CN212506365U - High pile cap foundation installation system suitable for ultra-shallow water area - Google Patents

High pile cap foundation installation system suitable for ultra-shallow water area Download PDF

Info

Publication number
CN212506365U
CN212506365U CN202021372432.2U CN202021372432U CN212506365U CN 212506365 U CN212506365 U CN 212506365U CN 202021372432 U CN202021372432 U CN 202021372432U CN 212506365 U CN212506365 U CN 212506365U
Authority
CN
China
Prior art keywords
shallow
pile
barge
shallow draft
pile cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021372432.2U
Other languages
Chinese (zh)
Inventor
张健翔
赵玉琢
王怀明
贺广零
陈建征
孔德煌
王小合
宪凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Heavy Industries Co Ltd
Original Assignee
Huadian Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Heavy Industries Co Ltd filed Critical Huadian Heavy Industries Co Ltd
Priority to CN202021372432.2U priority Critical patent/CN212506365U/en
Application granted granted Critical
Publication of CN212506365U publication Critical patent/CN212506365U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Landscapes

  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a wind power generation equipment technical field, concretely relates to be suitable for high pile cap basis mounting system in extremely shallow waters. A high pile cap foundation installation system for use in extremely shallow waters comprising: the shallow draft barge is arranged in a foundation area of a high pile cap to be constructed; a transport vessel adapted to transport material to a shallow draft barge; the hoisting device is arranged on the shallow draft barge; and a pile holding frame for positioning the pile sinking position. The utility model discloses well adoption shallow draft barge replaces traditional pile driving barge, utilizes embracing the pile frame can directly be under construction pile sinking on the shallow draft barge, realizes the installation to high pile cap basis. The utility model discloses well shallow draft barge is mostly the double-deck end, improves the security of operation, and the resource is easily look for, and the low price has reduced the construction cost on high pile cap basis. And the shallow draft barge has shallow draft and enters a part of ultra-shallow water area when the shallow draft barge is still wet, so that the construction range is wide, and meanwhile, part of offshore wind power shallow water machine positions which cannot be constructed have construction conditions.

Description

High pile cap foundation installation system suitable for ultra-shallow water area
Technical Field
The utility model relates to a wind power generation equipment technical field, concretely relates to be suitable for high pile cap basis mounting system in extremely shallow waters.
Background
At the present stage, the development and construction of domestic offshore wind power gradually enter a motorway, and partial offshore wind power projects need to face the problem that the water depth is deep or even extremely shallow (ships can only enter a construction field while being wet and need to be constructed on beach). Particularly, in offshore wind power geology in some areas, a soil covering layer is shallow, a rock stratum is arranged at the lower part, and currently, for the geological condition with the rock stratum at the lower part, the most mature offshore wind power foundation solution is a high-pile bearing platform foundation.
But sinking of high pilings foundations in extremely shallow waters requires the use of a pile driving vessel. The hull structure of the traditional pile driving ship is a single-layer bottom (namely, the bottom of the ship is only one layer), if the bottom of the ship is isolated by barriers (such as rocks), the effect is serious, and if the bottom of the ship is modified into a double-layer bottom, the cost is huge. And the piling ship generally has deeper draft, and a part of places with shallow water depth (about 2 m) can not enter the piling ship while the part is tide.
SUMMERY OF THE UTILITY MODEL
Therefore, the to-be-solved technical problem of the present invention is to overcome the pile sinking problem of high pile cap foundation in the ultra-shallow water area, thereby providing a high pile cap foundation installation system suitable for the ultra-shallow water area.
In order to solve the above problem, the utility model provides a be suitable for high pile cap basis mounting system in extremely shallow waters includes: the shallow draft barge is arranged in a foundation area of a high pile cap to be constructed; a transport vessel adapted to transport material to the shallow draft barge; the hoisting device is arranged on the shallow draft barge; and a pile holding frame for positioning the pile sinking position.
Further, the shallow draft barge is fixed on the foundation area of the high pile cap to be constructed by anchor cables.
Furthermore, the hoisting device is a crawler crane, and at least two crawler cranes are arranged on the shallow draft barge.
Further, the crawler crane is disposed adjacent to a side of the shallow draft barge.
Further, the pile embracing frame is provided with a plurality of guide cylinders, and the guide cylinders are suitable for positioning the steel piles.
Further, the bottom of the pile holding frame is of a suction barrel structure, and a pump prying block system is arranged on the suction barrel.
Further, the hydraulic hammer is suitable for fixing the steel pile in the guide cylinder.
The utility model discloses technical scheme has following advantage:
1. the utility model provides a be suitable for high pile cap basis mounting system in extremely shallow waters includes: the shallow draft barge is arranged in a foundation area of a high pile cap to be constructed; a transport vessel adapted to transport material to a shallow draft barge; the hoisting device is arranged on the shallow draft barge; and a pile holding frame for positioning the pile sinking position.
The utility model discloses well adoption shallow draft barge replaces traditional pile driving barge, utilizes embracing the pile frame can directly be under construction pile sinking on the shallow draft barge, realizes the installation to high pile cap basis. The utility model provides a shallow draft barge is mostly the double-deck end, has improved the security of operation, and the resource easily seeks, and the low price has reduced the construction cost of high pile cap basis. And the shallow draft barge has shallow draft, can enter a part of ultra-shallow water area when being wet, has wide construction range, and simultaneously ensures that part of offshore wind power shallow water machine positions which cannot be constructed have construction conditions.
2. The utility model provides a be suitable for among the high pile cushion cap basis mounting system in extremely shallow waters hoisting accessory be crawler crane, two at least crawler cranes set up on shallow draft barge. The arrangement of the at least two crawler cranes is convenient for hoisting the steel piles transversely placed on the transport ship into a vertical state, so that the subsequent installation is convenient.
3. The utility model provides a bottom of embracing pile frame among the high pile cushion cap basis mounting system who is suitable for extremely shallow waters is suction bucket structure, is provided with pump sled piece system on the suction bucket. The pile embracing frame fixing mode of the suction tube can automatically level the installation bottom of the pile embracing frame by utilizing air pressure and water pressure, and the installation efficiency of the pile embracing frame is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a top view of a high pile cap foundation installation system suitable for an ultra-shallow water area according to an embodiment 1 of the present invention;
fig. 2 is a schematic diagram of a pile sinking process in a high pile cap foundation installation system suitable for an ultra-shallow water area according to the present invention in embodiment 1.
Description of reference numerals:
1-shallow draft barge;
2-a transport ship;
3-hoisting device;
4, embracing a pile frame;
5-a hydraulic hammer;
6-steel piles;
7-anchor cable.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
Example 1
As shown in fig. 1 and 2, the high pile cap foundation installation system for the present embodiment includes: the shallow draft barge 1 is arranged in a foundation area of a high pile cap to be constructed; a transport vessel 2 adapted to transport material to the shallow draft barge 1; the hoisting device 3 is arranged on the shallow draft barge 1; and a pile embracing frame 4 for positioning the pile sinking position.
The shallow draft barge 1 in this embodiment is a bottom-mountable double-deck barge, which is abundant and easy to find.
As shown in fig. 1, the shallow draft barge 1 in the present embodiment is an unpowered vessel, and when construction starts, the shallow draft barge is pulled to the area of the high pile cap foundation to be constructed by using a transport vessel or other power vessels (such as a jettison vessel) and the like, and the shallow draft barge 1 is fixed by using anchor cables 7, so as to provide a good construction platform for the next construction.
After the shallow draft barge 1 is secured, the carrier 2 can transport the lifting devices 3 to the shallow draft barge 1 and effect assembly on the shallow draft barge 1.
In other embodiments, the hoisting device 3 may be assembled on the shallow draft barge 1 in advance, and dragged along with the shallow draft barge 1 into the foundation area of the high pile cap to be constructed.
The hoisting device 3 in the embodiment is a crawler crane which can move freely, and the high-pile sinking platform foundation material can be hoisted conveniently. In the embodiment, two crawler cranes are arranged on the shallow draft barge 1, and the two crawler cranes have different models, one is large and the other is small. When the steel pile 6 is transported in the transport ship 2, the steel pile 6 transversely placed on the transport ship needs to be lifted to be in a vertical state, two crawler cranes respectively lift two ends of the steel pile 6, the lifting heights are different due to different sizes of the crawler cranes, the steel pile 6 is easily lifted to be in a vertical state, and subsequent pile sinking work is facilitated.
Of course, in other embodiments, the number of the crawler cranes can be three, four, etc., so as to improve the efficiency of lifting the materials.
Of course, in other embodiments, the hoisting device may also be a tower crane, a gantry crane, or the like.
To facilitate the lifting of the steel piles 6 from the carrier vessel 2, crawler cranes are mounted close to the side of the shallow draft barge 1.
The shallow draft barge 1 is adopted to replace a traditional piling barge, so that a corresponding pile embracing structure is lacked to realize the positioning piling of the steel pile 6, and the pile embracing frame 4 is provided in the embodiment. The pile embracing frame 4 is provided with a plurality of guide cylinders, wherein the number of the guide cylinders is determined according to the number of the steel piles 6 required in the pile sinking process. Under the hoisting action of the crawler crane, the steel piles 6 are inserted into the guide cylinders, so that the implementation positions of the steel piles 6 are preliminarily positioned.
The pile embracing frame 4 in this embodiment needs to position the steel pile 6, so it needs to be fixed in the area of the foundation of the high pile cap. In order to fix the pile embracing frame 4, the bottom of the pile embracing frame 4 in the embodiment is of a suction barrel structure, and a pump prying block system is arranged on the suction barrel. In the process that the pile embracing frame 4 sinks into the seabed, the suction barrel is filled with water, the water in the suction barrel is continuously sucked out through the pump prying block system, and the suction barrel is gradually pressed into a mud layer on the seabed under the action of the external seawater pressure and the atmospheric pressure, so that the pile embracing frame 4 is fixed. When the quantity of suction bucket is a plurality of, through what more easily control the submerged distance between different suction buckets of suction water yield, conveniently guarantee the levelness of whole embracing pile frame 4.
Of course, in other embodiments, the pile embracing frame 4 may also be driven by pile sinking with a heavy object at the bottom.
After the steel pile 6 is inserted into the guide cylinder in the pile embracing frame 4 under the action of the crawler crane, preliminary fixing is realized under the action of the pile embracing frame 4. And then the crawler crane lifts the hydraulic hammer 5, the upper end of the steel pile 6 is beaten, and the steel pile 6 is wedged into the seabed mud layer to realize final fixation.
After the steel piles 6 are fixed, subsequent rock-socketed construction is carried out. Before the rock-socketed construction is carried out, water is injected into the suction barrel of the pile embracing frame 4 and ejected out, the pile embracing frame 4 is hoisted back to the shallow draft barge 1, and then the rock-socketed platform is installed for the rock-socketed construction. Because the construction period of the rock-socketed construction is longer, the rock-socketed construction does not use shallow draft to participate. After the shallow draft barge finishes pile sinking operation, the shallow draft barge can go to the next machine position for construction, and the construction efficiency is improved.
And (4) carrying out bearing platform construction after rock-socketed construction, wherein the construction mainly comprises the steps of binding of steel bars in the traditional bearing platform, installation of a foundation ring, concrete pouring and the like.
Therefore, in the embodiment, the shallow draft barge is adopted to replace the traditional pile driving barge, and pile sinking can be directly constructed on the shallow draft barge by utilizing the pile embracing frame, so that the high pile cap foundation is installed. The shallow draft barge in the embodiment is mostly provided with double-layer bottoms, so that the operation safety is improved, the resources are easy to find, the price is low, and the construction cost of the high pile cap foundation is reduced. And the shallow draft barge has shallow draft, can enter a part of ultra-shallow water area when being wet, has wide construction range, and simultaneously ensures that part of offshore wind power shallow water machine positions which cannot be constructed have construction conditions.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications can be made without departing from the scope of the invention.

Claims (7)

1. A high pile cap foundation installation system adapted for use in extremely shallow waters comprising:
the shallow draft barge (1) is arranged in a foundation area of a high pile cap to be constructed;
a transport vessel (2) adapted to transport material to the shallow draft barge (1);
a lifting device (3) arranged on the shallow draft barge (1);
and a pile holding frame (4) for positioning the pile sinking position.
2. High pile cap foundation installation system for very shallow waters according to claim 1, characterised in that the shallow draft barge (1) is anchored at the high pile cap foundation area to be constructed with anchor lines.
3. High pile cap foundation installation system for extremely shallow waters according to claim 1, characterised in that the hoisting means (3) are crawler cranes, at least two crawler cranes being arranged on the shallow draft barge (1).
4. High pile cap foundation installation system for extremely shallow waters according to claim 3, characterised in that the crawler cranes are placed close to the sides of the shallow draft barge (1).
5. High pile cap foundation installation system for very shallow waters according to claim 1, characterised in that the pile embracing frame (4) has several guiding cylinders adapted to position the steel piles (6).
6. The system for installing the foundation of the high pile cap suitable for the ultra-shallow water areas according to claim 5, wherein the bottom of the pile embracing frame (4) is of a suction bucket structure, and a pump pry block system is arranged on the suction bucket.
7. The system for the installation of a foundation of a high pile cap suitable for extremely shallow waters according to claim 5, characterized in that it comprises a hydraulic hammer (5) suitable for fixing the steel pile (6) in the guide cylinder.
CN202021372432.2U 2020-07-13 2020-07-13 High pile cap foundation installation system suitable for ultra-shallow water area Active CN212506365U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021372432.2U CN212506365U (en) 2020-07-13 2020-07-13 High pile cap foundation installation system suitable for ultra-shallow water area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021372432.2U CN212506365U (en) 2020-07-13 2020-07-13 High pile cap foundation installation system suitable for ultra-shallow water area

Publications (1)

Publication Number Publication Date
CN212506365U true CN212506365U (en) 2021-02-09

Family

ID=74437008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021372432.2U Active CN212506365U (en) 2020-07-13 2020-07-13 High pile cap foundation installation system suitable for ultra-shallow water area

Country Status (1)

Country Link
CN (1) CN212506365U (en)

Similar Documents

Publication Publication Date Title
CN107542101B (en) Construction method of offshore four-buoy-buoyancy tank combined foundation structure
EP2837554A1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN111661273B (en) Installation and construction method of deep and open sea semi-submersible fan
CN103362113B (en) Offshore wind farm, bridge and marine works local buoyancy ocean platform and construction method
CN113026803B (en) Suction bucket-pile foundation composite structure applied to offshore electrical platform and construction method
CN205044921U (en) Multi -functional marine construction is from peaceful platform
CN102116017B (en) Foam platform for drilling on waterways
CN110761286A (en) Negative pressure cylinder type pile-first method jacket piling positioning guide device and working method
CN108454790A (en) Sit bottom jack up wind-powered electricity generation pile driving barge
CN111456075A (en) Pile barrel composite truss type offshore wind turbine foundation and construction process thereof
CN114855865B (en) Tensioning type fan foundation anchored on rock-based seabed and arrangement method
CN113047253A (en) Multifunctional self-elevating offshore wind power construction platform
CN210797617U (en) Pile barrel composite truss type offshore wind turbine foundation
CN202023182U (en) Waterborne drilling foam platform
CN201713827U (en) Fan base structure of offshore wind power station
CN212506365U (en) High pile cap foundation installation system suitable for ultra-shallow water area
CN211200388U (en) Negative pressure cylinder type pile-first method jacket piling positioning guide device
CN217870596U (en) Tensioning type fan foundation anchored on foundation seabed
CN201971133U (en) Bottom-supported blower installation platform
CN207143999U (en) A kind of underwater immersed tube and the device for setting up underwater immersed tube
CN214940343U (en) Floating suction cylinder foundation
CN111794262A (en) High pile cap foundation installation system and method suitable for ultra-shallow water area
CN214657029U (en) Single-column guide frame suitable for offshore wind power jacket foundation construction
CN212335969U (en) Migration base plate type positioning and piling integrated platform
CN113356179A (en) Treatment method of hydraulic structure foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant