CN212530445U - Workpiece storage bin unit - Google Patents

Workpiece storage bin unit Download PDF

Info

Publication number
CN212530445U
CN212530445U CN202020868183.XU CN202020868183U CN212530445U CN 212530445 U CN212530445 U CN 212530445U CN 202020868183 U CN202020868183 U CN 202020868183U CN 212530445 U CN212530445 U CN 212530445U
Authority
CN
China
Prior art keywords
workpiece
bin unit
chute
work piece
workpiece placing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020868183.XU
Other languages
Chinese (zh)
Inventor
陈富乳
金超超
周开祥
杨君飞
黄钱波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Welllih Robot Technology Co ltd
Original Assignee
Ningbo Welllih Robot Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Welllih Robot Technology Co ltd filed Critical Ningbo Welllih Robot Technology Co ltd
Priority to CN202020868183.XU priority Critical patent/CN212530445U/en
Application granted granted Critical
Publication of CN212530445U publication Critical patent/CN212530445U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Press Drives And Press Lines (AREA)

Abstract

The utility model discloses a work piece feed bin unit, including the frame, be provided with a plurality of bottom plate in the frame, be connected with the detachable work piece on the bottom plate and place the board, the work piece is placed and is provided with a plurality of work piece locating hole on the board, and the work piece is placed and is linked to each other through dismantling coupling mechanism between board and the bottom plate. The utility model discloses when using, once can place a large amount of work pieces of treating processing, the time greatly increased of processing can last, and the workman need not frequently to supply the work piece, and it is comparatively convenient to use.

Description

Workpiece storage bin unit
Technical Field
The utility model relates to a machining equipment technical field, in particular to work piece feed bin unit.
Background
In the field of machining, with advances in technology, robotic feeding has begun to gradually replace manual feeding. In the actual operation process, the worker needs to put the workpiece to be machined into a special tray in advance, then puts the tray near the manipulator, the manipulator can automatically clamp the workpiece, the workpiece is put into machining equipment for machining, and after machining is completed, the manipulator can automatically take out the machined workpiece and transport the workpiece away by other devices. After the workpieces on the tray are completely processed, workers need to replenish the next batch of workpieces to be processed to the tray in time, and then the workpieces can be continuously processed. Because the quantity of the workpieces which can be placed on the tray at one time is less, the continuous processing time after the tray is filled is shorter, so that workers need to frequently supplement the workpieces to the tray, and the use is inconvenient.
Disclosure of Invention
The utility model aims at solving in current machining process, because the work piece quantity that the tray once can place is less, the time that can last processing after the tray is filled with is shorter, leads to the workman to need frequently to supply the work piece to the tray, uses comparatively inconvenient problem, can effectively solve above-mentioned problem.
The utility model aims at realizing through the following technical scheme: the utility model provides a work piece feed bin unit, includes the frame, is provided with a plurality of bottom plate in the frame, is connected with the detachable work piece on the bottom plate and places the board, and the work piece is placed and is provided with a plurality of work piece locating hole on the board, and the work piece is placed and is linked to each other through dismantling coupling mechanism between board and the bottom plate.
The utility model discloses use with the cooperation of material loading manipulator. The workpiece to be processed is inserted into the workpiece positioning hole, the rack is provided with a plurality of workpiece placing plates, and thus a large number of workpieces can be placed in one workpiece bin unit. A plurality of work piece feed bin units can be used in combination, can form a large-scale work piece through the combination of a plurality of work piece feed bin units and place the feed bin, can once place a large amount of work pieces of treating processing, and the work piece is placed the feed bin and is being filled the back, and the time greatly increased that can continuously process, the workman need not frequently to supply the work piece, and it is comparatively convenient to use. The workpiece placing plate is connected with the bottom plate through the detachable connecting mechanism, the workpiece placing plate can be detached and replaced, and the workpiece placing plates with different specifications can be replaced according to the types of workpieces.
Preferably, the detachable connecting mechanism comprises a first jack arranged on the workpiece placing plate, a second jack arranged on the bottom plate and corresponding to the first jack, and a connecting piece, wherein the connecting piece comprises a connecting column, one end of the connecting column is provided with a pressing plate, and the pressing plate is provided with a screwing handle; the inner wall of the second jack is provided with a boss, the side face of the connecting column is provided with a chute, and the side face of the connecting column is also provided with an inlet groove which is connected with the chute and is used for leading the boss to enter the chute. When the workpiece placing plate is installed, the workpiece placing plate is placed on the bottom plate, the first insertion hole is aligned to the second insertion hole in the bottom plate, then the connecting column on the connecting piece is inserted into the first insertion hole and the second insertion hole, the boss reaches one end of the chute along the entering groove in the inserting process, then the handle is screwed in a rotating mode, the connecting column rotates for a certain angle, the boss slides in the chute in the rotating process, the connecting column moves downwards simultaneously in the rotating process under the action of the chute, the pressing plate presses the workpiece placing plate tightly, and finally the workpiece placing plate is tightly connected to the bottom plate; when the workpiece placing plate is disassembled, the handle is screwed only by reverse rotation, and then the connecting piece is pulled out, so that the workpiece placing plate can be taken down from the bottom plate.
Preferably, the climbing angle of the chute is 15-20 degrees.
Preferably, the inlet groove is arranged along the axial direction of the connecting column, and one end of the inlet groove, which is far away from the inclined groove, is in a bell mouth shape. The end of the inlet groove far away from the chute is in a horn mouth shape, so that the boss can conveniently enter.
Preferably, a baffle is arranged on one side of the frame.
Preferably, the baffle is provided with an observation window.
Preferably, the bottom plates are arranged in a vertical direction.
The utility model has the advantages that: the utility model discloses when using, once can place a large amount of work pieces of treating processing, the time greatly increased of processing can last, and the workman need not frequently to supply the work piece, and it is comparatively convenient to use.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an enlarged view of a portion a in fig. 1.
Fig. 3 is a sectional view of the workpiece placing plate when it is attached to the base plate.
Fig. 4 is an enlarged view of a portion B in fig. 3.
Fig. 5 is a schematic structural view of the connector.
In the figure: 1. frame, 2, bottom plate, 3, the board is placed to the work piece, 4, baffle, 5, observation window, 6, work piece locating hole, 7, connecting piece, 8, twist the handle, 9, clamp plate, 10, spliced pole, 11, boss, 12, get into the groove, 13, chute.
Detailed Description
The invention will be further described with reference to the following detailed description and accompanying drawings.
Example 1:
as shown in fig. 1 to 5, a workpiece bin unit includes a frame 1, a plurality of bottom plates 2 are disposed on the frame 1, and the bottom plates 2 are horizontally disposed. The bottom plate 2 is fixed on the frame 1 through bolts. The bottom plates 2 are arranged in a vertical direction. The bottom plate 2 is connected with a detachable workpiece placing plate 3, and a plurality of workpiece positioning holes 6 are formed in the workpiece placing plate 3. The workpiece placing plate 3 is connected with the bottom plate 2 through a detachable connecting mechanism. A baffle 4 is arranged on one side of the frame 1, and an observation window 5 is arranged on the baffle 4. The observation window 5 is made of acryl.
The detachable connecting mechanism comprises a first jack arranged on the workpiece placing plate 3, a second jack arranged on the bottom plate 2 and corresponding to the first jack, and a connecting piece 7, wherein the connecting piece 7 comprises a connecting column 10, a pressing plate 9 is arranged at one end of the connecting column 10, the pressing plate 9 is of a circular plate-shaped structure, and the diameter of the pressing plate 9 is larger than that of the first jack. The pressing plate 9 is provided with a twisting handle 8. The inner wall of the second jack is provided with a boss 11, and the cross section of the boss 11 is circular. The side of the connecting column 10 is provided with a chute 13, and the side of the connecting column 10 is further provided with an inlet groove 12 connected with the chute and used for leading the boss 11 to enter the chute 13. The climbing angle of the chute 13 is 15-20 degrees. One end of the entering groove 12 is connected with one end of the chute 13, the entering groove 12 is arranged along the axial direction of the connecting column 10, and one end of the entering groove 12 far away from the chute 13 is in a bell mouth shape. When the workpiece placing plate is installed, the workpiece placing plate is placed on the bottom plate, the first insertion hole is aligned to the second insertion hole in the bottom plate, then the connecting column on the connecting piece is inserted into the first insertion hole and the second insertion hole, the boss reaches one end of the chute along the entering groove in the inserting process, then the handle is screwed in a rotating mode, the connecting column rotates for a certain angle, the boss slides in the chute in the rotating process, the connecting column moves downwards simultaneously in the rotating process under the action of the chute, the pressing plate presses the workpiece placing plate tightly, and finally the workpiece placing plate is tightly connected to the bottom plate; when the workpiece placing plate is disassembled, the handle is screwed only by reverse rotation, and then the connecting piece is pulled out, so that the workpiece placing plate can be taken down from the bottom plate.
The utility model discloses use with the cooperation of material loading manipulator. The workpiece to be processed is inserted into the workpiece positioning hole, the rack is provided with a plurality of workpiece placing plates, and thus a large number of workpieces can be placed in one workpiece bin unit. A plurality of work piece feed bin units can be used in combination, can form a large-scale work piece through the combination of a plurality of work piece feed bin units and place the feed bin, can once place a large amount of work pieces of treating processing, and the work piece is placed the feed bin and is being filled the back, and the time greatly increased that can continuously process, the workman need not frequently to supply the work piece, and it is comparatively convenient to use. The workpiece placing plate is connected with the bottom plate through the detachable connecting mechanism, the workpiece placing plate can be detached and replaced, and the workpiece placing plates with different specifications can be replaced according to the types of workpieces.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the principles of the present invention.

Claims (7)

1. A work piece feed bin unit which characterized in that: the workpiece placing device comprises a rack, wherein a plurality of bottom plates are arranged on the rack, detachable workpiece placing plates are connected onto the bottom plates, a plurality of workpiece positioning holes are formed in the workpiece placing plates, and the workpiece placing plates are connected with the bottom plates through detachable connecting mechanisms.
2. The workpiece storage bin unit as claimed in claim 1, wherein the detachable connection mechanism comprises a first jack arranged on the workpiece placing plate, a second jack arranged on the bottom plate and corresponding to the first jack, and a connection piece, wherein the connection piece comprises a connection column, one end of the connection column is provided with a pressing plate, and the pressing plate is provided with a screwing handle; the inner wall of the second jack is provided with a boss, the side face of the connecting column is provided with a chute, and the side face of the connecting column is also provided with an inlet groove which is connected with the chute and is used for leading the boss to enter the chute.
3. The workpiece storage bin unit as claimed in claim 2, wherein the climbing angle of the chute is 15-20 degrees.
4. The workpiece storage bin unit of claim 2, wherein the inlet slot is arranged along the axial direction of the connecting column, and the end of the inlet slot, which is far away from the chute, is in a bell mouth shape.
5. The workpiece bin unit of claim 1, wherein a baffle is disposed on one side of the frame.
6. The workpiece bin unit of claim 5, wherein the baffle is provided with a viewing window.
7. The workpiece bin unit of claim 1, wherein the floor is vertically aligned.
CN202020868183.XU 2020-05-21 2020-05-21 Workpiece storage bin unit Active CN212530445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020868183.XU CN212530445U (en) 2020-05-21 2020-05-21 Workpiece storage bin unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020868183.XU CN212530445U (en) 2020-05-21 2020-05-21 Workpiece storage bin unit

Publications (1)

Publication Number Publication Date
CN212530445U true CN212530445U (en) 2021-02-12

Family

ID=74541212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020868183.XU Active CN212530445U (en) 2020-05-21 2020-05-21 Workpiece storage bin unit

Country Status (1)

Country Link
CN (1) CN212530445U (en)

Similar Documents

Publication Publication Date Title
CN209698584U (en) Bar depth drill automatic charging & discharging machine
CN105127453A (en) Bar machine tool with automatic feeding function and machining method
CN109048334B (en) Needle assembly equipment for animals
CN212530445U (en) Workpiece storage bin unit
CN115194269A (en) Automatic vertical tapping machine of material loading
CN214358763U (en) Screw conveying distributor
CN212531314U (en) Workpiece storage bin assembly
CN210968495U (en) Sand blasting unit is used in auto-parts production
CN207119868U (en) A kind of automatic tapping machine
CN207746595U (en) A kind of welding robot
CN213794641U (en) Tapping equipment is used in nut production
CN212639055U (en) Stock bin assembly
CN212371923U (en) Automatic feeding and discharging mechanism for grinding machine
CN215029581U (en) Convenient grinding bead loader
CN214978155U (en) Copper pipe cutting device
CN212607917U (en) Go up feed bin
CN212192065U (en) Drilling and tapping integrated machine
CN213857463U (en) Gear hobbing machine for gear machining
CN204934397U (en) Iron plate automatic charging machine
CN207239339U (en) A kind of tapping machine base
CN208078105U (en) A kind of battery material conveying equipment for battery production
CN212530970U (en) Workpiece feeding carrier
CN112238352A (en) Automatic face milling and drilling equipment for machining
CN216971120U (en) Automatic unloader of head abnormal shape screw tooth that grinds
CN206028795U (en) Eye nail drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A workpiece bin unit

Effective date of registration: 20220211

Granted publication date: 20210212

Pledgee: China Co. truction Bank Corp Yuyao branch

Pledgor: NINGBO WELLLIH ROBOT TECHNOLOGY CO.,LTD.

Registration number: Y2022330000201