CN212427897U - Dry-hanging stone system - Google Patents

Dry-hanging stone system Download PDF

Info

Publication number
CN212427897U
CN212427897U CN202021123533.6U CN202021123533U CN212427897U CN 212427897 U CN212427897 U CN 212427897U CN 202021123533 U CN202021123533 U CN 202021123533U CN 212427897 U CN212427897 U CN 212427897U
Authority
CN
China
Prior art keywords
stone
piece
dry
panel
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202021123533.6U
Other languages
Chinese (zh)
Inventor
陆通
王艳华
杜振东
胡宗友
彭晶
熊文辉
卞长磊
方军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Construction Engineering Fuqiang Real Estate Co ltd
Wuhan Construction Engineering Co Ltd
Original Assignee
Wuhan Construction Engineering Fuqiang Real Estate Co ltd
Wuhan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Construction Engineering Fuqiang Real Estate Co ltd, Wuhan Construction Engineering Co Ltd filed Critical Wuhan Construction Engineering Fuqiang Real Estate Co ltd
Priority to CN202021123533.6U priority Critical patent/CN212427897U/en
Application granted granted Critical
Publication of CN212427897U publication Critical patent/CN212427897U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a hang stone material system futilely, including erecting steel joist, still including setting up the horizontal steel joist on erecting steel joist, be provided with the back of the body on the horizontal steel joist and tie connecting device, the back of the body is tied connecting device and is connected with the back of the body bolt that corresponds on the stone material panel. The utility model discloses a butt joint spare realizes hanging the butt joint of stone material panel futilely, has reduced every the installation of a horizontal steel joist behind one's back of stone material panel economizes the material and saves labour, and firm in connection, operation simple to operate.

Description

Dry-hanging stone system
Technical Field
The utility model relates to an architectural decoration technical field, concretely relates to hang stone material system futilely.
Background
Along with the development of society, people's demand for happy life is more and more abundant, also requires more and more to the decorative effect of building. The dry hanging stone material for architectural decoration gives people a classical and heavy architectural effect. In the traditional connecting structure of the dry-hanging stone system, the back bolts of the stone panels are connected, so that the performance is excellent and the quality is stable. However, the steel keel of the system is used in large amount, especially the transverse keels are densely distributed, generally, 2 through long transverse keels need to be arranged at the back of 1 line of stone, and the steel consumption is large.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that overcome prior art's defect, provide a hang stone material system futilely, reduce the steel joist quantity of hanging the stone material futilely of back of the body bolt connection, and install simple easy operation, it is economic reasonable, not reduce decorative effect.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a hang stone material system futilely, is including erecting the steel joist, still including setting up the horizontal steel joist on erecting the steel joist, is provided with back of the body and ties connecting device on the horizontal steel joist, back of the body bolt connecting device and the back of the body bolt connection of corresponding on the stone material panel.
As above back of body bolt connecting device include the angle sign indicating number, the angle sign indicating number includes horizontal piece and vertical piece, horizontal piece is connected with vertical piece, horizontal piece passes through bolt pair with horizontal steel joist and is connected, the arch pendant includes the hunch portion, the back-off pendant of setting at one of them hunch foot of hunch portion and the backing sheet of setting at another hunch foot of hunch portion, back-off pendant back-off is at the top of vertical piece, adjusting bolt's screw thread end is from last to screwing in the screw hole on the back-off pendant and offset with the top of vertical piece down, the hunch portion is located the outside of vertical piece, the outside of vertical piece is hugged closely to the backing sheet, the back of body bolt passes the hunch portion and is tied the.
An adhesive tape is arranged between the inverted hanging piece and the vertical piece, and an adhesive tape is arranged between the supporting piece and the outer side of the vertical piece.
The vertical steel keels are vertically arranged in parallel, and the horizontal steel keels are horizontally arranged.
The stone panels are multiple, and the slab joints of the adjacent stone panels are sequentially filled with the foam rods and the sealant from inside to outside.
The utility model provides a hang stone material system futilely, still includes the butt joint piece, and the butt joint piece includes two cards of vertical setting, and the middle part of two cards is passed through horizontal connection piece and is connected, the side end face of four sides of stone material panel seted up the caulking groove, two pairs of sides of one of them card of butt joint piece are embedded into the caulking groove of the adjacent side end face of adjacent stone material panel respectively, another card of butt joint piece is located the inboard of adjacent stone material panel, horizontal connection piece passes the slab joint of adjacent stone material panel.
The foam bars and the sealant are sequentially filled from the card embedded into the caulking groove to the outer side of the stone panel in the slab joints of the adjacent stone panels.
The stone glue is filled between the card embedded into the caulking groove and the inner wall of the caulking groove, the stone glue is filled between the horizontal connecting sheet and the seam wall of the slab joint, and the stone glue is filled between the card positioned at the inner side of the adjacent stone panel and the inner side of the adjacent stone panel.
The rubber sheet is arranged between the arch part and the stone panel.
Compared with the prior art, the utility model, following beneficial effect has:
through the butt joint spare realizes hanging stone material panel's butt joint futilely, has reduced every stone material panel's a horizontal steel joist's behind one's back installation, and the material that economizes saves labour, and firm in connection, operation simple to operate, for traditional back of the body bolt connection hang stone material system futilely, the utility model discloses a hang stone material system futilely, steel joist material saves about 25%, and the manual work saves about 10%.
Drawings
FIG. 1 is a vertical layout view of the dry-hang stone system of the present invention;
FIG. 2 is a schematic view of the cross-sectional structure A-A of the present invention;
FIG. 3 is an enlarged view of the corner brace of the portion B of FIG. 2;
fig. 4 is an enlarged schematic view of a first embodiment of joining adjacent stone panels of the portion C of fig. 2;
fig. 5 is an enlarged schematic view of a second embodiment of joining adjacent stone panels at the portion C of fig. 2.
In the figure, 1-vertical steel keel, 2-horizontal steel keel, 3-back bolt connecting device, 4-stone panel, 5-back bolt, 6-back bolt nut, 7-arched pendant and 71-arch part; 72-a back-off pendant; 73-support sheet, 8-corner connector, 81-transverse sheet, 82-vertical sheet, 9-adjusting bolt, 10-bolt pair, 11-rubber sheet, 12-stone glue, 13-adhesive tape and 14-butt joint piece; 141-card; 142-horizontal connecting piece, 16-foam bar and 17-sealant.
Detailed Description
To facilitate understanding and practice of the invention by those of ordinary skill in the art, the following detailed description of the invention is provided in connection with the examples, and it is to be understood that the examples described herein are for purposes of illustration and explanation only and are not intended to limit the invention.
Example 1
Referring to fig. 1-5, a dry-hang stone system comprises a vertical steel keel 1 and a horizontal steel keel 2 arranged on the vertical steel keel 1, wherein a back bolt connecting device 3 is arranged on the horizontal steel keel 2, and the back bolt connecting device 3 is connected with a corresponding back bolt 5 on a stone panel 4.
Back bolt connecting device 3 includes angle sign indicating number 8, angle sign indicating number 8 includes horizontal piece 81 and vertical piece 82, horizontal piece 81 is connected with vertical piece 82, horizontal piece 81 passes through the vice 10 connection of bolt with horizontal steel joist 2, arch pendant 7 includes hunch portion 71, set up at the back-off pendant 72 of one of them hunch foot of hunch portion 71 and set up the backing sheet 73 at another hunch foot of hunch portion 71, back-off pendant 72 back-off is at the top of vertical piece, the screw thread end of adjusting bolt 9 is from last to screwing in the screw hole on the back-off pendant 72 and offset with the top of vertical piece down, hunch portion 71 is located the outside of vertical piece 82, the backing sheet 73 hugs closely the outside of vertical piece 82, back bolt 5 passes hunch portion 71 and is connected with back bolt nut 6.
An adhesive tape 13 is arranged between the inverted hanging piece 72 and the vertical piece 82, and the adhesive tape 13 is arranged between the supporting piece 73 and the outer side of the vertical piece 82.
The vertical steel keels 1 are vertically arranged in parallel, and the horizontal steel keels 2 are horizontally arranged.
The stone panels 4 are multiple, and the slab joints of the adjacent stone panels 4 are sequentially filled with the foam bars 16 and the sealant 17 from inside to outside.
In order to better define the relative position between the adjacent stone panels, the dry hanging stone system further comprises an abutting joint piece 14, wherein the abutting joint piece 14 comprises two vertically arranged clamping pieces 141, the middle parts of the two clamping pieces 141 are connected through a horizontal connecting piece 142, the side end faces of four sides of the stone panel 4 are provided with caulking grooves 41, two opposite sides of one clamping piece 141 of the abutting joint piece 14 are respectively embedded into the caulking grooves 41 of the adjacent side end faces of the adjacent stone panel 4, the other clamping piece of the abutting joint piece 14 is positioned at the inner side of the adjacent stone panel 4, and the horizontal connecting piece 142 penetrates through the slab joint of the adjacent stone panel 4.
The slab joints of the adjacent stone panels 4 are sequentially filled with the foam bars 16 and the sealant 17 from the card embedded into the caulking groove 41 to the outside of the stone panel 4.
The stone glue 12 is filled between the card 141 embedded in the caulking groove 41 and the inner wall of the caulking groove 41, the stone glue 12 is filled between the horizontal connecting sheet 142 and the seam wall of the slab seam, and the stone glue 12 is filled between the card 141 positioned at the inner side of the adjacent stone panel 4 and the inner side of the adjacent stone panel 4.
Preferably:
the section specification of the vertical steel keel 1 is 120mm multiplied by 60mm multiplied by 4 mm;
the section specification of the transverse steel keel 2 is L50mm multiplied by 5 mm;
the stone panel 4 is granite and has a specification of 30mm (thickness) x 600mm (width) x 900mm (height);
the butt joint piece 14 is made of aluminum profiles 6063-T5;
the back bolt 5 is an M6 stainless steel bolt;
the back bolt nut 6 is matched with the back bolt;
the arched hanging piece 7 is made of aluminum profiles 6063-T5;
the angle brace 8 is made of aluminum profiles 6063-T5 and is of an L-shaped cross section, a long round hole is formed in the transverse sheet 81, the bolt pair 10 penetrates through the long round hole in the transverse sheet 81 and the mounting hole in the transverse steel keel 2 to fix the angle brace 8 on the transverse steel keel 2, and the long round hole in the transverse sheet 81 is used for adjusting the front and back positions of the back bolt connecting device 3;
the adjusting bolt 9 is an M6 stainless steel bolt;
the bolt pair 10 is an M10 stainless steel bolt;
the slab joints between the stone panels 4 are 8mm joints and need to be subjected to glue injection and joint filling treatment.
The utility model discloses a concrete implementation mode is:
step 1, firstly, installing a vertical steel keel 1 on a building main body structure, and then welding a transverse steel keel 2 on the vertical steel keel 1. Only 1 transverse steel keel 2 is installed at the back of the stone panel in the 1 line. Before installation, bolt holes are drilled in the transverse steel keels 2 so as to facilitate subsequent installation of the back bolt connecting devices 3;
and 2, mounting the back bolt connecting device 3, and connecting the transverse steel keel 2 and the corner connector 8 by using a bolt pair 10.
On a working platform on the ground, a back bolt 5 is inserted into a back bolt hole on the back surface of the stone panel 4, a rubber sheet 11 and the arched hanging piece 7 are sequentially arranged on a screw rod of the back bolt 5, and then the back bolt nut 6 is arranged and fastened in place.
And 3, next, injecting stone glue 12 into the caulking groove 41 of the stone panel 4, inserting one side of the card 141 at the outer side of the butt joint piece 14 into the caulking groove 41, hanging the stone panel 4, hanging the inverted hanging piece 72 of the arched hanging piece 7 on the vertical piece 82 of the corner brace 8, and isolating the inverted hanging piece 72 from the vertical piece 82 by the adhesive tape 13 to play a role in noise prevention. The other pair of the outer side clamping pieces 141 of the butt-jointing piece 14 are inserted into the caulking grooves 41 of the stone panels 4 positioned below, so that the butt-jointing of the upper stone panel and the lower stone panel 4 is realized.
And 4, adjusting the adjusting bolt 9 until the design appearance requirement is met, and adjusting the relative position between the upper stone panel and the lower stone panel 4.
And circularly reciprocating, and installing the stone panels 4 in a row from bottom to top until the dry hanging is finished.
And 5, finally, filling foam rods 16 in the 8mm slab joints between the stone panels 4, and filling weather-resistant sealant 17 to complete construction.
The advantages are that:
the utility model relates to a rationally, the simple installation, the quality is guaranteed. The butt joint of the dry-hanging stone panels 4 is realized through the butt joint piece 14, the installation of one transverse steel keel 2 behind each stone panel is reduced, the materials and the labor are saved, and the connection is firm.
Example 2:
this example differs from example 1 only in that: the stone panel 4 is butt jointed by tight seams, the plate seams are only 2mm instead of 8mm, and the foam rod 16 does not need to be plugged and the weather-resistant sealant 17 needs to be filled. Generally used for decoration engineering without waterproof requirements, such as indoor dry-hanging stone systems.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.

Claims (9)

1. The utility model provides a hang stone material system futilely, is including erecting steel joist (1), its characterized in that, still including setting up horizontal steel joist (2) on erecting steel joist (1), is provided with back of the body and ties connecting device (3) on horizontal steel joist (2), back of the body ties connecting device (3) and stone material panel (4) on back of the body tie (5) of correspondence and be connected.
2. The dry hanging stone system as claimed in claim 1, wherein the back bolt connecting device (3) comprises a corner fastener (8), the corner fastener (8) comprises a transverse piece (81) and a vertical piece (82), the transverse piece (81) is connected with the transverse steel keel (2) through a bolt pair (10), the arched pendant (7) comprises an arch part (71), a back-off pendant (72) arranged on one arch foot of the arch part (71) and a support piece (73) arranged on the other arch foot of the arch part (71), the back-off pendant (72) is back-off on the top of the vertical piece, the threaded end of the adjusting bolt (9) is screwed into the threaded hole on the back-off pendant (72) from top to bottom and abuts against the top of the vertical piece, the arch part (71) is positioned on the outer side of the vertical piece (82), the support piece (73) is tightly attached to the outer side of the vertical piece (82), the back bolt (5) passes through the arch part (71) and is connected with the back bolt nut (6).
3. A system for dry hanging stone materials as claimed in claim 2, characterized in that an adhesive tape (13) is provided between the inverted hanging member (72) and the vertical piece (82), and an adhesive tape (13) is provided between the support piece (73) and the outer side of the vertical piece (82).
4. A system for dry-hanging stone materials as claimed in claim 1, wherein said vertical steel runners (1) are vertically arranged in parallel and said horizontal steel runners (2) are horizontally arranged.
5. A dry-hang stone system as claimed in claim 1, wherein the stone panels (4) are plural, and the slab joints of the adjacent stone panels (4) are sequentially filled with the foam bars (16) and the sealant (17) from inside to outside.
6. The dry-hang stone system as claimed in claim 1, further comprising an abutting member (14), wherein the abutting member (14) comprises two vertically disposed clamping pieces (141), the middle portions of the two clamping pieces (141) are connected by a horizontal connecting piece (142), the side end surfaces of the four sides of the stone panel (4) are provided with a caulking groove (41), two opposite sides of one clamping piece (141) of the abutting member (14) are respectively embedded into the caulking grooves (41) of the adjacent side end surfaces of the adjacent stone panel (4), the other clamping piece of the abutting member (14) is located at the inner side of the adjacent stone panel (4), and the horizontal connecting piece (142) passes through the slab joint of the adjacent stone panel (4).
7. Dry-hang stone system as claimed in claim 6, wherein the slab joints of adjacent stone panels (4) are filled with foam bars (16) and sealants (17) in sequence from the card inserted into the caulking groove (41) to the outside of the stone panel (4).
8. The dry-hang stone system as claimed in claim 6, wherein the stone glue (12) is filled between the card (141) inserted into the caulking groove (41) and the inner wall of the caulking groove (41), the stone glue (12) is filled between the horizontal connecting piece (142) and the seam wall of the board seam, and the stone glue (12) is filled between the card (141) located at the inner side of the adjacent stone panel (4) and the inner side of the adjacent stone panel (4).
9. -dry hang stone system as claimed in claim 2, wherein a rubber sheet (11) is arranged between the arch (71) and the stone panel (4).
CN202021123533.6U 2020-06-17 2020-06-17 Dry-hanging stone system Withdrawn - After Issue CN212427897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021123533.6U CN212427897U (en) 2020-06-17 2020-06-17 Dry-hanging stone system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021123533.6U CN212427897U (en) 2020-06-17 2020-06-17 Dry-hanging stone system

Publications (1)

Publication Number Publication Date
CN212427897U true CN212427897U (en) 2021-01-29

Family

ID=74281428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021123533.6U Withdrawn - After Issue CN212427897U (en) 2020-06-17 2020-06-17 Dry-hanging stone system

Country Status (1)

Country Link
CN (1) CN212427897U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593857A (en) * 2020-06-17 2020-08-28 武汉建工集团股份有限公司 Dry-hanging stone system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593857A (en) * 2020-06-17 2020-08-28 武汉建工集团股份有限公司 Dry-hanging stone system and construction method

Similar Documents

Publication Publication Date Title
CN204001323U (en) Waterproof combined curtain wall
CN213038591U (en) Outer wall covering and connecting type steel structure assembly type building
CN200982043Y (en) Argil plate curtain wall mounting structure
CN212427897U (en) Dry-hanging stone system
CN108797889A (en) A kind of steel and wood composite girder construction and its construction method
CN111593857A (en) Dry-hanging stone system and construction method
CN214785618U (en) Wood floor base material with hidden connecting seam
CN213980028U (en) Reinforcing member for connecting and corner parts of masonry wall
CN110629913B (en) Curtain wall structure adopting red brick decoration panel and construction method thereof
CN112900703A (en) Assembled low-energy-consumption curtain wall system and construction method thereof
CN210508175U (en) Assembled wallboard assembly
CN104018605A (en) Argil curtain wall and construction method thereof
CN215978110U (en) Roof group structure
CN104989010A (en) Connecting method for bamboo wood prefabricated wallboards
CN211690962U (en) Assembled keeps warm and decorates integrative outer wallboard and connected node
CN210685085U (en) External wall board made of diamond wood for light steel villa
CN111287364B (en) Component is hung futilely to open stone material curtain
CN209429343U (en) A kind of plate-jointing structure of concealed frame glass curtain wall
CN111206737A (en) Wall connecting piece of plug-in type low-carbon heat-preservation energy-saving plate
CN211597556U (en) Prefabricated heat preservation decorative column
CN217461300U (en) No basic unit's assembled wall body decorative panel mounting structure
CN203856158U (en) Ceiling corner enclosure device for dry-hanging stone veneers
CN219219780U (en) Template reinforcing structure for controlling shear wall root concrete forming quality
CN217325840U (en) Height-adjustable base structure with bottom connection
CN204940776U (en) Finished product wood veneer board keel blade inserting hanging structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20210129

Effective date of abandoning: 20220413

AV01 Patent right actively abandoned

Granted publication date: 20210129

Effective date of abandoning: 20220413