CN212475959U - Material lifting device for building construction - Google Patents

Material lifting device for building construction Download PDF

Info

Publication number
CN212475959U
CN212475959U CN202020517769.1U CN202020517769U CN212475959U CN 212475959 U CN212475959 U CN 212475959U CN 202020517769 U CN202020517769 U CN 202020517769U CN 212475959 U CN212475959 U CN 212475959U
Authority
CN
China
Prior art keywords
pulley
lifting rope
bottom plate
supporting plate
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020517769.1U
Other languages
Chinese (zh)
Inventor
葛志晟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoguan Fubang Construction Engineering Co.,Ltd.
Original Assignee
葛志晟
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 葛志晟 filed Critical 葛志晟
Priority to CN202020517769.1U priority Critical patent/CN212475959U/en
Application granted granted Critical
Publication of CN212475959U publication Critical patent/CN212475959U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a material lifting device for building construction, which comprises a bottom plate and a carrying device, wherein four support rods are arranged at the upper end of the bottom plate, a telescopic rod is arranged at the upper end of each support rod, a supporting plate is arranged at the upper end of the telescopic rod, a pulley is arranged at the right end of the supporting plate, a braking device is arranged at the upper end of the supporting plate, a conveying device is arranged at the lower end of the supporting, the conveying device is connected with the supporting plate in a sliding way, the lower end of the conveying device is provided with a lifting rope, the lower end of the lifting rope is provided with a connecting frame, the lower side of the connecting frame is provided with a carrying device, the braking device comprises a motor and a dragging wheel, the right end of the motor is provided with a bracket, a take-up pulley is sleeved in the bracket, the surface of the take-up pulley is provided with the lifting rope, the right side of the take-up pulley is provided with the, and drag the leading wheel and pass through the lifting rope and connect the take-up pulley, carrying device includes the shell, and the anterior installation round pin of shell left end, shell left end rear portion installation pinhole, the box is established to the shell endotheca, and box and shell sliding connection, and box left end middle part sets up the handle.

Description

Material lifting device for building construction
Technical Field
The utility model relates to a hoisting device specifically is a material hoisting device for construction.
Background
In the building construction, need regularly transport the building raw materials and the instrument on ground to the operation platform of take the altitude, material hoisting device for the building construction can save operating time and manpower resources through mechanical transportation material. However, the material lifting device for building construction in the current market needs to bind or clamp and embed a lifted object on the lifting hook before lifting the material, and needs to manually remove the bound or lifted material to separate the material from the lifting hook after being conveyed to a designated position, so that the process is complicated, and the construction efficiency is reduced.
Therefore, the utility model provides a material lifting device for construction to solve the above-mentioned problem of proposing.
Disclosure of Invention
An object of the utility model is to provide a material hoisting device for construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a material lifting device for building construction comprises a bottom plate and a carrying device, wherein four support rods are installed at the upper end of the bottom plate, telescopic rods are installed at the upper ends of the support rods and are connected with the support rods in a sliding mode, a supporting plate is installed at the upper end of each telescopic rod, pulleys are installed at the right end of the supporting plate, a braking device is installed at the upper end of the supporting plate, a conveying device is installed at the lower end of the supporting plate and is connected with the supporting plate in a sliding mode, lifting ropes are arranged at the lower end of each conveying device, a connecting frame is installed at the lower end of each lifting rope, the carrying device is installed on the lower side of the connecting frame and comprises a motor and a dragging wheel, the right end of the motor is installed with a supporting frame, a wire winding wheel is sleeved in the supporting frame, lifting ropes are arranged on the surface of the winding wheels and are connected with the winding wheels in a rolling mode, the dragging wheels are arranged, the right end of the upper chute is provided with a first threaded rod, the right end of the first threaded rod is provided with a first threaded hole, the first threaded hole is in threaded connection with the first threaded rod, the upper end of the first threaded hole is fixedly connected with the right part of the lower end of the supporting plate, the lower end of the upper chute is provided with a lower chute, the lower chute is in sliding connection with the upper chute, the right end of the lower chute is provided with a second threaded rod, the second threaded hole is in threaded connection with the second threaded rod, the upper end of the second threaded hole is fixedly connected with the right part of the lower end of the upper chute, the middle part of the lower end of the upper chute is provided with a sliding block, the lower end of the sliding block is provided with a connecting block, the lower side of the connecting block is provided with a connecting frame, the lower side of the connecting frame is provided with a carrying device, the connecting, and the box body is connected with the shell in a sliding way, and the middle part of the left end of the box body is provided with a handle.
As a further scheme of the utility model, be equipped with the gyro wheel in the connecting block, and the lifting rope passes through gyro wheel connection pulley and link.
As the utility model discloses further scheme again, four backup pads of bottom plate upper end installation, and backup pad symmetric distribution are in bottom plate upper end four corners.
As the utility model discloses the scheme of furthering again, bottom plate upper end installation slide rail, and slide rail and carrying device sliding connection.
As a further proposal, a connecting plate is arranged between the two front supporting rods of the bottom plate and the two rear supporting rods of the bottom plate.
As the utility model discloses scheme further again, two anterior branch front ends of bottom plate are equipped with control panel, and control panel is located the branch middle part.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses an adjustment telescopic link is with this control work height, and the workman on ground directly puts into the box with the material, and the box is transported the position that is close to the eminence workman through arresting gear and conveyor, and the workman of eminence only needs the rotational pin alright directly take the material out, and this process has shortened the time that the workman put in and take the material greatly, has promoted work efficiency.
Drawings
Fig. 1 is a schematic structural view of a material lifting device for building construction.
Fig. 2 is a schematic structural view of a braking device in the material lifting device for building construction.
Fig. 3 is a schematic structural view of a slide block in the material lifting device for building construction.
Fig. 4 is a schematic structural view of a conveyor in a material lifting device for building construction.
Fig. 5 is a schematic structural view of a carrying device in the material lifting device for building construction.
In the figure: 1. a base plate; 2. a slide rail; 3. a strut; 4. a telescopic rod; 5. a support plate; 51. a first threaded rod; 52. a first threaded hole; 6. a braking device; 61. a motor; 62. a support; 63. a take-up pulley; 64. a lifting rope; 65. a dragging wheel; 7. a conveyance device; 71. an upper chute; 72. a lower chute; 73. a second threaded hole; 74. a second threaded rod; 75. a pulley; 76. connecting blocks; 77. a slider; 8. a pin hole; 9. a pin; 10. a carrying device; 101. a housing; 102. a handle; 103. a box body; 11. A connecting plate; 12. a support plate; 13. a connecting frame; 14. a control panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 5, in the embodiment of the present invention, a material lifting device for building construction comprises a bottom plate 1 and a carrying device 10, wherein four support rods 3 are installed at the upper end of the bottom plate 1, a telescopic rod 4 is installed at the upper end of each support rod 3, the telescopic rod 4 is slidably connected with the support rods 3, a supporting plate 5 is installed at the upper end of each telescopic rod 4, a pulley 75 is installed at the right end of the supporting plate 5, a braking device 6 is installed at the upper end of the supporting plate 5, a conveying device 7 is installed at the lower end of the supporting plate 5, the conveying device 7 is slidably connected with the supporting plate 5, a lifting rope 64 is arranged at the lower end of the conveying device 7, a connecting frame 13 is installed at the lower end of the lifting rope 64, the carrying device 10 is installed at the lower side of the connecting frame 13, the braking device 6 comprises a motor 61 and a dragging wheel 65, a bracket 62 is installed at the right end of the motor 61, a take-, the dragging wheel 65 is connected with the take-up wheel 63 through the lifting rope 64, the dragging wheel 65 is connected with the lifting rope 64 in a rolling way, the conveying device 7 comprises an upper chute 71 and a sliding block 77, the upper end of the upper chute 71 is connected with the supporting plate 5 in a sliding way, the right end of the upper chute 71 is provided with a first threaded rod 51, the right end of the first threaded rod 51 is provided with a first threaded hole 52, the first threaded hole 52 is in threaded connection with the first threaded rod 51, the upper end of the first threaded hole 52 is fixedly connected with the right part of the lower end of the supporting plate 5, the lower end of the upper chute 71 is provided with a lower chute 72, the lower chute 72 is in sliding connection with the upper chute 71, the right end of the lower chute 72 is provided with a second threaded rod 74, the right end of the second threaded rod 74 is provided with a second threaded hole 73, the second threaded hole 73 is in threaded connection with the second threaded rod 74, a connecting frame 13 is arranged at the lower side of the connecting block 76, a carrying device 10 is arranged at the lower side of the connecting frame 13, the connecting frame 13 is connected with the connecting block 76 and the carrying device 10 through a lifting rope 64, the carrying device 10 comprises a shell 101, a pin 9 is arranged at the front part of the left end of the shell 101, the pin 9 is rotationally connected with the shell 101, a pin hole 8 is arranged at the rear part of the left end of the shell 101, a box body 103 is sleeved in the shell 101, the box body 103 is slidably connected with the shell 101, a handle 102 is arranged at the middle part of the left end of the box body 103, rollers are arranged in the connecting block 76, the lifting rope 64 is connected with a pulley 75 and the connecting frame 13 through the rollers, four supporting plates 12 are arranged at the upper end of the bottom plate 1, the supporting plates 12 are symmetrically distributed at four corners of the upper end of the bottom plate 1, sliding rails 2 are arranged at, the front ends of the two support rods 3 at the front part of the bottom plate 1 are provided with control panels 14, and the control panels 14 are positioned in the middle parts of the support rods 3.
The utility model discloses a theory of operation is: the supporting plate 12 is fixed with the ground, the telescopic rod 4 is drawn out of the supporting rod 3 to a proper length, required materials are placed in the box body 103, the box body 103 is fixed in the shell 101 through the rotating pin 9 to the pin hole 8, the carrying device 10 moves to the position under the supporting plate 5 along the sliding rail 2, the motor 61 is started to drive the take-up pulley 63 to rotate, the lifting rope 64 lifts the carrying device 10 through the drawing wheel 65 and the connecting frame 13, when the specified height is reached, the threaded rod one 51 rotates, the upper sliding groove 71 slides leftwards relative to the supporting plate 5, similarly, the lower sliding groove 72 slides leftwards relative to the upper sliding groove 71, the sliding block 77 slides to the specified position in the upper sliding groove 71 and the lower sliding groove 72, the rotating pin 9 is separated from the pin hole 8, the box body 103 is drawn out through.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A material lifting device for building construction is characterized by comprising a bottom plate (1) and a carrying device (10), wherein four supporting rods (3) are installed at the upper end of the bottom plate (1), telescopic rods (4) are installed at the upper ends of the supporting rods (3), the telescopic rods (4) are connected with the supporting rods (3) in a sliding mode, a supporting plate (5) is installed at the upper end of each telescopic rod (4), pulleys (75) are installed at the right end of the supporting plate (5), a braking device (6) is installed at the upper end of the supporting plate (5), a conveying device (7) is installed at the lower end of the supporting plate (5), the conveying device (7) is connected with the supporting plate (5) in a sliding mode, a lifting rope (64) is arranged at the lower end of the conveying device (7), a connecting frame (13) is installed at the lower end of the lifting rope (64), the carrying device (10) is installed at the lower side of the, a take-up pulley (63) is sleeved in the support (62), a lifting rope (64) is arranged on the surface of the take-up pulley (63), the lifting rope (64) is connected with the take-up pulley (63) in a rolling manner, a dragging wheel (65) is arranged on the right side of the take-up pulley (63), the dragging wheel (65) is connected with the take-up pulley (63) through the lifting rope (64), the dragging wheel (65) is connected with the lifting rope (64) in a rolling manner, the conveying device (7) comprises an upper chute (71) and a sliding block (77), the upper end of the upper chute (71) is connected with the supporting plate (5) in a sliding manner, the right end of the upper chute (71) is provided with a threaded rod I (51), the right end of the threaded rod I (51) is provided with a threaded hole I (52), the threaded hole I (52) is connected with the threaded rod I (51) in a threaded manner, the upper end of the threaded hole I (52) is fixedly connected with the right end of the, a second threaded rod (74) is arranged at the right end of the lower sliding groove (72), a second threaded hole (73) is arranged at the right end of the second threaded rod (74), the second threaded hole (73) is in threaded connection with the second threaded rod (74), the upper end of the second threaded hole (73) is fixedly connected with the right part of the lower end of the upper sliding groove (71), a sliding block (77) is installed in the middle of the lower end of the upper sliding groove (71), the sliding block (77) is in sliding connection with the upper sliding groove (71), a connecting block (76) is installed at the lower end of the sliding block (77), a connecting frame (13) is installed at the lower side of the connecting block (76), a carrying device (10) is installed at the lower side of the connecting frame (13), the connecting frame (13) is connected with the connecting block (76) and the carrying device (10) through a lifting rope (64), the carrying device (10) comprises a shell (101), a pin (9, the box body (103) is sleeved in the shell (101), the box body (103) is connected with the shell (101) in a sliding mode, and the middle of the left end of the box body (103) is provided with the handle (102).
2. The material lifting device for building construction as claimed in claim 1, wherein a roller is provided in the connecting block (76), and the lifting rope (64) is connected to the pulley (75) and the connecting frame (13) through the roller.
3. The material lifting device for building construction according to claim 1, characterized in that four supporting plates (12) are installed at the upper end of the bottom plate (1), and the supporting plates (12) are symmetrically distributed at four corners of the upper end of the bottom plate (1).
4. The material lifting device for building construction according to claim 1, characterized in that the upper end of the bottom plate (1) is provided with a slide rail (2), and the slide rail (2) is connected with the carrying device (10) in a sliding way.
5. The material lifting device for building construction according to claim 1, characterized in that a connecting plate (11) is installed between the two struts (3) at the front of the bottom plate (1) and the two struts (3) at the rear of the bottom plate (1).
6. The material lifting device for building construction according to claim 1, characterized in that the front ends of the two struts (3) at the front part of the bottom plate (1) are provided with control panels (14), and the control panels (14) are positioned in the middle parts of the struts (3).
CN202020517769.1U 2020-04-08 2020-04-08 Material lifting device for building construction Active CN212475959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020517769.1U CN212475959U (en) 2020-04-08 2020-04-08 Material lifting device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020517769.1U CN212475959U (en) 2020-04-08 2020-04-08 Material lifting device for building construction

Publications (1)

Publication Number Publication Date
CN212475959U true CN212475959U (en) 2021-02-05

Family

ID=74450522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020517769.1U Active CN212475959U (en) 2020-04-08 2020-04-08 Material lifting device for building construction

Country Status (1)

Country Link
CN (1) CN212475959U (en)

Similar Documents

Publication Publication Date Title
CN204433827U (en) A kind of grain delivery trolley and magazine loading attachment
CN206172883U (en) Large pipe support promotes device of taking one's place
CN110733847A (en) automatic sand paving device on hydraulic engineering inclined plane
CN205114772U (en) Perpendicular conveyer of ready -package elevartor shaft material
CN212475959U (en) Material lifting device for building construction
CN207483217U (en) A kind of building crane
CN211173166U (en) Building construction overhanging type mobile blanking platform
CN217537955U (en) Safe elevating gear based on housing construction
CN203173281U (en) Retractable belt conveyor
CN206125079U (en) Communication cable transfer car(buggy) of being under construction
CN204980884U (en) Lifting mechanism
CN211444885U (en) Elevating gear for construction
CN208980255U (en) Unpowered stringing pallet
CN113213315A (en) Transfer method for building partition board
CN209908537U (en) A handling device for tunnel lining cutting platform truck rail
CN110817693A (en) Quick installation of wiping line, maintenance device
CN218025006U (en) Highway construction is with simple and easy hoist and mount conveyer
CN211545790U (en) Raw material lifting device for shopping bag production
CN217708606U (en) Material conveying and lifting equipment for bridge construction of bridge engineering
CN219314469U (en) A conveyer for electronic sofa production
CN220950757U (en) Steel turning plate of safety channel for construction elevator
CN211393602U (en) Quick installation of wiping line, maintenance device
CN208378253U (en) A kind of Engine Hoisting conveyer
CN219312799U (en) Material conveying device for tunnel construction
CN210794911U (en) Automatic carrying and overturning equipment for optical fiber perform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210811

Address after: 512000 No. a, floor 9, office building a, Fortune Plaza, wulitingliang village, Zhenjiang District, Shaoguan City, Guangdong Province

Patentee after: Shaoguan Fubang Construction Engineering Co.,Ltd.

Address before: 232000 23-1-7, Qianfeng village, Guoqing Road, tianjia'an District, Huainan City, Anhui Province

Patentee before: Ge Zhicheng

TR01 Transfer of patent right