CN212521141U - Drawing device for budget of constructional engineering - Google Patents

Drawing device for budget of constructional engineering Download PDF

Info

Publication number
CN212521141U
CN212521141U CN202020327783.5U CN202020327783U CN212521141U CN 212521141 U CN212521141 U CN 212521141U CN 202020327783 U CN202020327783 U CN 202020327783U CN 212521141 U CN212521141 U CN 212521141U
Authority
CN
China
Prior art keywords
connecting rod
drawing board
lifting
subassembly
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020327783.5U
Other languages
Chinese (zh)
Inventor
王培新
杨俊�
唐建
张建伟
谢庆荣
罗双杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huihong Construction Group Co ltd
Original Assignee
Huihong Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huihong Construction Group Co ltd filed Critical Huihong Construction Group Co ltd
Priority to CN202020327783.5U priority Critical patent/CN212521141U/en
Application granted granted Critical
Publication of CN212521141U publication Critical patent/CN212521141U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a drawing device for building engineering budget, including removal subassembly, lifting unit and drawing subassembly, lifting unit installs on the removal subassembly, drawing subassembly installs on lifting unit, drawing subassembly includes support column, vertical installation first drawing subassembly and the horizontal rotation of mounting on the support column install the second drawing subassembly on the support column, first drawing subassembly passes through the spliced pole fixed mounting on the support column, be equipped with the ring channel coaxial with the support column on the support column, be equipped with the ring cover of the center pin rotation around the support column in the ring channel, one side of ring cover is connected with the horizontal pole, the second drawing subassembly with the horizontal pole is connected; the drawing device provides a plurality of drawing stations for a drafter, and the height of the drawing device can be adjusted according to the height of the drafter.

Description

Drawing device for budget of constructional engineering
Technical Field
The utility model relates to a building engineering instrument technical field, concretely relates to a drawing device for building engineering budget.
Background
Engineering drawing is a professional basic subject, is based on the projection theory of drawing geometry, takes a ruler, compasses and a drawing board as tools, takes a blackboard, a wood mold and a wall map as media, and has a history of more than 200 years. The engineering drawing plays an important role in many aspects such as cultivating the space imagination and the conception ability of students as the basis of creative thinking, promoting the industrialization process and the like, the engineering drawing is an essential technical document in production, is a universal 'engineering language' in the world, is a good drawing device, can enable a plotter to work more efficiently, but the existing drawing device has the following defects: firstly, most of the existing drawing boards are simple and easy wooden frames for carrying the drawing boards, the angle of the drawing boards is fixed or the adjusting range of the drawing boards is limited, the drawing boards are not beneficial to use, and the angle is limited, so that the drawing boards are not beneficial to display; secondly, the following steps: the drawing board is single and cannot provide a plurality of drawing stations; thirdly, the method comprises the following steps: the existing drawing device can not be lifted.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a drawing device for building engineering budget can provide a plurality of drawing stations for the person of drawing, can adjust drawing device's height according to the person's of drawing height to solve the technical problem who mentions in the background art.
The purpose of the utility model is realized through the following technical scheme:
a mapping device for construction project budget comprises a moving assembly, a lifting assembly and a mapping assembly, wherein the lifting assembly is mounted on the moving assembly, the mapping assembly is mounted on the lifting assembly,
drawing subassembly includes support column, vertical installation first drawing subassembly and horizontal rotation on the support column install in second drawing subassembly on the support column, first drawing subassembly passes through spliced pole fixed mounting on the support column, be equipped with the ring channel coaxial with the support column on the support column, be equipped with the rotatory ring cover of center pin around the support column in the ring channel, one side of ring cover is connected with the horizontal pole, second drawing subassembly with the horizontal pole is connected.
Further, first drawing subassembly includes locating piece, connecting block, first drawing board and second drawing board, locating piece and connecting block parallel arrangement, first drawing board and second drawing board are installed between locating piece and the connecting block and form triangle-shaped supporting structure.
Further, all be equipped with the board of placing of tilt up on first drawing board and the second drawing board, be equipped with paper storage plate between first drawing board and the second drawing board.
Further, the second drawing subassembly includes third drawing board and fourth drawing board, third drawing board and fourth drawing board are perpendicular to each other, the third drawing board with horizontal pole fixed connection, the third drawing board passes through expanding spring with the fourth drawing board and is connected, it has two telescopic bearing diagonal that are parallel to each other still to articulate between third drawing board and the fourth drawing board.
Further, the removal subassembly includes mount pad and bottom plate, the both sides of mount pad all are equipped with rubber roller, the inside of mount pad is equipped with the mounting groove, the interior fixedly connected with fixed block of mounting groove, the top of fixed block is equipped with buffer spring, buffer spring's top fixed connection connecting rod, connecting rod fixed mounting be in the bottom of bottom plate.
Furthermore, the outside of fixed block is equipped with the chucking piece that is located the mounting groove inner wall.
Further, the lifting component comprises a rectangular bottom support, a hydraulic cylinder and a lifting support, the rectangular bottom support is fixedly mounted on the moving component, two long edges of the rectangular bottom support are provided with sliding grooves, the hydraulic cylinder is mounted on one side of any short edge of the bottom support, an output shaft of the hydraulic cylinder is connected with a driving connecting rod, two ends of the driving connecting rod are provided with sliding blocks matched with the sliding grooves, the two sides of the driving connecting rod are provided with the lifting support, and a lifting plate is arranged on the lifting support.
Furthermore, auxiliary shafts parallel to the output shaft are symmetrically arranged on two sides of the output shaft, the lifting support comprises two groups of symmetrically arranged lifting assemblies, each lifting assembly comprises a first connecting rod and a second connecting rod, one end of each first connecting rod is hinged to one end of the corresponding driving connecting rod, the other end of each first connecting rod is hinged to the corresponding lifting plate, one end of each second connecting rod is hinged to one inner side of the corresponding bottom support, the other end of each second connecting rod is hinged to the corresponding lifting plate, and the middle parts of the first connecting rods and the middle parts of the second connecting rods are hinged to each other.
Further, the first connecting rod and the second connecting rod are equal in length.
The utility model has the advantages that:
the utility model discloses a drawing device for building engineering budget, it installs two sets of drawing components at lifting unit, can provide the station of a plurality of directions for the person of drawing so that use simultaneously for a plurality of persons of drawing, and drawing component can realize the regulation of height along with lifting unit in order to adapt to the person of drawing's height, and second drawing component can rotate around the support column to can realize the demand that different angles looked over the drawing; the moving assembly effectively ensures the stability of the equipment in use and movement by utilizing the elasticity of the buffer spring, and the clamping block positioned on the inner wall of the mounting groove is arranged on the outer side of the fixed block, so that the stability is improved; its lifting unit passes through the pneumatic cylinder and drives the drive connecting rod along bottom sprag length direction horizontal migration, and the mode that the drive connecting rod drove the lift support vertical lift has realized the lift of lifter plate to drive the regulation of whole display device lift realization height, only need a pneumatic cylinder just can realize stable jacking effect moreover.
Drawings
Fig. 1 is a schematic view of the overall mechanism of the present invention;
fig. 2 is a schematic view of the specific structure of the lifting assembly of the present invention;
FIG. 3 is a schematic view of the mounting structure of the hydraulic cylinder and the bottom bracket of the present invention;
in the figure, 1-moving component, 101-mounting seat, 102-rubber roller, 103-mounting groove, 104-fixing block, 105-clamping block, 106-buffer spring, 107-connecting rod, 2-lifting component, 3-drawing component, 301-supporting column, 4-connecting column, 5-annular groove, 6-annular ring, 7-horizontal rod, 8-positioning block, 9-connecting block, 10-first drawing board, 11-second drawing board, 12-placing board, 13-paper storage board, 14-third drawing board, 15-fourth drawing board, 16-telescopic spring, 17-telescopic inclined support, 18-bottom board, 19-bottom bracket, 20-hydraulic cylinder, 2001-output shaft, 2002-auxiliary shaft, 21-chute, 22-driving connecting rod, 23-sliding block, 24-lifting plate, 25-first connecting rod and 26-second connecting rod.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by those skilled in the art without creative efforts belong to the protection scope of the present invention.
Example 1
Referring to fig. 1-3, the present invention provides a technical solution:
referring to fig. 1, a drawing device for construction budget includes a moving assembly 1, a lifting assembly 2 and a drawing assembly 3, wherein the lifting assembly 2 is mounted on the moving assembly 1, the drawing assembly 3 is mounted on the lifting assembly 2,
drawing component 3 includes support column 301, vertical installation first drawing component 3 and horizontal rotation on the support column 301 install in second drawing component 3 on the support column 301, first drawing component 3 passes through spliced pole 4 fixed mounting on support column 301, be equipped with on the support column 301 with the coaxial ring channel 5 of support column 301, be equipped with in the ring channel 5 around the rotatory ring cover 6 of the center pin of support column 301, one side of ring cover 6 is connected with horizontal pole 7, second drawing component 3 with horizontal pole 7 is connected.
The utility model discloses a drawing device for building engineering budget installs two sets of drawing components 3 on lifting unit 2, can provide the station of a plurality of directions so that a plurality of drawing people of worker use simultaneously for the person of drawing, and drawing component 3 can realize the height regulation in order to be suitable for the person of drawing along with lifting unit 2, and second drawing component 3 can rotate around support column 301 to can realize the demand that different angles looked over the drawing.
Referring to fig. 1, the first drawing assembly 3 includes a positioning block 8, a connecting block 9, a first drawing board 10 and a second drawing board 11, the positioning block 8 and the connecting block 9 are arranged in parallel, and the first drawing board 10 and the second drawing board 11 are installed between the positioning block 8 and the connecting block 9 to form a triangular bracket structure.
Referring to fig. 1, a placing plate 12 is disposed on each of the first drawing board 10 and the second drawing board 11, and a paper storage plate 13 is disposed between the first drawing board 10 and the second drawing board 11.
The utility model discloses first drawing board 10 and the relative setting of second drawing board 11 of first drawing subassembly 3, drawing board in opposite directions and upright, first drawing subassembly 3 provides two drawing stations when having saved the space, and the board 12 of placing of tilt up is used for placing the instrument of drawing, and paper storage plate 13 is used for depositing the drawing paper.
Referring to fig. 1, the second drawing assembly 3 includes a third drawing board 14 and a fourth drawing board 15, the third drawing board 14 and the fourth drawing board 15 are perpendicular to each other, the third drawing board 14 is fixedly connected to the crossbar 7, the third drawing board 14 is connected to the fourth drawing board 15 through a telescopic spring 16, and two telescopic oblique supports 17 parallel to each other are hinged between the third drawing board 14 and the fourth drawing board 15.
The utility model discloses second drawing subassembly 3 has third drawing board 14 and fourth drawing board 15 that mutually perpendicular set up, and fourth drawing board 15 can also be used for holding the instrument of drawing except can being used for drawing the drawing.
Referring to fig. 1, the moving assembly 1 includes a mounting seat 101 and a bottom plate 18, rubber rollers 102 are disposed on both sides of the mounting seat 101, a mounting groove 103 is disposed inside the mounting seat 101, a fixing block 104 is fixedly connected to an inside of the mounting groove 103, a buffer spring 106 is disposed at a top end of the fixing block 104, a top end of the buffer spring 106 is fixedly connected to a connecting rod 107, and the connecting rod 107 is fixedly mounted at a bottom end of the bottom plate 18.
Referring to fig. 1, a clamping block 105 located on the inner wall of the mounting groove 103 is disposed outside the fixing block 104.
The utility model discloses a remove subassembly 1 and utilize buffer spring 106's elasticity, the effectual stability of having guaranteed the device when using and when removing, the quantity of mounting groove 103 can be established to two, and two mounting grooves 103 symmetries are seted up the inside of mount pad 101, the outside of fixed block 104 is equipped with the chucking piece 105 that is located on the mounting groove 103 inner wall, has strengthened the steadiness ability.
Referring to fig. 2-3, the lifting assembly 2 includes a rectangular bottom bracket 19, a hydraulic cylinder 20 and a lifting bracket, the rectangular bottom bracket 19 is fixedly mounted on the moving assembly 1, two long sides of the rectangular bottom bracket 19 are both provided with a sliding chute 21, the hydraulic cylinder 20 is mounted on one side of any short side of the bottom bracket 19, an output shaft 2001 of the hydraulic cylinder 20 is connected with a driving connecting rod 22, two ends of the driving connecting rod 22 are both provided with a sliding block 23 matched with the sliding chute 21, two sides of the driving connecting rod 22 are also provided with the lifting bracket, and the lifting bracket is provided with a lifting plate 24.
Referring to fig. 2-3, auxiliary shafts 2002 parallel to the output shaft 2001 are symmetrically disposed on two sides of the output shaft 2001, the lifting bracket includes two sets of symmetrically disposed lifting assemblies 2, each lifting assembly 2 includes a first connecting rod 25 and a second connecting rod 26, one end of the first connecting rod 25 is hinged to one end of the driving connecting rod 22, the other end of the first connecting rod 25 is hinged to the lifting plate 24, one end of the second connecting rod 26 is hinged to one inner side of the bottom bracket 19, the other end of the second connecting rod 26 is hinged to the lifting plate 24, and the middle portions of the first connecting rod 25 and the second connecting rod 26 are hinged.
Referring to fig. 2-3, the first link 25 and the second link 26 are equal in length.
The utility model discloses a lifting unit 2 passes through pneumatic cylinder 20 and drives drive connecting rod 22 along 19 length direction horizontal migration of bottom support, drive connecting rod 22 drives the mode of lifting support vertical lift, the lift of lifter plate 24 has been realized, thereby it has realized the regulation of height to drive the lift of whole display device, only need a pneumatic cylinder 20 can realize stable jacking effect, setting through countershaft 2002, make drive connecting rod 22 be horizontal motion all the time, whole lifting unit 2's stability has been guaranteed, it is more convenient to use, first connecting rod 25 establishes to the same mode with second connecting rod 26's length, lifter plate 24 is in horizontal position all the time when guaranteeing the jacking, the jacking effect of whole device has been guaranteed, thereby drawing device's lift has been realized.
The foregoing is illustrative of the preferred embodiments of the present invention, and it is to be understood that the invention is not limited to the precise forms disclosed herein, and that various other combinations, modifications, and environments may be resorted to, falling within the scope of the invention as defined by the appended claims. But that modifications and variations may be effected by those skilled in the art without departing from the spirit and scope of the invention, which is to be limited only by the claims appended hereto.

Claims (9)

1. A mapping apparatus for construction budget, comprising: comprises a moving component (1), a lifting component (2) and a drawing component (3), wherein the lifting component (2) is arranged on the moving component (1), the drawing component (3) is arranged on the lifting component (2),
drawing subassembly (3) include support column (301), vertical installation first drawing subassembly and horizontal rotation on support column (301) install in second drawing subassembly on support column (301), first drawing subassembly passes through spliced pole (4) fixed mounting on support column (301), be equipped with on support column (301) with the coaxial ring channel (5) of support column (301), be equipped with in ring channel (5) around the rotatory ring cover (6) of center pin of support column (301), one side of ring cover (6) is connected with horizontal pole (7), second drawing subassembly with horizontal pole (7) are connected.
2. Drawing device for construction project budget according to claim 1, characterised in that: first drawing subassembly includes locating piece (8), connecting block (9), first drawing board (10) and second drawing board (11), locating piece (8) and connecting block (9) parallel arrangement, install first drawing board (10) and second drawing board (11) between locating piece (8) and connecting block (9) and form triangle-shaped supporting structure.
3. Drawing device for construction project budget according to claim 2, characterised in that: all be equipped with tilt up's on first drawing board (10) and second drawing board (11) place board (12), be equipped with paper storage plate (13) between first drawing board (10) and second drawing board (11).
4. Drawing device for construction project budget according to claim 1, characterised in that: the second drawing assembly comprises a third drawing board (14) and a fourth drawing board (15), the third drawing board (14) and the fourth drawing board (15) are perpendicular to each other, the third drawing board (14) is fixedly connected with the cross rod (7), the third drawing board (14) is connected with the fourth drawing board (15) through a telescopic spring (16), and two mutually parallel telescopic inclined supports (17) are hinged between the third drawing board (14) and the fourth drawing board (15).
5. Drawing device for construction project budget according to claim 1, characterised in that: remove subassembly (1) including mount pad (101) and bottom plate (18), the both sides of mount pad (101) all are equipped with rubber gyro wheel (102), the inside of mount pad (101) is equipped with mounting groove (103), the interior fixedly connected with fixed block (104) of mounting groove (103), the top of fixed block (104) is equipped with buffer spring (106), the top fixed connection connecting rod (107) of buffer spring (106), connecting rod (107) fixed mounting be in the bottom of bottom plate (18).
6. Drawing device for construction project budget according to claim 5, characterised in that: and a clamping block (105) positioned on the inner wall of the mounting groove (103) is arranged on the outer side of the fixing block (104).
7. Drawing device for construction project budget according to claim 1, characterised in that: lifting unit (2) include rectangle bottom support (19), pneumatic cylinder (20) and lifting support, rectangle bottom support (19) fixed mounting be in on removal subassembly (1), two of rectangle bottom support (19) all are equipped with spout (21) on the long limit, pneumatic cylinder (20) are installed one side of the arbitrary minor face of bottom support (19), the output shaft (2001) of pneumatic cylinder (20) are connected with drive connecting rod (22), the both ends of drive connecting rod (22) all be equipped with slider (23) that spout (21) match, the both sides of drive connecting rod (22) still are equipped with lifting support, the last lifter plate (24) that is equipped with of lifting support.
8. Drawing device for construction project budget according to claim 7, characterised in that: auxiliary shafts (2002) parallel to the output shaft (2001) are symmetrically arranged on two sides of the output shaft (2001), the lifting support comprises two groups of symmetrically arranged lifting assemblies (2), each lifting assembly (2) comprises a first connecting rod (25) and a second connecting rod (26), one end of each first connecting rod (25) is hinged to one end of each driving connecting rod (22), the other end of each first connecting rod (25) is hinged to the lifting plate (24), one end of each second connecting rod (26) is hinged to one inner side of the bottom support (19), the other end of each second connecting rod is hinged to the lifting plate (24), and the middle portions of the first connecting rods (25) and the second connecting rods (26) are hinged to each other.
9. Drawing device for construction project budget according to claim 8, characterised in that: the first connecting rod (25) and the second connecting rod (26) are equal in length.
CN202020327783.5U 2020-03-16 2020-03-16 Drawing device for budget of constructional engineering Expired - Fee Related CN212521141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020327783.5U CN212521141U (en) 2020-03-16 2020-03-16 Drawing device for budget of constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020327783.5U CN212521141U (en) 2020-03-16 2020-03-16 Drawing device for budget of constructional engineering

Publications (1)

Publication Number Publication Date
CN212521141U true CN212521141U (en) 2021-02-12

Family

ID=74526745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020327783.5U Expired - Fee Related CN212521141U (en) 2020-03-16 2020-03-16 Drawing device for budget of constructional engineering

Country Status (1)

Country Link
CN (1) CN212521141U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114446116A (en) * 2021-12-29 2022-05-06 南京艺寸信息技术有限公司 Interactive adjusting device for platform of beauty laboratory and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114446116A (en) * 2021-12-29 2022-05-06 南京艺寸信息技术有限公司 Interactive adjusting device for platform of beauty laboratory and using method thereof

Similar Documents

Publication Publication Date Title
CN209855238U (en) Be used for construction template fixing device
CN212521141U (en) Drawing device for budget of constructional engineering
CN211632225U (en) Drawing board
CN208971347U (en) A kind of stator tipper of locomotive stand-by motor
CN215699527U (en) Bearing assembly workbench
CN215984543U (en) Portable mapping device
CN212912546U (en) Staff salary comparison and analysis system
CN115139460A (en) Motor rotating injection platform device
CN211974352U (en) Building templates strutting arrangement
CN212886234U (en) Precise machine tool center frame for fastening slender shaft
CN211000005U (en) 3D printing device
CN211827708U (en) Computer network practice teaching comprehensive experiment platform
CN211319491U (en) Integrated teaching and display sports equipment
CN112120447A (en) Advanced mathematical function figure teaching assistor
CN112160575A (en) Bearing frame convenient for height adjustment for building construction
CN219331115U (en) Demonstration board capable of adjusting lifting
CN211021732U (en) Liftable picture is hung
CN216429265U (en) Clamping device of aluminum alloy glass breast board
CN218066947U (en) High-frequency vibration's strutting arrangement
CN210691412U (en) Teaching dedicated device of calling roll
CN218571890U (en) Stable lifting device for automobile teaching aid model
CN217708798U (en) Lifting platform
CN216084028U (en) Display device for Chinese teaching
CN220203315U (en) Wall trowelling device
CN217626784U (en) Piece together cloth processing with flat device of exhibition

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210212