CN212447653U - Shallow is transported to polyethylene winding arrangement wall pipe - Google Patents

Shallow is transported to polyethylene winding arrangement wall pipe Download PDF

Info

Publication number
CN212447653U
CN212447653U CN202020472179.1U CN202020472179U CN212447653U CN 212447653 U CN212447653 U CN 212447653U CN 202020472179 U CN202020472179 U CN 202020472179U CN 212447653 U CN212447653 U CN 212447653U
Authority
CN
China
Prior art keywords
rope
recess
back timber
groove
curb plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020472179.1U
Other languages
Chinese (zh)
Inventor
刘品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Hehua Technology Co ltd
Original Assignee
Jiangxi Hehua Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Hehua Technology Co ltd filed Critical Jiangxi Hehua Technology Co ltd
Priority to CN202020472179.1U priority Critical patent/CN212447653U/en
Application granted granted Critical
Publication of CN212447653U publication Critical patent/CN212447653U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pallets (AREA)

Abstract

The utility model relates to a tubular product production facility field provides a shallow is transported to polyethylene winding arrangement wall pipe. The bottom plate comprises a base plate, the both sides of bottom plate are equipped with the curb plate, it leads to the groove to be equipped with the curb plate in the middle of the curb plate, the top of curb plate is equipped with the back timber, the back timber is equipped with the recess, the medial surface of back timber is equipped with the rope groove, the outside terminal surface of back timber still is equipped with the side wall, two relative back timbers have hung the rope, the both ends of rope all are fixed with the shackle, the shackle is placed in the recess, the rope passes the rope groove, still be equipped with spacing post in the recess, spacing post is located to the shackle cover, the inboard one corner of recess still is equipped with the pivot, the pivot upper end is rotated and is connected with the baffle, baffle part nestification. The utility model is provided with a damping elastic band, which can reduce the bump; the rope is directly matched and sleeved, so that the pipe is convenient to hoist; meanwhile, the forklift operation space is arranged, so that the forklift operation is facilitated, the labor is saved, and the working efficiency is improved.

Description

Shallow is transported to polyethylene winding arrangement wall pipe
Technical Field
The utility model relates to a tubular product production facility field, in particular to shallow is transported to polyethylene winding arrangement wall pipe.
Background
The polyethylene winding structure wall pipe, also called Kera pipe, is a general name of thermoplastic circular pipe with smooth inner wall, spiral reinforcing rib on the outer wall, polyethylene resin as main material and winding formation process. The pipe wall has the characteristics of light weight, high pressure resistance, good toughness, quick construction, long service life and the like, and the cost is greatly reduced by the excellent pipe wall structure design compared with pipes with other structures. And the connection is convenient and reliable, so the connector is widely applied at home and abroad. A great number of concrete pipes and cast iron pipes are replaced. The polyethylene winding structure wall pipe is widely applied to municipal drainage and sewage pipeline system engineering. Therefore, in order to be suitable for drainage and pollution discharge engineering, the polyethylene winding structure wall pipe has a larger pore size, and the pore size of the existing product is generally in the range of 200-4000 mm.
After the polyethylene winding arrangement wall pipe is produced, generally use manpower or shallow to transport tubular product outdoor or indoor warehouse to stack, the stacking of tubular product generally can use fork truck and navigation to hang, need leave the fork entering space with the tubular product bed hedgehopping before fork truck fork tubular product, need hoist with the bolt lifting rope before the tubular product navigation hangs. Therefore, a transfer cart is needed, a forklift can directly fork the pipes from the cart, the cart is already equipped when the lifting ropes need to be tied, and the pipes can be directly lifted from the transfer cart for stacking by using a crane through simple fastening ropes.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a shallow is transported to polyethylene winding arrangement wall pipe, mainly used solve and transport the warehouse with finished product tubular product from producing the line, make things convenient for the fork truck in warehouse and boat to hang and carry out stacking and hoist and mount of tubular product, and need not lift up pad height and noose rope again after tubular product transports the warehouse, use manpower sparingly, improve work efficiency.
The above technical problem of the present invention can be solved by the following technical solutions: the side plate separating device comprises a bottom plate, universal wheels are arranged at four corners of the bottom plate, side plates are arranged at two sides of the bottom plate, a side plate through groove is arranged in the middle of each side plate, the side plates at each side are separated into two parts by the side plate through groove, a top beam is arranged at the top of each side plate and provided with a groove, the grooves are arranged on the upper end surface and the two end surfaces of the outer end surface of the top beam, a rope groove is arranged on the inner end surface of the top beam and communicated with the grooves, a side groove is also arranged on the outer end surface of the top beam and communicated with the grooves, a rope is hung between the two opposite top beams, shackles are fixed at two ends of the rope and placed in the grooves, the rope penetrates through the rope grooves, limiting columns are arranged in the grooves, the shackles are sleeved on the limiting columns, and a rotating shaft, the utility model discloses a spacing post is fixed on the top of back timber, pivot upper end is rotated and is connected with the baffle, the baffle is located spacing post with the top of breaking out, just baffle part nestification is in aforementioned side groove, the outside terminal surface of back timber is in the top of side groove also is equipped with the pivot, the pivot is rotated and is connected with the pin, the pin blocks the baffle when hanging perpendicularly naturally and comes in and go out the side groove, the one end of back timber still is equipped with the jack, the jack is inserted and is equipped with the push rod.
Preferably, the upper end of the bottom plate is also provided with a heightening plate. The heightening plate can heighten the placed pipe, so that a gap is reserved between the pipe and the bottom of the bottom plate, and the fork of the forklift is convenient to move to the bottom of the pipe to fork the pipe.
Preferably, the shackle is provided with a bolt, and the bolt controls the opening and closing of the shackle.
The utility model has the advantages that: the trolley is provided with a damping elastic band, so that the trolley can be directly placed under the material overturning frame to be connected; the cable is reserved on the trolley in a hanging mode, when the trolley needs to be hoisted and stacked, the pipe can be directly hoisted from the trolley by directly buckling the shackles at the two ends of the cable, and the cable does not need to be sleeved by lifting the pipe; the pipe lifting device is characterized in that the trolley is internally provided with a heightening plate and a side plate through groove, so that the pipe can be conveniently lifted by the forklift bracket from the trolley without heightening the pipe again.
Drawings
Fig. 1 is an isometric view of the present invention;
fig. 2 is a front view of the present invention;
fig. 3 is a top view of the present invention;
fig. 4 is a left side view of the present invention;
the notation in the figure is:
1. the structure of the safety belt comprises a bottom plate, 2 side plates, 3 top beams, 301 rope grooves, 302 side grooves, 303 grooves, 4 elastic bands, 5 ropes, 6 push rods, 7 universal wheels, 8 heightening plates, 9 baffle plates, 10 rotating shafts, 11 shackles, 12 bolts, 13 stop levers, 14 side plate through grooves, 15 jacks and 16 limiting columns.
Detailed Description
The technical solution of the present invention is further specifically described below by way of examples and with reference to the accompanying drawings.
Example (b): the polyethylene winding structure wall pipe transfer cart of the embodiment comprises a bottom plate (1), universal wheels (7) are arranged at four corners of the bottom plate (1), side plates (2) are arranged at two sides of the bottom plate (1), a side plate through groove (14) is arranged in the middle of each side plate (2), the side plate (2) at each side is divided into two by the side plate through groove (14), a top beam (3) is arranged at the top of each side plate (2), a groove (303) is arranged on each top beam (3), the grooves (303) are arranged on the top beam (3) and two end faces of the outer end face, a rope groove (301) is arranged on the inner end face of each top beam (3), the rope grooves (301) are communicated with the grooves (303), a side groove (302) is also arranged on the outer end face of each top beam (3), a rope (5) is hung between two opposite top beams (3), shackles (11) are fixed at two ends of each rope (5), shackle (11) is placed in recess (303), rope (5) then passes rope groove (301), still all be equipped with spacing post (16) in recess (303), spacing post (16) are located to shackle (11) cover, recess (303) inboard one corner still is equipped with pivot (10), pivot (10) upper end is rotated and is connected with baffle (9), baffle (9) are located spacing post (16) and shackle (11) top, and baffle (9) part nestification is in aforementioned side groove (302), the outside end face of back timber (3) also is equipped with pivot (10) in the top of side groove (302), pivot (10) rotate and are connected with pin (13), block baffle (9) the side groove (302) of cominging in and going out when pin (13) naturally hang perpendicularly, the one end of back timber (3) still is equipped with jack (15), jack (15) are inserted and are equipped with push rod (6).
Wherein, the upper end of the bottom plate (1) is also provided with a heightening plate (8), the shackle (11) is provided with a bolt (12), and the bolt (12) controls the opening and closing of the shackle (11). The heightening plate (8) can heighten the placed pipe, so that a gap is reserved between the pipe and the bottom of the bottom plate (1), and the fork of the forklift is convenient to move to the bottom of the pipe to fork the pipe.
During the use, will the utility model discloses push away and connect the material district, take out push rod (6), directly fall into the shallow with tubular product in, tubular product successively contacts increase board (8) of rope (5) and bottom plate (1) upper end under the slow down effect of elastic cord (4), pushes away the warehouse with the shallow that is equipped with tubular product again, at the in-process of transshipping tubular product to the warehouse, the visual self condition of transportation personnel, selective insert push rod (6) and locate jack (15) in, because also can directly push away tubular product and control the direction.
After the tube stock reaches the warehouse, if the position for stacking the tube stock is not high, the fork truck is selected to stack the tube stock, and at the moment, the fork of the fork truck is directly inserted into the bottom of the tube stock from the side plate through groove (14) to fork the tube stock. If the pipes need to be hoisted by the crane to be stacked, the stop lever (13) is pulled out, the baffle (9) is rotated outwards, and the shackle (11) is taken out. And the bolt (12) on one shackle (11) is screwed out, the two shackles (11) are fastened, and then the bolt (12) is screwed, and then the shackles (11) can be hooked by the hoisting hook for hoisting.
The present embodiment is only an exemplary embodiment of the present invention, and for those skilled in the art, based on the application method and principle disclosed in the present invention, various modifications or variations can be easily made, and not only limited to the structure described in the above embodiments of the present invention, therefore, the manner described in the foregoing is only a preferred embodiment, but not limiting, and all equivalent changes and modifications made according to the present invention are within the scope of the present invention.

Claims (3)

1. The utility model provides a shallow is transported to polyethylene winding arrangement wall pipe, includes bottom plate (1), bottom plate (1) bottom four corners is equipped with universal wheel (7), its characterized in that, the both sides of bottom plate (1) are equipped with curb plate (2), be equipped with curb plate logical groove (14) in the middle of curb plate (2), curb plate logical groove (14) will be every side curb plate (2) separate into two, the top of curb plate (2) is equipped with back timber (3), back timber (3) are equipped with recess (303), two terminal surfaces of up end and outside terminal surface of back timber (3) are located in recess (303), the medial surface of back timber (3) is equipped with rope groove (301), rope groove (301) with recess (303) intercommunication, the outside terminal surface of back timber (3) still is equipped with side groove (302), side groove (302) also with recess (303) intercommunication, two relative back timber (3) have hung rope (5) within a definite time, both ends of rope (5) all are fixed with shackle (11), shackle (11) place in recess (303), rope (5) then pass rope groove (301), still all be equipped with spacing post (16) in recess (303), shackle (11) cover is located spacing post (16), recess (303) inboard one corner still is equipped with pivot (10), pivot (10) upper end rotation is connected with baffle (9), baffle (9) are located spacing post (16) with shackle (11) top, and baffle (9) part nestification is in aforementioned side groove (302), the outside terminal surface of back timber (3) is in the top of side groove (302) also is equipped with pivot (10), pivot (10) rotation is connected with pin (13), block baffle (9) when pin (13) nature hangs perpendicularly come in and go out side groove (302), one end of the top beam (3) is also provided with an insertion hole (15), and a push rod (6) is inserted into the insertion hole (15).
2. The polyethylene winding structure wall pipe transfer cart according to claim 1, wherein the upper end of the bottom plate (1) is further provided with a heightening plate (8).
3. A polyethylene wound structural wall pipe transfer cart according to claim 1, wherein said shackles (11) are provided with bolts (12), said bolts (12) controlling the opening and closing of said shackles (11).
CN202020472179.1U 2020-04-02 2020-04-02 Shallow is transported to polyethylene winding arrangement wall pipe Expired - Fee Related CN212447653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020472179.1U CN212447653U (en) 2020-04-02 2020-04-02 Shallow is transported to polyethylene winding arrangement wall pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020472179.1U CN212447653U (en) 2020-04-02 2020-04-02 Shallow is transported to polyethylene winding arrangement wall pipe

Publications (1)

Publication Number Publication Date
CN212447653U true CN212447653U (en) 2021-02-02

Family

ID=74471773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020472179.1U Expired - Fee Related CN212447653U (en) 2020-04-02 2020-04-02 Shallow is transported to polyethylene winding arrangement wall pipe

Country Status (1)

Country Link
CN (1) CN212447653U (en)

Similar Documents

Publication Publication Date Title
CN103572763B (en) Large-span steel supports pattern foundation pit supporting structure Demolition Construction method
CN104326376B (en) A kind of anti-storm wind the design of available mechanism can topple over the harbour jenny of transfer
CN201276399Y (en) Apparatus hoisting mechanism for tall building floor non-steel platform
CN209988942U (en) Assembled building superimposed sheet lifting device
CN108946475B (en) Overturning and hoisting system and method for horizontal equipment
CN212447653U (en) Shallow is transported to polyethylene winding arrangement wall pipe
CN202296815U (en) Hoisting support rod for large-tonnage large-span structure
CN218642255U (en) Assembled construction hoist device
CN207943826U (en) High-speed railway bridge floor series concrete multi-transportation vehicle
CN215626205U (en) Auxiliary crane device for ALC wallboard installation
CN210558996U (en) Assembled building model platform double-limb column lifting appliance
CN108059088B (en) Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine
CN212639768U (en) Pipeline unloading device
CN111285229A (en) Super high-rise power distribution room equipment hoisting engineering construction structure
CN110606434A (en) Super-large crane for building
CN205990200U (en) 360 ° of luffing independent hoist device
CN214570017U (en) Pipe culvert hoisting device
CN204162325U (en) A kind of can anti-storm wind mechanism design can be utilized to topple over the harbour jenny of transfer
CN213894985U (en) Lightweight anticollision barrier link plate installation device
CN217921004U (en) Quick hoist and mount system of superimposed sheet
CN220098274U (en) Pipeline transfer device for finish rolling pipe
CN215558542U (en) Portable curtain board hoist device
CN215592329U (en) Be used for high-rise external wall brick brickwork handling equipment along with climbing frame interlude
CN210854974U (en) Riser pipe hoist device
CN208054718U (en) A kind of U-shaped hanging apparatus for lifting Large-diameter Steel reinforced concrete pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210202

CF01 Termination of patent right due to non-payment of annual fee