Prior art keywords
scaffold
bolts
sides
support body
stair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021031646.3U
Other languages
Chinese (zh)
Inventor
林鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021031646.3U priority Critical patent/CN212507286U/en
Application granted granted Critical
Publication of CN212507286U publication Critical patent/CN212507286U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a building engineering combination formula scaffold frame, including support body and eight bolts, two first dead levers are installed through wherein four bolts fixed interlude respectively to the both sides on support body top, and two second dead levers are installed through other four bolts fixed interlude respectively to the both sides side on support body top, and four spouts have been seted up respectively to the bottom of support body both sides, and the inside of every spout all is equipped with supports adjustment mechanism, the beneficial effects of the utility model are that: through the eight bolts that set up, be convenient for install respectively and dismantle two first dead levers and two second dead levers, through four sliders and four spouts that set up, be convenient for adjust the position of four supporting legs respectively, through four first screws and four screw holes that set up, the height of four supporting legs of being convenient for fix, through the stair subassembly that sets up, the staff of being convenient for scrambles, through four block pieces that set up, the installation and the dismantlement of the L shape plywood of being convenient for.

Description

Combined scaffold for constructional engineering
Technical Field
The utility model relates to a scaffold frame, in particular to building engineering combination formula scaffold frame belongs to scaffold frame technical field.
Background
The scaffold is in order to guarantee that each work progress goes on smoothly and the work platform who sets up, divide into outer scaffold according to the position of setting up, interior scaffold, can divide into wood scaffold frame, bamboo scaffold frame, steel pipe scaffold frame according to the material difference, divide into pole setting formula scaffold frame, bridge type scaffold frame, gate-type scaffold frame, suspension type scaffold frame, hanging type scaffold frame, choose formula scaffold frame, climb formula scaffold frame, current scaffold frame is not convenient for remove and fixed, the staff's of being not convenient for safe climbing, the practicality and the security of scaffold frame have been reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering combination formula scaffold to the removal of being not convenient for that proposes in solving above-mentioned background art and fixed, the problem of the staff's safe climbing of being not convenient for.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering combination formula scaffold, includes support body and eight bolts, two first dead levers are installed through wherein four bolts fixed interlude respectively to the both sides on support body top, two second dead levers are installed through another four bolts fixed interlude respectively to the both sides side on support body top, four spouts, every have been seted up respectively to the bottom of support body both sides the inside of spout all is equipped with supports adjustment mechanism, every support adjustment mechanism all includes supporting leg and slider, four the slider is slidable mounting respectively in the inside of four spouts, four the supporting leg is fixed mounting respectively in the outside of four sliders, four through four first screws the top and the bottom of spout inner wall all set up threaded hole, four first screw cooperatees with four screw holes therein respectively.
As a preferred technical scheme of the utility model, the inside fixed mounting of support body has the stair subassembly, the stair subassembly includes the bracing piece, the top of bracing piece is connected with the middle part block on support body one side top, the bottom of bracing piece and the bottom fixed connection of support body opposite side inner wall, the avris of bracing piece has a plurality of stair board, a plurality of through a plurality of second screw fixed mounting the avris of stair board all with the inner wall fixed connection of support body avris through a plurality of second screw.
As a preferred technical scheme of the utility model, two layers of spread groove, four have all been seted up in the four corners on support body top the both sides of two layers of spread groove all seted up with bolt assorted hole.
As a preferred technical scheme of the utility model, the equal fixed mounting in four corners of support body bottom has the universal wheel that has the wheel to stop.
As an optimal technical scheme of the utility model, two install L shape plywood through four block blocks between the first dead lever.
As an optimal technical scheme of the utility model, four the bottom of supporting leg and the equal fixed mounting in top of a plurality of stair tread have the slipmat.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to a building engineering combination formula scaffold, eight bolts through setting up, be convenient for install respectively and dismantle two first dead levers and two second dead levers, four sliders and four spouts through the setting, be convenient for adjust the position of four supporting legs respectively, four first screws and four screw holes through setting up, the height of four supporting legs of being convenient for fix, four universal wheels that have the wheel through setting up and stop, be convenient for remove or interim fixed scaffold, bracing piece through the setting, a plurality of second screw and a plurality of stair board, the staff's climbing of being convenient for, improve the security when using, through four block that set up, be convenient for the installation and the dismantlement of L shape plywood, through four holes and four two layers spread groove that set up, be convenient for install and dismantle two layers of scaffold, the practicality of scaffold has been improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic sectional structure of the present invention;
fig. 3 is a schematic side view of the cross-sectional structure of the present invention.
In the figure: 1. a frame body; 2. a first fixing lever; 3. a second fixing bar; 4. a bolt; 5. an L-shaped laminate; 6. a clamping block; 7. a support adjustment mechanism; 71. supporting legs; 72. a slider; 73. a threaded hole; 74. a first screw; 8. a universal wheel; 9. a stair assembly; 91. a stair tread; 92. a support bar; 93. a second screw; 10. a hole; 11. two layers of connecting grooves; 12. a chute; 13. a non-slip mat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model provides a combined scaffold for building engineering, comprising a frame body 1 and eight bolts 4, two first fixing rods 2 are respectively fixedly inserted and installed on two sides of the top end of the frame body 1 through four bolts 4, two second fixing rods 3 are respectively fixedly inserted and installed on two sides of the top end of the frame body 1 through another four bolts 4, which is convenient for installing and disassembling the two first fixing rods 2 and the two second fixing rods 3, four sliding grooves 12 are respectively arranged on the bottom of two sides of the frame body 1, a supporting and adjusting mechanism 7 is arranged inside each sliding groove 12, each supporting and adjusting mechanism 7 comprises a supporting leg 71 and a sliding block 72, four sliding blocks 72 are respectively slidably installed inside the four sliding grooves 12, four supporting legs 71 are respectively fixedly installed on the outer sides of the four sliding blocks 72 through four first screws 74, threaded holes 73 are respectively arranged on the top and the bottom of the inner walls of the, the four first screws 74 are respectively matched with the four threaded holes 73, so that the positions of the four supporting legs 71 can be adjusted and fixed.
Preferably, the stair assembly 9 is fixedly installed inside the frame body 1, the stair assembly 9 comprises a support rod 92, the top end of the support rod 92 is connected with the middle part of the top end of one side of the frame body 1 in a clamping manner, the bottom end of the support rod 92 is fixedly connected with the bottom of the inner wall of the other side of the frame body 1, a plurality of stair boards 91 are fixedly installed on the side of the support rod 92 through a plurality of second screws 93, and the side of the stair boards 91 are fixedly connected with the inner wall of the side of the frame body 1 through the second screws 93, so that workers can climb the scaffold safely; four corners of the top end of the frame body 1 are provided with two layers of connecting grooves 11, and two sides of the four two layers of connecting grooves 11 are provided with holes 10 matched with the bolts 4, so that the two layers of scaffolds are convenient to mount and dismount; four corners of the bottom end of the frame body 1 are fixedly provided with universal wheels 8 with wheel brakes, so that the scaffold can be conveniently moved and temporarily fixed; the two first fixing rods 2 are clamped and installed with the L-shaped laminate 5 through the four clamping blocks 6, so that the L-shaped laminate 5 is convenient to detach and install; the bottom of four supporting legs 71 and the equal fixed mounting in top of a plurality of stair board 91 have slipmat 13, have improved the non-skid property of four supporting legs 71 and a plurality of stair board 91.
When in specific use, the utility model relates to a combined scaffold for building engineering, firstly, the frame body 1 is moved to the corresponding working position through four universal wheels 8 with wheel brakes, the wheel brakes on the four universal wheels 8 are adjusted to be temporarily fixed, then the four first screws 74 are respectively disassembled, the four supporting legs 71 are respectively slid to the proper height position in the four corresponding chutes 12 through four sliders 72, in the sliding process, the four universal wheels 8 respectively pass through the hollow parts of the four supporting legs 71 and do not influence each other, then the four first screws 74 are threadedly installed in the matched four threaded holes 73, two first fixing rods 2 are fixedly inserted and installed at the two sides of the top end of the frame body 1 through the four bolts 4, two second fixing rods 3 are fixedly inserted and installed at the two sides of the top end of the frame body 1 through the other four bolts 4, the top end of a supporting rod 92 is connected with the middle part of the top end of one side of a frame body 1 in a clamping way, the bottom end of the supporting rod 92 is fixedly connected with the bottom of the inner wall of the other side of the frame body 1, a plurality of stair boards 91 are fixedly arranged between the side of the supporting rod 92 and the inner wall of the side of the frame body 1 through a plurality of second screws 93, finally, four clamping blocks 6 at two sides of an L-shaped laminate 5 are connected with two first fixing rods 2 in a clamping way, the assembly of the scaffold is completed, when a worker needs to reach the top end of the L-shaped laminate 5 from the ground to work, the working worker enters a stair area from an opening at the other side of the frame body 1 and reaches the top end of the L-shaped laminate 5 through the plurality of stair boards 91, when a second-layer scaffold needs to be installed, the scaffold is installed through four holes 10 and four second-layer connecting grooves 11, when, two first fixing rods 2 and two second fixing rods 3 are separated from the frame body 1 by respectively disassembling the eight bolts 4, and then the plurality of stair boards 91 and the support rods 92 are separated from the frame body 1 by the plurality of second screws 93.
In the description of the present invention, it should be understood that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, for example, it may be fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The combined scaffold for the building engineering comprises a scaffold body (1) and eight bolts (4), and is characterized in that two first fixing rods (2) are respectively fixedly and alternately arranged on two sides of the top end of the scaffold body (1) through four bolts (4), two second fixing rods (3) are respectively fixedly and alternately arranged on two sides of the top end of the scaffold body (1) through another four bolts (4), four sliding grooves (12) are respectively formed in the bottoms of two sides of the scaffold body (1), a supporting and adjusting mechanism (7) is arranged in each sliding groove (12), each supporting and adjusting mechanism (7) comprises a supporting leg (71) and a sliding block (72), the four sliding blocks (72) are respectively and slidably arranged in the four sliding grooves (12), and the four supporting legs (71) are respectively and fixedly arranged on the outer sides of the four sliding blocks (72) through four first screws (74), threaded holes (73) are formed in the tops and the bottoms of the inner walls of the four sliding grooves (12), and the four first screws (74) are matched with the four threaded holes (73) respectively.
2. A combined scaffold for construction engineering according to claim 1, wherein: the inside fixed mounting of support body (1) has stair subassembly (9), stair subassembly (9) include bracing piece (92), the top of bracing piece (92) is connected with the middle part block on support body (1) one side top, the bottom of bracing piece (92) and the bottom fixed connection of support body (1) opposite side inner wall, the avris of bracing piece (92) has a plurality of stair board (91), a plurality of through a plurality of second screw (93) fixed mounting the avris of stair board (91) all with the inner wall fixed connection of support body (1) avris through a plurality of second screw (93).
3. A combined scaffold for construction engineering according to claim 1, wherein: two layers of connecting grooves (11) are formed in four corners of the top end of the frame body (1), and holes (10) matched with the bolts (4) are formed in two sides of the two layers of connecting grooves (11).
4. A combined scaffold for construction engineering according to claim 1, wherein: four corners of the bottom end of the frame body (1) are fixedly provided with universal wheels (8) with wheel brakes.
5. A combined scaffold for construction engineering according to claim 1, wherein: and an L-shaped laminate (5) is clamped and installed between the two first fixing rods (2) through four clamping blocks (6).
6. A combined scaffold for construction engineering according to claim 1, wherein: the bottom ends of the four supporting legs (71) and the top ends of the plurality of stair boards (91) are fixedly provided with anti-slip pads (13).
CN202021031646.3U 2020-06-08 2020-06-08 Combined scaffold for constructional engineering Expired - Fee Related CN212507286U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021031646.3U CN212507286U (en) 2020-06-08 2020-06-08 Combined scaffold for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021031646.3U CN212507286U (en) 2020-06-08 2020-06-08 Combined scaffold for constructional engineering

Publications (1)

Publication Number Publication Date
CN212507286U true CN212507286U (en) 2021-02-09

Family

ID=74383487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021031646.3U Expired - Fee Related CN212507286U (en) 2020-06-08 2020-06-08 Combined scaffold for constructional engineering

Country Status (1)

Country Link
CN (1) CN212507286U (en)

Similar Documents

Publication Publication Date Title
CN210421868U (en) But height-adjusting's stable form engineering construction scaffold
CN212507286U (en) Combined scaffold for constructional engineering
CN207268071U (en) A kind of adjustable for height safety scaffold
CN205936370U (en) Module cat ladder that can disassemble
CN210738051U (en) Scaffold for building engineering
KR20110080196A (en) Railling system for safety
CN220620949U (en) Scaffold for building engineering
CN209723581U (en) A kind of adjustable scaffold ladder
CN203188596U (en) Rapidly installed combination stairs
CN207296335U (en) A kind of high stability scaffold for building
CN212836653U (en) Step ladder for climbing frame
CN212802456U (en) Novel attached lifting scaffold
CN218149967U (en) Top layer protection structure of attached lifting scaffold
CN214118037U (en) Staircase for building convenient to adjust
CN209468945U (en) A kind of temporary stairways handrail
CN219808681U (en) Metal climbing frame convenient to equipment for high-rise building construction
CN218880596U (en) Frame type pier body construction platform
CN217269954U (en) Unpowered directional mobile two-dimensional operation platform
CN219773521U (en) Hand and foot rest with safeguard measure
CN109025790A (en) A kind of constructions work is with can be used more convenient comfortable ladder
CN219732700U (en) Tool for building steel structure factory building
CN220790693U (en) Elevator well limb protection device
CN220747577U (en) Reinforced steel structure platform
CN210977263U (en) Safety ascending platform for single crystal furnace combination
CN216042535U (en) Climbing frame for building construction

Legal Events

Date Code Title Description
GR01 Patent grant