CN207296335U - A kind of high stability scaffold for building - Google Patents

A kind of high stability scaffold for building Download PDF

Info

Publication number
CN207296335U
CN207296335U CN201721188889.6U CN201721188889U CN207296335U CN 207296335 U CN207296335 U CN 207296335U CN 201721188889 U CN201721188889 U CN 201721188889U CN 207296335 U CN207296335 U CN 207296335U
Authority
CN
China
Prior art keywords
fixedly connected
montant
fixed
scaffold
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721188889.6U
Other languages
Chinese (zh)
Inventor
陈超锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zheng Wei
Zhengda Construction Group Co.,Ltd.
Original Assignee
Wenzhou Fu Fu Municipal Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Fu Fu Municipal Construction Engineering Co Ltd filed Critical Wenzhou Fu Fu Municipal Construction Engineering Co Ltd
Priority to CN201721188889.6U priority Critical patent/CN207296335U/en
Application granted granted Critical
Publication of CN207296335U publication Critical patent/CN207296335U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a kind of high stability scaffold for building, including fixed seat, fixed block is fixedly connected with the top of the fixed seat, contiguous block is fixedly connected with the top of the fixed block, the top of the contiguous block is fixedly connected with one end of fixed frame, the other end of the fixed frame has been bolted to connection fixed plate, the first montant is fixedly connected with the right side of the fixed plate, the first montant bottom is fixedly connected with firm block, and first the right side of montant supporting rod is fixedly connected with by Quick Release connector, connecting shaft is fixedly connected with the top of first montant.The high stability scaffold for building, scaffold is integrally fixed by the cooperation of fixed seat and fixed frame, wheel is moved scaffold, the first montant and the second montant is fixed in connecting shaft, it ensure that the stability of montant, the cooperation of supporting rod and fixed link is improved the stability of scaffold, it is therefore prevented that scaffold rocks when staff works.

Description

A kind of high stability scaffold for building
Technical field
Building appliance technical field is the utility model is related to, is specially a kind of high stability scaffold for building.
Background technology
Scaffold is to ensure workbench that each work progress is smoothed out and sets up.Position by setting up is divided into outer Scaffold, internal scaffolding;It can be divided into timber scaffolding, bamboo scaffolding, steel pipe scaffold by material difference;It is divided into by structural form vertical Rod-type scaffold, bridge scaffold, door-type scaffold, swinging scaffold, suspended scaffold, choose formula scaffold, climb formula foot hand Frame.
Traditional scaffold is easily produced and rocked because staff moves, work staff and pacify in the way that works Impact entirely, and traditional scaffold can only be climbed up and down by pedal, be climbed extremely not when from higher height undercarriage Just it is careless slightly to be easy for making a misstep and accident occur, it is necessary to which careful slowly moves.A kind of for this reason, it is proposed that height for building Stability scaffold.
Utility model content
The purpose of this utility model is to provide a kind of high stability scaffold for building, to solve in above-mentioned background technology Traditional scaffold is proposed in the way that works, easily produces and rocks because staff moves, staff's work safety is made Into influence, and traditional scaffold can only be climbed up and down by pedal, and climbing is extremely inconvenient when from higher height undercarriage, needs Careful slowly to move, it is careless slightly to be easy for making a misstep and the problem of unexpected occur.
To achieve the above object, the utility model provides following technical solution:A kind of high stability scaffold for building, bag Fixed seat is included, fixed block is fixedly connected with the top of the fixed seat, contiguous block, institute are fixedly connected with the top of the fixed block State the top of contiguous block to be fixedly connected with one end of fixed frame, the other end of the fixed frame has been bolted to connection fixation Plate, is fixedly connected with the first montant on the right side of the fixed plate, the first montant bottom is fixedly connected with firm block, and first The right side of montant is fixedly connected with supporting rod by Quick Release connector, is fixedly connected with connecting shaft at the top of first montant, institute State and the second montant is fixedly connected with the top of connecting shaft, mounting blocks, the installation are fixedly connected with the top of second montant Workbench is fixedly connected with the top of block.
The bottom of the firm block is fixedly connected with wheel carrier, and the bottom of the wheel carrier is fixedly connected with wheel by shaft, And fixed link is fixedly connected with the right side of firm block, two hand rods, and two hands are fixedly connected with the top of the fixed link It is equidistant between handrail to be fixedly connected with four gangboards.
Preferably, anti-skid mesh is fixedly connected with the top of the workbench, and the left and right ends of workbench are fixedly connected with There is railing.
Preferably, the surface of the gangboard is provided with non-slip mat.
Preferably, the Quick Release connector that passes on left of second montant is fixedly connected with supporting rod.
Preferably, the quantity that the supporting rod is set is four, and each two supporting rod is fixedly connected by fixing piece.
Compared with prior art, the beneficial effects of the utility model are:The high stability scaffold for building, passes through fixation Scaffold is integrally fixed in the cooperation of seat and fixed frame, and wheel is moved scaffold, and connecting shaft is perpendicular to first Bar and the second montant are fixed, and ensure that the stability of montant, and the cooperation of supporting rod and fixed link makes the stability of scaffold It is improved, it is therefore prevented that scaffold rocks when staff works, and the setting of gangboard and hand rod facilitates staff and climb Climb, avoid staff and make a misstep and accident occurs.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
In figure:1st, fixed seat;2nd, fixed block;3rd, contiguous block;4th, fixed frame;, 5 bolts;6th, fixed plate;7th, the first montant; 8th, Quick Release connector;9th, connecting shaft;10th, the second montant;11st, mounting blocks;12nd, railing;13rd, non-slip mat;14th, workbench;15th, it is terraced Plate;16th, fixing piece;17th, hand rod;18th, supporting rod;19th, wheel;20th, wheel carrier;21st, block is consolidated;22nd, fixed link.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained, shall fall within the protection scope of the present invention.
Referring to Fig. 1, the utility model provides a kind of technical solution:A kind of high stability scaffold for building, including it is solid Reservation 1, the top of fixed seat 1 are fixedly connected with fixed block 2, and the top of fixed block 2 is fixedly connected with contiguous block 3, contiguous block 3 Top is fixedly connected with one end of fixed frame 4, and the other end of fixed frame 4 is fixedly connected with fixed plate 6, fixed plate 6 by bolt 5 Right side be fixedly connected with the first montant 7,7 bottom of the first montant is fixedly connected with firm block 21, and the right side of the first montant 7 leads to Cross Quick Release connector 8 and be fixedly connected with supporting rod 18, the top of first montant 7 is fixedly connected with connecting shaft 9, connecting shaft 9 Top is fixedly connected with the second montant 10, and the top of the second montant 10 is fixedly connected with mounting blocks 11, and the top of mounting blocks 11 is consolidated Surely it is connected with workbench 14.
The bottom of firm block 21 is fixedly connected with wheel carrier 20, and the bottom of wheel carrier 20 is fixedly connected with wheel 19 by shaft, And the right side of firm block 21 is fixedly connected with fixed link 22, the top of fixed link 22 is fixedly connected with two hand rods 17, and two It is equidistant between a hand rod 17 to be fixedly connected with four gangboards 15.
In the utility model:The top of workbench 14 is fixedly connected with anti-skid mesh 13, and the left and right ends of workbench 13 are equal It is fixedly connected with railing 12, it is therefore prevented that accident occurs because foot is sliding when staff works.
In the utility model:The surface of gangboard 15 is provided with non-slip mat, ensure that safety during staff's climbing.
In the utility model:The Quick Release connector 8 that passes on left of second montant 10 is fixedly connected with supporting rod 18, strengthens foot The stability of hand cradle.
In the utility model:The quantity that supporting rod 18 is set is four, and each two supporting rod 18 is solid by fixing piece 16 Fixed connection.
Operation principle:Staff installs supporting rod 18 by Quick Release connector 8 first and scaffold is fixed, and passes through The montant of scaffold is fixed in connecting shaft 9, then the position of scaffold is moved by wheel 19, finally by bolt 5 are fixedly mounted fixed seat 1, the position of scaffold are fixed, staff is climbed by gangboard 15 and hand rod 17.
In summary:The high stability scaffold for building, it is whole to scaffold by fixed seat 1 and the cooperation of fixed frame 4 Body is fixed, and wheel 19 is moved scaffold, and the first montant 7 and the second montant 10 is fixed in connecting shaft 9, It ensure that the stability of montant, supporting rod 18 and the cooperation of fixed link 22 are improved the stability of scaffold, it is therefore prevented that work Scaffold rocks when making person works, and the setting of gangboard 15 and hand rod 17 facilitates staff's climbing, avoids work Personnel make a misstep and accident occur.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed, or further include as this process, method, article or equipment Intrinsic key element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from the principle of the utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of high stability scaffold for building, including fixed seat(1), it is characterised in that:The fixed seat(1)Top consolidate Surely it is connected with fixed block(2), the fixed block(2)Top be fixedly connected with contiguous block(3), the contiguous block(3)Top With fixed frame(4)One end be fixedly connected, the fixed frame(4)The other end pass through bolt(5)It is fixedly connected with fixed plate (6), the fixed plate(6)Right side be fixedly connected with the first montant(7), first montant(7)Bottom is fixedly connected with surely Gu block(21), and the first montant(7)Right side pass through Quick Release connector(8)It is fixedly connected with supporting rod(18), first montant (7)Top be fixedly connected with connecting shaft(9), the connecting shaft(9)Top be fixedly connected with the second montant(10), described Two montants(10)Top be fixedly connected with mounting blocks(11), the mounting blocks(11)Top be fixedly connected with workbench (14);
The firm block(21)Bottom be fixedly connected with wheel carrier(20), the wheel carrier(20)Bottom be fixedly connected by shaft There is wheel(19), and firm block(21)Right side be fixedly connected with fixed link(22), the fixed link(22)Top fix connect It is connected to two hand rods(17), and two hand rods(17)Between equidistant be fixedly connected with four gangboards(15).
A kind of 2. high stability scaffold for building according to claim 1, it is characterised in that:The workbench(14)'s Top is fixedly connected with anti-skid mesh(13), and workbench(13)Left and right ends be fixedly connected with railing(12).
A kind of 3. high stability scaffold for building according to claim 1, it is characterised in that:The gangboard(15)Table Face is provided with non-slip mat.
A kind of 4. high stability scaffold for building according to claim 1, it is characterised in that:Second montant(10) Pass on left Quick Release connector(8)It is fixedly connected with supporting rod(18).
A kind of 5. high stability scaffold for building according to claim 1, it is characterised in that:The supporting rod(18)If The quantity put is four, and each two supporting rod(18)Pass through fixing piece(16)It is fixedly connected.
CN201721188889.6U 2017-09-16 2017-09-16 A kind of high stability scaffold for building Expired - Fee Related CN207296335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721188889.6U CN207296335U (en) 2017-09-16 2017-09-16 A kind of high stability scaffold for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721188889.6U CN207296335U (en) 2017-09-16 2017-09-16 A kind of high stability scaffold for building

Publications (1)

Publication Number Publication Date
CN207296335U true CN207296335U (en) 2018-05-01

Family

ID=62442679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721188889.6U Expired - Fee Related CN207296335U (en) 2017-09-16 2017-09-16 A kind of high stability scaffold for building

Country Status (1)

Country Link
CN (1) CN207296335U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021004009A1 (en) * 2019-07-10 2021-01-14 上海建为历保科技股份有限公司 Scaffold used for restoration of large old structures

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021004009A1 (en) * 2019-07-10 2021-01-14 上海建为历保科技股份有限公司 Scaffold used for restoration of large old structures

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN207296335U (en) A kind of high stability scaffold for building
CN205822747U (en) Architectural engineering scaffold
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN205532243U (en) Electric power overhauls with support of ascending a height
CN204876577U (en) Building construction system
CN208533990U (en) A kind of support device for building structure construction
CN206053272U (en) A kind of traveling centering
CN205936370U (en) Module cat ladder that can disassemble
CN214462346U (en) Assembled scaffold for housing construction engineering
CN205296792U (en) Raise scaffold
CN210888010U (en) Construction handling frame
CN213928213U (en) Aluminum alloy profile folding ladder
CN201433558Y (en) Small size scaffold
CN212317446U (en) Anti-falling support for building construction aluminum alloy climbing frame
CN2529945Y (en) Mobile scaffold
CN209723581U (en) A kind of adjustable scaffold ladder
CN209443737U (en) A kind of outer eaves scaffold for building
CN207568153U (en) Floor concrete casting operation platform is built in a kind of room
CN220768776U (en) Scaffold convenient to remove and ascend a height
CN220686692U (en) Cantilever operation platform for installing inclined outer curtain wall keel
CN209443739U (en) A kind of architectural engineering scaffold
CN209384687U (en) A kind of working anti-fall device of structural steelwork
CN220058729U (en) Multifunctional building construction frame
CN212714802U (en) Water conservancy slope protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180711

Address after: 638500, 16 layers of Jin Yun Building, Ting Zi Qiu Lu, Ding Ping Town, Lin Shui county, Guang'an, Sichuan.

Patentee after: Zhengda Construction Group Co.,Ltd.

Address before: 401120 6 New South Road, Yubei District, Chongqing, 2 7, 5-2

Patentee before: Zheng Wei

Effective date of registration: 20180711

Address after: 401120 6 New South Road, Yubei District, Chongqing, 2 7, 5-2

Patentee after: Zheng Wei

Address before: 325014 second, Wutian street, Wutian street, Ouhai District, Wenzhou, Zhejiang, China second

Patentee before: WENZHOU BOFU MUNICIPAL CONSTRUCTION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501

Termination date: 20180916

CF01 Termination of patent right due to non-payment of annual fee