CN212405217U - Pile foundation underpins structure - Google Patents
Pile foundation underpins structure Download PDFInfo
- Publication number
- CN212405217U CN212405217U CN202020619952.2U CN202020619952U CN212405217U CN 212405217 U CN212405217 U CN 212405217U CN 202020619952 U CN202020619952 U CN 202020619952U CN 212405217 U CN212405217 U CN 212405217U
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- natural gas
- jack
- underpinning
- gas pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model belongs to the technical field of the technique of pile foundation underpin and specifically relates to a pile foundation underpin structure is related to. The pile foundation underpinning structure comprises a pile foundation, a bearing platform, a jack and an underpinning plate, wherein the bearing platform is fixedly arranged on the pile foundation; the bottom and the cushion cap fixed connection of jack, the top and the underpinning board fixed connection of jack, the underpinning board has the cambered surface that is used for bearing natural gas line. The utility model discloses has following effect: 1. the natural gas pipeline support device has the advantages that the natural gas pipeline can be supported after ground settlement; 2. the natural gas pipeline is placed on the supporting and replacing plate stably and is not easy to deviate; 3. the natural gas pipeline is not easy to be damaged by collision when arranged inside the pipe ditch, and the service life of the natural gas pipeline is long; 4. the maintenance and the replacement of the natural gas pipeline are more convenient; 5. effectively preventing the pipeline from being damaged in the extrusion process of external force.
Description
Technical Field
The utility model belongs to the technical field of the technique of pile foundation underpin and specifically relates to a pile foundation underpin structure is related to.
Background
At present, in the building engineering, the existing pile foundation is often processed to realize pile foundation underpinning, that is, a new building underpinning structure is used to support a pile or a foundation to be underpinned, and the load borne by the pile or the foundation is converted to the underpinning structure of the new building.
Chinese utility model patent with grant publication number CN204826007 discloses a pile foundation underpinning structure, and its technical scheme main points are: the pile foundation pile replacement device comprises two underpinning piles and one underpinning beam, wherein the two underpinning piles are symmetrically arranged on two sides of an original pile foundation, and two ends of the underpinning beam are respectively placed on the corresponding underpinning piles and are cast with the original pile foundation. This pile foundation underpins structure is when being used for laying natural gas line, lays natural gas line on the underpinning roof beam usually to the underpinning roof beam can support natural gas line.
The above prior art solutions have the following drawbacks: for some ground surfaces with thick sludge layers, settlement can occur for a long time, and at the moment, a new pile foundation underpinning structure needs to be paved on the pile foundation again to support the natural gas pipeline, so that construction is difficult, and cost is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a pile foundation underpins structure, it has still can carry out the advantage that supports to natural gas line after the ground subsides.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model discloses a pile foundation underpinning structure, which comprises a pile foundation, a bearing platform, a jack and an underpinning plate, wherein the bearing platform is fixedly arranged on the pile foundation; the bottom of jack with cushion cap fixed connection, the top and the underpinning board fixed connection of jack, the underpinning board has the cambered surface that is used for bearing natural gas line.
Through adopting above-mentioned technical scheme, after the ground subsides, the jack will hold in the palm the natural gas line jack-up on trading the board and the underpinning board to natural gas line still can keep at original height, and this pile foundation underpins structure still can support natural gas line after the ground subsides.
The present invention may be further configured in a preferred embodiment as: the bearing platform is internally provided with a groove, and the jack is arranged in the groove.
Through adopting above-mentioned technical scheme, the jack is comparatively firm with being connected of cushion cap, and the jack is difficult for suffering the collision damage simultaneously.
The present invention may be further configured in a preferred embodiment as: still include the rubber pad, the rubber pad sets up on the cambered surface.
Through adopting above-mentioned technical scheme, when natural gas pipeline placed on the underpinning board, the rubber pad has increased the frictional force between natural gas pipeline and the underpinning board to natural gas pipeline places comparatively stably on the underpinning board, and difficult skew.
The present invention may be further configured in a preferred embodiment as: the pile foundation pile further comprises anchoring ribs, and the bearing platform is fixedly connected with the pile foundation through the anchoring ribs.
Through adopting above-mentioned technical scheme, the connection of cushion cap and pile foundation is comparatively stable.
The present invention may be further configured in a preferred embodiment as: brick walls are arranged on two sides of the bearing platform, and a pipe ditch used for containing a natural gas pipeline is formed by the brick walls and the bearing platform.
Through adopting above-mentioned technical scheme, natural gas line sets up and is difficult for suffering the collision impaired when the trench is inside, natural gas line's long service life.
The present invention may be further configured in a preferred embodiment as: the pipe ditch is provided with an opening, and a pipe ditch cover plate is arranged on the opening.
Through adopting above-mentioned technical scheme, can open the trench apron and maintain the change to natural gas line when the inside natural gas line of trench damages to natural gas line's maintenance is changed comparatively conveniently.
The present invention may be further configured in a preferred embodiment as: expansion joints are arranged on the pipe trench cover plate at intervals.
Through adopting above-mentioned technical scheme, the expansion joint can prevent that trench cover from producing the crack because of climate temperature variation.
The present invention may be further configured in a preferred embodiment as: and sand is filled in the pipe trench.
By adopting the technical scheme, the pipeline can be prevented from being damaged in the extrusion process of external force, and if the pipeline is backfilled by a large rigid object, the rigid object can be mutually extruded with the pipeline under the action of the external force, so that the pipeline is damaged. And the use of sand backfilling can avoid this.
To sum up, the utility model discloses a following at least one useful technological effect:
1. the natural gas pipeline support device has the advantages that the natural gas pipeline can be supported after ground settlement;
2. the natural gas pipeline is placed on the supporting and replacing plate stably and is not easy to deviate;
3. the natural gas pipeline is not easy to be damaged by collision when arranged inside the pipe ditch, and the service life of the natural gas pipeline is long;
4. the maintenance and the replacement of the natural gas pipeline are more convenient;
5. effectively preventing the pipeline from being damaged in the extrusion process of external force.
Drawings
Fig. 1 is a schematic structural diagram of a part of a pile foundation underpinning structure according to an embodiment of the present invention.
In the figure, 1, pile foundation; 2. a bearing platform; 3. a jack; 4. supporting and replacing the plate; 5. a cambered surface; 6. a groove; 7. a rubber pad; 8. anchoring ribs; 9. brick walls; 10. a pipe trench; 11. an opening; 12. a pipe trench cover plate; 13. sand; 14. a natural gas pipeline.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, for the utility model discloses a pile foundation underpins structure, including pile foundation 1, anchor muscle 8, cushion cap 2, jack 3 and underpinning board 4, pile foundation 1 and ground fixed connection, pile foundation 1 forms through pouring. Cushion cap 2 passes through anchor muscle 8 and pile foundation 1 fixed connection, and anchor muscle 8 penetrates pile foundation 1 to cushion cap 2 is comparatively stable with being connected of pile foundation 1. The bearing platform 2 is also formed by pouring, a groove 6 is formed in the top end of the bearing platform 2, and the jack 3 is arranged inside the groove 6. The top of jack 3 and underpinning board 4 fixed connection, underpinning board 4 is the arc, and underpinning board 4 has the cambered surface 5 that is used for bearing natural gas line 14. After the ground subsides, jack 3 will ask to trade the natural gas line 14 jack-up on board 4 and the underpinning board 4 to natural gas line 14 still can keep at original height, and this pile foundation underpins structure still can support natural gas line 14 after the ground subsides.
Preferably, as shown in fig. 1, the pile foundation underpinning structure further comprises a rubber pad 7, the rubber pad 7 is arranged on the cambered surface 5, and the rubber pad 7 and the cambered surface 5 can be adhered through bonding. When the natural gas pipeline 14 is placed on the underpinning plate 4, the rubber pads 7 increase the friction force between the natural gas pipeline 14 and the underpinning plate 4, so that the natural gas pipeline 14 is placed on the underpinning plate 4 more stably and is not easy to deviate.
Finally, as shown in fig. 1, brick walls 9 are laid on both sides of the bearing platform 2, and the brick walls 9 on both sides of the bearing platform 2 and the bearing platform 2 form a pipe trench 10 for accommodating a natural gas pipeline 14. The trench 10 has an opening 11, and a trench cover 12 is provided on the opening 11. Therefore, the natural gas pipe 14 is not easily damaged by collision when being installed inside the pipe trench 10, and the service life of the natural gas pipe 14 is long. Preferably, the trench cover 12 is provided with expansion joints at intervals, and the expansion joints can prevent the trench cover 12 from cracking due to climate temperature changes. The pipe ditch 10 is filled with sand 13. The sand 13 prevents the pipe from being damaged during the extrusion process by an external force, and if it is backfilled with a large hard object, the hard object may be pressed against the pipe by the external force, thereby damaging the pipe. And backfilling with sand 13 can avoid this.
The implementation principle of the embodiment is as follows: during construction, the pile foundation 1 is firstly erected on the ground, the pile foundation 1 is then provided with the bearing platform 2, the anchoring ribs 8 are adopted to penetrate through the bearing platform 2 and the pile foundation 1, the connection between the pile foundation 1 and the bearing platform 2 is stable, the jack 3 is arranged in the groove 6 of the bearing platform 2, meanwhile, the brick walls 9 are built on two sides of the bearing platform 2 to form a pipe ditch 10 for containing the natural gas pipeline 14, the natural gas pipeline 14 is placed on the underpinning plate 4 connected to the top end of the jack 3, sand 13 is then backfilled in the pipe ditch 10, and finally, the pipe ditch cover plate 12 is covered on the top end opening 11 of the pipe ditch 10. So after the ground subsides, jack 3 will ask to trade board 4 and ask to trade the natural gas line 14 jack-up on the board 4 to natural gas line 14 still can keep at original height, and this pile foundation underpins the structure and still can support natural gas line 14 after the ground subsides.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides a pile foundation underpins structure, includes pile foundation (1), its characterized in that: the pile foundation support is characterized by further comprising a bearing platform (2), a jack (3) and a support changing plate (4), wherein the bearing platform (2) is fixedly arranged on the pile foundation (1);
the bottom of jack (3) with cushion cap (2) fixed connection, the top and the support of jack (3) are traded board (4) fixed connection, support and trade board (4) and have cambered surface (5) that are used for bearing natural gas pipeline (14).
2. A pile foundation underpin structure according to claim 1, characterized in that: a groove (6) is formed in the bearing platform (2), and the jack (3) is arranged in the groove (6).
3. A pile foundation underpin structure according to claim 2, wherein: the rubber cushion is characterized by further comprising a rubber cushion (7), wherein the rubber cushion (7) is arranged on the cambered surface (5).
4. A pile foundation underpin structure according to claim 3, wherein: still include anchor muscle (8), cushion cap (2) are through anchor muscle (8) and pile foundation (1) fixed connection.
5. A pile foundation underpin structure according to any one of claims 1 to 4, wherein: brick walls (9) are arranged on two sides of the bearing platform (2), and a pipe ditch (10) used for containing a natural gas pipeline (14) is formed by the brick walls (9) and the bearing platform (2).
6. A pile foundation underpin structure according to claim 5, wherein: the pipe ditch (10) is provided with an opening (11), and a pipe ditch cover plate (12) is arranged on the opening (11).
7. A pile foundation underpin structure according to claim 6, wherein: expansion joints are arranged on the pipe trench cover plate (12) at intervals.
8. A pile foundation underpin structure as claimed in claim 6 or 7, wherein: sand (13) is filled in the pipe trench (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020619952.2U CN212405217U (en) | 2020-04-23 | 2020-04-23 | Pile foundation underpins structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020619952.2U CN212405217U (en) | 2020-04-23 | 2020-04-23 | Pile foundation underpins structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212405217U true CN212405217U (en) | 2021-01-26 |
Family
ID=74300979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020619952.2U Active CN212405217U (en) | 2020-04-23 | 2020-04-23 | Pile foundation underpins structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212405217U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162797A (en) * | 2022-07-21 | 2022-10-11 | 陕西燃气集团交通能源发展有限公司 | Construction and transformation method of LNG (liquefied Natural gas) station |
-
2020
- 2020-04-23 CN CN202020619952.2U patent/CN212405217U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115162797A (en) * | 2022-07-21 | 2022-10-11 | 陕西燃气集团交通能源发展有限公司 | Construction and transformation method of LNG (liquefied Natural gas) station |
CN115162797B (en) * | 2022-07-21 | 2024-04-12 | 陕西燃气集团交通能源发展有限公司 | Construction and transformation method of LNG (liquefied Natural gas) station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107142856B (en) | Abutment reconstruction method, abutment reconstruction pier and jacking reconstruction bridge | |
CN212405217U (en) | Pile foundation underpins structure | |
CN114319143A (en) | Bridge top pushes away interim mound structure suitable for in deep soft soil stratum | |
CN106968164B (en) | Cable way bridge abutment | |
CN105220720A (en) | Building foundation, Collapsible Loess District reinforcing pile and pressing pile construction method thereof | |
JP5210202B2 (en) | Support structure between concrete soil | |
CN211257014U (en) | Ultra-deep foundation pit settlement post-cast strip force transmission structure | |
CN213452051U (en) | Along with bridge laying gas pipeline structure | |
CN211171579U (en) | Take seamless antidetonation abutment of disconnect-type strap | |
KR101160186B1 (en) | Pile slab construction technique for railroad land subsidence reduction | |
JP2005248523A (en) | Structure of pile head joint section | |
CN113502847B (en) | Assembled rigid support protection foundation structure for buried pipeline | |
CN215289648U (en) | Foundation pit trestle slope | |
CN215165641U (en) | Supporting structure adopting combination of triangular supports and Larsen steel sheet piles | |
CN109742715B (en) | Arrangement structure of electric power pipe trench after transition and modification and electric power pipe trench transition and modification method | |
CN210563525U (en) | Concrete beam modified structure based on bolt positioning structure | |
CN208763025U (en) | A kind of foundation pit support device | |
CN210439159U (en) | Double-layer foundation structure of steel pipe pile support suitable for weak geological conditions | |
CN209855802U (en) | Subway station shield constructs machine operation platform that digs of slagging tap | |
CN206346220U (en) | A kind of pile foundation barricade antidetonation retaining structure of the cushion containing EPS | |
CN220908480U (en) | Municipal road trench reinforced structure | |
CN203270593U (en) | Compensated foundation aerial floor | |
CN216405146U (en) | Bridge top pushes away interim mound structure suitable for in deep soft soil stratum | |
CN210288625U (en) | Open joint blind ditch escape canal structure | |
CN219527220U (en) | Road below reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |