CN212452654U - Safe operation platform of construction usefulness on foundation ditch - Google Patents
Safe operation platform of construction usefulness on foundation ditch Download PDFInfo
- Publication number
- CN212452654U CN212452654U CN202021347419.1U CN202021347419U CN212452654U CN 212452654 U CN212452654 U CN 212452654U CN 202021347419 U CN202021347419 U CN 202021347419U CN 212452654 U CN212452654 U CN 212452654U
- Authority
- CN
- China
- Prior art keywords
- girder
- auxiliary
- foundation pit
- lacing wire
- footpath
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to a safe operation platform of construction usefulness on foundation ditch, including two piece at least horizontal girders, set up two piece at least auxiliary beams in the middle of two girders, a footpath roof beam of every girder outside parallel arrangement, set up a supporting beam in the middle of two auxiliary beams, set up a supporting beam in the middle of footpath roof beam and the girder, set up the enhancement lacing wire between girder and the auxiliary beam, set up the lug on the girder, all girder, auxiliary beam, footpath roof beam top all set up safety fence, the full deck scaffold board in whole supporting beam top. The operation platform can assemble all components on the flat ground, the safe operation platform is directly and stably placed above the foundation pit by using a crane, and the safe operation platform can be integrally circulated and used one by one in a close distance without erecting a scaffold from the bottom of the foundation pit; the platform is convenient to disassemble and transport, manpower and material resources are saved, the construction period and the construction cost are reduced, and safety risks are avoided.
Description
Technical Field
The utility model relates to an operation platform, specificly relate to a safe operation platform of construction usefulness on the foundation ditch.
Background
At present, in the construction process of transmission and transformation line engineering, when the foundation of a power line tower is built, a larger foundation pit needs to be excavated, and a base and a support column need to be installed in the foundation pit and concrete needs to be poured. Usually the support is located near the very center of the pit, and the height of the support is level with or slightly above the ground. In the construction process, the vibration rod is manually operated, and the levelness and the height are manually measured at the position of the strut, namely the center suspension position of the foundation pit. Constructors often need to set up higher scaffolds.
When the base and the support pillar need to be poured with concrete at the same time, the rooting points of the scaffold are not arranged, and the scaffold cannot be erected. Thus, concrete vibration defoaming and related measurement work of the strut will not be performed. Under the existing construction technology, the base can only be poured with concrete and cured, the base is used as a scaffold rooting point, a scaffold is erected on the base, and then other work of the foundation pit center pillar is completed. Therefore, a safe operation platform for construction on a foundation pit is needed to solve the problem of suspended operation in the center of the foundation pit.
At present, a construction mode is to pour a pillar and a base in two steps and erect a scaffold, so that the construction period is long, the operation steps are complicated, the construction period is not favorable to be saved, and more potential safety hazards exist.
Disclosure of Invention
The technical problem to be solved is solved.
The utility model is not enough to prior art, the utility model aims to overcome above-mentioned defect, provide a simple structure, be convenient for the equipment demolish with remote transportation, can wholly closely circulate and use, construction material cost and time are with low costs, the safe operation platform can be dismantled to the defeated transformer line that the security performance is high.
The second technical proposal.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a safe operation platform of construction usefulness on foundation ditch which characterized in that: including two piece at least horizontal girder, set up two piece at least auxiliary girder in the middle of two girders, a pavement roof beam of every girder outside parallel arrangement, set up a supporting beam in the middle of two auxiliary girder, set up a supporting beam in the middle of pavement roof beam and the girder, set up between girder and the auxiliary girder and strengthen the lacing wire, set up the lug on the girder, all girder, auxiliary girder, pavement roof beam top all set up security fence, full deck scaffold board in a complete supporting beam top.
Furthermore, the main beam and the auxiliary beam are connected by bolts or buckles, and the auxiliary beam is arranged above the main beam at the connection position; the main beam and the supporting beam are connected by bolts or buckles, and the supporting beam is arranged above the main beam at the connection part; the auxiliary beam and the supporting beam are connected by bolts or buckles, and the supporting beam is arranged above the auxiliary beam at the connecting part; the footpath beams are connected with the supporting beams by bolts or buckles, and the supporting beams are arranged above the footpath beams at the connecting parts.
Further, adopt bolted connection or buckle connection between girder and the enhancement lacing wire, adopt bolted connection or buckle connection between auxiliary girder and the enhancement lacing wire, the enhancement lacing wire sets up respectively in the below of girder and auxiliary girder, strengthen lacing wire and girder contained angle 45, strengthen lacing wire and auxiliary girder contained angle 45.
Furthermore, the connection mode between each main beam and the lifting lug is welding.
Furthermore, a sleeve plugging mode is adopted among the main beam, the auxiliary beam, the footpath beam and the fence.
Furthermore, the included angle between the main beam and the edge of the foundation pit is not more than 60 degrees, and the main beam is firmly arranged on the edge of the foundation pit.
(III) the beneficial effects.
The utility model discloses simple structure, girder and auxiliary girder, a supporting beam intermediate junction use bolted connection or buckle to be connected, and safe firm to set up security fence, the risk that work does not have the eminence to fall on the platform. The utility model is convenient to assemble, can assemble all components on the flat ground, uses a crane to directly and stably place the safe operation platform above the foundation pit for direct use, can be wholly used one by one in a short distance without erecting a scaffold from the bottom of the foundation pit; the platform is convenient to disassemble and transport, manpower and material resources are saved, the construction period and the construction cost are reduced, and safety risks are avoided.
Drawings
FIG. 1 is a schematic view of the structure of the present invention; fig. 2 is a side view of the structure of the present invention shown in fig. 1 from direction a.
In the figure: 1-main beam, 2-auxiliary beam, 3-footpath beam, 4-supporting beam, 5-reinforcing tie bar, 6-fence, 7-lifting lug and 8-foundation pit.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "right center", "horizontal", "parallel", "middle", "upper", "outer", "lower", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
As shown in fig. 1, the safe operation platform for construction on a foundation pit comprises two horizontal main beams 1, two auxiliary beams 2, two footpath beams 3, twelve supporting beams 4, four reinforcing tie bars 5, thirty-meter fences 6 and four lifting lugs 7. Two auxiliary beams 2 are arranged between the two main beams 1, the joints of the main beams 1 and the auxiliary beams 2 are connected by bolts, and the auxiliary beams 2 are arranged above the main beams 1 at the joints; a footpath beam 3 is arranged on the outer side of each main beam 1 in parallel, four support beams 4 are arranged between each footpath beam 3 and the main beam 1, the joints of the main beams 1 and the support beams 4 are connected by bolts, the support beams 4 are arranged above the main beams 1 at the joints, the joints of the footpath beams 3 and the support beams 4 are connected by bolts, and the support beams 4 are arranged above the footpath beams 3 at the joints; four supporting beams 4 are arranged between the two auxiliary beams 2, the joints of the auxiliary beams 2 and the supporting beams 4 are connected by bolts, and the supporting beams 4 are arranged above the auxiliary beams 2 at the joints; a reinforcing lacing wire 5 is arranged between the main beam 1 and the auxiliary beam 2, the joint of the main beam 1 and the reinforcing lacing wire 5 is connected by a bolt, the joint of the auxiliary beam 2 and the reinforcing lacing wire 5 is connected by a bolt, the reinforcing lacing wire 5 is respectively arranged below the main beam 1 and the auxiliary beam 2, the included angle between the reinforcing lacing wire 5 and the main beam 1 is 45 degrees, and the included angle between the reinforcing lacing wire 5 and the auxiliary beam 2 is 45 degrees; two lifting lugs 7 are arranged on each main beam 1, and the lifting lugs 7 are connected with the main beams 1 in a welding mode; safety fences 6 are arranged above the main beam 1, the auxiliary beam 2 and the footpath beam 3, and a sleeve plugging mode is adopted among the main beam 1, the auxiliary beam 2, the footpath beam 3 and the fences 6; fully paving scaffold boards on all the support beams 4; an included angle between the main beam 1 and the edge of the foundation pit 8 is not more than 60 degrees, and the main beam is firmly arranged on the edge of the foundation pit 8.
After one foundation pit 8 is constructed and used, the crane can be used for integrally transferring the operation platform to the next foundation pit for continuous use.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can substitute or change the technical solution and the inventive concept of the present invention within the technical scope of the present invention.
Claims (6)
1. The utility model provides a safe operation platform of construction usefulness on foundation ditch which characterized in that: including two piece at least horizontal girder (1), set up two piece at least auxiliary girder (2) in the middle of two girder (1), a pavement roof beam (3) of every girder (1) outside parallel arrangement, set up a supporting beam (4) in the middle of two auxiliary girder (2), set up a supporting beam (4) in the middle of pavement roof beam (3) and girder (1), girder (1) sets up in the middle of auxiliary girder (2) and strengthens lacing wire (5), set up lug (7) on every girder (1), auxiliary girder (2) and pavement roof beam (3) top set up rail (6), the full pavement scaffold board in all supporting beam (4) tops.
2. A safety work platform for use in constructing a foundation pit as claimed in claim 1, wherein: the main beam (1) and the auxiliary beam (2) are connected by bolts or buckles, and the auxiliary beam (2) is arranged above the main beam (1) at the joint; the main beam (1) is connected with the supporting beam (4) through bolts or buckles, and the supporting beam (4) is arranged above the main beam (1) at the connecting part; the auxiliary beam (2) is connected with the supporting beam (4) through bolts or buckles, and the supporting beam (4) is arranged above the auxiliary beam (2) at the connecting part; the footpath beam (3) and the supporting beam (4) are connected by adopting a bolt or a buckle, and the supporting beam (4) is arranged above the footpath beam (3) at the joint.
3. A safety work platform for use in constructing a foundation pit as claimed in claim 1, wherein: adopt bolted connection or buckle connection between girder (1) and the enhancement lacing wire (5), adopt bolted connection or buckle connection between auxiliary girder (2) and the enhancement lacing wire (5), it sets up respectively in the below of girder (1) and auxiliary girder (2) to strengthen lacing wire (5), strengthen lacing wire (5) and girder (1) contained angle 45, strengthen lacing wire (5) and auxiliary girder (2) contained angle 45.
4. A safety work platform for use in constructing a foundation pit as claimed in claim 1, wherein: the connection mode between each main beam (1) and the lifting lug (7) is welding.
5. A safety work platform for use in constructing a foundation pit as claimed in claim 1, wherein: the main beam (1), the auxiliary beam (2), the footpath beam (3) and the fence (6) are plugged in and pulled out through sleeves.
6. A safety work platform for use in constructing a foundation pit as claimed in claim 1, wherein: the included angle between the main beam (1) and the edge of the foundation pit (8) is not more than 60 degrees, and the main beam is firmly arranged on the edge of the foundation pit (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021347419.1U CN212452654U (en) | 2020-07-10 | 2020-07-10 | Safe operation platform of construction usefulness on foundation ditch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021347419.1U CN212452654U (en) | 2020-07-10 | 2020-07-10 | Safe operation platform of construction usefulness on foundation ditch |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212452654U true CN212452654U (en) | 2021-02-02 |
Family
ID=74484383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021347419.1U Active CN212452654U (en) | 2020-07-10 | 2020-07-10 | Safe operation platform of construction usefulness on foundation ditch |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212452654U (en) |
-
2020
- 2020-07-10 CN CN202021347419.1U patent/CN212452654U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205775852U (en) | A kind of active force conversion support for steel structure support moulding bed top | |
CN103321155B (en) | Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier | |
CN207974601U (en) | A kind of large size earthing concrete tank dome steel support structure | |
CN215760673U (en) | Temporary supporting structure for shuttle-shaped column | |
CN102261043A (en) | Assembled steel pipe upright post system | |
CN111676972A (en) | Safe operation platform of construction usefulness on foundation ditch | |
CN205369229U (en) | But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid | |
CN212897482U (en) | Construction platform for high-rise building overhanging structural layer | |
CN212452654U (en) | Safe operation platform of construction usefulness on foundation ditch | |
CN111809654A (en) | Assembled tower crane foundation structure | |
CN209798542U (en) | safety construction assembled bent cap operation platform | |
CN211815605U (en) | Construction device for pile column type pier tie beam and capping beam | |
CN202152442U (en) | Assembling type steel tube-vertical post system | |
CN205296206U (en) | Tower cane foundation | |
CN105544402B (en) | A kind of hanging gang form support frame and construction method for pier capping beam high | |
CN210369025U (en) | Floor-free tower crane foundation construction structure with steel structure | |
CN209906223U (en) | Beam gantry crane | |
CN114482561A (en) | Steel structure roof installation method | |
CN208685457U (en) | Cast-in-place box beam bracket device | |
CN203923923U (en) | High pier steel truss girder sets up gate-type lifting station | |
CN206655113U (en) | Lattice support post and overhead rail system for overhead rail system | |
CN206655064U (en) | Type steel support column and overhead rail system for overhead rail system | |
CN111119222A (en) | Assembling device for ultra-high voltage direct current transmission line iron tower in alpine region | |
CN205617245U (en) | A unsettled built -up plate support frame for high pier capping beam | |
CN218989921U (en) | Reinforcing bar operation platform of superelevation pier shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |