match, has improved economic nature.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic view of a vertical structure of a prefabricated assembled hollow pier suitable for a high-earthquake area provided by the embodiment of the utility model;
fig. 2 is a schematic plane structure diagram of a prefabricated assembled hollow pier suitable for a high-earthquake area provided by the embodiment of the utility model;
fig. 3 is a schematic view of a bottom section elevation structure of a prefabricated assembled hollow pier suitable for a high-earthquake region provided by the embodiment of the utility model;
fig. 4 is a schematic diagram of assembling a middle section of a prefabricated assembled hollow pier suitable for a high-earthquake area, provided by the embodiment of the utility model;
fig. 5 is a schematic cross-sectional view taken along line I-I in fig. 4 according to an embodiment of the present invention;
fig. 6 is a schematic view of assembling a middle section and a top section of a prefabricated hollow pier suitable for a high-earthquake area provided by the embodiment of the utility model;
fig. 7 is a schematic cross-sectional view at II-II in fig. 6 according to an embodiment of the present invention.
Icon:
1-a base;
2-a bottom segment;
3-an intermediate section;
4-top segment;
5-splicing seams;
6-annular shear key;
61-shear bond reinforcement;
7-prestressed coarse steel bars;
71-a coarse steel bar pipeline;
72-a connector;
73-the thick steel bar stretching end;
74-thick steel bar anchoring end;
8-prestressed steel strands;
81-steel strand pipe;
82-steel strand tensioning end;
9-pressing slurry;
10-tensioning end anchor grooves;
11-protective cover.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Examples
As shown in fig. 1-7, for the embodiment of the present invention provides a schematic structural diagram of a prefabricated assembled hollow pier suitable for a high-earthquake area, the hollow pier of the present invention is explained with reference to the accompanying drawings, and the concrete structure and steps are as follows.
The embodiment of the utility model provides a hollow pier is assembled in prefabrication that provides and be applicable to high earthquake district, as shown in fig. 1-7, by down and on in proper order including basis 1, end festival section 2, middle section 3 and top section 4, still include: the foundation 1 and the bottom section 2 are completed by adopting one-time in-situ concrete pouring; the bottom section 2, the middle section 3 and the top section 4 are assembled in a prefabricating way; the top of the bottom section 2 is embedded with a thick steel bar anchoring end 74; the top surface of the bottom section 2, the top surface and the bottom surface of the middle section 3 and the bottom surface of the top section 4 are all provided with annular shear keys 6; the top surface of the bottom section 2 is pre-embedded with prestressed thick steel bars 7; coarse steel bar channels are pre-embedded in the middle section 3 and the top section 4, prestressed coarse steel bars 7 penetrate through the coarse steel bar channels, and the prestressed coarse steel bars 7 are tensioned and anchored; after the segments are assembled, the prestressed steel strand 8 penetrates from the top surface of the top segment, the prestressed steel strand 8 is tensioned through the steel strand tensioning end 82, and the steel strand tensioning end 82 is located on the top segment 4 and the bottom segment 2 respectively.
The alternative of this embodiment is, the height of end section 2 is not less than 1 ~ 1.5 times pier stud minor face length, in addition, arranges denser reinforcing bar in end section inside, makes end section and basis form wholly.
The annular shear key 6 is of a trapezoidal structure, the bottom width is at least 1/2 of the wall thickness of the pier column, and the height is 1/3-1/2 of the wall thickness of the pier column.
The alternative of this embodiment is that annular shear key 6 is arranged along pier wall periphery, and shear key reinforcing bars 61 are arranged inside annular shear key 6.
By combining the two schemes, the upper and lower shear keys have enough lap joint length, and the mutual shear resistance effect is ensured; the annular shear keys are arranged along the periphery of the pier wall, and shear key steel bars are arranged inside the annular shear keys; compare general concrete shear force key and follow the isolated arrangement of mound wall direction, and highly less, the reinforcing bar can't be arranged to inside, for plain concrete structure, cyclic annular shear force key size is great, and inside can lay the reinforcing bar, and the cyclic annular ability of shearing of arranging is stronger, and the die block board is more regular, and it is convenient to make.
It needs to be supplemented that the thick steel bar pipelines and the steel strand pipelines are arranged in a full-length mode, and the pipelines between the segments correspond to one another.
It needs to be supplemented that the prestressed thick steel bars adopt a bonding mode to carry out grouting on the pipeline, so that the cooperative stress between the thick steel bars and the sections is enhanced, and the connection performance is improved.
The alternative scheme of this embodiment is that the prestressed thick steel bar 7 is anchored in segments, the prestressed thick steel bar 7 is tensioned through the thick steel bar tensioning end 73, the thick steel bar tensioning end 73 is located on the top surface of each segment, and after the middle segment 3 is installed, a part of the thick steel bar can be tensioned and anchored; and lengthening the other part of the thick steel bars, connecting the lengthened thick steel bars through a connector 72, anchoring after installing a middle section 3 until the top section 4 is installed, and tensioning on the pier top of the pier. Therefore, the stress of the structure is gradually increased along the bottom section and upwards to the top section, the number of the thick steel bars passing through the sections is gradually increased, the structural arrangement is matched with the stress, and the economy is improved.
The prestressed steel strand is in an unbonded mode, the pipeline is not subjected to grouting, self-resetting capability is provided for the assembled pier through the steel strand, residual deformation is reduced, and the post-earthquake restoration capability is improved.
The alternative of this embodiment does, and steel strand wires stretch-draw end 82 is provided with stretch-draw end anchor groove 10, sets up protective cover 11 on the stretch-draw end anchor groove 10, and protective cover 11 passes through the bolt and links to each other with each segment section, makes things convenient for the dismouting, and the operation process can be inspected the prestressing force steel strand wires to can change as required, be applicable to when the condition that the not very big prestressing force steel strand wires of change of shake back structural loss.
The alternative of this embodiment is that, the reservation has tensioning end anchor socket 10 during the cast-in-place construction of bottom subsection 2, and 8 below anchor in tensioning end anchor socket 10 of prestressing force stranded conductor adopt both ends stretch-draw, and the tensioning end anchor socket of bottom subsection is located pier bottom position, and the stretch-draw of being convenient for, and wear to restraint conveniently, arrange in a flexible way, avoid the shortcoming that U type prestressing tendons arranged.
The alternative of this embodiment does, and prestressing force thick steel bar 7 and prestressing force steel strand wires 8 set up respectively in the inside and outside of pier mound wall, compare the tradition and arrange in the middle of the mound wall, are favorable to guaranteeing whole sectional linkage effect.
The alternative of this embodiment is that, prestressed steel strand 8 adopts the unbonded steel strand, and the tensioning end anchor groove 10 is interior not to be grouted, and prestressed steel strand 8 can be changed.
The concrete structure of the hollow pier provided by the embodiment is further explained by combining the construction method of the prefabricated assembled hollow pier suitable for the high-earthquake area as follows:
the hollow pier that this embodiment provided includes basis 1, bottom segment 2, middle segment 3 and top segment 4 by down in proper order on and, includes the following step:
firstly, constructing a foundation 1 and a bottom section 2, integrally pouring concrete once, and prefabricating a middle section 3 and a top section 4 to be assembled;
secondly, hoisting the middle section 3, smearing splicing seams 5 of epoxy resin glue on the top surface of the bottom section 2, lengthening the prestressed coarse steel bars 7 pre-embedded in the bottom section 2 through a connector 72, penetrating into a coarse steel bar pipeline 71 of the middle section 3, tensioning a part of the prestressed coarse steel bars 7, and injecting grouting material of the part of the coarse steel bar pipeline 71;
hoisting the next middle section 3, coating a splicing seam 5 of epoxy resin adhesive on the top surface of the previous middle section 3, lengthening the prestressed coarse steel bars 7 pre-embedded in the previous middle section 3 through a connector 72, penetrating into a coarse steel bar pipeline 71 of the next middle section 3, tensioning the other part of the prestressed coarse steel bars 7, and injecting grouting material for the part of the coarse steel bar pipeline 71;
step four, sequentially installing the middle sections 3 in the same manner as the step three;
fifthly, hoisting the top section 4, smearing splicing seams 5 of epoxy resin glue on the top surface of the middle section 3, lengthening the prestressed thick steel bars 7 pre-embedded in the middle section 3 through a connector 72, penetrating into the thick steel bar pipeline 71 of the top section 4, tensioning the residual prestressed thick steel bars 7, and injecting pressure slurry 9 into the residual thick steel bar pipeline 71;
step six, sequentially penetrating prestressed steel strands 8 into the steel strand pipelines 81 of the bottom section 2, the middle section 3 and the top section 4 from the top, tensioning two ends of a top steel strand tensioning end 82 and a bottom steel strand tensioning end 82, and anchoring;
and seventhly, mounting a protective cover 11 at the position of the anchor groove 10 at the tensioning end, and finishing construction.
The embodiment of the utility model provides a hollow pier is assembled in prefabrication suitable for high earthquake district can obtain following effect:
1. the prestressed thick steel bars 7 and the prestressed steel strands 8 are connected together, so that the energy consumption capacity and ductility of the assembled pier are improved, the self-resetting capacity is realized, and the residual deformation is small; the prestressed coarse steel bars 7 and the prestressed steel strands 8 are convenient to construct, flexible in arrangement and small in mutual interference, multiple groups can be arranged, the stress requirement is met, and the prestressed coarse steel bars and the prestressed steel strands can be applied to high-intensity seismic areas;
2. the bottom section 2 and the foundation 1 are integrally cast at one time, so that the stress of a plastic hinge area at the bottom of the assembled pier is enhanced, and the stress requirement of a high-vibration area is met;
3. the annular shear keys 6 are arranged among the segments, and the segments are strong in shearing resistance by adopting a reinforced concrete structure;
4. the prestressed steel strand tensioning end anchor groove 10 is not poured with anchor sealing concrete, the tensioning end anchor groove 10 is provided with the protective cover 11, the protective cover 11 is connected through bolts, so that the assembly and disassembly are convenient, the operation process is convenient for inspecting the prestressed steel strand 8, the prestressed steel strand 8 can be replaced according to needs, and the prestressed steel strand tensioning end anchor groove is suitable for the situation that the prestressed steel strand 8 needs to be replaced when the structural loss is not large after an earthquake;
5. the prestressed thick steel bar 7 is anchored in sections, and joints can be pre-pressed in the construction process and the stability of the sections is ensured; along bottom section 2 upwards to top section 4, the structure atress crescent, the thick reinforcing bar quantity that passes through in the section increases gradually, and the structure is arranged and is forced the phase-match, has improved economic nature.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the embodiments of the present invention.

Claims (9)

1. The utility model provides a hollow pier is assembled in prefabrication suitable for high earthquake district, by down and on in proper order including basis (1), bottom segment (2), middle segment (3) and top segment (4), its characterized in that still includes:
the foundation (1) and the bottom section (2) are completed by adopting one-time cast-in-place concrete;
the bottom section (2), the middle section (3) and the top section (4) are assembled in a prefabricating way;
the top of the bottom section (2) is embedded with a thick steel bar anchoring end (74);
the top surface of the bottom section (2), the top surface and the bottom surface of the middle section (3) and the bottom surface of the top section (4) are all provided with annular shear keys (6);
the top surface of the bottom section (2) is pre-embedded with prestressed thick steel bars (7);
coarse steel bar channels which are arranged in a penetrating mode are pre-embedded in the middle section (3) and the top section (4), prestressed coarse steel bars (7) penetrate through the coarse steel bar channels, and the prestressed coarse steel bars (7) are tensioned and anchored;
after the sections are assembled, a prestressed steel strand (8) penetrates from the top surface of the top section, the prestressed steel strand (8) is tensioned through a steel strand tensioning end (82), and the steel strand tensioning end (82) is located on the top section (4) and the bottom section (2) respectively.
2. The prefabricated assembled hollow pier suitable for high-earthquake areas as claimed in claim 1, wherein the height of the bottom section (2) is not less than 1-1.5 times of the length of the short side of the pier column.
3. The prefabricated assembled hollow pier suitable for the high-earthquake-region as claimed in claim 1, wherein the annular shear key (6) is of a trapezoidal structure, the bottom width is at least 1/2 of the wall thickness of the pier column, and the height is 1/3-1/2 of the wall thickness of the pier column.
4. The prefabricated assembled hollow pier suitable for the high-earthquake-region as claimed in claim 3, wherein the annular shear keys (6) are arranged along the periphery of the pier wall, and shear key steel bars (61) are arranged inside the annular shear keys (6).
5. The prefabricated assembled hollow pier suitable for high-earthquake areas as claimed in claim 1, wherein the prestressed coarse steel bars (7) are anchored in sections, the prestressed coarse steel bars (7) are tensioned through coarse steel bar tensioning ends (73), the coarse steel bar tensioning ends (73) are located on the top surfaces of the sections, and after the middle section (3) is installed, a part of the coarse steel bars can be tensioned and anchored; and lengthening the other part of the thick steel bars, connecting the lengthened thick steel bars through a connector (72), anchoring after installing an intermediate segment (3) until the top segment (4) is installed, and tensioning at the pier top of the pier.
6. The precast assembled hollow pier applicable to high-earthquake areas as claimed in claim 1, wherein the steel strand tension ends (82) are provided with tension end anchor grooves (10), the tension end anchor grooves (10) are provided with protecting covers (11), and the protecting covers (11) are connected with the segments through bolts.
7. The precast assembled hollow pier applicable to high-earthquake areas as claimed in claim 1, wherein a tensioning end anchor groove (10) is reserved in the cast-in-place construction of the bottom section (2), and the lower part of the prestressed steel strand (8) is anchored in the tensioning end anchor groove (10).
8. The prefabricated assembled hollow pier suitable for the high-earthquake-region as claimed in claim 1, wherein the prestressed reinforcement bars (7) and the prestressed steel strands (8) are respectively arranged on the inner side and the outer side of the pier wall.
9. The prefabricated assembled hollow pier suitable for the high-earthquake-region as claimed in claim 6, wherein the prestressed steel strand (8) is an unbonded steel strand, no grouting is performed in the tensioning end anchor groove (10), and the prestressed steel strand (8) can be replaced.
CN202020318137.2U 2020-03-14 2020-03-14 Hollow pier is assembled in prefabrication suitable for high earthquake district Active CN212561126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020318137.2U CN212561126U (en) 2020-03-14 2020-03-14 Hollow pier is assembled in prefabrication suitable for high earthquake district

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020318137.2U CN212561126U (en) 2020-03-14 2020-03-14 Hollow pier is assembled in prefabrication suitable for high earthquake district

Publications (1)

Publication Number Publication Date
CN212561126U true CN212561126U (en) 2021-02-19

Family

ID=74619649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020318137.2U Active CN212561126U (en) 2020-03-14 2020-03-14 Hollow pier is assembled in prefabrication suitable for high earthquake district

Country Status (1)

Country Link
CN (1) CN212561126U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113106852A (en) * 2021-05-14 2021-07-13 上海市政工程设计研究总院(集团)有限公司 Light modularized prefabricated assembled pier structure
CN113356037A (en) * 2021-05-31 2021-09-07 郑州大学 Cast-in-place UHPC-NC combination formula antidetonation pier in outer assembly
CN114541252A (en) * 2022-04-07 2022-05-27 安徽省交通规划设计研究总院股份有限公司 Segment prestress assembled pier with core column and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113106852A (en) * 2021-05-14 2021-07-13 上海市政工程设计研究总院(集团)有限公司 Light modularized prefabricated assembled pier structure
CN113356037A (en) * 2021-05-31 2021-09-07 郑州大学 Cast-in-place UHPC-NC combination formula antidetonation pier in outer assembly
CN114541252A (en) * 2022-04-07 2022-05-27 安徽省交通规划设计研究总院股份有限公司 Segment prestress assembled pier with core column and construction method

Similar Documents

Publication Publication Date Title
CN107165272B (en) Prestressed assembled concrete frame node connecting structure and construction method thereof
CN212561126U (en) Hollow pier is assembled in prefabrication suitable for high earthquake district
CN109736479B (en) Assembly type shear wall joint structure and splicing method thereof
CN105735469B (en) A kind of part adhesive precast prestressed concrete frame structure
KR101325245B1 (en) Bridge Post which is assembled by precasted units
CN103711330A (en) Method for using prefabricated reinforced concrete frame to reinforce existing structure through prestressing assembly
CN111827092A (en) Prefabricated assembled hollow pier suitable for being provided with diaphragm plate and construction method
CN211113140U (en) Equal cast-in-place assembly type hollow pier system
KR100727114B1 (en) Precast segment for constructing through bridges and the constructing method using it
CN111877140A (en) Connecting structure for segment prefabricated assembled pier combination and construction method
CN111827095B (en) Prefabricated assembled hollow pier with built-in rib plates and construction method
CN212582714U (en) Fully-assembled prefabricated raft foundation
CN111827091A (en) Prefabricated assembled hollow pier connected through prestress and construction method
CN113202016A (en) Prefabricated assembled hollow pier suitable for high-earthquake area and construction method
CN212103636U (en) Hollow pier is assembled in prefabrication based on UHPC seam
CN212103640U (en) Steel bar sleeve connecting structure and segment prefabricated assembly type pier adopting same
CN111851564A (en) Spliced bearing platform plate structure connected with pile foundation and construction method
CN212561130U (en) Prefabricated assembled hollow pier connected through prestress
CN212801617U (en) Assembled bearing platform plate structure connected with pile foundation
CN212103638U (en) A connection structure that is used for prefabricated pin-connected panel pier combination of segment
CN210887572U (en) Mixed reinforcement embedded low-prestress dry beam-column joint
CN204590336U (en) A kind of overlapped shear wall based on half prefabricated ultra-tough steel concrete
CN112049026A (en) Prefabricated beam section, high early strength UHPC wet joint and long-span beam bridge suspension splicing construction method thereof
CN111827094A (en) Cluster grouting corrugated pipe assembling pier connected with prefabricated bearing platform and construction method
CN112942619A (en) Wallboard in assembled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant