CN210738051U - Scaffold for building engineering - Google Patents

Scaffold for building engineering Download PDF

Info

Publication number
CN210738051U
CN210738051U CN201920969480.0U CN201920969480U CN210738051U CN 210738051 U CN210738051 U CN 210738051U CN 201920969480 U CN201920969480 U CN 201920969480U CN 210738051 U CN210738051 U CN 210738051U
Authority
CN
China
Prior art keywords
branch
scaffold
supporting
brace table
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920969480.0U
Other languages
Chinese (zh)
Inventor
华少亮
滕海剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dongyang Third Construction Engineering Co ltd
Original Assignee
Zhejiang Dongyang Third Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dongyang Third Construction Engineering Co ltd filed Critical Zhejiang Dongyang Third Construction Engineering Co ltd
Priority to CN201920969480.0U priority Critical patent/CN210738051U/en
Application granted granted Critical
Publication of CN210738051U publication Critical patent/CN210738051U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for building engineering, which comprises a supporting table, a chute is arranged on a first supporting rod and a second supporting rod, the supporting table is convenient to be connected with the chute through a sliding block in a sliding way, the supporting table can be manually controlled to slide up and down, the height of the supporting table is adjusted, the four corners of the supporting table are fixed with the first supporting rod and the second supporting rod by fixing a first fixing block and a second fixing block through bolts and nuts, the firmness of the supporting table is improved, the stability of the supporting table is improved by fixing a pair of first supporting rods and the bottom ends of a pair of second supporting rods through a reinforcing connecting plate, a worker can conveniently climb the supporting table through arranging a pedal, the scaffold can be moved by pushing the scaffold through arranging a brake universal wheel, the scaffold can be fixed by simultaneously treading a brake plate of the brake universal wheel, the scaffold is prevented from sliding when the worker works, the use is convenient, the stability and the mobility are good, the working efficiency is improved, and the application field is wide.

Description

Scaffold for building engineering
Technical Field
The utility model relates to a scaffold frame, in particular to scaffold frame for building engineering belongs to scaffold frame with adjusting technical field.
Background
At present, in the building engineering, for example, repair and wall whitewash the wall, often need to build the scaffold, the scaffold indicates that the job site is for the workman to operate and solve various supports of building perpendicularly and horizontal transportation for convenient to do, but most scaffold need many people to hand now when climbing on the brace table, can not adjust the height of brace table simultaneously, poor stability, fixed insecure, mobility can be poor, needs many people to lift, wastes time and energy, influences work efficiency scheduling problem.
SUMMERY OF THE UTILITY MODEL
The utility model provides a scaffold frame for building engineering through being equipped with the footboard, consolidating connecting plate, brake universal wheel, slider, spout, first fixed block and the effectual solution such as second fixed block most scaffold frame now, when climbing on a supporting bench, it is hand to need many people, can not adjust a supporting bench's height simultaneously, poor stability, fixed insecure, and the mobility is poor, needs many people to lift, wastes time and energy, influences work efficiency scheduling problem.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a scaffold frame for building engineering, which comprises a supporting table, the both sides that the brace table was kept away from mutually are equipped with a pair of first branch and a pair of second branch respectively and are adjacent to the four corners of brace table respectively, equal fixedly connected with consolidates the connecting plate between two that first branch and second branch are adjacent, two equal fixedly connected with a plurality of footboard between the first branch and between two second branches, first branch and second branch bottom all are equipped with the brake universal wheel.
As a preferred technical scheme of the utility model, the brace table includes the slider, slider fixed connection is in brace table first branch and second branch both sides four corners department relatively, the first fixed block of the equal fixedly connected with in both sides four corners department of brace table perpendicular to slider.
As a preferred technical scheme of the utility model, first branch and second branch include the spout, the spout is seted up on the lateral wall of the relative brace table of first branch and second branch, two the equal fixedly connected with a plurality of second fixed block in both sides that the both sides that first branch was kept away from mutually and two second branches were kept away from mutually, be connected with the bolt on the second fixed block.
As an optimal technical scheme of the utility model, the slider in brace table four corners is corresponding with the spout of first branch and second branch respectively, the brace table passes through slider sliding connection on the spout of first branch and second branch.
As a preferred technical scheme of the utility model, screw and corresponding have all been seted up on first fixed block and the second fixed block, the bolt alternates the screw of first fixed block and second fixed block and rather than threaded connection, threaded connection has the nut on the bolt.
The utility model discloses the beneficial effect who reaches is:
1. this scaffold frame for building engineering is equipped with the spout on through first branch and second branch, and the brace table of being convenient for passes through slider sliding connection at the spout, can manually control brace table and slide from top to bottom, adjusts the height of brace table, through using first fixed block of bolt and nut fixed and second fixed block, makes brace table four corners fixed with first branch and second branch, improves its fastness.
2. This scaffold frame for building engineering fixes between a pair of first branch and a pair of second branch bottom through being equipped with the reinforcement connecting plate, improves its stability, and through being equipped with the footboard, the staff of being convenient for steps on and climbs the supporting bench on the footboard.
3. This scaffold frame for building engineering through being equipped with the brake universal wheel, promotes this scaffold frame alright remove, steps on the brake block of brake universal wheel simultaneously, alright fix it, avoids staff's during operation, and the scaffold frame slides.
The novel multifunctional electric water heater has the advantages of being reasonable in overall structure, convenient to adjust, convenient to use, firm in fixation, good in stability and mobility, high in practicability, wide in application field and the like, and the working efficiency is improved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic perspective view of the supporting platform of the present invention;
fig. 3 is an enlarged schematic structural diagram of the utility model a.
In the figure: 1. a support table; 2. a first support bar; 3. a second support bar; 4. a pedal; 5. reinforcing the connecting plate; 6. braking the universal wheel; 11. a slider; 12. a first fixed block; 21. a chute; 22. a second fixed block; 23. and (4) bolts.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example (b): as shown in fig. 1-3, a scaffold for building engineering, including a supporting table 1, the both sides that supporting table 1 kept away from mutually are equipped with a pair of first branch 2 and a pair of second branch 3 respectively and are adjacent to the four corners of supporting table 1 respectively, equal fixedly connected with reinforcing connection board 5 between two adjacent first branch 2 and second branch 3, equal fixedly connected with a plurality of footboard 4 between two first branches 2 and between two second branches 3, first branch 2 and 3 bottom of second branch all are equipped with brake universal wheel 6.
The supporting table 1 comprises a sliding block 11, the sliding block 11 is fixedly connected at four corners of two sides of the supporting table 1 opposite to a first supporting rod 2 and a second supporting rod 3, the four corners of two sides of the supporting table 1 vertical to the sliding block 11 are fixedly connected with a first fixing block 12, the first supporting rod 2 and the second supporting rod 3 comprise sliding grooves 21, the sliding grooves 21 are arranged on the side walls of the first supporting rod 2 and the second supporting rod 3 opposite to the supporting table 1, two sides of the two first supporting rods 2 far away from each other and two sides of the two second supporting rods 3 far away from each other are fixedly connected with a plurality of second fixing blocks 22, the second fixing blocks 22 are connected with bolts 23, the sliding blocks 11 at four corners of the supporting table 1 respectively correspond to the sliding grooves 21 of the first supporting rod 2 and the second supporting rod 3, the supporting table 1 is connected to the sliding grooves 21 of the first supporting rod 2 and the second supporting rod 3 in a sliding mode through, the bolt 23 penetrates through the screw holes of the first fixing block 12 and the second fixing block 22 and is in threaded connection with the first fixing block and the second fixing block, and a nut is in threaded connection with the bolt 23.
Specifically, when the utility model is used, the support table 1 is connected with the sliding grooves 21 of the first support bar 2 and the second support bar 3 in a sliding way through the sliding block 11, the support table 1 is manually controlled to slide up and down, the height of the support table 1 is adjusted, then the bolt 23 is used for penetrating the first fixing block 12 to the corresponding screw hole of the second fixing block 22, the other end of the bolt 23 is screwed down by the nut to fix the bolt, after the first fixing block 12 at the four corners of the support table 1 and the second fixing block 22 of the first support bar 2 and the second support bar 3 are fixed in sequence, the whole body is pushed, the brake universal wheel 6 is moved to a specified position, then the brake plate of the brake universal wheel 6 is stepped on to fix the brake universal wheel, the brake universal wheel 6 can not roll, the pedal 4 can be stepped on, the support table 1 is climbed, the support table 1 can work when standing on the support table 1, for example, work such as wall surface painting and wall, the bottom ends of the first supporting rod 2 and the second supporting rod 3 are connected through a reinforcing connecting plate 5, and stability is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a scaffold frame for building engineering which characterized in that: including brace table (1), the both sides of keeping away from mutually of brace table (1) are equipped with a pair of first branch (2) and a pair of second branch (3) respectively and are adjacent to the four corners of brace table (1) respectively, equal fixedly connected with consolidates connecting plate (5), two between two that first branch (2) and second branch (3) are adjacent a plurality of footboard (4) of equal fixedly connected with between first branch (2) and between two second branches (3), first branch (2) and second branch (3) bottom all are equipped with brake universal wheel (6).
2. A scaffold for construction engineering according to claim 1, characterized in that: brace table (1) includes slider (11), slider (11) fixed connection is in brace table (1) relative first branch (2) and second branch (3) both sides four corners department, the equal fixedly connected with first fixed block (12) of both sides four corners department of brace table (1) perpendicular to slider (11), first branch (2) and second branch (3) include spout (21), spout (21) are seted up on the lateral wall of first branch (2) and second branch (3) relative brace table (1), two the equal fixedly connected with a plurality of second fixed block (22) in both sides that first branch (2) were kept away from mutually and two second branches (3), be connected with bolt (23) on second fixed block (22).
3. A scaffold for construction engineering according to claim 1, characterized in that: the slide blocks (11) at four corners of the supporting table (1) correspond to the slide grooves (21) of the first supporting rod (2) and the second supporting rod (3) respectively, and the supporting table (1) is connected to the slide grooves (21) of the first supporting rod (2) and the second supporting rod (3) in a sliding mode through the slide blocks (11).
4. A scaffold for construction engineering according to claim 2, wherein: screw holes are formed in the first fixing block (12) and the second fixing block (22) and are corresponding to each other, the bolt (23) penetrates through the screw holes of the first fixing block (12) and the second fixing block (22) and is in threaded connection with the screw holes, and a nut is connected to the bolt (23) in a threaded mode.
CN201920969480.0U 2019-06-26 2019-06-26 Scaffold for building engineering Active CN210738051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920969480.0U CN210738051U (en) 2019-06-26 2019-06-26 Scaffold for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920969480.0U CN210738051U (en) 2019-06-26 2019-06-26 Scaffold for building engineering

Publications (1)

Publication Number Publication Date
CN210738051U true CN210738051U (en) 2020-06-12

Family

ID=70984938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920969480.0U Active CN210738051U (en) 2019-06-26 2019-06-26 Scaffold for building engineering

Country Status (1)

Country Link
CN (1) CN210738051U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622638A (en) * 2021-09-16 2021-11-09 张相润 Construction frame and method for manufacturing construction frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113622638A (en) * 2021-09-16 2021-11-09 张相润 Construction frame and method for manufacturing construction frame

Similar Documents

Publication Publication Date Title
CN210738051U (en) Scaffold for building engineering
CN210239225U (en) Interim steel construction stair that building engineering used
CN210288107U (en) Hanging basket for bridge engineering
CN211341658U (en) Portable secondary construction telescopic stool
CN218541510U (en) Reinforced structure of template corner is pour to frame post
CN214329828U (en) Effectual frame of climbing of antiskid
CN212533772U (en) Bridge is with pile foundation reinforcing apparatus convenient to installation
CN209920179U (en) Building material apron culvert apron drawing of patterns equipment
CN211037746U (en) Device for mounting climbing frame
CN205476454U (en) Board device falls in instrument formula building
CN209040855U (en) A kind of cable duct lateral sulcus watchman's wooden clapper integration lining trolley adapting to horizontal slope variation
CN205977084U (en) Modular insulating folding ladder
CN220504631U (en) Novel ladder frame suitable for construction site
CN217500971U (en) Supporting platform suitable for prefabricated part protection and operation integration
CN210685313U (en) Safe convenient house steel connection structure
CN215717022U (en) Construction machinery construction scaffold
CN211871276U (en) Auxiliary mounting bracket for electric power engineering
CN221742151U (en) Assembled ladder cage convenient to adjust
CN221590309U (en) Building engineering is with climbing frame
CN214741446U (en) Plug-in type adjustable T-shaped platform
CN219158882U (en) Combined folding engineering ladder for constructional engineering
CN220467493U (en) Photovoltaic panel installation work platform
CN206458058U (en) A kind of Portable detachable firm scaffold for building
CN211949496U (en) Multifunctional construction scaffold
CN212773364U (en) Bearing frame for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant